Show Job Controls
Bid Cobra

BRAZOS BS 6-R (0049-09-088)

Items: 22

County: BRAZOS
Length: N/A
Highway: BS 6-R
District: BRYAN
Control Number: 0049-09-088
DBE Goal: N/A
Project: F 2022(058)
Guaranty: N/A
Time: 11 WORKING DAYS
Engineer's Estimate: $910,094.83
Date: 10/07/2021 (4 years ago)
Contract Number: N/A
Type: SEAL COAT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$910,094.83
$847,125.27
Over/Under Est: -6.92% -$62,969.56
Over/Under Est: 40.24% $366,220.51
Amt Left: 50.66% $429,190.07

Bid Items & Bid Tabulations

22 Total 0 of 22
BRAZOS  |  BS 6-R  |  BRYAN  |  0049-09-088  |  10/07/2021  |  $910,094.83  |  F 2022(058)  |  SEAL COAT  |  11 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
COX PAVING OF TEXAS, INC.
BRANNAN PAVING CO., LTD.
ASPH (A-R TYPE II)
GAL 125,671.000 $2.800 $3.000 $4.170
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 2,645.000 $100.000 $94.000 $102.570
MOBILIZATION
LS 1.000 $200,000.000 $100,000.000 $300,300.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $5,000.000 $7,600.000 $55,000.000
INTERSECTIONS (SURF TREAT)
SY 12,317.000 $2.000 $4.000 $4.350
DRIVEWAYS (SURF TREAT)
SY 2,202.000 $2.000 $4.000 $6.850
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,606.000 $0.500 $0.650 $0.010
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,136.000 $0.500 $0.650 $0.010
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 195.000 $1.000 $5.000 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 11,473.000 $1.000 $0.500 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 430.000 $6.850 $5.000 $7.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 6.000 $32.000 $25.000 $20.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 11,859.000 $0.170 $0.190 $0.150
REFL PAV MRK TY II (W) 4" (SLD)
LF 47,647.000 $0.110 $0.190 $0.150
REFL PAV MRK TY II (Y) 4" (BRK)
LF 10,456.000 $0.120 $0.190 $0.150
REFL PAV MRK TY II (Y) 4" (SLD)
LF 82,651.000 $0.110 $0.190 $0.150
PREFAB PAV MRK TY C (W) (ARROW)
EA 28.000 $225.000 $28.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 28.000 $275.000 $28.000 $250.000
REFL PAV MRKR TY I-C
EA 1,091.000 $3.000 $3.000 $3.700
REFL PAV MRKR TY II-A-A
EA 718.000 $3.000 $3.000 $3.700
REFL PAV MRKR TY II-C-R
EA 457.000 $3.000 $3.000 $3.700
TMA (MOBILE OPERATION)
DAY 15.000 $140.000 $250.000 $10.000
Totals: $910,094.830 $847,125.270 $1,276,315.340