Show Job Controls
Bid Cobra

BRAZORIA SH0288 (6435-66-001)

Items: 40

County: BRAZORIA
Length: N/A
Highway: SH0288
District: HOUSTON
Control Number: 6435-66-001
DBE Goal: 0.0%
Project: RMC - 643566001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,710,676.08
Date: 03/06/2024 (2 years ago) Changed
Contract Number: N/A
Type: CONCRETE SPALL REPAIR
Mail/Deliver Bids To: N/A
MARIA APONTE
ROBERT ETHEREDGE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,710,676.08
$1,467,925.30
Over/Under Est: -14.19% -$242,750.78
Over/Under Est: 19.54% $334,269.92
Amt Left: 39.31% $577,020.70
Over/Under Est: 25.83% $441,848.92
Amt Left: 46.64% $684,599.70
Delta: -5.26% -$107,579.00
Over/Under Est: 32.11% $549,318.92
Amt Left: 53.96% $792,069.70
Delta: -4.99% -$107,470.00
$2,352,797.00
Over/Under Est: 37.54% $642,120.92
Amt Left: 60.28% $884,871.70
Delta: -4.11% -$92,802.00
Over/Under Est: 54.13% $925,953.92
Amt Left: 79.62% $1,168,704.70
Delta: -12.06% -$283,833.00

Bid Items & Bid Tabulations

40 Total 0 of 40
BRAZORIA  |  SH0288  |  HOUSTON  |  6435-66-001  |  03/06/2024  |  $1,710,676.08  |  RMC - 643566001  |  CONC SPALL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC
B & MS CONSTRUCTION, INC.
STRUCTURAL INTEGRITY GROUP LLC
MC2 CIVIL, LLC
GARRET SHIELDS INFRASTRUCTURE
REMOVING CONC (RIPRAP)
SY 300.000 $45.860 $13.000 $35.000 $40.000 $54.000 $30.000 $50.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 200.000 $10.500 $3.300 $35.000 $35.000 $45.000 $10.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 20.000 $18.670 $27.000 $500.000 $35.000 $200.000 $150.000 $50.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 100.000 $25.370 $27.000 $100.000 $47.000 $250.000 $150.000 $50.000
BLOCK SODDING
SY 120.000 $7.250 $14.000 $10.000 $45.000 $45.000 $10.000 $12.000
FERTILIZER
AC 0.020 $3,500.000 $2,117.000 $100,000.000 $1,100.000 $9,000.000 $10,000.000 $10,000.000
VEGETATIVE WATERING
MG 2.980 $60.000 $52.000 $200.000 $1,350.000 $750.000 $150.000 $500.000
FULL - DEPTH REPAIR CRCP (15")
SY 100.000 $850.000 $500.000 $750.000 $440.000 $700.000 $775.000 $600.000
FULL - DEPTH REPAIR CRCP (8"-14")
SY 300.000 $450.000 $450.000 $500.000 $400.000 $500.000 $725.000 $500.000
CEM STABIL BKFL
CY 100.000 $105.420 $125.000 $225.000 $300.000 $400.000 $75.000 $600.000
FLOWABLE BACKFILL
CY 300.000 $323.050 $425.000 $450.000 $450.000 $425.000 $250.000 $500.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 200.000 $96.000 $9.400 $75.000 $146.000 $65.000 $150.000 $250.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 588.000 $163.330 $16.000 $325.000 $180.000 $150.000 $150.000 $200.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 588.000 $216.400 $200.000 $225.000 $180.000 $160.000 $150.000 $300.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 350.000 $235.000 $22.000 $225.000 $175.000 $250.000 $350.000 $300.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 300.000 $269.000 $225.000 $275.000 $380.000 $280.000 $350.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2,700.000 $103.750 $25.000 $125.000 $175.000 $215.000 $150.000 $230.000
CONC STR REPAIR (STANDARD)
SF 200.000 $123.330 $8.500 $125.000 $190.000 $180.000 $150.000 $200.000
RIPRAP (CONC)(4 IN)
CY 100.000 $575.000 $450.000 $750.000 $500.000 $750.000 $800.000 $500.000
RIPRAP (CONC)(5 IN)
CY 100.000 $533.150 $450.000 $750.000 $550.000 $780.000 $800.000 $500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 50.000 $596.850 $450.000 $900.000 $560.000 $780.000 $1,600.000 $500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 200.000 $300.000 $175.000 $250.000 $295.000 $375.000 $370.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 100.000 $250.000 $200.000 $300.000 $400.000 $400.000 $370.000 $300.000
RIPRAP (CONC)(FLUME)
CY 100.000 $683.330 $450.000 $500.000 $750.000 $1,000.000 $1,600.000 $500.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 400.000 $50.080 $20.000 $55.000 $30.000 $65.000 $70.000 $60.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,500.000 $40.000 $20.000 $50.000 $58.000 $55.000 $75.000 $70.000
CLEANING EXISTING JOINTS
LF 2,000.000 $30.000 $15.000 $20.000 $35.000 $20.000 $30.000 $50.000
MOBILIZATION (CALLOUT)
EA 13.000 $563.580 $500.000 $2,500.000 $750.000 $750.000 $100.000 $2,000.000
MOBILIZATION (EMERGENCY)
EA 3.000 $829.200 $1,000.000 $1,000.000 $750.000 $1,000.000 $2,500.000 $2,000.000
CONC CURB & GUTTER (TY II)
LF 100.000 $55.330 $40.000 $50.000 $35.000 $85.000 $95.000 $50.000
CONC CURB (DOWEL)
LF 100.000 $25.530 $9.500 $15.000 $60.000 $65.000 $75.000 $50.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 25,000.000 $3.000 $3.200 $5.000 $7.000 $3.600 $3.990 $10.000
CLEANING / SWEEPING (HANDWORK)
SY 500.000 $0.300 $1.000 $10.000 $69.000 $15.000 $6.000 $5.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 2.000 $3,750.000 $9,500.000 $7,500.000 $7,000.000 $15,000.000 $10,000.000 $5,000.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 90.000 $33.000 $18.000 $100.000 $75.000 $80.000 $100.000 $100.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 200.000 $122.060 $92.000 $125.000 $125.000 $115.000 $100.000 $100.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 10.000 $200.000 $209.000 $250.000 $80.000 $150.000 $350.000 $100.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 8,000.000 $7.170 $7.300 $7.000 $9.000 $8.250 $8.500 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $410.270 $200.000 $100.000 $400.000 $125.000 $300.000 $100.000
TMA (STATIONARY)
DAY 50.000 $225.630 $7,500.000 $250.000 $350.000 $250.000 $2,000.000 $500.000
Totals: $1,710,676.080 $1,467,925.300 $2,044,946.000 $2,152,525.000 $2,259,995.000 $2,352,797.000 $2,636,630.000