Show Job Controls
Bid Cobra

BRAZORIA SH0332 (6380-50-001)

Items: 37

County: BRAZORIA
Length: N/A
Highway: SH0332
District: HOUSTON
Control Number: 6380-50-001
DBE Goal: N/A
Project: RMC - 638050001
Guaranty: N/A
Time: 138 W
Engineer's Estimate: $2,666,610.16
Date: 03/03/2022 (4 years ago)
Contract Number: N/A
Type: EROSION REPAIR
Mail/Deliver Bids To: N/A
MARIA APONTE
RAJENDRA HADA
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$2,666,610.16
$2,207,945.40
Over/Under Est: -17.2% -$458,664.76
$2,748,106.40
Over/Under Est: 3.06% $81,496.24
Amt Left: 24.46% $540,161.00
Over/Under Est: 3.67% $97,817.84
Amt Left: 25.2% $556,482.60
Delta: -0.59% -$16,321.60
Over/Under Est: 9.13% $243,397.29
Amt Left: 31.8% $702,062.05
Delta: -5.27% -$145,579.45
$3,307,218.00
Over/Under Est: 24.02% $640,607.84
Amt Left: 49.79% $1,099,272.60
Delta: -13.65% -$397,210.55

Bid Items & Bid Tabulations

37 Total 0 of 37
BRAZORIA  |  SH0332  |  HOUSTON  |  6380-50-001  |  03/03/2022  |  $2,666,610.16  |  RMC - 638050001  |  EROSION REPAIR  |  138 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
EARTH BUILDERS, L.P.
TEXAS GULF CONSTRUCTION COMPANY, INC.
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
ISI CONTRACTING, INC.
PREPARING ROW
AC 0.100 $55,000.000 $10,000.000 $50,000.000 $81,491.000 $145,000.000 $25,000.000
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 20.000 $14.000 $75.000 $50.000 $163.000 $189.000 $15.000
EXCAVATION (ROADWAY)
CY 200.000 $74.000 $20.000 $40.000 $140.250 $57.000 $30.000
EXCAVATION (SPECIAL)
CY 1,300.000 $25.000 $20.000 $40.000 $34.250 $46.000 $35.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,463.000 $9.010 $20.000 $50.000 $45.000 $75.000 $32.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 2,605.000 $41.010 $60.000 $130.000 $111.500 $69.000 $60.000
BLOCK SODDING
SY 1,748.000 $24.000 $4.300 $4.000 $3.250 $1.750 $3.000
FERTILIZER
AC 0.360 $966.800 $1,000.000 $1,600.000 $574.000 $13,100.000 $1,000.000
VEGETATIVE WATERING
MG 36.200 $60.000 $50.000 $60.000 $114.750 $370.000 $30.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 200.000 $200.000 $125.000 $60.000 $120.000 $130.000 $85.000
CEM STABIL BKFL
CY 34.680 $240.090 $50.000 $130.000 $88.000 $185.000 $125.000
TEMPORARY SPL SHORING
SF 17,121.000 $53.190 $10.000 $38.000 $51.000 $44.000 $70.000
SHEET PILING (PZ - 27)
SF 10,800.000 $48.260 $99.500 $65.000 $42.750 $52.000 $80.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 2.600 $1,521.150 $5,000.000 $4,000.000 $10,658.500 $4,655.000 $4,000.000
RIPRAP (CONC)(6 IN)
CY 94.000 $1,500.000 $520.000 $590.000 $503.250 $618.000 $500.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,542.000 $275.000 $135.000 $220.000 $148.500 $193.000 $222.370
RIPRAP (MOW STRIP)(6 IN)
CY 9.000 $589.050 $680.000 $590.000 $629.000 $603.000 $765.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,980.000 $950.000 $1,100.000 $1,800.000 $2,530.000 $1,100.000
REMOV STR (PIPE)
LF 67.000 $37.160 $15.000 $20.000 $49.250 $70.000 $20.000
MOBILIZATION
LS 1.000 $197,000.000 $220,000.000 $260,000.000 $138,977.500 $535,160.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $4,000.000 $14,250.000 $4,000.000 $55,677.500 $5,500.000 $5,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 455.000 $3.470 $3.000 $5.000 $1.750 $4.750 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 455.000 $1.330 $1.000 $1.000 $1.250 $10.580 $2.000
DRIVEWAYS (BASE)
SY 86.000 $15.000 $15.000 $50.000 $120.000 $95.000 $80.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $28.240 $28.750 $40.000 $34.500 $47.000 $38.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,000.000 $2,000.000 $2,500.000 $2,582.500 $3,145.000 $2,300.000
REMOVE METAL BEAM GUARD FENCE
LF 337.500 $2.450 $1.000 $6.000 $1.250 $10.600 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,200.000 $3,500.000 $3,900.000 $4,878.250 $4,870.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $567.310 $275.000 $350.000 $574.000 $4,720.000 $342.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $339.450 $785.000 $680.000 $1,176.500 $2,040.000 $697.160
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $15.050 $50.000 $70.000 $57.500 $630.000 $55.910
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,900.000 $2,500.000 $5,000.000 $9,756.500 $1,900.000 $4,000.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 10.000 $115.000 $885.000 $350.000 $655.500 $472.000 $575.000
THERMO PIPE(18")(PP)(TY S)(TY II)
LF 65.000 $50.000 $45.000 $65.000 $98.250 $156.000 $62.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 612.000 $61.740 $50.000 $120.000 $102.250 $74.000 $160.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 725.000 $82.560 $62.500 $60.000 $72.250 $65.000 $55.000
TMA (STATIONARY)
DAY 152.000 $281.400 $175.000 $250.000 $288.000 $330.000 $250.000
Totals: $2,666,610.164 $2,207,945.400 $2,748,106.400 $2,764,428.005 $2,910,007.450 $3,307,218.000