Show Job Controls
Bid Cobra

BRAZORIA SH0035 (6376-75-001)

Items: 54

County: BRAZORIA
Length: 0.0100 MILES
Highway: SH0035
District: HOUSTON
Control Number: 6376-75-001
DBE Goal: N/A
Project: RMC - A00139797
Guaranty: $41,000.00
Time: 66 WORKING DAYS
Engineer's Estimate: $2,045,252.35
Date: 03/05/2025 (1 year ago)
Contract Number: 3254201
Type: ACP OVERLAY
Project ID: A00139797
Project Description: SITE-SPECIFIC CONCRETE PAVEMENT REPAIR WITH OVERLAY.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$2,045,252.35
$1,892,568.70
Over/Under Est: -7.47% -$152,683.65
Over/Under Est: -7.15% -$146,303.88
Amt Left: 0.34% $6,379.77
Over/Under Est: -6.76% -$138,241.22
Amt Left: 0.76% $14,442.43
Delta: -0.42% -$8,062.66
Over/Under Est: 0.11% $2,329.14
Amt Left: 8.19% $155,012.79
Delta: -7.37% -$140,570.36
Over/Under Est: 5.4% $110,494.89
Amt Left: 13.91% $263,178.54
Delta: -5.28% -$108,165.75
Over/Under Est: 48.86% $999,277.20
Amt Left: 60.87% $1,151,960.85
Delta: -41.23% -$888,782.31
Subcontractor Percentage Amount
DIAMOND SURFACE, INC. 0.00% $0.00
DIIBS SPECIALISTS, LLC 0.00% $0.00
TEXAS CORRUGATORS 0.00% $0.00
TEXOP CONSTRUCTION 0.00% $0.00
TRAFFIC SIGNS & LINES, LLC 0.00% $0.00
TRAFFIC SYSTEMS CONSTRUCTION, INC. 0.00% $0.00
TRP CONSTRUCTION GROUP, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

54 Total 0 of 54
BRAZORIA  |  SH0035  |  HOUSTON  |  6376-75-001  |  03/05/2025  |  $2,045,252.35  |  RMC - A00139797  |  ACP OVERLAY  |  66 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENVIRONMENTAL ALLIES, INC.
ELITE KINGS CONSTRUCTION, LLC
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
FORDE CONSTRUCTION COMPANY, INC.
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
REMOV CONC (MOWSTRIP)
LF 100.000 $17.000 $35.000 $20.000 $23.000 $44.000 $30.000 $33.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 106.800 $15.000 $22.000 $10.050 $163.000 $80.000 $25.000 $31.000
ASPH (AC-20-5TR)
GAL 29,923.000 $4.500 $4.000 $4.000 $3.160 $4.000 $4.250 $5.000
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 125.000 $200.000 $260.000 $205.000 $670.000 $550.000 $440.000 $1,100.000
SP MIXES SP-D SAC-B PG76-22
TON 5,430.000 $158.000 $154.000 $150.000 $125.000 $137.000 $150.000 $210.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 144.000 $200.000 $250.000 $120.000 $374.250 $200.000 $170.000 $275.000
PLANE CONC PAV(0" TO 1.5")
SY 9,370.000 $12.250 $11.000 $16.130 $5.550 $20.000 $19.000 $25.000
FULL - DEPTH REPAIR CRCP (10")
CY 150.000 $1,500.000 $1,500.000 $1,216.190 $1,800.000 $2,040.000 $1,950.000 $3,175.000
FULL - DEPTH REPAIR CRCP (13")
CY 48.000 $1,500.000 $1,650.000 $1,750.000 $1,900.000 $2,040.000 $2,100.000 $3,500.000
CONC STR REPAIR (STANDARD)
SF 50.000 $195.170 $150.000 $170.000 $150.000 $200.000 $170.000 $230.000
RIPRAP (MOW STRIP)(4 IN)
CY 17.600 $792.740 $900.000 $600.000 $1,136.000 $1,070.000 $1,400.000 $2,100.000
ADJUSTING MANHOLES
EA 12.000 $2,608.760 $850.000 $1,500.000 $3,825.000 $1,700.000 $1,200.000 $375.000
MOBILIZATION
LS 1.000 $170,574.820 $100,000.000 $25,000.000 $183,000.000 $75,000.000 $150,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $10,000.000 $1,750.000 $15,000.000 $6,050.000 $13,000.000 $5,000.000 $7,100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 146.000 $157.840 $120.000 $200.000 $56.000 $150.000 $250.000 $170.000
TMA (STATIONARY)
DAY 80.000 $450.000 $235.000 $350.000 $336.000 $250.000 $350.000 $320.000
TMA (MOBILE OPERATION)
DAY 18.000 $440.450 $950.000 $360.000 $336.000 $175.000 $300.000 $650.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $27.740 $35.000 $44.000 $30.400 $37.000 $36.000 $45.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $36.850 $60.000 $43.000 $107.000 $133.000 $57.000 $145.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $3.730 $6.000 $4.000 $3.500 $6.000 $10.000 $8.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,414.930 $3,500.000 $2,800.000 $3,350.000 $4,900.000 $3,750.000 $5,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $354.270 $275.000 $1,500.000 $500.000 $610.000 $300.000 $380.000
CONDT (PVC) (SCH 80) (2")
LF 175.000 $16.500 $27.000 $19.200 $12.000 $12.500 $14.000 $16.000
ELEC CONDR (NO.8) BARE
LF 175.000 $2.300 $6.000 $2.410 $1.950 $2.000 $2.500 $5.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,500.000 $4,000.000 $1,831.000 $1,400.000 $1,450.000 $1,600.000 $1,520.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $43.480 $35.000 $40.450 $31.000 $12.000 $35.000 $53.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 5,160.000 $1.900 $0.650 $2.000 $0.350 $0.400 $0.380 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 3,000.000 $0.570 $0.550 $2.000 $0.350 $0.400 $0.380 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,285.000 $0.870 $0.750 $1.200 $0.700 $0.750 $0.750 $1.100
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 615.000 $2.000 $2.000 $2.210 $1.500 $1.550 $2.000 $2.500
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 670.000 $6.150 $5.000 $9.000 $3.000 $3.100 $5.000 $4.750
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 5,160.000 $0.570 $0.650 $0.790 $0.350 $0.400 $0.380 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 40,592.000 $0.560 $0.500 $0.720 $0.350 $0.400 $0.380 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,285.000 $2.030 $1.750 $1.500 $1.000 $1.050 $1.200 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 615.000 $3.880 $4.000 $4.510 $3.000 $3.100 $3.500 $4.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 670.000 $10.210 $10.000 $11.960 $6.000 $6.200 $7.000 $10.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,160.000 $4.190 $1.500 $1.360 $1.250 $1.300 $1.500 $2.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 5,160.000 $0.520 $1.000 $1.040 $0.600 $0.620 $0.640 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 3,000.000 $1.000 $1.000 $1.230 $0.600 $0.620 $0.640 $1.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 5,160.000 $0.770 $1.000 $1.060 $0.600 $0.620 $0.640 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 40,592.000 $0.530 $0.800 $1.270 $0.600 $0.620 $0.640 $1.000
PREFAB PM TY C (W)(ARROW)
EA 38.000 $274.370 $300.000 $250.000 $250.000 $258.000 $275.000 $400.000
PREFAB PM TY C (W)(WORD)
EA 12.000 $343.840 $400.000 $250.000 $350.000 $360.000 $375.000 $530.000
REFL PAV MRKR TY I-C
EA 130.000 $7.950 $6.750 $9.000 $6.000 $6.200 $7.000 $10.000
REFL PAV MRKR TY II-A-A
EA 450.000 $7.820 $6.750 $7.260 $6.000 $6.200 $7.000 $10.000
ELIM EXT PM & MRKRS (PLOWABLE RPMS)
EA 600.000 $6.000 $2.000 $1.000 $10.000 $10.300 $10.000 $16.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 2,120.000 $12.410 $11.000 $11.950 $18.000 $20.000 $22.000 $28.000
CONTINUOUS GRINDING-CONCRETE PAVEMENT
SY 4,305.000 $10.000 $11.500 $10.000 $15.860 $16.000 $17.500 $23.000
VIVDS PROSR SYS (INSTALL ONLY)
EA 4.000 $1,300.000 $950.000 $3,885.000 $750.000 $770.000 $850.000 $302.000
VIVDS CAM ASSY (INSTALL ONLY)
EA 4.000 $750.000 $950.000 $1,012.000 $950.000 $978.000 $1,100.000 $910.000
VIVDS CABLING (INSTALL ONLY)
LF 460.000 $2.220 $13.000 $2.550 $1.850 $2.000 $2.500 $4.000
VIVDS PROS CABINET EQUIP (REMOVE)
EA 4.000 $800.000 $550.000 $4.000 $110.000 $113.000 $140.000 $3.000
VIVDS CAM ASSY (REMOVE)
EA 24.000 $500.000 $550.000 $80.000 $150.000 $155.000 $180.000 $3.000
VIVDS CABLING (REMOVE)
LF 5,330.000 $0.150 $1.150 $6.000 $0.550 $0.600 $0.700 $4.000
Totals: $2,045,252.354 $1,892,568.700 $1,898,948.470 $1,907,011.130 $2,047,581.490 $2,155,747.240 $3,044,529.550