REMOV CONC (MEDIANS)
|
SY
|
2.000
|
$30.000
|
$30.530
|
$212.000
|
$150.000
|
$350.000
|
$125.000
|
$350.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
20.000
|
$5.100
|
$20.000
|
$53.000
|
$150.000
|
$160.000
|
$50.000
|
$120.000
|
|
|
REMOV CONC (CURB RAMP)
|
SY
|
14.000
|
$40.000
|
$20.000
|
$76.000
|
$125.000
|
$190.000
|
$50.000
|
$120.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
6.000
|
$38.000
|
$20.000
|
$225.000
|
$500.000
|
$1,000.000
|
$75.000
|
$900.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
41.000
|
$315.000
|
$159.000
|
$472.000
|
$470.000
|
$190.000
|
$275.000
|
$270.000
|
|
|
BLOCK SODDING
|
SY
|
128.000
|
$5.150
|
$7.440
|
$10.000
|
$5.250
|
$5.250
|
$15.000
|
$12.000
|
|
|
FERTILIZER
|
AC
|
0.030
|
$1,295.000
|
$1,800.000
|
$1,600.000
|
$850.000
|
$850.000
|
$1,000.000
|
$11,500.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
0.360
|
$43.000
|
$20.000
|
$150.000
|
$2,000.000
|
$30.000
|
$250.000
|
$7,500.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
221.000
|
$355.000
|
$150.000
|
$327.000
|
$224.000
|
$248.000
|
$185.000
|
$265.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
9,204.000
|
$2.300
|
$3.380
|
$3.300
|
$8.400
|
$3.500
|
$9.350
|
$4.650
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
3,259.000
|
$148.100
|
$140.000
|
$142.000
|
$150.300
|
$155.000
|
$160.000
|
$209.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
28,761.000
|
$5.560
|
$3.000
|
$2.600
|
$2.670
|
$2.100
|
$3.000
|
$5.500
|
|
|
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
|
CY
|
60.000
|
$857.000
|
$1,000.000
|
$2,400.000
|
$2,094.000
|
$2,094.800
|
$1,000.000
|
$2,475.000
|
|
|
CEM STABIL BKFL
|
CY
|
2.000
|
$68.000
|
$267.480
|
$350.000
|
$2,500.000
|
$168.000
|
$300.000
|
$110.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
184.000
|
$285.000
|
$539.690
|
$275.170
|
$260.000
|
$259.690
|
$350.000
|
$300.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
66.000
|
$380.000
|
$710.110
|
$295.210
|
$280.000
|
$278.610
|
$400.000
|
$330.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$740.000
|
$946.430
|
$915.000
|
$1,000.000
|
$2,500.000
|
$1,250.000
|
$1,100.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
754.000
|
$40.000
|
$34.620
|
$18.000
|
$16.500
|
$16.500
|
$12.000
|
$20.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
20.000
|
$144.000
|
$110.360
|
$150.000
|
$80.000
|
$465.000
|
$290.000
|
$350.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,380.000
|
$1,803.090
|
$2,700.000
|
$1,200.000
|
$4,388.000
|
$2,500.000
|
$3,700.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$844.000
|
$575.000
|
$500.000
|
$850.000
|
$2,035.000
|
$800.000
|
$2,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$203,178.030
|
$100,000.000
|
$147,000.000
|
$90,000.000
|
$187,000.000
|
$140,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$10,000.000
|
$1,500.000
|
$6,300.000
|
$6,000.000
|
$8,600.000
|
$7,000.000
|
$10,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
120.000
|
$130.000
|
$250.000
|
$90.000
|
$65.000
|
$56.000
|
$300.000
|
$95.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$450.000
|
$200.000
|
$175.000
|
$210.000
|
$336.000
|
$350.000
|
$285.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$355.000
|
$360.000
|
$175.000
|
$210.000
|
$336.000
|
$350.000
|
$675.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
350.000
|
$4.000
|
$5.220
|
$5.000
|
$5.000
|
$8.600
|
$5.000
|
$4.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
350.000
|
$1.380
|
$2.500
|
$1.000
|
$2.000
|
$7.250
|
$2.500
|
$4.750
|
|
|
CONC SIDEWALKS (4")
|
SY
|
260.000
|
$100.000
|
$50.000
|
$125.000
|
$200.000
|
$102.000
|
$110.000
|
$105.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
168.000
|
$95.000
|
$202.500
|
$125.000
|
$250.000
|
$150.000
|
$114.000
|
$110.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,850.000
|
$3,040.190
|
$4,000.000
|
$4,500.000
|
$5,186.000
|
$3,400.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 22)
|
SY
|
262.000
|
$150.000
|
$100.000
|
$182.000
|
$385.000
|
$134.000
|
$120.000
|
$118.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
60.000
|
$25.000
|
$44.000
|
$27.500
|
$60.000
|
$30.000
|
$75.000
|
$70.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,140.000
|
$2,298.960
|
$2,250.000
|
$2,800.000
|
$6,233.550
|
$3,150.000
|
$2,675.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
160.000
|
$5.500
|
$5.250
|
$3.150
|
$5.000
|
$5.000
|
$5.000
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,950.000
|
$2.990
|
$3,100.000
|
$3,671.000
|
$3,950.000
|
$4,250.000
|
$4,400.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
290.000
|
$14.130
|
$15.000
|
$16.750
|
$16.000
|
$15.810
|
$20.000
|
$19.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
3,220.000
|
$9.520
|
$15.000
|
$10.000
|
$10.000
|
$9.330
|
$12.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
605.000
|
$30.380
|
$15.000
|
$22.000
|
$21.000
|
$20.610
|
$25.000
|
$24.500
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
290.000
|
$37.160
|
$15.000
|
$22.000
|
$20.000
|
$19.630
|
$30.000
|
$23.500
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
605.000
|
$3.000
|
$2.000
|
$1.050
|
$1.000
|
$1.000
|
$2.000
|
$1.200
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
3,800.000
|
$1.580
|
$2.000
|
$1.550
|
$1.500
|
$1.480
|
$2.250
|
$1.800
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
170.000
|
$5.000
|
$2.000
|
$2.300
|
$2.200
|
$2.190
|
$3.000
|
$2.700
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
1,860.000
|
$5.350
|
$2.000
|
$1.550
|
$1.410
|
$1.410
|
$2.500
|
$1.700
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
12,100.000
|
$2.590
|
$2.000
|
$3.000
|
$2.900
|
$2.860
|
$3.500
|
$3.400
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
1.000
|
$2,000.000
|
$5,000.000
|
$7,300.000
|
$6,910.000
|
$6,906.550
|
$7,700.000
|
$8,250.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
30.000
|
$1,454.000
|
$3,079.520
|
$1,270.000
|
$1,210.000
|
$1,201.300
|
$1,400.000
|
$1,400.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$4,828.500
|
$10,000.000
|
$7,600.000
|
$7,200.000
|
$7,193.840
|
$7,800.000
|
$8,500.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(U)
|
EA
|
1.000
|
$7,070.000
|
$3,874.790
|
$5,800.000
|
$5,600.000
|
$5,505.850
|
$6,200.000
|
$6,500.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
|
EA
|
1.000
|
$7,885.000
|
$3,874.900
|
$5,500.000
|
$5,300.000
|
$5,281.500
|
$6,000.000
|
$6,250.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
108.000
|
$48.830
|
$75.660
|
$95.000
|
$90.000
|
$89.950
|
$100.000
|
$107.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
15.000
|
$825.340
|
$1,025.000
|
$680.000
|
$435.000
|
$875.000
|
$500.000
|
$515.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
152.000
|
$6.360
|
$2.000
|
$6.400
|
$6.000
|
$6.000
|
$4.000
|
$7.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
596.000
|
$5.110
|
$2.000
|
$6.350
|
$6.000
|
$6.000
|
$4.000
|
$7.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
398.000
|
$1.720
|
$2.000
|
$0.650
|
$0.620
|
$2.500
|
$1.000
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
18,270.000
|
$1.300
|
$2.000
|
$0.650
|
$0.620
|
$1.400
|
$0.700
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
3,824.000
|
$1.720
|
$2.000
|
$0.850
|
$0.820
|
$2.000
|
$1.350
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
1,112.000
|
$5.940
|
$2.000
|
$0.500
|
$0.450
|
$4.000
|
$2.500
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
950.000
|
$12.780
|
$2.000
|
$4.700
|
$4.500
|
$8.000
|
$4.550
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
50.000
|
$435.620
|
$100.000
|
$127.000
|
$120.000
|
$300.000
|
$130.000
|
$140.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
44.000
|
$266.250
|
$150.000
|
$137.000
|
$130.000
|
$350.000
|
$145.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
16.000
|
$65.670
|
$179.000
|
$26.000
|
$25.000
|
$35.000
|
$65.000
|
$30.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
28,814.000
|
$1.150
|
$2.000
|
$0.650
|
$0.620
|
$1.400
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
595.000
|
$1.700
|
$2.000
|
$1.850
|
$1.750
|
$2.450
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,439.000
|
$1.990
|
$2.000
|
$1.850
|
$1.750
|
$0.950
|
$1.400
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
615.000
|
$11.280
|
$2.000
|
$9.500
|
$9.000
|
$6.270
|
$10.000
|
$10.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$204.020
|
$20.000
|
$290.000
|
$275.000
|
$150.000
|
$200.000
|
$325.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$245.530
|
$20.000
|
$312.000
|
$295.000
|
$250.000
|
$225.000
|
$350.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
16.000
|
$40.500
|
$56.900
|
$60.000
|
$57.500
|
$50.000
|
$75.000
|
$70.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
5.000
|
$170.250
|
$169.950
|
$280.000
|
$265.000
|
$100.000
|
$170.000
|
$315.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
5.000
|
$210.250
|
$180.000
|
$300.000
|
$285.000
|
$100.000
|
$275.000
|
$350.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
49.000
|
$5.390
|
$6.000
|
$4.250
|
$4.000
|
$5.780
|
$5.000
|
$5.000
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
6,681.000
|
$1.160
|
$1.030
|
$1.250
|
$1.170
|
$0.950
|
$1.500
|
$1.400
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
3,725.000
|
$1.330
|
$1.060
|
$1.250
|
$1.170
|
$0.950
|
$1.500
|
$1.400
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
121.000
|
$1.790
|
$1.870
|
$3.350
|
$3.190
|
$1.500
|
$4.500
|
$3.750
|
|
RE PM TY III (W)(24")(SLD)
|
LF
|
167.000
|
$10.690
|
$14.050
|
$10.500
|
$10.190
|
$8.000
|
$20.000
|
$12.000
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
7,530.000
|
$1.140
|
$1.040
|
$1.250
|
$1.170
|
$0.950
|
$1.500
|
$1.400
|
|
RE PM TY III (Y)(12")(SLD)
|
LF
|
722.000
|
$4.220
|
$5.380
|
$5.400
|
$5.100
|
$4.000
|
$12.000
|
$6.000
|
|
RE PM TY III (W)(ARROW)
|
EA
|
4.000
|
$189.000
|
$5.000
|
$334.000
|
$315.000
|
$450.000
|
$500.000
|
$375.000
|
|
RE PM TY III (W)(WORD)
|
EA
|
4.000
|
$210.000
|
$1.300
|
$355.000
|
$355.000
|
$450.000
|
$500.000
|
$400.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
10,060.000
|
$1.150
|
$1.330
|
$0.950
|
$0.880
|
$0.700
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
13,698.000
|
$1.250
|
$1.330
|
$0.950
|
$0.880
|
$0.700
|
$1.000
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
76.000
|
$6.840
|
$6.210
|
$6.350
|
$6.000
|
$6.000
|
$7.000
|
$7.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
487.000
|
$16.300
|
$7.260
|
$6.350
|
$6.000
|
$6.000
|
$7.000
|
$7.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
17,570.000
|
$0.530
|
$1.060
|
$0.500
|
$0.490
|
$0.470
|
$0.450
|
$0.600
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
90.000
|
$2.130
|
$1.510
|
$1.000
|
$0.980
|
$0.930
|
$0.650
|
$1.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
522.000
|
$3.390
|
$2.110
|
$1.700
|
$1.680
|
$1.480
|
$1.000
|
$2.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
160.000
|
$5.600
|
$4.670
|
$3.500
|
$3.300
|
$2.670
|
$1.400
|
$4.000
|
|
|
ELIM EXT PM & MRKS (36")(YLD TRI)
|
EA
|
16.000
|
$30.250
|
$26.880
|
$26.500
|
$25.000
|
$78.000
|
$55.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
42,289.000
|
$0.350
|
$0.440
|
$0.050
|
$0.040
|
$0.010
|
$0.150
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,560.000
|
$1.870
|
$0.220
|
$0.070
|
$0.060
|
$0.020
|
$0.300
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
771.000
|
$0.910
|
$0.540
|
$0.090
|
$0.080
|
$0.150
|
$0.800
|
$0.090
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
782.000
|
$1.420
|
$3.960
|
$0.200
|
$0.160
|
$0.250
|
$1.250
|
$0.190
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
24.000
|
$49.950
|
$29.080
|
$5.300
|
$5.000
|
$10.000
|
$60.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
20.000
|
$58.070
|
$36.050
|
$5.300
|
$5.000
|
$10.000
|
$60.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
5.000
|
$5.010
|
$36.050
|
$5.300
|
$5.000
|
$10.000
|
$60.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
5.000
|
$24.720
|
$41.200
|
$5.300
|
$5.000
|
$10.000
|
$60.000
|
$6.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
3.000
|
$31,140.000
|
$30,000.000
|
$36,000.000
|
$35,000.000
|
$34,239.090
|
$38,000.000
|
$40,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
3.000
|
$7,493.000
|
$5,000.000
|
$9,800.000
|
$9,500.000
|
$9,339.840
|
$10,450.000
|
$11,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
32.000
|
$292.100
|
$200.000
|
$312.000
|
$300.000
|
$295.030
|
$320.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
8.000
|
$300.600
|
$200.000
|
$312.000
|
$300.000
|
$295.030
|
$320.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
32.000
|
$294.100
|
$200.000
|
$312.000
|
$295.000
|
$295.030
|
$320.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
6.000
|
$295.100
|
$200.000
|
$312.000
|
$295.000
|
$295.030
|
$320.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
32.000
|
$292.100
|
$200.000
|
$312.000
|
$296.000
|
$295.030
|
$320.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
12.000
|
$295.100
|
$200.000
|
$312.000
|
$296.000
|
$295.030
|
$320.000
|
$350.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$816.400
|
$1,000.000
|
$723.000
|
$683.000
|
$682.460
|
$750.000
|
$800.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
8.000
|
$273.480
|
$100.000
|
$245.000
|
$232.000
|
$231.280
|
$270.000
|
$275.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
30.000
|
$229.730
|
$150.000
|
$198.000
|
$188.000
|
$187.460
|
$210.000
|
$220.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
940.000
|
$1.210
|
$2.000
|
$1.750
|
$1.700
|
$1.660
|
$2.300
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
980.000
|
$1.790
|
$2.000
|
$2.750
|
$2.600
|
$2.600
|
$3.250
|
$3.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
7,353.000
|
$2.300
|
$2.000
|
$3.300
|
$3.250
|
$3.120
|
$4.000
|
$3.500
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
4.000
|
$15,107.000
|
$15,000.000
|
$17,600.000
|
$16,700.000
|
$16,629.470
|
$18,200.000
|
$19,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
4.000
|
$14,147.000
|
$15,000.000
|
$18,000.000
|
$17,000.000
|
$16,997.330
|
$18,600.000
|
$20,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
$16,025.450
|
$19,000.000
|
$19,300.000
|
$18,500.000
|
$18,247.000
|
$19,950.000
|
$21,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
3.000
|
$12,520.500
|
$20,000.000
|
$20,300.000
|
$19,200.000
|
$19,160.030
|
$20,900.000
|
$22,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
2.000
|
$25,650.230
|
$30,000.000
|
$38,000.000
|
$36,000.000
|
$35,803.330
|
$39,700.000
|
$42,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$26,500.450
|
$30,000.000
|
$39,000.000
|
$38,000.000
|
$37,054.320
|
$41,200.000
|
$44,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
8.000
|
$2,050.000
|
$3,505.000
|
$3,180.000
|
$3,010.000
|
$3,001.670
|
$3,350.000
|
$3,500.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$750.000
|
$1,559.000
|
$928.000
|
$900.000
|
$876.240
|
$970.000
|
$1,100.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,000.000
|
$567.000
|
$3,550.000
|
$3,400.000
|
$3,353.530
|
$3,700.000
|
$4,000.000
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
3.000
|
$8,102.120
|
$8,000.000
|
$9,100.000
|
$8,850.000
|
$8,624.470
|
$9,720.000
|
$10,500.000
|
|
|
RVDS (PRESENCE DET)(INSTALL ONLY)
|
EA
|
16.000
|
$840.650
|
$1,500.000
|
$1,200.000
|
$1,141.000
|
$1,140.250
|
$1,270.000
|
$1,400.000
|
|
|
RVDS (ADVANCE DET)(INSTALL ONLY)
|
EA
|
6.000
|
$985.760
|
$1,000.000
|
$1,200.000
|
$1,160.000
|
$1,152.700
|
$1,290.000
|
$1,400.000
|
|
|
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
|
LF
|
680.000
|
$2.950
|
$2.000
|
$5.000
|
$4.750
|
$4.730
|
$6.000
|
$5.750
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
36.000
|
$55.550
|
$330.500
|
$18.000
|
$18.000
|
$17.030
|
$50.000
|
$20.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
3.000
|
$850.250
|
$4,000.000
|
$4,000.000
|
$3,800.000
|
$3,769.750
|
$4,350.000
|
$5,000.000
|
|
|
BRIDGE DECK CLEANING
|
SY
|
3,288.000
|
$10.000
|
$4.000
|
$7.000
|
$13.500
|
$10.000
|
$1.000
|
$2.500
|
|
Totals: |
$2,336,182.940
|
$2,192,872.710
|
$2,287,604.180
|
$2,335,631.440
|
$2,362,253.470
|
$2,394,033.850
|
$2,782,836.670
|