Show Job Controls
Bid Cobra

BRAZORIA CR (0912-31-307)

Items: 79

County: BRAZORIA
Length: N/A
Highway: CR
District: HOUSTON
Control Number: 0912-31-307
DBE Goal: N/A
Project: BR 2019(421)
Guaranty: N/A
Time: 219 WORKING DAYS
Engineer's Estimate: $2,751,921.89
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
MARIA APONTE
RAJENDRA HADA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,751,921.89
$3,440,532.59
Over/Under Est: 25.02% $688,610.70
Over/Under Est: 34.78% $957,130.43
Amt Left: 7.8% $268,519.73
Over/Under Est: 43.16% $1,187,832.34
Amt Left: 14.51% $499,221.64
Delta: -6.22% -$230,701.91
Subcontractor Percentage Amount
GMJ PAVING COMPANY LLC 4.54% $166,098.18
WILLOW CITY SIGN & RAIL, INC. 2.49% $91,097.90
HUNTER DEMOLITION & WRECKING CORPORATION 2.46% $90,000.33
BUYERS BARRICADES HOUSTON, LLC 1.94% $70,975.87
REPUBLIC TRAFFIC SAFETY, INC. 0.79% $28,902.55
QUALITY TURF FARMS, L.C. 0.31% $11,341.51
PINNACLE GRINDING AND GROOVING LLC 0.20% $7,317.10
HOUSTON SAWING & DRILLING 0.20% $7,317.10
S&S BRIDGE PAINTING 0.16% $5,853.68
Total: 13.09% $478,904.22

Bid Items & Bid Tabulations

79 Total 0 of 79
BRAZORIA  |  CR  |  HOUSTON  |  0912-31-307  |  06/30/2022  |  $2,751,921.89  |  BR 2019(421)  |  BRIDGE REPL  |  219 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
JOHN REED AND COMPANY, LLC
ARANDA BROTHERS CONSTRUCTION CO., INC.
PREPARING ROW
STA 12.870 $12,000.000 $3,000.000 $9,600.000 $7,500.000
RMV TRT & UNTRT BASE & ASPH PV(12"-18")
SY 2,589.000 $5.500 $18.000 $15.000 $15.000
EXCAVATION (ROADWAY)
CY 313.000 $9.000 $40.000 $45.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3,531.000 $10.500 $28.000 $45.000 $25.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 1,725.000 $50.000 $62.000 $70.000 $90.000
BLOCK SODDING
SY 2,736.000 $3.500 $3.500 $4.000 $6.000
STRAW OR HAY MULCH
SY 2,736.000 $0.500 $0.200 $0.250 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 2,736.000 $0.150 $0.250 $0.250 $1.000
FERTILIZER
AC 1.131 $650.000 $500.000 $800.000 $1,750.000
VEGETATIVE WATERING
MG 42.681 $20.000 $40.000 $50.000 $80.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 3,892.000 $25.000 $21.000 $40.000 $35.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 72.000 $200.000 $270.000 $300.000 $210.000
LIME TRT (SUBGRADE)(8")
SY 4,005.000 $5.000 $6.000 $3.000 $7.000
PRIME COAT (MC-30)
GAL 945.000 $5.000 $5.500 $8.000 $10.000
CEM STABIL BKFL
CY 210.000 $50.000 $50.000 $60.000 $80.000
TEMPORARY SPL SHORING
SF 653.000 $15.000 $100.000 $10.000 $25.000
DRILL SHAFT (36 IN)
LF 1,352.000 $170.000 $349.000 $360.000 $458.000
CL C CONC (ABUT)
CY 131.200 $950.000 $1,900.000 $1,800.000 $1,550.000
CL C CONC (RAIL FOUNDATION)
CY 13.000 $450.000 $780.000 $1,000.000 $1,150.000
REINF CONC SLAB
SF 7,800.000 $18.000 $33.000 $25.000 $22.500
APPROACH SLAB
CY 149.000 $850.000 $635.000 $600.000 $750.000
PRESTR CONC GIRDER (TX28)
LF 967.500 $170.000 $215.000 $275.000 $260.000
RIPRAP (CONC)(5 IN)
CY 211.000 $550.000 $525.000 $400.000 $485.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 96.000 $435.000 $585.000 $400.000 $475.000
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 $700.000 $678.000 $600.000 $650.000
RAIL (TY T223)
LF 557.500 $120.000 $183.000 $125.000 $150.000
RAIL (TY T631LS)
LF 172.000 $90.000 $80.000 $90.000 $225.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 240.000 $120.000 $237.000 $145.000 $150.000
CONC BOX CULV (10 FT X 7 FT)
LF 76.000 $900.000 $1,500.000 $1,500.000 $1,500.000
RC PIPE (CL III)(24 IN)
LF 26.000 $95.000 $114.000 $72.000 $125.000
RC PIPE (CL III)(30 IN)
LF 138.000 $120.000 $130.000 $97.000 $155.000
RC PIPE (CL III)(36 IN)
LF 53.000 $125.000 $170.000 $146.000 $195.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $50,000.000 $46,000.000 $70,000.000 $37,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $3,000.000 $2,350.000 $2,500.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,000.000 $2,550.000 $2,500.000 $3,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 5.000 $3,000.000 $2,450.000 $2,000.000 $4,250.000
SET (TY II) (36 IN) (RCP) (2.5: 1) (C)
EA 1.000 $3,500.000 $2,550.000 $4,144.000 $5,500.000
REMOV STR (PIPE)
LF 50.000 $35.000 $25.000 $10.000 $20.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $35,000.000 $22,000.000 $66,000.000 $50,000.000
REMOV STR (RET WALL)
LF 36.000 $40.000 $225.000 $100.000 $50.000
REMOV STR (DRIVEWAY CULVERT)
EA 4.000 $200.000 $1,000.000 $1,800.000 $3,500.000
MOBILIZATION
LS 1.000 $240,629.270 $310,000.000 $370,000.000 $475,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $7,000.000 $7,500.000 $12,500.000 $6,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 640.000 $30.000 $30.000 $40.000 $40.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 800.000 $30.000 $140.000 $40.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 800.000 $7.500 $18.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,414.000 $2.500 $3.250 $3.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,414.000 $0.750 $0.800 $1.000 $2.000
DRIVEWAYS (ACP)
SY 462.000 $100.000 $85.000 $60.000 $40.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $30.000 $28.000 $38.000 $45.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,150.000 $1,400.000 $1,300.000 $1,850.000
SHORT RADIUS
LF 112.500 $270.000 $60.000 $64.000 $75.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 8.000 $1,000.000 $1,200.000 $1,300.000 $2,150.000
REMOVE METAL BEAM GUARD FENCE
LF 40.000 $3.500 $5.500 $1.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $350.000 $550.000 $200.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,300.000 $3,500.000 $3,000.000 $2,550.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 2.000 $300.000 $400.000 $400.000 $557.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $520.000 $650.000 $700.000 $1,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $580.000 $700.000 $1,220.000 $1,950.000
REMOVE SM RD SN SUP&AM
EA 26.000 $80.000 $90.000 $50.000 $450.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 16.000 $25.000 $27.000 $30.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 25.000 $35.000 $32.000 $20.000 $100.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 8.000 $300.000 $225.000 $175.000 $1,500.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 8.000 $310.000 $225.000 $175.000 $1,500.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $35.000 $27.000 $15.000 $20.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 33.000 $5.500 $13.000 $15.000 $20.000
PAVEMENT SEALER 6"
LF 4,502.000 $0.200 $0.250 $0.200 $1.000
PAVEMENT SEALER 24"
LF 33.000 $1.500 $4.500 $1.000 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,744.000 $0.500 $0.800 $2.850 $4.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 150.000 $0.500 $1.000 $2.850 $4.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,608.000 $0.500 $0.900 $2.850 $3.500
REFL PAV MRKR TY II-A-A
EA 26.000 $4.500 $8.000 $15.000 $250.000
PAV SURF PREP FOR MRK (6")
LF 4,502.000 $0.050 $0.400 $0.060 $1.000
PAV SURF PREP FOR MRK (24")
LF 33.000 $0.150 $2.250 $0.250 $1.000
TACK COAT
GAL 227.000 $2.500 $5.000 $8.000 $10.000
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
TON 306.000 $180.000 $220.000 $180.000 $250.000
D-GR HMA TY-D PG70-22 (EXEMPT)
TON 310.000 $160.000 $220.000 $180.000 $275.000
ASBESTOS ABATEMENT (COATINGS)
SF 60.000 $820.000 $100.000 $100.000 $470.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 962.000 $130.000 $50.000 $20.000 $100.000
Totals: $2,751,921.890 $3,440,532.590 $3,709,052.320 $3,939,754.230