BRAZORIA SH 35 (0178-02-089)

Items: 55

County: BRAZORIA
Length: N/A
Highway: SH 35
District: HOUSTON
Control Number: 0178-02-089
DBE Goal: N/A
Project: C 178-2-89
Guaranty: N/A
Time: 145 WORKING DAYS
Engineer's Estimate: $3,881,431.68
Date: 07/10/2018 (7 years ago)
Contract Number: N/A
Type: DIAMOND GRINDING & O/L,W/LP DETRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,881,431.68
$4,772,337.96
Over/Under Est: 22.95% $890,906.28
Over/Under Est: 44.03% $1,709,103.56
Amt Left: 17.14% $818,197.28
Over/Under Est: 58.71% $2,278,642.30
Amt Left: 29.08% $1,387,736.02
Delta: -10.19% -$569,538.74
Over/Under Est: 72.88% $2,828,673.21
Amt Left: 40.6% $1,937,766.93
Delta: -8.93% -$550,030.91

Bid Items & Bid Tabulations

55 Total 0 of 55
BRAZORIA  |  SH 35  |  HOUSTON  |  0178-02-089  |  07/10/2018  |  $3,881,431.68  |  C 178-2-89  |  DIAMOND GRINDING & O/L,W/LP DETRS  |  145 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DIAMOND SURFACE, INC.
MAIN LANE INDUSTRIES LTD.
DIAMOND CORING COMPANY, INC
ANGEL BROTHERS HOLDINGS CORP.
BACKFILL (TY A OR B)
STA 506.400 $200.000 $231.500 $150.000 $172.500 $196.000
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
SY 109,415.000 $1.200 $2.500 $2.000 $2.310 $4.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 9,028.000 $81.000 $117.500 $98.000 $112.700 $96.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $40.000 $66.250 $64.000 $73.600 $47.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 500.000 $30.000 $41.250 $34.000 $39.100 $33.500
FULL - DEPTH REPAIR CPJR (9")
SY 800.000 $152.000 $485.000 $320.000 $372.850 $342.000
FULL - DEPTH REPAIR CPJR (10")
SY 100.000 $230.000 $515.000 $330.000 $418.290 $353.000
RIPRAP (MOW STRIP)(4 IN)
CY 16.000 $455.000 $750.000 $1,000.000 $1,150.000 $640.000
CLEANING AND SEALING EXISTING JOINTS
LF 63,624.000 $4.000 $2.500 $2.100 $2.560 $2.250
MOBILIZATION
LS 1.000 $349,580.000 $385,329.000 $513,000.000 $603,775.150 $170,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $1,187.500 $10,000.000 $30,119.650 $13,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $21.500 $25.000 $30.000 $23.000 $22.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 3.000 $1,650.000 $2,125.000 $1,860.000 $1,955.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 89.000 $2.500 $2.500 $8.000 $2.300 $2.250
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,350.000 $3,250.000 $2,850.000 $2,990.000 $2,880.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $250.000 $375.000 $350.000 $345.000 $330.000
CONDT (PVC) (SCH 80) (2")
LF 3,000.000 $7.500 $18.750 $8.750 $10.060 $9.350
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,200.000 $17.000 $43.750 $12.500 $15.530 $14.500
ELEC CONDR (NO.8) BARE
LF 4,200.000 $1.100 $1.440 $1.350 $1.730 $1.600
GROUND BOX TY D (162922)W/APRON
EA 27.000 $890.000 $1,250.000 $925.000 $1,063.750 $990.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 11.000 $30.000 $18.750 $38.000 $17.250 $16.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 53,391.000 $0.220 $0.140 $0.160 $0.210 $0.170
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 120,540.000 $0.220 $0.140 $0.150 $0.590 $0.160
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 1,000.000 $0.600 $0.325 $0.330 $0.450 $0.350
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 11,458.000 $0.350 $0.325 $0.330 $4.210 $0.350
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 2,426.000 $1.850 $5.800 $1.550 $2.760 $1.700
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 142.000 $43.000 $69.200 $65.000 $57.500 $70.000
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
EA 12.000 $135.000 $152.100 $85.000 $86.250 $91.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 150.000 $44.000 $115.000 $75.000 $57.500 $80.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 125,208.000 $0.220 $0.140 $0.180 $0.230 $0.190
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 500.000 $1.000 $1.880 $0.900 $1.150 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,729.000 $1.000 $1.880 $0.900 $1.050 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,469.000 $5.200 $7.500 $4.250 $6.330 $4.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 71.000 $108.000 $106.300 $115.000 $161.000 $123.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $190.000 $143.800 $150.000 $207.000 $160.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 6.000 $185.000 $231.500 $175.000 $161.000 $190.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 75.000 $123.000 $119.000 $125.000 $161.000 $133.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 52,491.000 $0.750 $0.730 $0.490 $0.510 $0.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 52,941.000 $0.500 $0.580 $0.460 $0.320 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 60,270.000 $0.420 $0.580 $0.460 $0.320 $0.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 61,150.000 $0.430 $0.580 $0.480 $0.320 $0.500
REFL PAV MRKR TY I-C
EA 849.000 $3.500 $4.400 $3.500 $4.490 $3.750
REFL PAV MRKR TY II-A-A
EA 34.000 $3.700 $5.000 $3.500 $4.490 $3.750
ELIM EXT PAV MRK & MRKS (6")
LF 294.000 $0.400 $1.250 $0.950 $1.150 $1.000
PAV SURF PREP FOR MRK (6")
LF 210,365.000 $0.030 $0.030 $0.020 $0.080 $0.020
PAV SURF PREP FOR MRK (8")
LF 4,340.000 $0.060 $0.050 $0.020 $0.160 $0.020
PAV SURF PREP FOR MRK (24")
LF 1,025.000 $0.200 $1.250 $0.100 $0.430 $0.110
PAV SURF PREP FOR MRK (ARROW)
EA 40.000 $8.000 $12.500 $4.000 $10.580 $4.250
PAV SURF PREP FOR MRK (WORD)
EA 42.000 $9.000 $12.500 $4.000 $10.580 $4.250
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 4,200.000 $1.000 $1.880 $1.500 $1.470 $1.400
VEH LP DETECT (SAWCUT)
LF 17,400.000 $10.000 $15.000 $10.500 $10.350 $9.650
FIBER REINFORCED POLYMER PATCHING MATLS
LB 30,000.000 $4.140 $5.200 $2.400 $2.760 $2.600
CONTINUOUS DIAMOND GRINDING CONC PVMT
SY 136,161.000 $10.500 $9.970 $20.000 $19.370 $28.750
TMA (STATIONARY)
DAY 75.000 $200.000 $231.500 $250.000 $460.000 $300.000
TMA (MOBILE OPERATION)
DAY 37.000 $190.000 $294.000 $550.000 $920.000 $475.000
Totals: $3,881,431.680 $4,772,337.960 $5,590,535.240 $6,160,073.980 $6,710,104.890