BRAZORIA BS 288B (0111-08-126)

Items: 17

County: BRAZORIA
Length: N/A
Highway: BS 288B
District: HOUSTON
Control Number: 0111-08-126
DBE Goal: N/A
Project: STP 2023(348)HES
Guaranty: N/A
Time: 82 WORKING DAYS
Engineer's Estimate: $1,799,584.50
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
MARIA APONTE
RAJENDRA HADA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,799,584.50
$1,319,307.50
Over/Under Est: -26.69% -$480,277.00
$1,494,377.88
Over/Under Est: -16.96% -$305,206.62
Amt Left: 13.27% $175,070.38
Over/Under Est: -16.56% -$297,971.50
Amt Left: 13.82% $182,305.50
Delta: -0.48% -$7,235.12
Over/Under Est: -8.67% -$156,054.02
Amt Left: 24.58% $324,222.98
Delta: -9.45% -$141,917.48
Over/Under Est: -7.79% -$140,151.55
Amt Left: 25.78% $340,125.45
Delta: -0.97% -$15,902.47

Bid Items & Bid Tabulations

17 Total 0 of 17
BRAZORIA  |  BS 288B  |  HOUSTON  |  0111-08-126  |  01/05/2023  |  $1,799,584.50  |  STP 2023(348)HES  |  HAZARD ELIM & SAFETY  |  82 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
TRAF-TEX, INC.
THIRD COAST SERVICES LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
ALLSTATE SIGNAL & CONSTRUCTION, LLC
MOBILIZATION
LS 1.000 $163,216.000 $80,000.000 $40,478.000 $150,000.000 $65,743.110 $104,425.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,000.000 $2,600.000 $2,354.000 $3,500.000 $693.430 $1,625.000
CONDT (PVC) (SCH 80) (2")
LF 245.000 $11.000 $13.500 $13.550 $11.000 $13.540 $30.560
CONDT (PVC) (SCH 80) (3")
LF 27,830.000 $22.500 $16.500 $18.700 $16.000 $20.120 $20.090
CONDT (PVC) (SCH 80) (3") (BORE)
LF 11,065.000 $26.000 $18.500 $24.000 $22.000 $27.410 $25.090
CONDT (RM) (2")
LF 360.000 $45.000 $33.000 $32.330 $35.000 $110.920 $28.120
CONDT (RM) (3")
LF 770.000 $75.000 $35.000 $74.300 $50.000 $132.510 $39.360
ELEC CONDR (NO.14) INSULATED
LF 41,435.000 $1.000 $1.000 $0.960 $1.300 $0.710 $1.160
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 490.000 $1.750 $2.650 $7.150 $2.950 $3.490 $8.400
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 43,240.000 $2.500 $1.350 $1.490 $2.800 $1.500 $2.680
FO SPLICE ENCLOSURE (TYPE 2)
EA 9.000 $1,354.000 $575.000 $2,785.830 $2,595.000 $671.710 $1,515.000
FIBER OPTIC FUSION SPLICE
EA 120.000 $60.000 $77.000 $34.410 $26.000 $36.630 $102.400
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 2.000 $1,500.000 $150.000 $1,004.240 $2,200.000 $200.170 $1,090.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 12.000 $1,000.000 $175.000 $1,640.540 $1,995.000 $227.910 $1,255.000
ITS MULTI-DUCT CND (RMC)
LF 1,000.000 $120.000 $75.000 $148.510 $110.000 $185.210 $145.720
TMA (STATIONARY)
DAY 82.000 $190.000 $125.000 $192.350 $200.000 $214.800 $200.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 74.000 $3,750.000 $4,250.000 $3,496.450 $3,115.000 $3,415.210 $3,882.000
Totals: $1,799,584.500 $1,319,307.500 $1,494,377.880 $1,501,613.000 $1,643,530.480 $1,659,432.950