Items: 31

County: BOWIE
Length: 0.0100 MILES
Highway: US0059
District: ATLANTA
Control Number: 6495-70-001
DBE Goal: 0.0%
Project: RMC - A00218937
Guaranty: $0.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $182,810.00
Date: 03/18/2026 (2 months ago) Changed
Contract Number: 3261906
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218937
Project Description: CALLOUT METAL BEAM GUARD FENCE REPAIR (NORTH)TASK #19I18922
Mail/Deliver Bids To: N/A
JASON DUPREE
CHARLOTTE ASLIN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$182,810.00
1
$180,035.00
Over/Under Est: -1.52% -$2,775.00
Over/Under Est: 22.08% $40,360.00
Amt Left: 23.96% $43,135.00
$235,139.20
Over/Under Est: 28.62% $52,329.20
Amt Left: 30.61% $55,104.20
Delta: -5.36% -$11,969.20

Bid Items & Bid Tabulations

31 Total 0 of 31
BOWIE  |  US0059  |  ATLANTA  |  6495-70-001  |  03/18/2026  |  $182,810.00  |  RMC - A00218937  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
AUSTIN BARRICADE COMPANY, L.L.C.
H. V. CAVER, INC.
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 40.000 $140.000 $100.000 $55.000 $304.500
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $640.000 $300.000 $100.000 $609.000
MOBILIZATION (CALLOUT)
EA 20.000 $550.000 $1.000 $1,500.000 $630.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5.000 $100.000 $1.000 $250.000 $101.500
TMA (STATIONARY)
DAY 100.000 $250.000 $1.000 $1.000 $203.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $29.000 $45.000 $40.000 $31.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,390.000 $1,000.000 $1,500.000 $1,638.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $3.000 $8.000 $3.050
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $175.000 $1.000 $1.000 $253.750
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,200.000 $4,000.000 $5,000.000 $3,937.500
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $300.000 $50.000 $1.000 $279.130
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 25.000 $30.000 $10.000 $20.000 $32.760
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $30.000 $10.000 $20.000 $32.760
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 25.000 $25.000 $10.000 $20.000 $32.760
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 20.000 $25.000 $10.000 $20.000 $32.760
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,000.000 $20.000 $45.000 $44.000 $26.460
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 25.000 $46.000 $40.000 $50.000 $27.720
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $65.000 $500.000 $1.000 $44.100
REPLACE TIMBER POST W/O CONC FND
EA 50.000 $80.000 $70.000 $85.000 $115.920
REPLACE STEEL POST W/O CONC FND
EA 50.000 $50.000 $10.000 $100.000 $78.120
REPLACE TIMBER POST W/ CONC FND
EA 50.000 $90.000 $60.000 $85.000 $163.800
REPLACE STEEL POST W/ CONC FND
EA 50.000 $45.000 $80.000 $100.000 $119.700
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $725.000 $1,000.000 $1,000.000 $1,757.700
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 250.000 $32.000 $60.000 $50.000 $42.840
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $75.000 $85.000 $180.000 $126.000
REPLACE BLOCKOUT
EA 50.000 $40.000 $30.000 $180.000 $46.620
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $50.000 $200.000 $100.000 $189.000
REPLACE SGT OBJECT MARKER
EA 10.000 $34.000 $100.000 $1.000 $50.400
REPLACE SGT CABLE ANCHOR
EA 10.000 $87.000 $200.000 $1.000 $315.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $175.000 $100.000 $1.000 $201.600
REPLACE SGT STRUT
EA 10.000 $300.000 $200.000 $1.000 $214.200
Totals: $182,810.000 $180,035.000 $223,170.000 $235,139.200