BOWIE FM 1297 (2879-01-010)

Items: 63

County: BOWIE
Length: N/A
Highway: FM 1297
District: ATLANTA
Control Number: 2879-01-010
DBE Goal: N/A
Project: STP 1602(316)
Guaranty: N/A
Time: 85 WORKING DAYS
Engineer's Estimate: $2,503,450.00
Date: 01/04/2017 (9 years ago)
Contract Number: N/A
Type: GR,BS,SURF & PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,503,450.00
$2,668,802.19
Over/Under Est: 6.6% $165,352.19
Over/Under Est: 13.35% $334,226.30
Amt Left: 6.33% $168,874.11
Over/Under Est: 15.07% $377,175.00
Amt Left: 7.94% $211,822.81
Delta: -1.51% -$42,948.70
Over/Under Est: 20.51% $513,388.45
Amt Left: 13.04% $348,036.26
Delta: -4.73% -$136,213.45
$3,252,239.00
Over/Under Est: 29.91% $748,789.00
Amt Left: 21.86% $583,436.81
Delta: -7.80% -$235,400.55
Over/Under Est: 35.32% $884,146.20
Amt Left: 26.93% $718,794.01
Delta: -4.16% -$135,357.20

Bid Items & Bid Tabulations

63 Total 0 of 63
BOWIE  |  FM 1297  |  ATLANTA  |  2879-01-010  |  01/04/2017  |  $2,503,450.00  |  STP 1602(316)  |  GR,BS,SURF & PAV MRKS  |  85 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. V. CAVER, INC.
H. H. HOWARD & SONS, INC.
FRITCHER CONSTRUCTION SERVICES
LONGVIEW BRIDGE AND ROAD, LTD.
FNH CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 47.890 $2,000.000 $4,000.000 $2,000.000 $3,500.000 $4,500.000 $5,000.000 $4,000.000
REMOVING CONC (RIPRAP)
SY 44.000 $30.000 $16.000 $10.000 $26.250 $18.000 $30.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 2,071.000 $20.000 $15.000 $15.000 $21.000 $25.000 $20.000 $20.000
EXCAVATION (ROADWAY)
CY 8,419.000 $15.000 $15.000 $10.000 $8.000 $18.000 $20.000 $15.000
EXCAVATION (CHANNEL)
CY 14.000 $25.000 $30.000 $100.000 $15.000 $75.000 $30.000 $50.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 5,513.000 $15.000 $15.000 $12.000 $18.000 $18.000 $30.000 $17.000
BLOCK SODDING
SY 52,806.000 $3.000 $3.500 $5.000 $3.500 $6.000 $5.000 $4.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 19,010.000 $1.000 $0.090 $1.000 $1.000 $1.100 $0.500 $0.900
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 19,010.000 $0.900 $0.090 $1.000 $1.000 $1.100 $0.500 $0.900
VEGETATIVE WATERING
MG 844.900 $10.000 $0.010 $20.000 $50.000 $12.500 $40.000 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 8,000.000 $3.000 $1.300 $3.000 $1.500 $1.100 $6.500 $1.500
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 10,941.000 $22.000 $27.500 $25.000 $20.000 $26.000 $24.000 $33.000
CEMENT
TON 162.000 $150.000 $250.000 $200.000 $250.000 $325.000 $190.000 $250.000
CEMENT TREAT (SUBGRADE) (8")
SY 11,998.000 $3.000 $3.500 $4.000 $5.000 $3.000 $3.500 $5.000
PRIME COAT & BLOTTER (MC-30)
GAL 2,737.000 $5.250 $7.000 $7.000 $5.000 $5.500 $8.000 $10.000
ASPH (TIER I)
GAL 4,200.000 $3.000 $5.000 $7.000 $6.600 $5.000 $8.000 $7.000
AGGR (TY-B GR-4)
CY 99.990 $100.000 $110.000 $200.000 $187.000 $210.000 $200.000 $180.000
D-GR HMA TY-D SAC-A PG70-22
TON 2,030.000 $125.000 $150.000 $150.000 $150.000 $120.000 $140.000 $128.000
PLANE ASPH CONC PAV(0" TO 2")
SY 13,210.000 $3.500 $3.000 $2.000 $1.500 $2.000 $10.000 $4.000
CUT & RESTORING PAV
SY 586.000 $150.000 $99.000 $100.000 $85.000 $60.000 $200.000 $85.000
TRENCH EXCAVATION PROTECTION
LF 88.000 $3.000 $20.000 $10.000 $3.000 $22.000 $3.500 $50.000
CL A CONC (CURB OUTLET)(TY II)
EA 1.000 $1,200.000 $1,505.000 $3,500.000 $7,875.000 $3,000.000 $5,000.000 $1,500.000
RIPRAP (CONC)(4 IN)
CY 43.000 $400.000 $505.000 $500.000 $578.000 $575.000 $550.000 $500.000
CONC BOX CULV (6 FT X 3 FT)
LF 630.000 $400.000 $300.000 $650.000 $600.000 $585.000 $400.000 $600.000
RC PIPE (CL III)(18 IN)
LF 56.000 $55.000 $45.000 $40.000 $58.000 $50.000 $65.000 $50.000
RC PIPE (CL III)(24 IN)
LF 1,497.000 $70.000 $60.000 $60.000 $68.250 $66.000 $85.000 $60.000
WINGWALL (PW - 2) (HW=4 FT)
EA 4.000 $10,000.000 $18,700.000 $15,000.000 $12,075.000 $14,000.000 $5,200.000 $10,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $700.000 $800.000 $600.000 $1,155.000 $675.000 $650.000 $700.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 68.000 $910.000 $1,200.000 $900.000 $1,523.000 $1,000.000 $850.000 $900.000
REMOV STR (PIPE)
LF 1,709.000 $20.000 $12.000 $5.000 $11.000 $12.000 $30.000 $15.000
MOBILIZATION
LS 1.000 $246,969.500 $314,000.000 $200,000.000 $283,500.000 $225,000.000 $300,000.000 $335,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $2,500.000 $4,000.000 $3,000.000 $1,870.000 $8,500.000 $8,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 92.000 $27.500 $36.000 $50.000 $38.000 $40.000 $30.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 92.000 $8.000 $8.000 $10.000 $10.000 $14.000 $15.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,360.000 $2.250 $2.200 $3.500 $3.500 $2.500 $4.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,360.000 $1.000 $0.500 $1.000 $1.500 $0.450 $2.000 $1.250
CONC CURB & GUTTER (TY II)
LF 1,058.000 $40.000 $22.850 $30.000 $22.250 $32.000 $35.000 $38.000
DRIVEWAYS (CONC)
SY 2,931.000 $68.000 $57.500 $100.000 $89.250 $60.000 $65.000 $125.000
DRIVEWAYS (ACP)
SY 1,822.000 $45.000 $54.000 $60.000 $30.000 $60.000 $42.000 $100.000
TURNOUTS (ACP)
SY 82.000 $55.000 $50.000 $60.000 $39.000 $95.000 $42.000 $100.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 8.000 $215.000 $275.000 $300.000 $302.000 $300.000 $650.000 $350.000
CONDT (PVC) (SCH 40) (2")
LF 20.000 $8.000 $10.000 $10.000 $8.000 $11.000 $15.000 $50.000
ELEC CONDR (NO.6) BARE
LF 40.000 $1.400 $2.000 $2.000 $2.000 $4.000 $2.000 $5.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $550.000 $560.000 $600.000 $617.000 $650.000 $650.000 $600.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 13.000 $320.000 $354.000 $400.000 $389.000 $500.000 $650.000 $400.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $33.000 $80.450 $100.000 $89.000 $90.000 $100.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,922.000 $0.500 $0.150 $0.200 $1.000 $0.550 $0.500 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 9,922.000 $0.500 $0.150 $0.200 $1.000 $0.550 $0.500 $0.200
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 3,969.000 $1.750 $0.950 $1.000 $1.000 $1.500 $1.000 $1.200
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 205.000 $1.000 $1.100 $1.200 $1.100 $1.100 $8.000 $1.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 246.000 $15.000 $11.500 $12.500 $14.300 $14.500 $15.000 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $200.000 $200.000 $250.000 $204.330 $205.000 $250.000 $220.000
PREFAB PAV MRK TY C (W) (TPL ARROW)
EA 1.000 $450.000 $485.000 $500.000 $440.000 $440.000 $500.000 $535.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $300.000 $295.000 $300.000 $260.000 $260.000 $350.000 $325.000
REFL PAV MRKR TY I-C
EA 24.000 $3.500 $3.000 $3.000 $4.500 $4.400 $5.000 $3.350
REFL PAV MRKR TY II-A-A
EA 255.000 $3.500 $3.000 $3.000 $4.250 $4.200 $5.000 $3.350
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 40.000 $3.500 $3.500 $2.000 $3.250 $5.000 $2.000 $8.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $2,300.000 $3,000.000 $3,000.000 $3,015.000 $3,000.000 $5,000.000 $8,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $150.000 $57.000 $100.000 $105.000 $100.000 $120.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $11,075.000 $2,500.000 $12,500.000 $25,000.000 $1,500.000 $25,000.000
REFL PAV MRK WET(Y) 4" (BRK)
LF 2,450.000 $0.250 $0.350 $0.500 $1.000 $0.550 $0.500 $0.500
REFL PAV MRK WET(W) 4" (SLD)
LF 9,216.000 $0.250 $0.240 $0.250 $1.000 $0.550 $0.500 $0.300
REFL PAV MRK WET(Y) 4" (SLD)
LF 10,054.000 $0.250 $0.240 $0.250 $1.000 $0.550 $0.500 $0.300
Totals: $2,503,450.000 $2,668,802.199 $2,837,676.300 $2,880,625.000 $3,016,838.450 $3,252,239.000 $3,387,596.200