BOWIE FM 989 (1231-01-073)

Items: 76

County: BOWIE
Length: 2.0050 MILES
Highway: FM 989
District: ATLANTA
Control Number: 1231-01-073
DBE Goal: 0.0%
Project: C 1231-1-73
Guaranty: $52,000.00
Time: 69 WORKING DAYS
Engineer's Estimate: $2,583,732.90
Date: 10/02/2024 (1 year ago)
Contract Number: 10243211
Type: OV
Project ID: A00130848
Project Description: RESURFACE EXISTING 4-LANE HIGHWAY
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,583,732.90
1
$2,429,230.47
Over/Under Est: -5.98% -$154,502.43
$2,688,912.96
Over/Under Est: 4.07% $105,180.06
Amt Left: 10.69% $259,682.49
Over/Under Est: 4.09% $105,635.70
Amt Left: 10.71% $260,138.13
Delta: -0.02% -$455.64
Over/Under Est: 5.35% $138,270.40
Amt Left: 12.05% $292,772.83
Delta: -1.21% -$32,634.70
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 8.88% $215,715.67
O. TREVINO CONSTRUCTION, LLC 7.64% $185,593.21
BAHENA CONSTRUCTION CO., INC. 6.39% $155,227.83
DUSTROL, INC. 4.37% $106,157.37
WITHERS CONSTRUCTION, LLC 2.46% $59,759.07
J. H. ODEN CONTRACTING COMPANY 1.90% $46,155.38
SOUTHWEST ENVIRONMENT SERVICES LLC 0.89% $21,620.15
PANOLA SIGN & BARRICADE, INC. 0.57% $13,846.61
DUSTIN ALLEN, INC. 0.56% $13,603.69
Total: 33.66% $817,678.98

Bid Items & Bid Tabulations

76 Total 0 of 76
BOWIE  |  FM 989  |  ATLANTA  |  1231-01-073  |  10/02/2024  |  $2,583,732.90  |  C 1231-1-73  |  OV  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
TRUE ROADS, LLC
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 23.000 $3,200.000 $2,808.000 $3,000.000 $7,500.000 $8,000.000
REMOV CONC (MOWSTRIP)
LF 75.000 $17.000 $35.850 $55.000 $25.000 $30.000
REMOV CONC (CURB & GUTTER)
LF 30.000 $15.000 $32.400 $135.000 $40.000 $30.000
EMBANK (VEH)(OC)(TY C)
CY 160.000 $100.000 $210.480 $85.000 $50.000 $40.000
BACKFILL (TY B)
STA 98.000 $300.000 $174.280 $675.000 $600.000 $500.000
BLADING
STA 98.000 $350.000 $174.280 $100.000 $350.000 $300.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 65,127.000 $1.100 $0.110 $0.130 $0.150 $0.150
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 65,127.000 $1.100 $0.480 $0.550 $0.450 $0.500
VEGETATIVE WATERING
TGL 1,042.000 $30.000 $35.760 $14.000 $30.000 $12.000
SP MIXES SP-D SAC-A PG76-22
TON 5,539.000 $160.000 $190.470 $210.000 $176.000 $180.000
TACK COAT
GAL 7,552.000 $4.500 $6.010 $6.000 $5.000 $6.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,000.000 $94.000 $45.740 $115.000 $65.000 $55.000
PLANE ASPH CONC PAV (1.5")
SY 49,097.000 $4.000 $2.720 $1.750 $4.000 $4.000
PLANE ASPH CONC PAV (1" TO 2")
SY 2,254.000 $8.000 $2.720 $6.250 $7.000 $6.000
FULL - DEPTH REPAIR CPCD (14")
CY 78.000 $400.000 $1,934.280 $1,400.000 $800.000 $1,100.000
CUT & RESTORE ASPH PAVING
SY 40.000 $155.000 $135.000 $185.000 $260.000 $125.000
CEM STABIL BKFL
CY 15.000 $280.000 $324.000 $420.000 $375.000 $425.000
TRENCH EXCAVATION PROTECTION
LF 75.000 $15.000 $16.200 $42.000 $25.000 $40.000
CL C CONC (COLLAR)
EA 2.000 $1,300.000 $810.000 $2,600.000 $2,500.000 $1,500.000
RIPRAP (CONC)(4 IN)
CY 8.000 $622.000 $864.000 $1,250.000 $1,050.000 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 11.800 $725.000 $864.000 $775.000 $995.000 $850.000
ARMOR JOINT
LF 60.000 $150.000 $486.000 $150.000 $100.000 $100.000
RC PIPE (CL III)(18 IN)
LF 1,008.000 $85.000 $62.640 $70.000 $70.000 $75.000
RC PIPE (CL III)(24 IN)
LF 2.000 $105.000 $108.000 $300.000 $2,500.000 $150.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 1.000 $15,000.000 $12,960.000 $7,500.000 $12,000.000 $12,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 27.000 $1,050.000 $1,080.000 $1,000.000 $1,100.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,000.000 $1,944.000 $3,000.000 $1,800.000 $1,500.000
REMOV STR (SET)
EA 24.000 $500.000 $216.000 $650.000 $350.000 $400.000
REMOV STR (PIPE)
LF 20.000 $20.000 $16.200 $100.000 $90.000 $50.000
MOBILIZATION
LS 1.000 $220,000.000 $97,169.210 $250,000.000 $280,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $16,555.050 $7,500.000 $10,000.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $12,056.330 $20,000.000 $20,000.000 $25,000.000
TMA (STATIONARY)
DAY 55.000 $270.000 $451.200 $300.000 $200.000 $300.000
TMA (MOBILE OPERATION)
DAY 5.000 $300.000 $831.190 $300.000 $350.000 $500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 12.000 $44.000 $64.800 $75.000 $120.000 $70.000
ROCK FILTER DAMS (REMOVE)
LF 12.000 $14.000 $21.600 $25.000 $100.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $4.500 $4.320 $5.000 $5.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.400 $1.080 $1.250 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $11.500 $4.320 $5.000 $12.000 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.500 $1.080 $1.250 $4.000 $1.000
CONC CURB & GUTTER (TY II)
LF 30.000 $60.000 $81.000 $135.000 $275.000 $85.000
TURNOUTS (ACP)
SY 208.000 $87.000 $127.140 $110.000 $110.000 $150.000
TURNOUTS (SURF TREAT)
SY 505.000 $97.000 $125.770 $72.000 $110.000 $125.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $28.000 $34.560 $40.000 $32.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,650.000 $1,944.000 $2,250.000 $1,710.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $4.000 $10.800 $12.500 $3.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $380.000 $432.000 $500.000 $200.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,300.000 $4,644.000 $5,400.000 $3,750.000 $3,500.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 7.000 $690.000 $686.880 $690.000 $770.000 $700.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 16.000 $387.000 $340.200 $940.000 $380.000 $350.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 3.000 $393.000 $378.000 $1,050.000 $420.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $900.000 $722.520 $1,250.000 $800.000 $750.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 15.000 $700.000 $478.440 $1,250.000 $530.000 $500.000
REMOVE SM RD SN SUP&AM
EA 16.000 $200.000 $106.920 $94.000 $120.000 $120.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $50.000 $54.000 $62.000 $60.000 $55.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 18.000 $87.000 $162.000 $95.000 $150.000 $140.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 9,800.000 $0.500 $0.380 $0.440 $0.500 $0.400
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 8,440.000 $1.000 $0.380 $0.440 $0.500 $0.400
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 51,560.000 $1.000 $0.300 $0.350 $0.400 $0.320
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 19,550.000 $2.000 $1.400 $1.620 $1.750 $1.450
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 4,900.000 $1.300 $1.080 $1.250 $1.300 $1.100
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 21,980.000 $1.300 $1.080 $1.250 $1.300 $1.100
PRFB RUMBLE STRIP (BLK)(1 )(CENTERLINE)
LF 9,769.000 $7.000 $4.640 $5.500 $5.500 $4.750
PREFAB PM TY C (W)(8")(SLD)
LF 228.000 $5.500 $6.480 $7.500 $8.000 $7.000
PREFAB PM TY C (W)(24")(SLD)
LF 164.000 $16.500 $16.200 $18.750 $20.000 $16.500
PREFAB PM TY C (W)(ARROW)
EA 2.000 $250.000 $243.000 $280.000 $300.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $320.000 $324.000 $375.000 $400.000 $350.000
PREFAB PM TY C (W)(RR XING)
EA 4.000 $650.000 $675.000 $780.000 $800.000 $700.000
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 19,538.000 $7.000 $4.430 $5.000 $5.000 $4.500
REFL PAV MRKR TY I-C
EA 258.000 $6.000 $6.480 $7.500 $8.000 $7.000
REFL PAV MRKR TY II-A-A
EA 406.000 $6.000 $6.480 $7.500 $8.000 $7.000
ELIM EXT PM & MRKS (6")
LF 14,317.500 $1.000 $0.590 $0.700 $0.800 $0.600
ELIM EXT PM & MRKS (8")
LF 228.000 $5.000 $1.080 $1.250 $1.300 $1.100
ELIM EXT PM & MRKS (24")
LF 80.000 $100.000 $5.400 $6.250 $6.000 $5.500
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $100.000 $108.000 $125.000 $130.000 $110.000
PAV SURF PREP FOR MRK (BLAST CLN)(6")
LF 120.000 $1.000 $3.240 $3.750 $4.000 $3.300
Totals: $2,583,732.900 $2,429,230.475 $2,688,912.960 $2,689,368.600 $2,722,003.300