Bid Cobra

BOWIE FM 989 (1231-01-069)

Items: 31

County: BOWIE
Length: N/A
Highway: FM 989
District: ATLANTA
Control Number: 1231-01-069
DBE Goal: N/A
Project: F 2023(683)
Guaranty: N/A
Time: 33 WORKING DAYS
Engineer's Estimate: $1,574,414.20
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE EXISTING 4-LANE HIGHWAY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,574,414.20
1
$1,902,107.55
Over/Under Est: 20.81% $327,693.35
$1,927,584.75
Over/Under Est: 22.43% $353,170.55
Amt Left: 1.34% $25,477.20

Bid Items & Bid Tabulations

31 Total 0 of 31
BOWIE  |  FM 989  |  ATLANTA  |  1231-01-069  |  05/04/2023  |  $1,574,414.20  |  F 2023(683)  |  RESURF EXIST 4-LANE HWY  |  33 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 9.000 $3,500.000 $1,740.000 $12,500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 3.000 $1,500.000 $1,160.000 $2,500.000
BACKFILL (TY C)
STA 101.000 $450.000 $453.940 $200.000
BOND FBR MTRX SEED (PERM) (URBAN)(SAND)
SY 2,521.000 $2.250 $1.160 $1.000
VEGETATIVE WATERING
MG 108.400 $25.000 $125.500 $50.000
PLANE ASPH CONC PAV (1.5")
SY 51,672.000 $4.000 $3.310 $4.000
PLANE ASPH CONC PAV (1.5"-2")
SY 1,300.000 $10.000 $11.600 $5.000
MOBILIZATION
LS 1.000 $147,000.000 $76,084.300 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $10,000.000 $29,850.950 $8,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $500.000 $2,056.570 $1,100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,700.000 $0.850 $0.580 $0.750
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 21,553.000 $0.850 $0.580 $0.750
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 2,124.000 $2.500 $3.800 $0.750
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 4,860.000 $2.500 $3.800 $0.750
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 236.000 $20.000 $13.920 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $265.000 $232.000 $250.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $420.000 $377.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 7.000 $310.000 $272.600 $250.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $750.000 $777.200 $250.000
REFL PAV MRKR TY I-C
EA 204.000 $6.000 $4.640 $6.000
REFL PAV MRKR TY II-A-A
EA 364.000 $5.000 $4.640 $6.000
SP MIXES SP-D SAC-A PG76-22
TON 5,711.000 $160.000 $225.120 $210.000
TACK COAT
GAL 7,789.000 $5.800 $6.390 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,000.000 $3,329.530 $10,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $5.000 $14.500 $10.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 20,421.000 $0.600 $1.040 $1.000
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 4,700.000 $0.600 $1.160 $1.300
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 21,621.000 $0.500 $1.040 $1.000
REFL PAV MARK AWT (W) 8" (SLD) (100 MIL
LF 1,488.000 $1.200 $1.160 $2.000
TMA (STATIONARY)
DAY 57.000 $265.000 $484.140 $250.000
TMA (MOBILE OPERATION)
DAY 18.000 $230.000 $879.610 $550.000
Totals: $1,574,414.200 $1,902,107.550 $1,927,584.750