Show Job Controls
Bid Cobra

BOWIE SH 93 (0945-01-042)

Items: 51

County: BOWIE
Length: N/A
Highway: SH 93
District: ATLANTA
Control Number: 0945-01-042
DBE Goal: N/A
Project: STP 2020(064)
Guaranty: N/A
Time: 268 WORKING DAYS
Engineer's Estimate: $1,622,468.53
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: PED
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,622,468.53
$1,637,145.40
Over/Under Est: 0.9% $14,676.87
$1,732,104.18
Over/Under Est: 6.76% $109,635.65
Amt Left: 5.8% $94,958.78
Over/Under Est: 24.48% $397,151.39
Amt Left: 23.36% $382,474.52
Delta: -16.60% -$287,515.74
$2,044,475.40
Over/Under Est: 26.01% $422,006.87
Amt Left: 24.88% $407,330.00
Delta: -1.23% -$24,855.48
$2,094,188.00
Over/Under Est: 29.07% $471,719.47
Amt Left: 27.92% $457,042.60
Delta: -2.43% -$49,712.60

Bid Items & Bid Tabulations

51 Total 0 of 51
BOWIE  |  SH 93  |  ATLANTA  |  0945-01-042  |  12/04/2019  |  $1,622,468.53  |  STP 2020(064)  |  PED  |  268 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J.R. POPE COMPANY, INC.
TI-ZACK CONCRETE, INC.
EAST TEXAS BRIDGE, INC.
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
REMOVING CONC (DRIVEWAYS)
SY 2,653.000 $20.000 $20.000 $20.000 $15.000 $20.000 $20.000
REMOVING CONC (CTB)
LF 120.000 $9.800 $50.000 $15.000 $40.000 $20.000 $100.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 2,792.000 $20.000 $10.000 $10.000 $9.000 $20.000 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 98.000 $11.200 $20.000 $25.000 $15.000 $20.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 186.000 $9.300 $38.000 $45.000 $40.000 $50.000 $35.000
FURNISHING AND PLACING TOPSOIL (4")
SY 8,380.000 $1.100 $5.000 $4.000 $3.000 $5.000 $6.000
BLOCK SODDING
SY 8,380.000 $5.000 $5.000 $4.500 $5.000 $5.000 $6.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 8,380.000 $0.600 $1.000 $1.000 $0.750 $0.750 $2.000
VEGETATIVE WATERING
MG 134.540 $27.240 $50.000 $40.000 $18.000 $10.000 $50.000
RETAINING WALL (CAST - IN - PLACE)
SF 838.000 $66.250 $50.000 $47.000 $85.000 $120.000 $85.000
RIPRAP (CONC)(4 IN)
CY 8.000 $405.400 $800.000 $900.000 $550.000 $500.000 $550.000
RIPRAP (CONC)(6 IN)
CY 4.000 $554.950 $800.000 $900.000 $550.000 $600.000 $650.000
RAIL (TY C221)
LF 449.000 $62.790 $157.000 $145.000 $200.000 $150.000 $185.000
RAIL (HANDRAIL)(TY B)
LF 60.000 $122.800 $96.000 $115.000 $120.000 $150.000 $185.000
MOBILIZATION
LS 1.000 $142,000.000 $150,000.000 $144,000.000 $180,000.000 $160,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $2,500.000 $3,000.000 $1,500.000 $6,000.000 $8,000.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,806.000 $3.850 $2.000 $0.010 $3.200 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,806.000 $2.240 $0.600 $0.010 $1.500 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,798.000 $4.800 $5.400 $0.010 $7.000 $5.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,798.000 $1.330 $1.500 $0.010 $2.500 $1.000 $12.000
CONC CURB (TY II)
LF 357.000 $17.000 $10.000 $35.000 $20.000 $20.000 $30.000
CONC CURB & GUTTER (TY II)
LF 1,815.000 $30.000 $30.000 $39.000 $40.000 $30.000 $35.000
DRIVEWAYS (CONC)
SY 2,804.000 $95.000 $75.000 $91.000 $100.000 $100.000 $85.000
CONC SIDEWALKS (6")
SY 7,704.000 $66.570 $66.000 $91.000 $80.000 $80.000 $65.000
CURB RAMPS (TY 1)
EA 7.000 $1,439.850 $1,500.000 $1,400.000 $2,500.000 $1,500.000 $2,000.000
CURB RAMPS (TY 3)
EA 8.000 $1,925.950 $1,800.000 $1,400.000 $2,500.000 $1,800.000 $2,000.000
CURB RAMPS (TY 6)
EA 16.000 $2,113.500 $1,800.000 $1,400.000 $2,500.000 $2,500.000 $2,000.000
CURB RAMPS (TY 7)
EA 19.000 $1,510.700 $1,500.000 $1,400.000 $2,500.000 $1,800.000 $2,000.000
CURB RAMPS (TY 10)
EA 7.000 $1,848.950 $1,500.000 $1,400.000 $2,500.000 $1,800.000 $2,000.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 34.000 $190.490 $150.000 $225.000 $500.000 $160.000 $75.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 445.000 $107.170 $80.000 $200.000 $160.000 $180.000 $85.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $2.900 $10.000 $11.000 $4.000 $4.000 $3.000
GROUND BOX TY D (162922)
EA 2.000 $990.900 $900.000 $450.000 $1,000.000 $800.000 $850.000
REMOVE GROUND BOX
EA 2.000 $158.950 $300.000 $50.000 $500.000 $300.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $539.000 $700.000 $350.000 $1,000.000 $500.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,081.560 $870.000 $350.000 $1,000.000 $750.000 $650.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 9.000 $585.600 $510.000 $350.000 $700.000 $500.000 $650.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 14.000 $493.870 $780.000 $350.000 $700.000 $500.000 $450.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $497.680 $900.000 $350.000 $700.000 $500.000 $450.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 2.000 $377.500 $540.000 $350.000 $700.000 $500.000 $450.000
REMOVE SM RD SN SUP&AM
EA 25.000 $96.300 $120.000 $100.000 $275.000 $100.000 $150.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,014.000 $5.900 $14.400 $9.000 $16.500 $7.000 $20.000
PAVEMENT SEALER 24"
LF 1,014.000 $1.910 $3.600 $1.000 $2.500 $4.000 $20.000
ELIM EXT PAV MRK & MRKS (4")
LF 186.000 $1.000 $3.600 $1.000 $5.000 $1.000 $2.000
ELIM EXT PAV MRK & MRKS (8")
LF 601.000 $1.520 $6.000 $1.500 $9.000 $5.000 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 938.000 $4.300 $7.200 $1.500 $12.000 $5.000 $6.000
PAV SURF PREP FOR MRK (24")
LF 1,014.000 $2.200 $3.600 $0.500 $2.500 $2.000 $6.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 14.000 $65.900 $150.000 $50.000 $115.000 $100.000 $500.000
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 14.000 $300.000 $900.000 $250.000 $275.000 $900.000 $1,850.000
TMA (STATIONARY)
DAY 350.000 $210.000 $250.000 $25.000 $175.000 $250.000 $350.000
TMA (MOBILE OPERATION)
DAY 14.000 $32.500 $250.000 $25.000 $100.000 $250.000 $850.000
Totals: $1,622,468.530 $1,637,145.400 $1,732,104.180 $2,019,619.920 $2,044,475.400 $2,094,188.000