BOWIE US 59 (0218-01-108)

Items: 40

County: BOWIE
Length: 2.1900 MILES
Highway: US 59
District: ATLANTA
Control Number: 0218-01-108
DBE Goal: 0.0%
Project: C 218-1-108
Guaranty: $60,000.00
Time: 69 WORKING DAYS
Engineer's Estimate: $3,000,439.61
Date: 01/08/2025 (1 year ago)
Contract Number: 1253219
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00207978
Project Description: PERFORM SURFACE RESTORATION TO EXISTING 4-LANE HIGHWAY
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,000,439.61
$2,402,680.34
Over/Under Est: -19.92% -$597,759.27
Over/Under Est: -18.72% -$561,804.41
Amt Left: 1.5% $35,954.86
$3,234,347.82
Over/Under Est: 7.8% $233,908.21
Amt Left: 34.61% $831,667.48
Delta: -32.63% -$795,712.62
Over/Under Est: 32.17% $965,324.39
Amt Left: 65.06% $1,563,083.66
Delta: -22.61% -$731,416.18
Subcontractor Percentage Amount
CATOCON, INC. 6.08% $147,993.24
STRIPE-A-ZONE, LLC 3.83% $93,226.01
SOUTHWEST ENVIRONMENT SERVICES LLC 1.44% $35,051.03
PROFESSIONAL TRAFFIC CONTROL LLC 0.37% $9,006.17
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.33% $8,032.53
Total: 12.05% $293,308.98

Bid Items & Bid Tabulations

40 Total 0 of 40
BOWIE  |  US 59  |  ATLANTA  |  0218-01-108  |  01/08/2025  |  $3,000,439.61  |  C 218-1-108  |  SURF/ROADWAY RESTOR  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
O. TREVINO CONSTRUCTION, LLC
WINDING ROAD CONSTRUCTION, INC.
STX CIVIL
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
PREPARING ROW
STA 38.000 $5,500.000 $3,100.000 $2,760.000 $4,025.000 $11,000.000
REMOV CONC (MOWSTRIP)
LF 400.000 $30.000 $26.000 $25.000 $40.250 $200.000
EMBANK (VEH)(OC)(TY A)
CY 35.000 $95.000 $91.000 $250.000 $287.500 $200.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 667.000 $0.500 $3.000 $10.000 $0.600 $3.000
FULL DEPTH CONCRETE REPAIR CPCD (12")
SY 5,681.000 $375.000 $295.000 $274.000 $397.000 $450.000
FLOWABLE BACKFILL
CY 10.000 $300.000 $440.000 $1,000.000 $2,415.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 34.000 $740.000 $670.000 $1,000.000 $715.000 $1,000.000
MOBILIZATION
LS 1.000 $270,000.000 $240,000.000 $210,000.000 $230,000.000 $390,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,000.000 $5,000.000 $15,000.000 $8,625.000 $4,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $25,000.000 $5,000.000 $25,000.000 $17,250.000 $5,000.000
TMA (STATIONARY)
DAY 65.000 $250.000 $500.000 $1,500.000 $402.500 $350.000
TMA (MOBILE OPERATION)
DAY 14.000 $300.000 $500.000 $500.000 $517.500 $350.000
MILL RUMBLE STRIPS (CONC) (SHLDR)
LF 500.000 $0.500 $20.000 $20.000 $0.800 $20.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $25.500 $32.000 $30.000 $37.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,800.000 $2,680.000 $3,000.000 $2,702.500 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $4.000 $1.600 $5.000 $6.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,750.000 $4,000.000 $4,200.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $225.000 $530.000 $500.000 $402.500 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $975.000 $925.000 $825.000 $977.500 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $1,100.000 $1,100.000 $1,000.000 $1,202.900 $1,200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 20.000 $500.000 $490.000 $605.000 $585.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $550.000 $570.000 $1,000.000 $819.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 42.000 $120.000 $105.000 $85.000 $133.500 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $50.000 $32.000 $100.000 $56.000 $50.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 600.000 $2.000 $1.100 $1.250 $2.750 $2.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,821.000 $1.250 $1.840 $2.000 $4.550 $3.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 23,281.000 $0.950 $0.740 $1.000 $0.850 $2.000
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 5,821.000 $1.250 $0.740 $2.000 $1.070 $2.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 25,559.000 $0.900 $0.740 $1.000 $0.950 $2.000
PREFAB PM TY C (W)(24")(SLD)
LF 108.000 $16.500 $14.000 $20.000 $21.000 $20.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 60.000 $105.000 $53.000 $60.000 $56.500 $75.000
REFL PAV MRKR TY I-C
EA 36.000 $5.000 $6.600 $10.000 $6.500 $10.000
REFL PAV MRKR TY II-A-A
EA 44.000 $5.500 $6.600 $10.000 $5.850 $10.000
REFL PAV MRKR TY II-C-R
EA 286.000 $5.500 $6.600 $10.000 $8.850 $10.000
ELIM EXT PM & MRKS (6")
LF 60,482.000 $0.580 $0.580 $0.700 $1.750 $1.000
ELIM EXT PM & MRKS (8")
LF 600.000 $1.000 $1.050 $2.000 $1.950 $2.000
ELIM EXT PM & MRKS (24")
LF 108.000 $5.000 $2.650 $10.000 $6.500 $3.000
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 60.000 $50.000 $3.300 $35.000 $30.500 $4.000
PAV SURF PREP FOR MRK (6")
LF 58,424.000 $0.500 $0.050 $0.200 $0.600 $0.500
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 284.000 $200.000 $315.000 $250.000 $417.000 $350.000
Totals: $3,000,439.610 $2,402,680.340 $2,438,635.200 $3,234,347.820 $3,965,764.000