BOWIE US 59 (0218-01-095)

Items: 23

County: BOWIE
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0218-01-095
DBE Goal: N/A
Project: STP 2018(352)HES
Guaranty: N/A
Time: 72 WORKING DAYS
Engineer's Estimate: $184,240.41
Date: 12/05/2017 (8 years ago)
Contract Number: N/A
Type: SIGNALS & SAFETY LIGHTING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$184,240.41
$175,785.35
Over/Under Est: -4.59% -$8,455.06
Over/Under Est: 9.16% $16,874.59
Amt Left: 14.41% $25,329.65
Over/Under Est: 12.98% $23,923.34
Amt Left: 18.42% $32,378.40
Delta: -3.50% -$7,048.75
Over/Under Est: 25.24% $46,510.90
Amt Left: 31.27% $54,965.96
Delta: -10.85% -$22,587.56
Over/Under Est: 33.5% $61,712.23
Amt Left: 39.92% $70,167.29
Delta: -6.59% -$15,201.33

Bid Items & Bid Tabulations

23 Total 0 of 23
BOWIE  |  US 59  |  ATLANTA  |  0218-01-095  |  12/05/2017  |  $184,240.41  |  STP 2018(352)HES  |  SIG & SAFETY LIGHTING  |  72 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SOUTH TEXAS ILLUMINATION, LLC
STRIPING TECHNOLOGY, L.P.
TEXAS TRAFFIC CONTROL SYSTEMS, INC.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
AMERICAN LIGHTING AND SIGNALIZATION, LLC
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 170.000 $210.000 $150.000 $155.000 $175.000 $166.830 $275.640
RIPRAP (CONC)(CL B)
CY 6.000 $385.000 $348.000 $900.000 $950.000 $864.350 $1,654.080
MOBILIZATION
LS 1.000 $12,053.110 $17,500.000 $10,000.000 $20,000.000 $22,349.640 $29,741.530
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $2,000.000 $3,000.000 $2,000.000 $2,500.000 $3,897.000 $3,414.350
REPLACE LUMINAIRE W/LED (250W EQ)
EA 4.000 $500.000 $1,270.000 $750.000 $800.000 $873.700 $612.950
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 17.000 $3,270.000 $3,000.000 $3,800.000 $3,000.000 $2,925.150 $2,545.960
CONDT (PVC) (SCH 40) (2")
LF 1,810.000 $5.300 $5.000 $5.200 $6.500 $12.230 $9.120
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,335.000 $14.000 $10.550 $21.000 $21.000 $28.660 $21.710
ELEC CONDR (NO.6) BARE
LF 3,335.000 $1.560 $1.180 $1.400 $1.250 $1.270 $1.300
ELEC CONDR (NO.6) INSULATED
LF 7,410.000 $1.670 $1.180 $2.500 $1.500 $1.390 $1.480
GROUND BOX TY A (122311)W/APRON
EA 2.000 $760.000 $690.000 $700.000 $750.000 $914.950 $1,172.430
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
EA 1.000 $5,706.000 $5,150.000 $5,500.000 $6,000.000 $5,880.950 $7,349.650
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 64.000 $22.000 $21.000 $36.000 $50.000 $31.820 $40.760
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $425.000 $885.000 $700.000 $1,000.000 $634.280 $609.270
PREFAB PAV MRK TY C (W) (NUMBER)
EA 4.000 $170.000 $230.000 $175.000 $205.000 $221.090 $253.580
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $250.000 $395.000 $300.000 $355.000 $331.090 $427.130
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $43.000 $120.000 $50.000 $200.000 $115.430 $132.830
PAV SURF PREP FOR MRK (NUMBER)
EA 4.000 $3.000 $120.000 $50.000 $200.000 $10.860 $132.830
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $23.000 $120.000 $50.000 $200.000 $10.860 $133.880
VEH SIG SEC (12")LED(YEL)
EA 4.000 $234.000 $245.000 $250.000 $210.000 $235.100 $248.690
BACK PLATE (12")(1 SEC)
EA 4.000 $80.000 $110.000 $55.000 $85.000 $136.200 $82.800
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 400.000 $13.000 $18.000 $13.000 $22.000 $20.340 $35.930
TMA (STATIONARY)
DAY 15.000 $229.000 $120.000 $100.000 $200.000 $384.300 $224.250
Totals: $184,240.410 $175,785.350 $201,115.000 $208,163.750 $230,751.310 $245,952.640