PREPARING ROW
|
STA
|
324.000
|
$3,092.000
|
$1,000.000
|
$1,875.000
|
$1,636.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
210.000
|
$25.000
|
$14.000
|
$20.000
|
$23.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
380.000
|
$13.060
|
$8.000
|
$6.500
|
$12.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
320.000
|
$10.000
|
$15.000
|
$10.350
|
$15.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
728.000
|
$7.280
|
$5.000
|
$4.000
|
$0.010
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,540.000
|
$18.790
|
$18.000
|
$15.000
|
$16.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
13,748.000
|
$32.000
|
$18.000
|
$23.000
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
558.000
|
$15.000
|
$30.000
|
$30.000
|
$38.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
310.000
|
$24.000
|
$30.000
|
$35.000
|
$38.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
231,886.000
|
$2.000
|
$0.250
|
$0.250
|
$0.010
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
231,886.000
|
$0.250
|
$0.170
|
$0.150
|
$0.240
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
115,942.000
|
$0.210
|
$0.120
|
$0.100
|
$0.180
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
115,942.000
|
$0.180
|
$0.120
|
$0.100
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
1,887.000
|
$33.780
|
$20.000
|
$1.000
|
$0.010
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
11,877.000
|
$1.640
|
$2.000
|
$1.250
|
$1.400
|
|
|
PROOF ROLLING
|
HR
|
24.500
|
$148.780
|
$75.000
|
$65.000
|
$145.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
18,341.000
|
$55.960
|
$60.000
|
$62.000
|
$80.000
|
|
|
FL BS (RDWY DEL)(TY D GR 3)(FINAL POS)
|
CY
|
12,774.000
|
$45.000
|
$55.000
|
$44.000
|
$38.000
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
SY
|
54,983.000
|
$1.220
|
$1.500
|
$1.000
|
$1.500
|
|
|
REWORK BS MTL (TY C)(4")(ORD COMP)
|
SY
|
45,544.000
|
$1.200
|
$1.250
|
$1.000
|
$1.400
|
|
|
CEMENT
|
TON
|
1,417.000
|
$230.000
|
$250.000
|
$230.000
|
$250.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
116,988.000
|
$4.450
|
$3.500
|
$2.500
|
$3.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
56,743.000
|
$3.000
|
$3.500
|
$0.010
|
$4.150
|
|
|
ASPH (CRS-2)
|
GAL
|
49,474.000
|
$4.160
|
$3.500
|
$3.850
|
$4.000
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
814.000
|
$155.000
|
$110.000
|
$140.000
|
$140.350
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,348.000
|
$8.330
|
$5.000
|
$5.500
|
$4.300
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
1,800.000
|
$8.330
|
$5.000
|
$5.750
|
$6.600
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
36.000
|
$25.900
|
$125.000
|
$105.000
|
$60.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,908.400
|
$216.000
|
$150.000
|
$225.000
|
$279.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
202.000
|
$20.490
|
$10.000
|
$7.750
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,286.000
|
$45.510
|
$40.000
|
$33.000
|
$32.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
400.000
|
$283.750
|
$250.000
|
$302.000
|
$230.000
|
|
|
CL B CONC (FLUME)
|
CY
|
2.000
|
$1,228.000
|
$1,200.000
|
$1,830.000
|
$3,000.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
27.600
|
$1,725.000
|
$2,500.000
|
$2,155.000
|
$1,600.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
22.100
|
$3,012.000
|
$2,500.000
|
$2,020.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
14.600
|
$2,030.000
|
$1,800.000
|
$1,725.000
|
$1,800.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
5,175.000
|
$20.000
|
$35.000
|
$25.000
|
$24.000
|
|
|
APPROACH SLAB
|
CY
|
69.000
|
$650.000
|
$1,000.000
|
$740.000
|
$700.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
681.120
|
$284.300
|
$200.000
|
$245.000
|
$200.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
454.080
|
$307.900
|
$200.000
|
$245.000
|
$220.000
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
23.000
|
$2,250.000
|
$600.000
|
$750.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
409.000
|
$182.000
|
$135.000
|
$230.000
|
$175.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
703.000
|
$182.000
|
$150.000
|
$135.000
|
$130.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.000
|
$647.600
|
$600.000
|
$650.000
|
$535.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
36.000
|
$126.500
|
$150.000
|
$105.000
|
$90.000
|
|
|
RAIL (TY SSTR)
|
LF
|
254.000
|
$65.000
|
$150.000
|
$180.000
|
$170.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
149.670
|
$437.500
|
$220.000
|
$340.000
|
$350.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
82.000
|
$223.900
|
$150.000
|
$150.000
|
$120.000
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
301.000
|
$122.440
|
$160.000
|
$233.000
|
$215.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
54.000
|
$277.500
|
$550.000
|
$317.000
|
$375.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
96.000
|
$375.000
|
$280.000
|
$328.000
|
$260.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
366.000
|
$437.000
|
$325.000
|
$394.000
|
$310.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
96.000
|
$577.000
|
$425.000
|
$501.000
|
$430.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
46.000
|
$400.000
|
$475.000
|
$617.000
|
$485.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
48.000
|
$551.000
|
$550.000
|
$679.000
|
$540.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
116.000
|
$958.000
|
$700.000
|
$838.000
|
$726.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)
|
LF
|
62.000
|
$1,514.000
|
$1,250.000
|
$1,865.000
|
$1,620.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
32.750
|
$1,688.000
|
$1,100.000
|
$977.000
|
$775.000
|
|
|
CONC BOX CULV (7.5 FT X 4 FT)(EXTEND)
|
LF
|
8.000
|
$1,800.000
|
$2,000.000
|
$1,034.000
|
$975.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
792.000
|
$99.000
|
$70.000
|
$91.000
|
$58.000
|
|
|
RC PIPE (CL III)(21 IN)
|
LF
|
48.000
|
$110.000
|
$80.000
|
$107.000
|
$69.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
252.000
|
$125.000
|
$95.000
|
$97.000
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
88.000
|
$155.000
|
$180.000
|
$137.000
|
$115.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
44.000
|
$222.000
|
$225.000
|
$246.000
|
$155.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$13,750.000
|
$11,500.000
|
$9,600.000
|
$9,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$17,307.000
|
$20,000.000
|
$16,700.000
|
$16,200.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$46,140.000
|
$32,000.000
|
$26,000.000
|
$26,565.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
4.000
|
$13,305.000
|
$7,300.000
|
$8,300.000
|
$2,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
4.000
|
$11,790.000
|
$7,800.000
|
$9,400.000
|
$2,200.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$7,727.000
|
$8,000.000
|
$9,500.000
|
$2,600.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
6.000
|
$12,000.000
|
$5,300.000
|
$8,800.000
|
$3,400.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$13,418.000
|
$8,100.000
|
$9,600.000
|
$3,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$18,778.000
|
$8,200.000
|
$10,900.000
|
$3,690.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$16,841.250
|
$10,500.000
|
$12,400.000
|
$5,175.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$24,300.000
|
$10,600.000
|
$12,400.000
|
$5,800.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 8 FT)(3:1) (C)
|
EA
|
2.000
|
$37,500.000
|
$12,500.000
|
$12,400.000
|
$18,850.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$13,425.000
|
$8,900.000
|
$12,400.000
|
$4,550.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$1,428.000
|
$1,050.000
|
$1,225.000
|
$1,070.000
|
|
|
SET (TY II) (21 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,700.000
|
$1,100.000
|
$1,225.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
18.000
|
$1,863.000
|
$1,425.000
|
$1,500.000
|
$1,325.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,000.000
|
$2,300.000
|
$2,400.000
|
$2,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,300.000
|
$2,500.000
|
$2,350.000
|
$2,150.000
|
|
|
SET (TY I)(S=7.5 FT)(HW=6 FT)(3:1) (C)
|
EA
|
2.000
|
$24,250.000
|
$13,200.000
|
$14,400.000
|
$7,580.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,364.360
|
$2,500.000
|
$3,500.000
|
$1,900.000
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$397.370
|
$1,500.000
|
$1,400.000
|
$250.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,475.000
|
$10.890
|
$17.000
|
$11.000
|
$9.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
122.000
|
$87.090
|
$80.000
|
$140.000
|
$60.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$48,000.000
|
$60,000.000
|
$75,000.000
|
$70,000.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
28.000
|
$60.000
|
$250.000
|
$200.000
|
$250.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,287,000.000
|
$1,000,000.000
|
$1,139,000.000
|
$1,240,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$7,240.000
|
$2,000.000
|
$19,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,708.000
|
$43.500
|
$35.000
|
$49.000
|
$48.950
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,708.000
|
$9.260
|
$6.000
|
$16.000
|
$15.950
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
22,624.000
|
$4.690
|
$3.000
|
$5.250
|
$4.110
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
22,624.000
|
$1.710
|
$0.750
|
$0.880
|
$0.880
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,058.000
|
$97.430
|
$100.000
|
$90.000
|
$90.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$6,500.000
|
$3,500.000
|
$5,500.000
|
$6,500.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
990.000
|
$16.350
|
$17.500
|
$20.000
|
$13.900
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,950.000
|
$7.060
|
$10.500
|
$16.000
|
$22.350
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
990.000
|
$14.570
|
$17.000
|
$16.000
|
$13.400
|
|
|
PORT CTB (FUR&INST)(F-SHAPE)(TY1)(MOD)
|
LF
|
120.000
|
$97.500
|
$200.000
|
$155.000
|
$160.400
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY1)(MOD)
|
LF
|
120.000
|
$14.570
|
$35.000
|
$22.000
|
$25.100
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
379.000
|
$31.250
|
$45.000
|
$39.000
|
$49.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
210.000
|
$125.000
|
$90.000
|
$125.000
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,904.000
|
$56.330
|
$25.000
|
$40.000
|
$69.000
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
2,483.000
|
$69.000
|
$40.000
|
$46.000
|
$69.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
63,697.000
|
$0.300
|
$0.220
|
$0.280
|
$0.160
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
31,789.000
|
$0.330
|
$0.220
|
$0.280
|
$0.200
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$48.830
|
$40.000
|
$35.000
|
$27.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$4,022.450
|
$3,000.000
|
$3,150.000
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
985.000
|
$2.670
|
$5.000
|
$4.400
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$560.000
|
$500.000
|
$167.000
|
$150.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$300.000
|
$277.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$4,638.000
|
$3,500.000
|
$3,225.000
|
$3,025.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
12.000
|
$2,805.000
|
$3,500.000
|
$2,700.000
|
$4,200.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
4.000
|
$2,958.750
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
4.000
|
$41,871.190
|
$35,000.000
|
$24,000.000
|
$25,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
30.000
|
$328.000
|
$300.000
|
$270.000
|
$250.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
5.000
|
$980.250
|
$1,000.000
|
$650.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
78.000
|
$1,201.250
|
$750.000
|
$550.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$1,365.340
|
$900.000
|
$650.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,983.750
|
$1,000.000
|
$875.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
87.000
|
$180.000
|
$150.000
|
$160.000
|
$150.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
10.000
|
$240.000
|
$500.000
|
$300.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$39.870
|
$60.000
|
$55.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
64.000
|
$133.000
|
$100.000
|
$160.000
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
62,361.000
|
$0.130
|
$0.250
|
$0.220
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
75,346.000
|
$0.150
|
$0.250
|
$0.670
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
288.000
|
$5.000
|
$8.000
|
$11.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,820.000
|
$0.260
|
$2.000
|
$1.940
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
144.000
|
$13.490
|
$12.000
|
$13.330
|
$12.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,460.000
|
$1.050
|
$1.500
|
$1.500
|
$1.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
162.000
|
$13.040
|
$15.000
|
$22.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
63,697.000
|
$0.490
|
$0.550
|
$0.470
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,445.000
|
$0.490
|
$0.750
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
51,337.000
|
$0.460
|
$0.550
|
$0.480
|
$0.430
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
780.000
|
$4.030
|
$7.000
|
$7.780
|
$7.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$3,590.180
|
$3,800.000
|
$3,100.000
|
$8,000.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
12,065.000
|
$120.000
|
$100.000
|
$118.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$3,011.210
|
$10,000.000
|
$10,000.000
|
$16,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
293.000
|
$307.990
|
$250.000
|
$50.000
|
$280.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
231.000
|
$64.900
|
$75.000
|
$25.000
|
$40.000
|
|
Totals: |
$13,280,169.753
|
$10,387,524.220
|
$11,397,446.940
|
$12,448,818.850
|