BOSQUE FM 219 (0724-02-024)

Items: 178

County: BOSQUE
Length: 9.7420 MILES
Highway: FM 219
District: WACO
Control Number: 0724-02-024
DBE Goal: 0.0%
Project: BR 2026(416)
Guaranty: $100,000.00
Time: 270 WORKING DAYS
Engineer's Estimate: $17,109,784.81
Date: 03/04/2026 (3 months ago)
Contract Number: 3263006
Type: REPLACE BRIDGE AND APPROACHES
Project ID: A00002148
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOSH VOILES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$17,109,784.81
$14,455,828.76
Over/Under Est: -15.51% -$2,653,956.05
Over/Under Est: -11.71% -$2,002,873.39
Amt Left: 4.5% $651,082.66
Over/Under Est: -10.65% -$1,821,951.76
Amt Left: 5.76% $832,004.29
Delta: -1.20% -$180,921.63
Over/Under Est: 19.12% $3,271,617.43
Amt Left: 40.99% $5,925,573.48
Delta: -33.32% -$5,093,569.19

Bid Items & Bid Tabulations

178 Total 0 of 178
BOSQUE  |  FM 219  |  WACO  |  0724-02-024  |  03/04/2026  |  $17,109,784.81  |  BR 2026(416)  |  REPLACE BRIDGE AND APPROACHES  |  270 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
JAY MILLS CONTRACTING, INCORPORATED
PREPARING ROW
STA 489.500 $800.000 $320.000 $400.000 $1,000.000 $650.000
REMOV CONC (MOWSTRIP)
LF 1,175.000 $12.000 $8.750 $12.300 $14.000 $9.000
REMOV CONC (RIPRAP)
SY 40.000 $25.000 $20.000 $21.000 $29.000 $18.000
REMOV CONC (DRIVEWAYS)
SY 1,138.000 $22.000 $17.000 $31.180 $15.000 $21.000
REMOV CONC (CURB RAMP)
SY 24.000 $20.000 $40.000 $35.000 $55.000 $21.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 597.000 $11.000 $11.000 $24.000 $15.000 $18.000
REMOV CONC (MISC)
SY 437.000 $30.000 $11.000 $43.000 $26.000 $30.000
RMV (0"-10") TRT/UNTRT BASE & ASPH PAV
SY 109.000 $6.500 $16.000 $6.950 $20.000 $25.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 10,395.000 $15.000 $2.900 $9.190 $5.000 $9.000
OBLITERATING ABANDONED ROAD
SY 660.000 $7.500 $2.950 $0.010 $10.000 $18.000
EXCAV (ROADWAY)
CY 36,610.000 $15.000 $9.750 $7.900 $12.000 $15.000
EXCAV (CHANNEL)
CY 659.000 $50.000 $12.000 $41.000 $25.000 $30.000
EMBANK (FNL)(OC)(TY B)
CY 38,972.000 $15.000 $9.750 $7.050 $15.000 $15.000
FURN & PLACE TOPSOIL (4")
SY 366,426.000 $0.750 $0.590 $0.270 $0.500 $3.800
BROADCAST SEED (PERM_RURAL_CLAY)
SY 392.000 $1.500 $0.200 $5.350 $6.000 $1.100
BROADCAST SEED (TEMP_WARM_COOL)
SY 392.000 $1.000 $0.160 $4.350 $5.000 $1.100
DRILL SEED (PERM_RURAL_CLAY)
SY 366,426.000 $0.230 $0.140 $0.140 $0.160 $0.190
DRILL SEED (TEMP_WARM_COOL)
SY 366,426.000 $0.190 $0.110 $0.090 $0.110 $0.190
VEGETATIVE WATERING
TGL 5,957.000 $0.230 $1.000 $6.000 $10.000 $21.000
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
SY 12,895.000 $1.500 $3.500 $1.500 $1.800 $2.200
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 30,673.000 $65.000 $55.000 $56.000 $70.000 $80.300
FL BS (RDWY DEL) (TY D GR 3)
TON 41,404.000 $32.500 $26.000 $25.000 $30.000 $29.500
REWORK BS MTL (TY C)(6")(ORD COMP)
SY 114,362.000 $1.500 $1.500 $1.000 $1.100 $3.750
CEMENT
TON 1,133.000 $250.000 $219.000 $222.000 $215.000 $242.000
CEMENT TRT (EXIST MATL & NEW BASE)(6")
SY 188,890.000 $2.750 $1.500 $2.500 $2.300 $4.100
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 214,277.000 $3.500 $1.000 $3.500 $2.620 $3.050
FOG SEAL (CSS-1H)
GAL 17,857.000 $5.000 $2.750 $4.600 $5.000 $5.060
ASPH (CRS-2)
GAL 106,848.000 $3.500 $2.950 $3.300 $2.750 $3.650
AGGR (TY-D OR L, GR-4)
CY 1,319.000 $180.000 $160.000 $125.000 $95.000 $137.500
SP MIXES SP-C SAC-B PG70-22
TON 20,533.000 $98.000 $117.000 $138.000 $84.000 $143.000
SP MIXES SP-C SAC-B PG76-22 (EXEMPT)
TON 1,096.000 $102.000 $143.000 $160.000 $102.000 $167.200
TACK COAT
GAL 18,761.000 $4.000 $1.500 $2.650 $3.000 $2.950
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,466.000 $90.000 $78.000 $89.000 $70.000 $93.500
PLANE & TEXT ASPH CONC PAV(0" TO 3")
SY 9,532.000 $4.000 $2.400 $1.990 $2.500 $1.800
FULL - DEPTH REPAIR CPCD (6")
CY 71.000 $1,500.000 $1,250.000 $260.000 $1,100.000 $500.000
CUT & RESTORE ASPH PAVING
SY 296.000 $275.000 $180.000 $150.000 $90.000 $200.000
CEM STABIL BKFL
CY 742.000 $300.000 $232.000 $256.000 $190.000 $130.000
TRENCH EXCAVATION PROTECTION
LF 826.000 $50.000 $9.400 $10.000 $15.000 $5.000
TEMPORARY SPL SHORING
SF 2,817.000 $30.000 $23.000 $35.000 $30.000 $50.000
DRILL SHAFT (18 IN)
LF 80.000 $180.000 $255.000 $121.000 $260.000 $126.500
DRILL SHAFT (36 IN)
LF 200.000 $300.000 $330.000 $422.000 $350.000 $286.000
CL C CONC (ABUT)(HPC)
CY 62.300 $1,300.000 $1,250.000 $1,237.000 $1,270.000 $1,100.000
REINF CONC SLAB
SF 5,060.000 $27.000 $30.000 $33.000 $30.000 $28.600
APPROACH SLAB
CY 70.600 $700.000 $675.000 $754.000 $1,000.000 $880.000
PRESTR CONC X-BEAM (5XB40)
LF 657.000 $270.000 $530.000 $542.000 $600.000 $705.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 25.000 $180.000 $285.000 $250.000 $315.000 $330.000
CONC STR REPAIR (STANDARD)
SF 25.000 $135.000 $285.000 $250.000 $240.000 $330.000
RIPRAP (CONC)(4 IN)
CY 3.000 $1,000.000 $870.000 $800.000 $1,100.000 $1,100.000
RIPRAP (MOW STRIP)(4 IN)
CY 209.000 $700.000 $625.000 $600.000 $700.000 $675.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 26.000 $175.000 $265.000 $250.000 $210.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,481.000 $180.000 $127.000 $150.000 $150.000 $160.000
MISC NON-BRIDGE (NBIS)
LB 112.000 $30.000 $22.000 $85.000 $35.000 $10.000
RAIL (TY T223)
LF 372.000 $175.000 $155.000 $170.000 $195.000 $154.000
ARMOR JOINT (SEALED)
LF 90.000 $160.000 $145.000 $159.000 $140.000 $167.000
CONC BOX CULV (8 FT X 3 FT)
LF 96.000 $830.000 $695.000 $635.000 $570.000 $655.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 24.000 $800.000 $765.000 $1,130.000 $1,120.000 $1,245.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 21.000 $1,100.000 $900.000 $1,200.000 $1,225.000 $1,320.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 24.000 $1,200.000 $1,045.000 $1,300.000 $1,275.000 $1,430.000
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 22.000 $1,450.000 $1,285.000 $1,595.000 $1,675.000 $1,775.000
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
LF 54.000 $1,200.000 $1,045.000 $1,260.000 $1,325.000 $1,400.000
RC PIPE (CL IV)(18 IN)
LF 2,256.000 $160.000 $77.000 $68.000 $86.000 $85.000
RC PIPE (CL IV)(24 IN)
LF 832.000 $170.000 $127.000 $92.000 $122.000 $115.000
RC PIPE (CL IV)(36 IN)
LF 668.000 $200.000 $263.000 $154.000 $200.000 $196.000
RC PIPE (CL IV)(42 IN)
LF 156.000 $260.000 $265.000 $284.000 $220.000 $326.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $20,000.000 $11,800.000 $11,100.000 $17,200.000 $12,300.000
WINGWALL (SW - 0) (HW=7 FT)
EA 2.000 $24,000.000 $12,100.000 $18,000.000 $15,600.000 $20,000.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1)(C)
EA 4.000 $26,000.000 $15,300.000 $20,150.000 $16,600.000 $22,350.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $9,357.400 $13,800.000 $12,500.000 $9,700.000 $14,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1)(C)
EA 2.000 $10,874.190 $14,700.000 $14,400.000 $13,600.000 $16,000.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1)(C)
EA 2.000 $14,500.000 $14,800.000 $16,470.000 $16,700.000 $18,250.000
SET (TY I)(S= 9 FT)(HW= 6 FT)(3:1)(C)
EA 2.000 $24,500.000 $16,400.000 $22,750.000 $18,500.000 $25,250.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 7.000 $620.000 $1,285.000 $915.000 $900.000 $1,020.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $725.000 $1,530.000 $1,125.000 $1,050.000 $1,350.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 102.000 $1,250.000 $1,530.000 $1,125.000 $1,050.000 $1,350.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,250.000 $1,380.000 $1,032.000 $1,120.000 $1,225.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,900.000 $1,550.000 $1,188.000 $1,230.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 7.000 $2,100.000 $1,830.000 $1,432.000 $1,400.000 $1,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 26.000 $1,800.000 $1,830.000 $1,432.000 $1,400.000 $1,850.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 11.000 $2,500.000 $2,830.000 $2,700.000 $3,020.000 $2,750.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 7.000 $4,000.000 $3,265.000 $3,600.000 $3,420.000 $3,200.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $5,500.000 $4,260.000 $8,000.000 $4,500.000 $4,250.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 6.000 $6,800.000 $4,335.000 $9,000.000 $4,600.000 $5,000.000
ADJUSTING MANHOLES
EA 2.000 $2,000.000 $2,100.000 $1,800.000 $2,500.000 $800.000
ADJUSTING MANHOLES (UTILITY VALVE)
EA 2.000 $800.000 $2,100.000 $1,800.000 $2,200.000 $400.000
CLEAN EXIST CULVERTS
EA 11.000 $4,000.000 $1,750.000 $3,000.000 $2,000.000 $3,250.000
REMOV STR (SET)
EA 116.000 $700.000 $500.000 $125.000 $300.000 $475.000
REMOV STR (WINGWALL)
EA 2.000 $2,150.000 $1,650.000 $1,200.000 $1,900.000 $1,400.000
REMOV STR (PIPE)
LF 2,118.000 $40.000 $15.500 $9.000 $20.000 $20.000
REMOV STR (BOX CULVERT)
LF 146.000 $44.000 $500.000 $50.000 $100.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $44,000.000 $27,500.000 $30,000.000 $55,400.000
REMOV STR (RR TRACK)
LF 207.000 $15.000 $70.000 $14.000 $60.000 $30.000
MOBILIZATION
LS 1.000 $1,270,000.000 $1,276,000.000 $1,200,000.000 $1,400,000.000 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $6,000.000 $15,000.000 $6,225.000 $3,500.000 $16,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,000.000 $5,500.000 $10,000.000 $24,000.000
TMA (STATIONARY)
DAY 394.000 $250.000 $5.000 $85.000 $150.000 $170.000
TMA (MOBILE OPERATION)
DAY 25.000 $700.000 $25.000 $605.000 $500.000 $170.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,987.000 $40.000 $37.000 $36.000 $40.000 $44.500
ROCK FILTER DAMS (REMOVE)
LF 1,987.000 $10.000 $10.000 $10.000 $5.000 $13.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 15,055.000 $4.000 $4.750 $3.500 $3.250 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 15,055.000 $1.250 $1.000 $1.000 $1.000 $0.550
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 22.000 $10.000 $10.000 $4.500 $10.000 $11.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 22.000 $3.200 $2.000 $1.000 $1.500 $5.600
CONSTRUCTING DETOURS
SY 1,649.000 $90.000 $50.000 $55.000 $80.000 $55.000
CONC CURB & GUTTER (TY II)
LF 77.000 $110.000 $83.000 $65.000 $95.000 $71.500
INTERSECTIONS (ACP)
SY 576.000 $65.000 $82.000 $85.000 $70.000 $80.000
DRIVEWAYS (CONC) (HES)
SY 469.000 $140.000 $210.000 $140.000 $140.000 $230.000
DRIVEWAYS (ACP) (TY 1)
SY 958.000 $40.000 $48.000 $48.000 $25.000 $45.000
DRIVEWAYS (ACP) (TY 2)
SY 6,115.000 $65.000 $63.000 $73.000 $50.000 $72.000
TURNOUTS (ACP)
SY 1,181.000 $65.000 $80.000 $35.000 $40.000 $70.000
CURB RAMPS (TY 1)
EA 1.000 $4,000.000 $4,250.000 $2,100.000 $3,500.000 $2,400.000
CURB RAMPS (TY 2)
EA 1.000 $4,000.000 $4,250.000 $2,200.000 $5,000.000 $2,500.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 88,838.000 $0.500 $0.200 $0.200 $0.200 $0.220
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 42,361.000 $0.500 $0.200 $0.210 $0.200 $0.230
MTL W-BEAM GD FEN (STEEL POST)
LF 3,000.000 $35.000 $29.500 $27.750 $35.000 $31.050
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,325.000 $2,830.000 $2,630.000 $2,500.000 $2,385.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,400.000 $1,075.000 $1,215.000 $1,500.000 $1,440.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000 $2,500.000 $2,000.000 $2,130.000 $2,400.000 $2,385.000
REMOVE METAL BEAM GUARD FENCE
LF 1,375.000 $4.000 $2.100 $5.000 $3.000 $2.800
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,100.000 $3,200.000 $2,965.000 $3,300.000 $3,220.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $320.000 $210.000 $250.000 $250.000 $280.000
WIRE FENCE (TY C)
LF 278.000 $32.000 $40.000 $31.000 $30.000 $56.000
WIRE FENCE (REMOVE)
LF 860.000 $3.000 $4.750 $13.000 $10.000 $5.600
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $300.000 $470.000 $450.000 $500.000 $555.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 26.000 $210.000 $280.000 $270.000 $300.000 $245.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 4.000 $250.000 $315.000 $300.000 $350.000 $266.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 6.000 $175.000 $33.500 $32.000 $35.000 $56.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 84.000 $1,200.000 $630.000 $600.000 $660.000 $780.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $1,250.000 $765.000 $730.000 $870.000 $855.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,000.000 $900.000 $860.000 $960.000 $1,055.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 9.000 $1,800.000 $700.000 $675.000 $740.000 $835.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $550.000 $870.000 $830.000 $950.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $650.000 $1,050.000 $1,000.000 $1,100.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 75.000 $200.000 $100.000 $100.000 $220.000 $115.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 44.000 $325.000 $340.000 $450.000 $375.000 $300.000
ISRSA TYS80(1)SA(T) (EXCLUDING SIGN)
EA 6.000 $750.000 $525.000 $500.000 $560.000 $780.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 9.000 $70.000 $78.000 $85.000 $70.000 $85.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 2.000 $60.000 $50.000 $58.000 $40.000 $26.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 36.000 $70.000 $50.000 $42.000 $40.000 $27.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $70.000 $95.000 $78.000 $85.000 $85.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 48.000 $80.000 $95.000 $78.000 $87.000 $85.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 202,588.000 $0.400 $0.180 $0.190 $0.220 $0.220
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 104.000 $1.500 $1.680 $1.000 $2.000 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(LNDP)
LF 36.000 $1.500 $0.890 $1.000 $0.950 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,986.000 $1.000 $0.350 $0.400 $0.370 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,336.000 $5.000 $3.160 $2.500 $4.000 $4.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 8.000 $150.000 $104.000 $40.000 $110.000 $50.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 4.000 $300.000 $315.000 $100.000 $330.000 $111.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 26.000 $150.000 $105.000 $40.000 $110.000 $58.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 42.000 $25.000 $36.000 $13.000 $40.000 $17.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 14,220.000 $0.450 $0.200 $0.210 $0.220 $0.220
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 145,050.000 $0.400 $0.180 $0.190 $0.220 $0.220
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 52.000 $2.200 $1.740 $1.000 $1.800 $1.150
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 18.000 $2.200 $1.050 $1.000 $1.100 $1.150
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,493.000 $2.000 $0.870 $0.840 $0.920 $0.830
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 668.000 $12.000 $6.580 $6.200 $7.700 $12.200
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 101,294.000 $0.750 $0.580 $0.500 $0.600 $0.650
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 7,110.000 $0.800 $0.580 $0.520 $0.600 $0.670
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 72,525.000 $0.750 $0.580 $0.500 $0.600 $0.650
PAVEMENT SLER 4"
LF 404.000 $0.500 $0.140 $0.200 $0.170 $1.950
PAVEMENT SLER 6"
LF 340.000 $0.700 $0.170 $0.300 $0.190 $2.500
PAVEMENT SLER (WORD)
EA 4.000 $30.000 $31.000 $25.000 $35.000 $27.500
PAVEMENT SLER (SYMBOL)
EA 4.000 $30.000 $94.000 $25.000 $100.000 $27.500
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
LF 404.000 $0.500 $0.410 $2.000 $0.460 $2.200
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
LF 80.000 $20.000 $11.300 $10.000 $12.000 $33.250
PREFAB PM TY C (W)(ARROW)
EA 9.000 $300.000 $245.000 $190.000 $250.000 $366.000
PREFAB PM TY C (W)(WORD)
EA 13.000 $300.000 $325.000 $255.000 $335.000 $427.000
PREFAB PM TY C (W)(RR XING)
EA 2.000 $600.000 $825.000 $400.000 $900.000 $887.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 21.000 $50.000 $63.000 $50.000 $70.000 $56.000
PRE PM TY C(BL&WH)(ACC PRK)(W/BORDR)SM
EA 4.000 $400.000 $315.000 $250.000 $350.000 $250.000
REFL PAV MRKR TY I-C
EA 118.000 $8.000 $4.200 $3.750 $5.000 $5.000
REFL PAV MRKR TY II-A-A
EA 2,600.000 $6.000 $4.200 $3.600 $5.000 $5.550
PAV SURF PREP FOR MRK (4")
LF 404.000 $0.500 $0.010 $1.000 $0.020 $0.550
PAV SURF PREP FOR MRK (6")
LF 340.000 $0.700 $0.020 $1.000 $0.040 $0.550
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $30.000 $13.000 $10.000 $17.000 $22.250
PAV SURF PREP FOR MRK (ACC PRK)(SM)
EA 4.000 $30.000 $50.000 $10.000 $60.000 $22.250
SUBSURFACE UTIL LOCATE (NON-PAVED AREA)
EA 41.000 $1,500.000 $250.000 $950.000 $450.000 $185.000
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 160.000 $100.000 $85.000 $75.000 $85.000 $84.000
LED ROADSIDE SIGN
EA 6.000 $3,200.000 $2,840.000 $2,700.000 $3,000.000 $3,300.000
Totals: $17,109,784.810 $14,455,828.760 $15,106,911.420 $15,287,833.050 $20,381,402.240
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $40,000.00
Total: $80,000.00