BOSQUE SH 174 (0519-03-035)

Items: 43

County: BOSQUE
Length: 0.0000 MILES
Highway: SH 174
District: WACO
Control Number: 0519-03-035
DBE Goal: 0.0%
Project: C 519-3-35
Guaranty: $100,000.00
Time: 90 WORKING DAYS
Engineer's Estimate: $5,127,755.82
Date: 10/01/2024 (1 year ago)
Contract Number: 10243021
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00004833
Project Description: HMA OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,127,755.82
$4,687,667.81
Over/Under Est: -8.58% -$440,088.01
Over/Under Est: -5.62% -$288,174.61
Amt Left: 3.24% $151,913.40
Over/Under Est: -3.89% -$199,560.52
Amt Left: 5.13% $240,527.49
Delta: -1.83% -$88,614.09
$6,614,676.00
Over/Under Est: 29% $1,486,920.18
Amt Left: 41.11% $1,927,008.19
Delta: -34.22% -$1,686,480.70
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 7.76% $315,668.11
FORTSON CONTRACTING, INC. 4.07% $165,563.04
D. I. J. CONSTRUCTION, INC. 1.56% $63,459.05
WEST TEXAS RUMBLE STRIP LLC 0.70% $28,475.22
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.54% $21,966.60
SUPERIOR TRAFFIC CONTROL, LLC 0.47% $19,119.07
WEST TEXAS ROCK RESOURCES, LLC 0.00% $0.00
SUPERIOR TRAFFIC SERVICES, LLC 0.00% $0.00
Total: 15.10% $614,251.09

Bid Items & Bid Tabulations

43 Total 0 of 43
BOSQUE  |  SH 174  |  WACO  |  0519-03-035  |  10/01/2024  |  $5,127,755.82  |  C 519-3-35  |  SURF/ROADWAY RESTOR  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
FNH CONSTRUCTION, LLC
REMOV CONC (MOWSTRIP)
LF 4,435.000 $15.000 $10.000 $8.150 $12.000 $30.000
BACKFILL (TY A OR B)
STA 223.000 $300.000 $360.000 $250.000 $300.000 $250.000
DRILL SEED (PERM_RURAL_CLAY)
SY 29,827.000 $0.200 $0.230 $0.300 $0.250 $0.500
DRILL SEED (TEMP_WARM_COOL)
SY 29,827.000 $0.200 $0.190 $0.250 $0.200 $0.500
VEGETATIVE WATERING
TGL 484.000 $50.000 $30.000 $10.000 $15.000 $50.000
D-GR HMA TY-B PG64-22
TON 14,277.000 $100.000 $104.100 $104.000 $110.000 $135.000
TACK COAT
GAL 17,148.000 $5.000 $2.600 $0.010 $3.000 $1.000
SP MIXES SP-C SAC-B PG70-22
TON 9,432.000 $115.000 $107.450 $127.000 $117.000 $160.000
TACK COAT
GAL 8,574.000 $5.000 $2.600 $0.010 $3.000 $1.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 14,000.000 $70.000 $60.900 $62.000 $65.000 $80.000
PLANE ASPH CONC PAV(0" TO 2")
SY 756.000 $6.000 $11.700 $6.000 $7.000 $10.000
PLANE ASPH CONC PAV(0" TO 4")
SY 85,741.000 $4.000 $2.700 $1.900 $3.000 $5.000
TEMPORARY SPL SHORING
SF 340.000 $50.000 $60.000 $27.000 $75.000 $55.000
RIPRAP (MOW STRIP)(4 IN)
CY 247.000 $650.000 $665.000 $735.000 $750.000 $500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $25,000.000 $60,000.000 $25,000.000 $45,000.000 $45,000.000
CLEAN EXIST CULVERTS
EA 2.000 $3,500.000 $4,500.000 $3,300.000 $3,500.000 $1,500.000
REMOV STR (WINGWALL)
EA 1.000 $4,500.000 $2,500.000 $3,000.000 $5,000.000 $5,000.000
MOBILIZATION
LS 1.000 $375,000.000 $285,000.000 $335,000.000 $229,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $2,510.000 $15,000.000 $5,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $5,900.000 $18,000.000 $6,000.000 $16,500.000
TMA (STATIONARY)
DAY 81.000 $300.000 $270.000 $250.000 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 240.000 $50.000 $20.000 $15.000 $50.000 $55.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,910.000 $6.500 $4.500 $6.250 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,910.000 $2.500 $1.000 $1.000 $1.000 $2.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 40,080.000 $0.200 $0.540 $0.370 $0.300 $0.500
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 17,644.000 $0.230 $0.380 $0.370 $0.300 $0.500
MTL W-BEAM GD FEN (STEEL POST)
LF 3,200.000 $32.000 $28.500 $31.000 $35.000 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 3,325.000 $3.500 $2.750 $3.000 $3.000 $6.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,000.000 $2,877.500 $3,125.000 $3,000.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $300.000 $250.000 $275.000 $300.000 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 22.000 $700.000 $426.390 $635.000 $500.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 55.000 $50.000 $45.000 $50.000 $50.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 24.000 $2.000 $1.000 $1.500 $1.500 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,882.000 $2.000 $1.000 $1.500 $1.500 $6.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 34.000 $2.000 $2.250 $2.230 $2.000 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 100.000 $2.000 $2.250 $1.090 $1.500 $6.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 43,076.000 $0.800 $0.740 $0.730 $0.650 $1.000
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 3,380.000 $0.800 $0.760 $0.810 $0.650 $1.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 27,827.000 $0.800 $0.740 $0.730 $0.650 $1.000
PREFAB PM TY C (W)(ARROW)
EA 1.000 $325.000 $300.000 $310.000 $350.000 $350.000
PREFAB PM TY C (W)(WORD)
EA 1.000 $375.000 $350.000 $410.000 $400.000 $350.000
REFL PAV MRKR TY I-C
EA 6.000 $6.000 $10.000 $5.400 $5.000 $6.000
REFL PAV MRKR TY II-A-A
EA 1,111.000 $6.000 $6.500 $5.400 $5.000 $6.000
Totals: $5,127,755.820 $4,687,667.810 $4,839,581.210 $4,928,195.300 $6,614,676.000