BOSQUE FM 56 (0398-01-042)

Items: 65

County: BOSQUE
Length: N/A
Highway: FM 56
District: WACO
Control Number: 0398-01-042
DBE Goal: N/A
Project: STP 2020(191)HES
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $1,369,154.40
Date: 11/05/2019 (6 years ago)
Contract Number: N/A
Type: INCREASE SUPERELEVATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,369,154.40
$1,514,248.15
Over/Under Est: 10.6% $145,093.75
Over/Under Est: 12.24% $167,628.94
Amt Left: 1.49% $22,535.19
Over/Under Est: 18.09% $247,718.14
Amt Left: 6.78% $102,624.39
Delta: -5.21% -$80,089.20

Bid Items & Bid Tabulations

65 Total 0 of 65
BOSQUE  |  FM 56  |  WACO  |  0398-01-042  |  11/05/2019  |  $1,369,154.40  |  STP 2020(191)HES  |  INCREASE SUPERELEVATION  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 1.000 $5,000.000 $5,000.000 $1,600.000 $2,000.000
REMOVING CONC (RIPRAP)
SY 14.000 $12.000 $35.000 $55.000 $45.000
REMOVING CONC (DRIVEWAYS)
SY 75.000 $15.000 $26.000 $28.000 $17.000
REMOVE CONC (MISC)
EA 1.000 $1,000.000 $2,000.000 $4,200.000 $300.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 182.000 $15.000 $11.000 $32.000 $8.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,945.000 $15.000 $35.000 $30.000 $35.000
BLOCK SODDING
SY 21,661.000 $3.600 $3.500 $4.500 $3.450
VEGETATIVE WATERING
MG 176.000 $13.000 $35.000 $25.000 $30.000
D-GR HMA(SQ) TY-B PG64-22
TON 2,295.000 $100.000 $101.000 $100.000 $108.000
D-GR HMA(SQ) TY-C SAC-B PG64-22
TON 2,897.000 $120.000 $95.000 $102.000 $112.000
TACK COAT
GAL 3,369.000 $3.000 $2.750 $4.500 $2.850
CL C CONC (RAIL FOUNDATION)
CY 11.000 $480.000 $1,250.000 $1,080.000 $2,500.000
CL C CONC (CURB)
CY 13.000 $910.000 $1,675.000 $950.000 $1,500.000
RIPRAP (CONC)(4 IN)
CY 100.000 $400.000 $495.000 $470.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $435.000 $495.000 $500.000 $650.000
RIPRAP (STONE TY R)(GROUT)(24 IN)
CY 51.000 $200.000 $375.000 $450.000 $300.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 28.000 $800.000 $1,000.000 $900.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 44.000 $60.000 $150.000 $105.000 $75.000
RC PIPE (CL III)(24 IN)
LF 10.000 $65.000 $400.000 $124.000 $150.000
RC PIPE (CL III)(30 IN)
LF 32.000 $90.000 $300.000 $160.000 $200.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $3,400.000 $4,000.000 $3,700.000 $4,500.000
HEADWALL (CH - PW - 0) (DIA= 72 IN)
EA 2.000 $15,500.000 $13,500.000 $14,800.000 $18,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $14,000.000 $10,500.000 $18,900.000 $20,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 3.000 $1,150.000 $1,250.000 $920.000 $950.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,500.000 $1,375.000 $1,150.000 $1,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,700.000 $1,800.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $3,500.000 $1,950.000 $2,100.000 $3,000.000
CLEAN EXIST CULVERTS
EA 4.000 $2,000.000 $1,850.000 $2,630.000 $1,500.000
REMOV STR (PIPE)
LF 15.000 $16.000 $25.000 $55.000 $35.000
REMOVE STR (DAMAGED BEAM)
EA 1.000 $1,000.000 $1,200.000 $2,100.000 $5,000.000
MOBILIZATION
LS 1.000 $121,148.000 $150,000.000 $139,750.190 $179,200.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $13,000.000 $10,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 825.000 $26.000 $35.000 $25.000 $25.750
ROCK FILTER DAMS (REMOVE)
LF 825.000 $11.000 $9.250 $5.000 $9.850
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,410.000 $3.500 $5.000 $3.000 $1.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,410.000 $0.500 $0.710 $1.000 $0.750
CONC CURB (RIBBON)
LF 64.000 $60.000 $50.000 $70.000 $100.000
INTERSECTIONS (ACP)
SY 711.000 $31.000 $50.000 $40.000 $34.000
DRIVEWAYS (CONC)
SY 248.000 $70.000 $85.000 $85.000 $125.000
DRIVEWAYS (ACP)
SY 999.000 $33.000 $55.000 $50.000 $30.000
TURNOUTS (ACP)
SY 92.000 $36.000 $100.000 $120.000 $154.000
RUMBLE STRIPS (CENTERLINE)
LF 4,102.000 $0.350 $3.000 $3.000 $2.500
MTL W-BEAM GD FEN (STEEL POST)
LF 912.500 $27.000 $24.000 $32.000 $21.750
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 37.500 $67.000 $80.000 $85.000 $72.350
REMOVE METAL BEAM GUARD FENCE
LF 558.000 $2.600 $2.200 $2.500 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,830.000 $2,900.000 $3,210.000 $2,674.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $240.000 $225.000 $240.000 $200.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 3.000 $270.000 $225.000 $240.000 $201.730
MAILBOX INSTALL-D (TWG-POST) TY 4
EA 2.000 $300.000 $290.000 $310.000 $257.980
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 6.000 $415.000 $428.000 $462.000 $385.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 14.000 $300.000 $375.000 $405.000 $337.600
RELOCATE SM RD SN SUP&AM TY TWT
EA 36.000 $340.000 $390.000 $420.000 $350.000
REMOVE SM RD SN SUP&AM
EA 4.000 $80.000 $100.000 $120.000 $100.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $80.000 $75.000 $81.000 $67.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $40.000 $35.000 $39.000 $31.950
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 889.000 $0.700 $1.400 $1.000 $1.200
REFL PAV MRK TY II (W) 24" (SLD)
LF 83.000 $3.000 $13.000 $14.500 $12.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 18,355.000 $0.300 $0.720 $0.080 $0.650
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 160.000 $0.300 $1.390 $1.500 $1.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 17,555.000 $0.300 $0.770 $0.850 $0.690
REFL PAV MRKR TY II-A-A
EA 230.000 $4.000 $6.500 $7.200 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $7,800.000 $1,500.000 $5,850.000 $1.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $3.500 $29.000 $32.000 $26.500
TMA (STATIONARY)
DAY 69.000 $180.000 $225.000 $250.000 $235.000
TMA (MOBILE OPERATION)
HR 256.000 $50.000 $35.000 $55.000 $45.000
Totals: $1,369,154.400 $1,514,248.150 $1,536,783.340 $1,616,872.550