Show Job Controls
Bid Cobra

BLANCO RM 473 (3278-01-003)

Items: 77

County: BLANCO
Length: N/A
Highway: RM 473
District: AUSTIN
Control Number: 3278-01-003
DBE Goal: N/A
Project: STP 2020(929)HES
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $3,895,929.60
Date: 06/05/2020 (6 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION AND SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,895,929.60
$3,837,576.30
Over/Under Est: -1.5% -$58,353.30
Over/Under Est: 3.44% $134,179.16
Amt Left: 5.02% $192,532.46
Over/Under Est: 9.03% $351,987.37
Amt Left: 10.69% $410,340.67
Delta: -5.40% -$217,808.21
Over/Under Est: 9.94% $387,254.75
Amt Left: 11.61% $445,608.05
Delta: -0.83% -$35,267.38

Bid Items & Bid Tabulations

77 Total 0 of 77
BLANCO  |  RM 473  |  AUSTIN  |  3278-01-003  |  06/05/2020  |  $3,895,929.60  |  STP 2020(929)HES  |  HAZARD ELIM AND SAFETY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAY FARIS, INC.
DEAN WORD COMPANY, LTD.
ANGEL BROTHERS HOLDINGS CORP.
TIERRA LEASE SERVICE, LLC
PREPARING ROW
STA 299.300 $2,000.000 $507.800 $426.691 $900.000 $220.000
REMOVING STB BASE AND ASPH PAV(10-14")
SY 3,661.000 $5.000 $8.920 $10.076 $8.000 $15.000
EXCAVATION (ROADWAY)
CY 11,132.000 $7.000 $11.150 $9.843 $16.000 $13.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 8,677.000 $5.000 $8.920 $10.934 $8.000 $11.000
SPEC EXCAV WORK (BACKHOE)
HR 80.000 $100.000 $55.750 $95.035 $90.000 $77.000
FURNISHING AND PLACING TOPSOIL (3")
SY 236,560.000 $1.100 $1.120 $0.750 $0.750 $2.000
BROADCAST SEED (TEMP) (WARM)
SY 236,560.000 $0.100 $0.140 $0.080 $0.110 $0.150
CELL FBR MLCH SEED(TEMP)(WARM)
SY 236,546.000 $0.300 $0.230 $0.130 $0.320 $0.250
CELL FBR MLCH SEED(TEMP)(COOL)
SY 236,546.000 $0.300 $0.230 $0.130 $0.320 $0.250
VEGETATIVE WATERING
MG 3,982.300 $10.000 $6.000 $18.250 $20.000 $25.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 7,697.000 $45.000 $55.320 $58.446 $61.000 $54.500
PRIME COAT (MULTI OPTION)
GAL 6,927.000 $4.000 $4.120 $4.079 $3.700 $4.000
ASPH (TIER II)
GAL 35,158.000 $3.500 $2.950 $2.968 $3.420 $3.200
AGGR(TY-D GR-4 SAC-B)
CY 771.000 $40.000 $87.610 $71.837 $152.000 $62.000
D-GR HMA(SQ) TY-D PG70-22
TON 3,456.000 $100.000 $74.940 $81.935 $74.000 $92.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 171.000 $103.000 $104.700 $133.553 $183.000 $130.000
TACK COAT
GAL 139.000 $3.000 $3.120 $18.941 $3.000 $7.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,325.000 $30.420 $34.680 $39.163 $36.000 $42.000
PLANE ASPH CONC PAV (1.5")
SY 667.000 $1.000 $10.040 $16.233 $6.000 $9.000
CEM STABIL BKFL
CY 159.000 $75.000 $195.000 $144.200 $134.000 $160.000
TRENCH EXCAVATION PROTECTION
LF 101.000 $3.500 $39.000 $5.150 $21.000 $27.000
TEMPORARY SPL SHORING
SF 3,355.000 $20.000 $19.650 $20.600 $30.000 $35.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 60.000 $130.000 $300.000 $206.000 $300.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 277.000 $450.000 $525.000 $453.200 $500.000 $515.000
CMP (GAL STL 24 IN)
LF 2.000 $75.000 $165.000 $61.800 $450.000 $200.000
CMP (GAL STL 30 IN)
LF 10.000 $250.000 $161.000 $154.500 $300.000 $200.000
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
LF 75.000 $900.000 $742.000 $1,236.000 $1,300.000 $1,100.000
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
LF 53.000 $1,000.000 $785.000 $1,442.000 $2,750.790 $1,100.000
RC PIPE (CL III)(18 IN)
LF 529.000 $55.000 $78.550 $51.500 $58.000 $72.000
RC PIPE (CL III)(24 IN)
LF 95.000 $80.000 $100.000 $72.100 $75.000 $90.000
WINGWALL (FW - S) (HW=8 FT)
EA 2.000 $10,000.000 $27,750.000 $18,540.000 $35,000.000 $20,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $22,000.000 $16,590.000 $28,840.000 $15,000.000 $23,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 6.000 $30,000.000 $16,855.000 $39,140.000 $15,000.000 $30,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 42.000 $800.000 $1,555.000 $1,236.000 $1,600.000 $1,200.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 10.000 $1,400.000 $2,505.000 $1,339.000 $1,600.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,200.000 $1,865.000 $1,545.000 $1,700.000 $1,600.000
SET (TY II) (30 IN) (CMP) (3: 1) (C)
EA 2.000 $1,900.000 $2,780.000 $2,575.000 $2,600.000 $2,300.000
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 6.000 $1,200.000 $3,500.000 $2,781.000 $2,600.000 $2,300.000
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 10.000 $2,000.000 $4,160.000 $4,635.000 $5,000.000 $3,400.000
SET (TY II) (48 IN) (CMP) (4: 1) (C)
EA 2.000 $5,000.000 $5,620.000 $7,210.000 $4,600.000 $4,600.000
SET (TY II) (66 IN) (CMP) (2: 1) (P)
EA 2.000 $7,000.000 $5,350.000 $10,300.000 $6,000.000 $8,000.000
SET (TY II) (DES 1) (CMP) (3: 1) (C)
EA 1.000 $8,000.000 $6,580.000 $1,802.500 $8,000.000 $1,000.000
CLEAN EXIST CULVERTS
EA 20.000 $2,000.000 $1,485.000 $1,545.000 $50.000 $1,600.000
REMOV STR (SET)
EA 9.000 $350.000 $750.000 $412.000 $500.000 $400.000
REMOV STR (WINGWALL)
EA 8.000 $1,000.000 $2,900.000 $1,236.000 $3,500.000 $1,600.000
REMOV STR (HEADWALL)
EA 3.000 $900.000 $1,145.000 $1,236.000 $3,500.000 $1,600.000
REMOV STR (PIPE)
LF 751.000 $12.000 $32.500 $10.300 $20.000 $10.000
MOBILIZATION
LS 1.000 $290,503.000 $414,850.570 $562,566.382 $347,500.000 $475,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,000.000 $11,528.000 $4,921.542 $12,000.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,560.000 $25.000 $18.360 $23.021 $23.000 $21.000
ROCK FILTER DAMS (REMOVE)
LF 1,560.000 $7.000 $6.390 $8.745 $5.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 25,305.000 $2.500 $2.950 $2.318 $4.000 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 25,305.000 $0.500 $0.480 $0.258 $0.250 $0.750
DRIVEWAYS (ACP)
SY 3,112.000 $30.000 $37.840 $42.455 $52.000 $40.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,637.500 $20.000 $21.820 $20.764 $22.000 $25.000
GUARDRAIL END TREATMENT (INSTALL)
EA 28.000 $2,775.000 $2,913.000 $2,726.600 $3,000.000 $3,200.000
WIRE FENCE (TY B)
LF 200.000 $25.000 $19.000 $25.750 $32.000 $11.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 38.000 $450.000 $515.000 $485.666 $500.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $600.000 $598.000 $657.367 $600.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 2.000 $900.000 $895.000 $968.612 $1,000.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 42.000 $80.000 $83.000 $77.250 $50.000 $110.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 130.000 $65.000 $47.000 $43.713 $45.000 $65.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 27.000 $90.000 $65.000 $77.199 $80.000 $70.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 68.000 $25.000 $20.000 $17.459 $20.000 $32.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 11,960.000 $1.000 $1.060 $1.385 $1.000 $0.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 58.000 $6.000 $14.100 $8.240 $15.000 $17.250
REFL PAV MRK TY II (W) 4" (SLD)
LF 59,885.000 $0.150 $0.050 $0.113 $0.050 $0.140
REFL PAV MRK TY II (W) 24" (SLD)
LF 58.000 $3.000 $2.000 $5.150 $2.150 $5.500
REFL PAV MRK TY II (Y) 4" (BRK)
LF 2,670.000 $0.150 $0.150 $0.113 $0.160 $0.150
REFL PAV MRK TY II (Y) 4" (SLD)
LF 47,905.000 $0.150 $0.130 $0.113 $0.140 $0.150
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 59,885.000 $0.500 $0.590 $0.659 $0.630 $0.640
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 47,905.000 $0.500 $0.590 $0.659 $0.630 $0.640
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,670.000 $0.300 $0.470 $0.371 $0.510 $1.100
REFL PAV MRKR TY II-A-A
EA 751.000 $3.000 $4.000 $4.120 $4.300 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $17,560.000 $11,000.000 $10,000.000
TMA (STATIONARY)
DAY 100.000 $185.000 $200.000 $567.000 $200.000 $300.000
TMA (MOBILE OPERATION)
HR 92.000 $55.000 $40.000 $54.000 $38.000 $25.000
Totals: $3,895,929.600 $3,837,576.300 $4,030,108.732 $4,247,916.970 $4,283,184.350