Show Job Controls
Bid Cobra

BEXAR FM2252 (6481-10-001)

Items: 19

County: BEXAR
Length: 0.0100 MILES
Highway: FM2252
District: SAN ANTONIO
Control Number: 6481-10-001
DBE Goal: 0.0%
Project: BPM - A00214337
Guaranty: $2,000.00
Time: 13 WORKING DAYS
Engineer's Estimate: $75,832.61
Date: 11/12/2025 (7 months ago) Changed
Contract Number: 11251502
Type: EROSION REPAIR
Project ID: A00214337
Project Description: SCOUR REPAIR BY INSTALLING GABIONS AND PED RAIL REPAIR
Mail/Deliver Bids To: N/A
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$75,832.61
$50,807.00
Over/Under Est: -33% -$25,025.61
Over/Under Est: -26.47% -$20,072.61
Amt Left: 9.75% $4,953.00
Over/Under Est: -20.78% -$15,761.61
Amt Left: 18.23% $9,264.00
Delta: -7.73% -$4,311.00
Over/Under Est: -16.9% -$12,818.61
Amt Left: 24.03% $12,207.00
Delta: -4.90% -$2,943.00
Over/Under Est: -3.72% -$2,824.61
Amt Left: 43.7% $22,201.00
Delta: -15.86% -$9,994.00
Over/Under Est: 22.58% $17,121.39
Amt Left: 82.96% $42,147.00
Delta: -27.32% -$19,946.00
Over/Under Est: 56.07% $42,518.39
Amt Left: 132.94% $67,544.00
Delta: -27.32% -$25,397.00

Bid Items & Bid Tabulations

19 Total 0 of 19
BEXAR  |  FM2252  |  SAN ANTONIO  |  6481-10-001  |  11/12/2025  |  $75,832.61  |  BPM - A00214337  |  EROSION REPAIR  |  13 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DIAMOND R CONTRACTING, LLC
VINCE CONSTRUCTION LLC
TAYLOR CONTRACTING LLC
BK FIELD OPERATIONS LLC
STRUCTURAL INTEGRITY GROUP LLC
BECK-REIT & SONS, LTD.
ICOS MANAGEMENT, LLC
REMOV CONC (RIPRAP)
CY 8.000 $500.000 $600.000 $25.000 $150.000 $750.000 $375.000 $65.000 $400.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $3.000 $1.000 $5.000 $2.000 $1.000 $4.000 $5.000 $5.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 250.000 $0.500 $1.000 $1.000 $1.000 $1.000 $2.000 $4.000 $2.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 250.000 $8.290 $1.000 $1.000 $2.500 $3.000 $4.000 $5.000 $12.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 60.000 $307.540 $90.000 $1.000 $300.000 $90.000 $150.000 $210.000 $250.000
GABION MATTRESSES (GALV)(12 IN)
SY 97.000 $144.000 $100.000 $150.000 $180.000 $144.000 $250.000 $288.000 $200.000
CLEAN EXIST CULVERTS
EA 1.000 $4,174.210 $5,000.000 $2,500.000 $3,000.000 $1,200.000 $3,500.000 $7,500.000 $8,000.000
MOBILIZATION
LS 1.000 $10,000.000 $5,000.000 $5,000.000 $1,500.000 $6,000.000 $7,300.000 $22,500.000 $21,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $3,500.000 $2,500.000 $1,000.000 $1.000 $1.000 $7,700.000 $1.000 $1.000
TMA (STATIONARY)
DAY 13.000 $111.540 $1.000 $150.000 $1.000 $1,000.000 $1.000 $1.000 $200.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $22.780 $1.000 $30.000 $10.000 $1.000 $1.000 $1.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $2.060 $1.000 $10.000 $1.000 $1.000 $1.000 $1.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $4.440 $2.000 $10.000 $2.000 $1.000 $4.000 $1.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $0.540 $2.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000
DRIFTWOOD REMOVAL
LS 1.000 $2,912.500 $5,000.000 $7,500.000 $1,500.000 $6,000.000 $3,500.000 $5,000.000 $5,000.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.100 $1,422.330 $50,000.000 $55,000.000 $15,000.000 $50,000.000 $10.000 $10,000.000 $20,000.000
TREE REMOVAL (12" - 18" DIA)
EA 8.000 $127.030 $100.000 $350.000 $750.000 $1.000 $290.000 $600.000 $2,000.000
TREE REMOVAL (24" - 30" DIA)
EA 3.000 $203.010 $100.000 $850.000 $750.000 $1.000 $700.000 $1,200.000 $3,000.000
REPLACE(STEEL RAIL)
LF 24.000 $395.000 $250.000 $210.000 $200.000 $200.000 $300.000 $150.000 $200.000
Totals: $75,832.613 $50,807.000 $55,760.000 $60,071.000 $63,014.000 $73,008.000 $92,954.000 $118,351.000