BEXAR IH0035 (6477-31-001)

Items: 172

County: BEXAR
Length: 0.0100 MILES
Highway: IH0035
District: SAN ANTONIO
Control Number: 6477-31-001
DBE Goal: N/A
Project: RMC - 647731001
Guaranty: $100,000.00
Time: 1095 CALENDAR DAYS
Engineer's Estimate: $27,474,954.60
Date: 01/07/2025 (1 year ago)
Contract Number: 1254012
Type: BUNDLED BID
Project ID: A00212993
Project Description: ROUTINE MAINTENANCE
Mail/Deliver Bids To: N/A
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$27,474,954.60
$21,118,743.16
Over/Under Est: -23.13% -$6,356,211.44
Over/Under Est: -19.02% -$5,226,766.20
Amt Left: 5.35% $1,129,445.24
Subcontractor Percentage Amount
A.E.A. TRANSPORTATION 0.00% $0.00
AIMS COMPANIES 0.00% $0.00
AUSTIN BARRICADE COMPANY, L.L.C. 0.00% $0.00
BOEN LANDSCAPING & IRRIGATION, LLC 0.00% $0.00
S & S BRIDGE PAINTING, INC. 0.00% $0.00
T&L CLEANING SERVICES LLC 0.00% $0.00
YES AMERICA NOW, INC. 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

172 Total 0 of 172
BEXAR  |  IH0035  |  SAN ANTONIO  |  6477-31-001  |  01/07/2025  |  $27,474,954.60  |  RMC - 647731001  |  BUNDLED BID  |  1095 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
GARRET SHIELDS INFRASTRUCTURE
REMOV CONC (CURB)
LF 100.000 $17.000 $1.000 $10.000
REMOV CONC (FOUNDATIONS)
CY 10.000 $357.000 $1.000 $150.000
REMOV CONC (MISC)
SY 50.000 $60.000 $50.000 $20.000
FLOWABLE BACKFILL
CY 100.000 $350.000 $62.500 $200.000
CLASS K CONCRETE (MISC)
CY 50.000 $500.000 $140.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $245.000 $290.000 $300.000
RIPRAP (CONC)(CL B)
CY 50.000 $425.000 $290.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $500.000 $420.000 $680.000
MOBILIZATION (CALLOUT)
EA 1,300.000 $1,500.000 $1.000 $1,200.000
MOBILIZATION (EMERGENCY)
EA 100.000 $500.000 $2,500.000 $1,200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $200.000 $1.000 $1.000
TMA (STATIONARY)
DAY 7,500.000 $150.000 $0.010 $1.000
TMA (MOBILE OPERATION)
HR 37,500.000 $25.000 $0.010 $1.000
PORT CTB (ALIGNING)
LF 5,000.000 $10.000 $11.750 $8.000
CONC CURB (TY II)
LF 180.000 $45.000 $6.000 $40.000
CONC SIDEWALKS (4")
SY 100.000 $60.000 $47.500 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,800.000 $32.000 $13.000 $28.000
MTL W-BEAM GD FEN (STEEL POST)
LF 200.000 $35.000 $17.000 $40.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 100.000 $70.000 $55.000 $80.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 100.000 $1,500.000 $750.000 $1,400.000
MTL BM GD FEN TRANS (NON - SYM)
EA 15.000 $1,100.000 $1,100.000 $1,000.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $550.000 $1,275.000 $600.000
REMOVE METAL BEAM GUARD FENCE
LF 1,800.000 $6.000 $10.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 20.000 $550.000 $145.000 $600.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $450.000 $150.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,000.000 $1.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $400.000 $1.000 $600.000
CHAIN LINK FENCE (REPAIR) (4')
LF 1,400.000 $20.000 $13.500 $15.000
CHAIN LINK FENCE (REMOVE)
LF 1,450.000 $6.500 $1.000 $5.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 700.000 $35.000 $35.000 $30.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 390.000 $35.000 $35.000 $30.000
POTHOLE REPAIR(STANDARD)(0"-5" DEEP)
SY 1,000.000 $150.000 $500.000 $150.000
POTHOLE REPAIR(STANDARD)(5"-10" DEEP)
SY 1,000.000 $160.000 $1.000 $80.000
EMERGENCY MOBILIZATION
EA 200.000 $250.000 $1.000 $60.000
STRIP MOWING
AC 4,980.000 $52.000 $55.000 $60.000
SPOT MOWING
AC 500.000 $65.000 $52.000 $70.000
FULL - WIDTH MOWING
AC 51,752.000 $57.000 $54.000 $56.000
LITTER REMOVAL
AC 289,512.000 $13.000 $10.500 $9.000
LITTER REMOVAL (SPOT)
AC 2,500.000 $70.000 $10.500 $75.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 6,573.600 $65.000 $100.000 $60.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 2,845.440 $65.000 $102.000 $60.000
DEBRIS REMOVAL (DIRECT CONNECTOR)
MI 1,317.600 $85.000 $102.000 $60.000
DRIFTWOOD REMOVAL
CY 7,000.000 $50.000 $80.500 $30.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 500.000 $200.000 $50.000 $40.000
CLEANING / SWEEPING (CENTER MEDIAN)
MI 5,486.400 $200.000 $206.000 $200.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 5,486.400 $200.000 $206.000 $200.000
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 1,591.200 $200.000 $206.000 $200.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 2,256.480 $200.000 $206.000 $200.000
CLEANING / SWEEPING (DIRECT CONNECTOR)
MI 1,317.600 $200.000 $206.000 $200.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 100.000 $175.000 $75.000 $180.000
CLEANING / SWEEPING (SPOT)
MI 300.000 $200.000 $300.000 $180.000
CLEANING / SWEEPING (HANDWORK)
SY 15,000.000 $5.000 $2.000 $3.000
GRAFFITI REMOVAL (PAINTING)
SF 120,000.000 $2.500 $2.150 $2.000
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 20,000.000 $25.000 $44.000 $18.000
DRAIN INLET CLEANING
EA 500.000 $20.000 $130.000 $160.000
PUMP STATION WELL CLEANING
EA 75.000 $2,000.000 $1,650.000 $2,000.000
BASKET AND INLET PIPE CLEANING
EA 75.000 $350.000 $350.000 $350.000
DOWNSPOUT CLEANING
EA 50.000 $225.000 $117.500 $200.000
SUMP CLEANING
EA 10.000 $500.000 $500.000 $300.000
SLOTTED DRAIN CLEANING
LF 1,000.000 $14.000 $1.250 $4.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 50,000.000 $25.000 $34.000 $18.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 295.000 $50.000 $19.000 $25.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 65.000 $42.000 $42.000 $600.000
REPLACE TIMBER POST W/O CONC FND
EA 50.000 $65.000 $500.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 1,000.000 $75.000 $1.000 $100.000
REPLACE TIMBER POST W/ CONC FND
EA 50.000 $82.000 $1.000 $100.000
REPLACE STEEL POST W/ CONC FND
EA 1,000.000 $92.000 $1.000 $80.000
REALIGN POSTS
EA 2,500.000 $30.000 $10.500 $15.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $80.000 $250.000 $25.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $100.000 $250.000 $25.000
REM OBSOLETE GET & REPL W/ SGT
EA 90.000 $4,000.000 $4,250.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 135.000 $1,100.000 $1,150.000 $1,400.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 5,700.000 $30.000 $87.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $85.000 $1.000 $120.000
REPAIR STEEL POST WITH BASE PLATE
EA 50.000 $125.000 $440.000 $300.000
RESET SGT IMPACT HEAD
EA 135.000 $250.000 $205.000 $280.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 50.000 $1,100.000 $100.000 $1,500.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 700.000 $38.000 $35.000 $40.000
REALIGN EXISTING RAIL
LF 1,250.000 $9.000 $7.000 $15.000
REPLACE CRT POST (WOOD)
EA 250.000 $70.000 $1.000 $100.000
REPLACE SINGLE GDRAIL TERM POST (WOOD)
EA 450.000 $55.000 $115.000 $115.000
REPLACE SINGLE GDRAIL TERM POST (STEEL)
EA 100.000 $85.000 $400.000 $400.000
REPLACE POSTS (TL-3)(GIBRALTAR)
EA 800.000 $140.000 $90.000 $170.000
REPLACE POSTS (TL-3)(NU-CABLE)
EA 700.000 $140.000 $160.000 $120.000
REPLACE POSTS (TL-3)(TRINITY)
EA 700.000 $140.000 $160.000 $150.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 50.000 $150.000 $135.000 $300.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 50.000 $150.000 $1.000 $100.000
REPLACE POSTS (TL-4)(TRINITY)
EA 50.000 $150.000 $1.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 40.000 $250.000 $295.000 $1.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $200.000 $147.500 $1.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $125.000 $295.000 $1.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $100.000 $147.500 $1.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 120.000 $2,000.000 $1,500.000 $2,800.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $2,000.000 $250.000 $3,000.000
REPLACE CABLE (TL-3)
LF 2,000.000 $10.000 $9.000 $5.000
REPLACE CABLE (TL-4)
LF 1,000.000 $10.000 $1.000 $4.000
CHECK / RE-TENSION CABLE (TL-3)
EA 20.000 $500.000 $1.000 $1.000
CHECK / RE-TENSION CABLE (TL-4)
EA 20.000 $525.000 $1.000 $1.000
POST AND CABLE FENCE (REMOVAL)
LF 550.000 $5.000 $1.000 $2.300
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 20.000 $140.000 $1.000 $1.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 2,000.000 $28.000 $30.000 $13.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 45.000 $300.000 $175.000 $100.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 75.000 $70.000 $100.000 $100.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 10.000 $120.000 $75.000 $100.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 500.000 $10.000 $18.000 $15.000
POST AND CABLE FENCE (REPAIR)
LF 5,500.000 $10.000 $13.000 $15.000
REPLACE (SMTC) NARROW
EA 3.000 $27,000.000 $1.000 $30,000.000
REPAIR (SMTC) NARROW
LF 250.000 $300.000 $350.000 $250.000
REPLACE (SMTC) WIDE
EA 2.000 $30,000.000 $18,000.000 $5.000
REPAIR (SMTC) WIDE
LF 50.000 $300.000 $450.000 $1.000
REPAIR (QUAD - ELITE) NARROW
LF 60.000 $400.000 $0.510 $250.000
REPAIR (QUAD - ELITE) WIDE
LF 60.000 $100.000 $1.000 $1.000
REPAIR (REACT)(M)
LF 100.000 $300.000 $162.500 $250.000
REPLACE (REACT) WIDE
EA 2.000 $21,000.000 $1.000 $1.000
REPAIR (NARROW QUAD)
LF 800.000 $450.000 $120.000 $300.000
REPAIR (WIDE QUAD)
LF 40.000 $500.000 $1,450.000 $350.000
REPLACE (TAU-M) NARROW
EA 10.000 $35,000.000 $21,000.000 $30,000.000
REPAIR (TAU-M) NARROW
LF 2,000.000 $400.000 $500.000 $425.000
REPLACE (INDIVIDUAL SAND BARREL)
EA 1,500.000 $525.000 $350.000 $500.000
REPAIR (REACT)(N)
LF 100.000 $300.000 $50.000 $1.000
REPAIR (REACT)(N)(CYLINDER ONLY)
EA 5.000 $5,000.000 $100.000 $1.000
REPAIR (REACT)(W)(CYLINDER ONLY)
EA 2.000 $5,000.000 $1.000 $1.000
REPAIR (REACT)(M)(CYLINDER ONLY)
EA 5.000 $5,000.000 $1.000 $1,000.000
REPAIR (QUAD)(N)(M)
LF 100.000 $400.000 $225.000 $400.000
REPLACE (QUAD)(N)(M)
EA 3.000 $30,000.000 $12,500.000 $26,000.000
REPAIR (QUAD)(W)(M)
LF 100.000 $400.000 $175.000 $1.000
REPLACE (QUAD)(W)(M)
EA 2.000 $35,000.000 $17,500.000 $12,000.000
REPLACE CRASH CUSH ATTEN (L)(N)(TL3)
EA 3.000 $28,000.000 $27,000.000 $25,000.000
REPLACE CRASH CUSH ATTEN (R)(N)(TL3)
EA 5.000 $35,000.000 $22,500.000 $27,000.000
REPLACE CRASH CUSH ATTEN (R)(W)(TL3)
EA 4.000 $38,000.000 $1.000 $1.000
REPLACE CRASH CUSH ATTEN (R)(N)(TL2)
EA 1.000 $26,000.000 $22,000.000 $1.000
REPAIR (STEEL PED. RAIL)
LF 230.000 $100.000 $420.000 $150.000
REPAIR (T6)
LF 250.000 $50.000 $1.000 $1.000
REPAIR (STL PIPE PED RAIL)(PR1)
LF 450.000 $104.000 $345.000 $160.000
REPLACE(STEEL RAIL)
LF 120.000 $75.000 $1.000 $70.000
PERM CONC TRF BARRIER REPAIR (F SHAPE)
LF 50.000 $150.000 $625.000 $300.000
PERM CONC TRF BARRIER REPLACE (F SHAPE)
LF 50.000 $225.000 $1.000 $100.000
PERM CONC TRF BARR REPAIR(SINGLE SLOPE)
LF 50.000 $150.000 $195.000 $300.000
PERM CONC TRF BARR REPL(SINGLE SLOPE)
LF 50.000 $225.000 $1.000 $100.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 50.000 $200.000 $500.000 $300.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 200.000 $250.000 $1.000 $200.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 55.000 $250.000 $200.000 $350.000
REM REPLACE CURB
EA 50.000 $175.000 $1.000 $1.000
REM/REPLACE VISION STRIP
EA 100.000 $100.000 $1.000 $1.000
REM/REPLACE CURB TRANS END SECTION
EA 25.000 $140.000 $1.000 $1.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 150.000 $55.000 $55.000 $150.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $150.000 $1.000 $150.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $150.000 $1.000 $200.000
INCIDENT MANAGEMENT (TYPE C)
HR 50.000 $150.000 $1.000 $150.000
INCIDENT MANAGEMENT (TYPE D)
HR 50.000 $175.000 $1.000 $150.000
INCIDENT MANAGEMENT (TYPE E)
HR 175.000 $250.000 $1.000 $300.000
INCIDENT MANAGEMENT (TYPE F)
HR 275.000 $150.000 $250.000 $160.000
INCIDENT MANAGEMENT (TYPE G)
HR 75.000 $100.000 $1.000 $85.000
INCIDENT MANAGEMENT (TYPE H)
HR 50.000 $100.000 $1.000 $200.000
INCIDENT MANAGEMENT (TYPE I)
HR 75.000 $175.000 $1.000 $200.000
INCIDENT MANAGMENT (TYPE J)
HR 50.000 $50.000 $1.000 $40.000
INCIDENT MANAGMENT (TYPE K)
HR 75.000 $100.000 $1.000 $100.000
INCIDENT MANAGMENT (TYPE L)
HR 75.000 $125.000 $1.000 $130.000
REPAIR LARGE RDSD SIGN SUPT & ASSEM
EA 100.000 $800.000 $900.000 $800.000
RELOCATE LARGE RDSD SIGN SUPT & ASSEM
EA 50.000 $100.000 $1.000 $100.000
REPLACE LARGE RDSD SIGN SUPT & ASSEM
EA 100.000 $1,100.000 $1,200.000 $1,000.000
REMOVE LARGE RDSD SIGN SUPT & ASSEM
EA 100.000 $65.000 $1.000 $100.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 500.000 $350.000 $12.500 $100.000
RELOCATE SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $150.000 $150.000 $100.000
REPLACE SMALL RDSD SIGN SUPT & ASSEM
EA 300.000 $425.000 $220.000 $450.000
REMOVE SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $125.000 $1.000 $100.000
VACUUM CLEANING OF BRIDGE JOINTS
CYC 8.000 $22,000.000 $1.000 $18,000.000
VACUUM CLEAN DRAIN INLETS AND RACEWAYS
CYC 12.000 $25,000.000 $45,000.000 $20,000.000
SNOW AND ICE CONTROL (TRUCK)
HR 500.000 $95.000 $1.000 $90.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 500.000 $75.000 $50.000 $100.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 500.000 $85.000 $125.000 $90.000
SNOW AND ICE CONTROL SEASON
MO 15.000 $100,000.000 $1.000 $100,000.000
Totals: $27,474,954.600 $21,118,743.160 $22,248,188.400