BEXAR FM0471 (6469-50-001)

Items: 20

County: BEXAR
Length: 0.0100 MILES
Highway: FM0471
District: SAN ANTONIO
Control Number: 6469-50-001
DBE Goal: N/A
Project: BPM - 646950001
Guaranty: $4,000.00
Time: 27 W
Engineer's Estimate: $185,056.92
Date: 11/14/2024 (1 year ago)
Contract Number: 11241501
Type: EROSION REPAIR
Project ID: A00210529
Project Description: EROSION REPAIR
Mail/Deliver Bids To: N/A
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$185,056.92
$174,951.00
Over/Under Est: -5.46% -$10,105.92
Over/Under Est: 17.8% $32,938.08
Amt Left: 24.6% $43,044.00
Over/Under Est: 36.15% $66,896.08
Amt Left: 44.01% $77,002.00
Delta: -15.58% -$33,958.00
Over/Under Est: 38.71% $71,641.08
Amt Left: 46.73% $81,747.00
Delta: -1.88% -$4,745.00
Over/Under Est: 85.48% $158,183.08
Amt Left: 96.19% $168,289.00
Delta: -33.71% -$86,542.00

Bid Items & Bid Tabulations

20 Total 0 of 20
BEXAR  |  FM0471  |  SAN ANTONIO  |  6469-50-001  |  11/14/2024  |  $185,056.92  |  BPM - 646950001  |  EROSION REPAIR  |  27 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
GARRET SHIELDS INFRASTRUCTURE
TEXAS ROAD CONSTRUCTION, LLC
AAD CONTRACTING INC.
FNH CONSTRUCTION, LLC
REMOV CONC (RIPRAP)
CY 110.000 $82.730 $110.000 $40.000 $150.000 $15.000 $100.000
EXCAV (CHANNEL)
CY 10.000 $526.350 $200.000 $50.000 $250.000 $18.000 $100.000
EMBANK (FNL)(OC)(TY B)
CY 118.000 $18.000 $50.000 $40.000 $100.000 $45.000 $100.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $5.170 $20.000 $5.000 $8.000 $6.000 $20.000
BROADCAST SEED (PERM_URBAN_CLAY)
SY 250.000 $0.290 $1.000 $0.500 $6.000 $1.000 $10.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 250.000 $1.580 $2.000 $5.000 $6.000 $3.000 $30.000
FLOWABLE BACKFILL
CY 10.000 $270.000 $500.000 $500.000 $150.000 $250.000 $350.000
RIPRAP (CONC)(5 IN)
CY 82.000 $500.000 $450.000 $525.000 $250.000 $450.000 $650.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 180.000 $204.140 $115.000 $300.000 $250.000 $140.000 $185.000
GABION MATTRESSES (GALV)(12 IN)
SY 452.000 $95.000 $112.000 $100.000 $225.000 $200.000 $185.000
GABION (1.5' X 3')(GALV)
CY 73.000 $210.000 $200.000 $300.000 $200.000 $250.000 $350.000
MOBILIZATION
LS 1.000 $10,000.000 $5,000.000 $15,000.000 $22,000.000 $25,000.000 $30,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $3,500.000 $2,000.000 $5,000.000 $2,000.000 $10,000.000 $8,500.000
TMA (STATIONARY)
DAY 27.000 $216.800 $1.000 $100.000 $200.000 $350.000 $250.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $21.130 $35.000 $20.000 $10.000 $8.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $9.730 $15.000 $5.000 $1.000 $1.000 $20.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $7.480 $5.000 $8.000 $1.000 $3.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.360 $5.000 $1.000 $1.000 $0.500 $9.000
DRIFTWOOD REMOVAL
LS 1.000 $500.000 $3,750.000 $5,000.000 $1.000 $10,000.000 $35,000.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.200 $2,000.000 $10,000.000 $1,000.000 $100.000 $40,000.000 $35,000.000
Totals: $185,056.920 $174,951.000 $217,995.000 $251,953.000 $256,698.000 $343,240.000