BEXAR MR0681 (6462-73-001)

Items: 27

County: BEXAR
Length: 0.0100 MILES
Highway: MR0681
District: SAN ANTONIO
Control Number: 6462-73-001
DBE Goal: N/A
Project: RMC - A00206740
Guaranty: $2,000.00
Time: 14 WORKING DAYS
Engineer's Estimate: $100,507.41
Date: 07/23/2025 (10 months ago) Changed
Contract Number: 7251502
Type: CULVERT REPLACEMENT
Project ID: A00206740
Project Description: CULVERT REPLACEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4615 NW LOOP 410, SAN ANTONIO, TX 78229
HENRY FOJTIK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$100,507.41
$98,815.00
Over/Under Est: -1.68% -$1,692.41
Over/Under Est: 6.46% $6,492.59
Amt Left: 8.28% $8,185.00
Over/Under Est: 26.54% $26,673.09
Amt Left: 28.71% $28,365.50
Delta: -18.86% -$20,180.50

Bid Items & Bid Tabulations

27 Total 0 of 27
BEXAR  |  MR0681  |  SAN ANTONIO  |  6462-73-001  |  07/23/2025  |  $100,507.41  |  RMC - A00206740  |  CULVERT REPL  |  14 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
DELGADO'S CONTRACTORS, LLC
PRESIDIO CONTRACTING, LLC
REMOV CONC (RIPRAP)
CY 1.000 $200.000 $500.000 $916.000 $245.000
EXCAV (CHANNEL)
CY 10.000 $30.140 $50.000 $40.000 $40.000
EMBANK (FNL)(OC)(TY B)
CY 10.000 $24.510 $50.000 $50.000 $104.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $1.860 $5.000 $7.000 $7.650
BROADCAST SEED (PERM_URBAN_CLAY)
SY 250.000 $0.600 $1.000 $1.000 $1.600
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 250.000 $3.000 $2.000 $5.000 $4.000
TACK COAT
GAL 11.000 $3.400 $5.000 $40.000 $25.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 300.000 $34.380 $50.000 $45.000 $100.000
CUT & RESTORING PAV
SY 35.000 $229.620 $150.000 $150.000 $65.000
FLOWABLE BACKFILL
CY 36.000 $206.970 $300.000 $325.000 $250.000
RIPRAP (CONC)(5 IN)
CY 3.000 $519.820 $600.000 $750.000 $1,120.000
CONC BOX CULV (6 FT X 2 FT)
LF 40.000 $736.490 $500.000 $800.000 $560.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1)(C)
EA 1.000 $10,067.460 $3,000.000 $5,500.000 $9,600.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $8,894.700 $3,000.000 $5,500.000 $12,000.000
REMOV STR (WINGWALL)
EA 1.000 $330.750 $2,000.000 $1,000.000 $725.000
REMOV STR (HEADWALL)
EA 1.000 $1,346.960 $2,000.000 $1,000.000 $725.000
REMOV STR (PIPE)
LF 12.000 $27.530 $100.000 $10.000 $40.000
REMOV STR (BOX CULVERT)
LF 29.000 $51.560 $200.000 $150.000 $67.000
MOBILIZATION
LS 1.000 $10,000.000 $10,000.000 $7,500.000 $12,700.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $3,500.000 $5,000.000 $2,000.000 $4,850.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $20.390 $10.000 $30.000 $23.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $7.150 $5.000 $5.000 $7.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 250.000 $5.300 $8.000 $7.000 $6.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 250.000 $0.860 $1.000 $1.000 $1.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 4.000 $93.450 $60.000 $40.000 $75.000
RE PM TY II (W) 4" (SLD)
LF 624.000 $0.700 $5.000 $3.000 $5.000
RE PM TY II (Y) 4" (SLD)
LF 624.000 $0.220 $5.000 $3.000 $5.000
Totals: $100,507.410 $98,815.000 $107,000.000 $127,180.500