BEXAR IH0010 (6372-51-001)

Items: 183

County: BEXAR
Length: N/A
Highway: IH0010
District: SAN ANTONIO
Control Number: 6372-51-001
DBE Goal: N/A
Project: RMC - 637251001
Guaranty: N/A
Time: 730 WORKING DAYS
Engineer's Estimate: $18,869,631.00
Date: 01/08/2021 (5 years ago)
Contract Number: N/A
Type: ROUTINE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$18,869,631.00
$14,188,793.24
Over/Under Est: -24.81% -$4,680,837.76
Over/Under Est: -19.11% -$3,606,467.40
Amt Left: 7.57% $1,074,370.36
Over/Under Est: -19.02% -$3,589,907.00
Amt Left: 7.69% $1,090,930.76
Delta: -0.11% -$16,560.40
Over/Under Est: -16.61% -$3,134,904.12
Amt Left: 10.9% $1,545,933.64
Delta: -2.98% -$455,002.88

Bid Items & Bid Tabulations

183 Total 0 of 183
BEXAR  |  IH0010  |  SAN ANTONIO  |  6372-51-001  |  01/08/2021  |  $18,869,631.00  |  RMC - 637251001  |  ROUTINE MAINT  |  730 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DBI SERVICES, LLC
ELITE CASTLE RESOURCES LLC
ROY JORGENSEN ASSOCIATES, INC.
CROSS PLUS CONSTRUCTION, LLC
REMOVING CONC (MEDIANS)
SY 100.000 $20.000 $21.000 $9.000 $9.750 $15.000
REMOVING CONC (FOUNDATIONS)
CY 20.000 $200.000 $350.000 $143.000 $143.000 $25.000
REMOVING CONC (CURB)
LF 100.000 $2.750 $6.000 $15.000 $4.500 $12.000
REMOVING CONC (MISC)
SY 100.000 $45.000 $50.000 $20.000 $14.500 $24.000
FLOWABLE BACKFILL
CY 100.000 $160.000 $100.000 $250.000 $273.000 $200.000
CL K CONC (MISC)
CY 100.000 $250.000 $300.000 $480.000 $446.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $175.000 $200.000 $350.000 $225.000 $250.000
RIPRAP (CONC)(CL B)
CY 50.000 $475.000 $900.000 $400.000 $390.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $1,050.000 $700.000 $450.000 $495.000 $600.000
MOBILIZATION (CALLOUT)
EA 800.000 $1,400.000 $600.000 $1,000.000 $1,100.000 $400.000
MOBILIZATION (EMERGENCY)
EA 100.000 $325.000 $300.000 $250.000 $196.000 $600.000
CONC CURB (TY II)
LF 100.000 $25.000 $30.000 $25.000 $17.750 $25.000
CONC SIDEWALKS (4")
SY 100.000 $85.000 $100.000 $100.000 $46.000 $46.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $20.000 $20.000 $21.000 $21.000 $23.100
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $20.000 $55.000 $24.000 $22.000 $23.100
MTL THRIE-BEAM GD FEN (TIM POST)
LF 50.000 $55.000 $100.000 $90.000 $33.500 $33.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 100.000 $1,350.000 $1,250.000 $995.000 $995.000 $1,320.000
MTL BM GD FEN TRANS (NON - SYM)
EA 15.000 $775.000 $1,200.000 $445.000 $425.000 $1,100.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $520.000 $1,200.000 $348.000 $348.000 $660.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.250 $12.000 $8.000 $2.000 $1.250
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $112.000 $500.000 $500.000 $499.000 $1.250
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $21.000 $160.000 $200.000 $448.000 $1.250
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,800.000 $3,000.000 $2,800.000 $1,995.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $390.000 $575.000 $400.000 $590.000 $1.100
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $650.000 $5,000.000 $800.000 $795.000 $4,400.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $5,000.000 $18,000.000 $9,000.000 $7,800.000 $20,900.000
CHAIN LINK FENCE (INSTALL) (6')
LF 200.000 $29.000 $20.000 $15.000 $13.500 $25.000
CHAIN LINK FENCE (REPAIR) (6')
LF 100.000 $12.000 $15.000 $10.000 $10.000 $35.000
CHAIN LINK FENCE (REMOVE)
LF 2,000.000 $6.000 $10.000 $5.000 $4.000 $5.000
CHAIN LINK FENCE (REPAIR) (4')
LF 500.000 $12.000 $15.000 $10.000 $10.000 $35.000
CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4'
EA 8.000 $680.000 $715.000 $700.000 $680.000 $1,259.000
CHAIN LINK FENCE (INSTALL) (4')
LF 200.000 $20.000 $25.000 $12.000 $11.000 $35.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 200.000 $6.000 $10.000 $25.000 $29.000 $5.500
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 300.000 $23.000 $25.000 $25.000 $25.000 $25.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 300.000 $32.000 $35.000 $25.000 $25.000 $30.000
POTHOLE REPAIR (STANDARD)
SY 2,000.000 $65.000 $100.000 $100.000 $123.500 $100.000
EMERGENCY MOBILIZATION
EA 200.000 $65.000 $235.000 $80.000 $47.000 $50.000
STRIP MOWING
AC 1,638.000 $35.000 $44.000 $48.000 $54.000 $45.000
FULL - WIDTH MOWING
AC 29,432.000 $40.000 $44.000 $48.000 $54.000 $41.990
SPOT MOWING
AC 150.000 $95.000 $50.000 $61.000 $54.000 $45.000
LITTER REMOVAL
AC 170,016.000 $12.000 $9.000 $9.000 $10.000 $9.850
LITTER REMOVAL (SPOT)
AC 100.000 $40.000 $120.000 $100.000 $100.000 $12.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 4,180.800 $50.000 $32.000 $48.000 $45.000 $59.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 1,888.800 $20.000 $32.000 $48.000 $45.000 $59.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 500.000 $45.000 $32.000 $48.000 $24.000 $59.000
DEBRIS REMOVAL (DIRECT CONNECTOR)
MI 2,251.200 $40.000 $32.000 $48.000 $45.000 $59.000
DEBRIS REMOVAL (HOV LANES)
MI 508.800 $25.000 $30.000 $85.000 $45.000 $105.000
CLEANING / SWEEPING (CENTER MEDIAN)
MI 4,483.200 $175.000 $170.000 $182.000 $170.000 $179.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 4,483.200 $175.000 $170.000 $182.000 $170.000 $179.000
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 2,066.400 $175.000 $170.000 $182.000 $170.000 $179.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 1,984.800 $175.000 $170.000 $182.000 $170.000 $179.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 100.000 $75.000 $180.000 $182.000 $225.000 $300.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $300.000 $180.000 $265.000 $350.000 $195.000
CLEANING / SWEEPING (HANDWORK)
SY 10,000.000 $1.250 $2.000 $3.000 $3.000 $1.000
CLEANING / SWEEPING (DIRECT CONNECTOR)
MI 2,251.200 $175.000 $180.000 $182.000 $170.000 $195.000
CLEANING/SWEEPING(HOV LANE)
MI 508.800 $175.000 $180.000 $182.000 $170.000 $195.000
GRAFFITI REMOVAL (PAINTING)
SF 120,000.000 $1.000 $1.000 $1.000 $0.950 $3.000
TREE TRIMMING AND BRUSH REMOVAL
LF 1,000.000 $25.000 $20.000 $15.000 $14.000 $6.000
DRAIN INLET CLEANING
EA 400.000 $120.000 $130.000 $150.000 $150.000 $100.000
PUMP STATION WELL CLEANING
EA 35.000 $1,800.000 $2,500.000 $2,000.000 $1,895.000 $4,000.000
BASKET AND INLET PIPE CLEANING
EA 35.000 $450.000 $800.000 $325.000 $325.000 $500.000
DOWNSPOUT CLEANING
EA 50.000 $195.000 $200.000 $200.000 $200.000 $200.000
SUMP CLEANING
EA 6.000 $375.000 $500.000 $450.000 $450.000 $500.000
SLOTTED DRAIN CLEANING
LF 1,000.000 $6.500 $7.000 $15.000 $10.000 $15.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 50,000.000 $15.000 $15.000 $15.000 $15.000 $23.200
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $35.000 $125.000 $15.000 $15.000 $33.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $30.000 $100.000 $24.000 $24.000 $44.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $15.000 $25.000 $35.000 $35.000 $28.000
REALIGN EXISTING RAIL
LF 500.000 $8.000 $12.000 $11.000 $5.000 $2.500
REM / REPL TIMBER/STL POST W/O CONC FND
EA 2,000.000 $40.000 $45.000 $100.000 $35.000 $44.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $60.000 $100.000 $100.000 $100.000 $220.000
REPAIR STEEL POST WITH BASE PLATE
EA 50.000 $110.000 $200.000 $120.000 $100.000 $11.000
REALIGN POSTS
EA 3,000.000 $15.000 $9.000 $5.000 $5.000 $27.500
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 10,000.000 $15.000 $24.000 $24.000 $24.000 $55.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 1,000.000 $55.000 $56.790 $100.000 $80.000 $1.100
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $50.000 $270.000 $20.000 $95.000 $220.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $60.000 $270.000 $20.000 $100.000 $220.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 75.000 $3,000.000 $3,400.000 $4,000.000 $3,500.000 $3,300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $850.000 $1,000.000 $950.000 $1,050.000 $8.800
REM & RESET SGT IMPACT HEAD
EA 350.000 $250.000 $250.000 $250.000 $200.000 $1.100
REMOVE AND REPLACE DAT
EA 50.000 $550.000 $1,600.000 $1,000.000 $950.000 $660.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 250.000 $25.000 $26.000 $50.000 $100.000 $27.500
REPLACE SINGLE GDRAIL TERM POST(WOOD)
EA 50.000 $150.000 $260.000 $100.000 $100.000 $77.000
REPLACE SINGLE GDRAIL TERM POST(STEEL)
EA 50.000 $150.000 $260.000 $250.000 $150.000 $110.000
REPLACE NON-SYMMETRICAL TRANSITION
EA 5.000 $1,000.000 $500.000 $300.000 $299.000 $1,100.000
REPLACE POSTS (TL-3)
EA 2,000.000 $120.000 $130.000 $280.000 $150.000 $132.000
REPLACE POSTS (TL-4)
EA 500.000 $130.000 $1.000 $180.000 $100.000 $110.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $115.000 $300.000 $200.000 $200.000 $110.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $120.000 $100.000 $200.000 $198.000 $11.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $120.000 $500.000 $150.000 $600.000 $110.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $150.000 $20.000 $150.000 $222.000 $11.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 50.000 $1,450.000 $3,000.000 $1,500.000 $3,000.000 $825.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $1,700.000 $1.000 $1,500.000 $2,000.000 $550.000
REPLACE CABLE (TL-3)
LF 2,000.000 $2.000 $8.500 $3.000 $9.500 $2.200
REPLACE CABLE (TL-4)
LF 1,000.000 $2.500 $2.000 $3.000 $3.000 $2.200
CHECK / RE-TENSION CABLE
EA 20.000 $250.000 $1,000.000 $1,000.000 $500.000 $22.000
POST AND CABLE FENCE (REMOVAL)
LF 2,000.000 $1.750 $1.000 $3.000 $2.950 $6.600
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 20.000 $110.000 $50.000 $25.000 $24.000 $55.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 2,500.000 $11.000 $15.000 $15.000 $11.000 $13.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 15.000 $115.000 $100.000 $100.000 $87.000 $55.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 200.000 $50.000 $70.000 $68.000 $62.000 $55.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 15.000 $115.000 $100.000 $100.000 $105.000 $55.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,000.000 $12.000 $9.000 $9.000 $9.000 $3.300
POST AND CABLE FENCE (REPAIR)
LF 15,000.000 $6.000 $5.000 $5.000 $4.750 $6.600
REMOVE AND REPLACE (TRACC)
EA 2.000 $15,000.000 $25,000.000 $13,000.000 $15,000.000 $22,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 2.000 $20,000.000 $18,000.000 $22,000.000 $21,000.000 $22,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 2.000 $22,000.000 $25,000.000 $24,000.000 $24,000.000 $24,200.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 2.000 $22,000.000 $100.000 $15,000.000 $37,000.000 $33,000.000
REPAIR (TRACC)
EA 25.000 $2,500.000 $4,000.000 $5,000.000 $4,000.000 $3,300.000
REPAIR (WIDE TRACC)
EA 5.000 $2,500.000 $4,000.000 $5,000.000 $3,000.000 $4,400.000
REPAIR (REACT)
EA 10.000 $2,100.000 $5,000.000 $5,000.000 $2,500.000 $3,300.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $22,000.000 $30,000.000 $35,000.000 $21,000.000 $22,000.000
REPAIR (CATGR - FRONT SECTION)
EA 2.000 $2,800.000 $5,000.000 $3,500.000 $4,250.000 $3,850.000
REPAIR (CATGR - END SECTION)
EA 2.000 $2,800.000 $2,931.320 $1,000.000 $1,000.000 $2,750.000
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $3,000.000 $4,500.000 $3,500.000 $5,000.000 $3,850.000
REPAIR (QUAD) (N) (BAY)
EA 175.000 $1,700.000 $2,000.000 $2,500.000 $1,900.000 $1,100.000
REPAIR (QUAD) (W) (BAY)
EA 25.000 $1,600.000 $2,000.000 $1,200.000 $1,700.000 $1,650.000
REMOVE AND REPLACE (FASTRACC)
EA 15.000 $17,000.000 $25,000.000 $25,000.000 $22,000.000 $24,400.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 20.000 $750.000 $1,500.000 $800.000 $2,100.000 $1,650.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 20.000 $1,000.000 $1,500.000 $800.000 $2,100.000 $1,650.000
REMOVE AND REPLACE (SMTC) (N)
EA 3.000 $21,000.000 $27,000.000 $27,000.000 $23,000.000 $20,900.000
REPAIR (SMTC) (N)
EA 25.000 $2,200.000 $2,000.000 $4,000.000 $3,490.000 $2,750.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $28,000.000 $32,000.000 $38,000.000 $30,000.000 $33,000.000
REPAIR (SMTC) (W)
EA 5.000 $2,000.000 $2,500.000 $3,000.000 $2,990.000 $2,450.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 800.000 $300.000 $500.000 $400.000 $455.000 $550.000
REMOVE AND REPLACE (SHORTRACC)
EA 2.000 $7,500.000 $25,000.000 $8,000.000 $20,000.000 $15,400.000
REMOVE AND REPLACE (TAU II) (N)
EA 2.000 $24,000.000 $2,000.000 $15,000.000 $20,000.000 $27,500.000
REPAIR TAU II (N)
LF 10.000 $275.000 $60.000 $450.000 $2,000.000 $110.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 2.000 $17,000.000 $30,000.000 $25,000.000 $27,000.000 $33,000.000
REPAIR (QUADGUARD)(MASH)(N)
LF 500.000 $200.000 $225.000 $200.000 $250.000 $220.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 2.000 $18,000.000 $2,000.000 $20,000.000 $25,000.000 $26,400.000
REPAIR (TAU)(MASH)(N)
LF 500.000 $200.000 $60.000 $220.000 $200.000 $275.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 500.000 $30.000 $10.000 $89.000 $87.000 $55.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 500.000 $125.000 $135.000 $120.000 $54.000 $85.000
REPAIR (EXISTING METAL PED. RAIL)
LF 500.000 $100.000 $135.000 $120.000 $55.000 $85.000
REPLACE (STEEL RAIL)
LF 100.000 $150.000 $135.000 $50.000 $66.000 $65.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 200.000 $250.000 $100.000 $100.000 $195.000 $250.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 200.000 $350.000 $100.000 $100.000 $120.000 $250.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 50.000 $200.000 $100.000 $200.000 $200.000 $200.000
REM/REPLACE CURB
EA 150.000 $30.000 $230.000 $225.000 $145.000 $150.000
REM/REPLACE VISION STRIP
EA 250.000 $20.000 $100.000 $100.000 $190.000 $185.000
REM/REPLACE CURB TRANS END SECTION
EA 25.000 $525.000 $215.000 $200.000 $240.000 $50.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 200.000 $130.000 $90.000 $100.000 $55.000 $55.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $95.000 $20.000 $80.000 $72.000 $75.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 500.000 $275.000 $200.000 $350.000 $315.000 $199.990
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $140.000 $150.000 $50.000 $50.000 $55.000
REPLACE SMALL RDSD SIGN SUPP & ASSEM
EA 300.000 $350.000 $350.000 $450.000 $390.000 $395.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 50.000 $22.000 $110.000 $50.000 $20.000 $25.000
TMA (STATIONARY)
DAY 5,200.000 $160.000 $1.000 $0.500 $1.000 $1.000
TMA (MOBILE OPERATION)
HR 25,000.000 $85.000 $1.000 $0.500 $1.000 $1.000
TMA (MOBILE OPERATION)
DAY 5,200.000 $170.000 $1.000 $0.500 $1.000 $1.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 100.000 $525.000 $600.000 $750.000 $750.000 $700.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 50.000 $210.000 $200.000 $100.000 $45.000 $100.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 150.000 $675.000 $500.000 $850.000 $1,000.000 $1,800.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 150.000 $37.000 $200.000 $100.000 $43.000 $150.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $135.000 $50.000 $125.000 $125.000 $99.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $200.000 $50.000 $150.000 $145.000 $99.000
INCIDENT MANAGEMENT (TYPE C)
HR 100.000 $350.000 $50.000 $100.000 $139.000 $99.000
INCIDENT MANAGEMENT (TYPE D)
HR 100.000 $500.000 $50.000 $150.000 $180.000 $99.000
INCIDENT MANAGEMENT (TYPE E)
HR 100.000 $575.000 $100.000 $300.000 $300.000 $352.000
INCIDENT MANAGEMENT (TYPE F)
HR 100.000 $190.000 $200.000 $250.000 $150.000 $350.000
INCIDENT MANAGEMENT (TYPE G)
HR 80.000 $95.000 $50.000 $75.000 $74.000 $100.000
INCIDENT MANAGEMENT (TYPE H)
HR 80.000 $130.000 $50.000 $100.000 $90.000 $99.000
INCIDENT MANAGEMENT (TYPE I)
HR 80.000 $220.000 $50.000 $200.000 $195.000 $99.000
INCIDENT MANAGEMENT (TYPE J)
HR 80.000 $380.000 $50.000 $50.000 $35.000 $99.000
INCIDENT MANAGEMENT (TYPE K)
HR 100.000 $135.000 $50.000 $100.000 $87.000 $299.000
INCIDENT MANAGEMENT (TYPE L)
HR 100.000 $275.000 $50.000 $117.000 $115.000 $99.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 500.000 $65.000 $100.000 $60.000 $25.000 $99.000
VACUUM CLEAN DRAIN INLETS AND RACEWAYS
CYC 8.000 $80,000.000 $20,000.000 $20,000.000 $20,000.000 $37,500.000
VACUUM CLEANING OF BRIDGE JOINTS
CYC 4.000 $28,000.000 $30,000.000 $20,000.000 $15,000.000 $17,000.000
SITE INSPECTION AND CLEANING
EA 600.000 $110.000 $145.000 $110.000 $102.000 $125.000
TRASH, DEBRIS, AND SEDIMENT REMOVAL
CYC 150.000 $260.000 $280.000 $275.000 $500.000 $299.000
REPLACING FILTER CARTRIDGES
EA 9,500.000 $35.000 $35.000 $35.000 $26.000 $42.000
ROTATION OF FILTER CARTRIDGES
EA 2,000.000 $12.000 $15.000 $20.000 $15.000 $13.560
MOWING AND TRIMMING
CYC 40.000 $180.000 $240.000 $250.000 $1,500.000 $225.000
REPLACE BLADDER VALVE
EA 15.000 $150.000 $135.000 $200.000 $140.000 $149.000
REPLACE BATTERY
EA 50.000 $55.000 $75.000 $200.000 $60.000 $65.210
SNOW AND ICE CONTROL (TRUCK)
HR 500.000 $100.000 $80.000 $80.000 $80.000 $100.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 500.000 $100.000 $80.000 $60.000 $50.000 $65.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 500.000 $100.000 $8.000 $80.000 $80.000 $99.000
SNOW AND ICE CONTROL SEASON
MO 10.000 $24,000.000 $50,000.000 $10,000.000 $45,000.000 $35,000.000
PERM CONC TRAFF BARRIER REPAIR
LF 50.000 $250.000 $100.000 $100.000 $100.000 $1,000.000
PERM CONC TRAFF BARRIER REPLACE
LF 50.000 $250.000 $200.000 $200.000 $195.000 $1,000.000
Totals: $18,869,631.000 $14,188,793.240 $15,263,163.600 $15,279,724.000 $15,734,726.880