BEXAR IH0035 (6372-50-001)

Items: 175

County: BEXAR
Length: N/A
Highway: IH0035
District: SAN ANTONIO
Control Number: 6372-50-001
DBE Goal: N/A
Project: RMC - 637250001
Guaranty: N/A
Time: 730 WORKING DAYS
Engineer's Estimate: $18,283,425.40
Date: 01/07/2021 (5 years ago)
Contract Number: N/A
Type: ROUTINE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$18,283,425.40
$14,977,836.16
Over/Under Est: -18.08% -$3,305,589.24
$16,258,645.80
Over/Under Est: -11.07% -$2,024,779.60
Amt Left: 8.55% $1,280,809.64
Over/Under Est: 16.07% $2,938,823.36
Amt Left: 41.69% $6,244,412.60
Delta: -30.53% -$4,963,602.96
Over/Under Est: 32.17% $5,882,577.40
Amt Left: 61.35% $9,188,166.64
Delta: -13.87% -$2,943,754.04
Subcontractor Percentage Amount
BK FIELD OPERATIONS LLC 8.08% $3,570,970.90
SWEEPING SERVICES OF TEXAS - OPERATING, L.P. 3.84% $1,697,095.08
YES AMERICA NOW, INC. 3.76% $1,661,738.93
AIMS COMPANIES 0.33% $145,844.11
JCW CONSTRUCTION, LLC 0.11% $48,614.70
BOEN LANDSCAPING & IRRIGATION, LLC 0.00% $0.00
AUSTIN BARRICADE COMPANY, L.L.C. 0.00% $0.00
Total: 16.12% $7,124,263.72

Bid Items & Bid Tabulations

175 Total 0 of 175
BEXAR  |  IH0035  |  SAN ANTONIO  |  6372-50-001  |  01/07/2021  |  $18,283,425.40  |  RMC - 637250001  |  ROUTINE MAINT  |  730 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
DBI SERVICES, LLC
CROSS PLUS CONSTRUCTION, LLC
ELITE CASTLE RESOURCES LLC
REMOVING CONC (MEDIANS)
SY 100.000 $20.000 $9.000 $10.000 $25.000 $100.000
REMOVING CONC (FOUNDATIONS)
CY 20.000 $200.000 $143.000 $20.000 $12.000 $100.000
REMOVING CONC (CURB)
LF 100.000 $2.750 $4.500 $100.000 $10.000 $100.000
REMOVING CONC (MISC)
SY 100.000 $45.000 $14.500 $100.000 $25.000 $100.000
FLOWABLE BACKFILL
CY 100.000 $160.000 $273.000 $100.000 $299.000 $250.000
CL K CONC (MISC)
CY 100.000 $250.000 $446.000 $300.000 $550.000 $600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 20.000 $175.000 $225.000 $150.000 $200.000 $250.000
RIPRAP (CONC)(CL B)
CY 50.000 $1,050.000 $396.000 $250.000 $450.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $475.000 $495.000 $240.000 $450.000 $600.000
MOBILIZATION (CALLOUT)
EA 800.000 $1,400.000 $1,370.000 $1,000.000 $500.000 $500.000
MOBILIZATION (EMERGENCY)
EA 100.000 $325.000 $196.000 $300.000 $1,000.000 $500.000
PORT CTB (ALIGNING)
LF 10,000.000 $3.000 $5.000 $10.000 $10.000 $10.000
CONC CURB (TY II)
LF 100.000 $25.000 $18.500 $10.000 $25.000 $45.000
CONC SIDEWALKS (4")
SY 100.000 $85.000 $48.000 $50.000 $59.000 $65.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $20.000 $22.000 $16.000 $22.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $20.000 $23.000 $30.000 $22.000 $25.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 50.000 $55.000 $35.000 $90.000 $58.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 100.000 $1,350.000 $995.000 $800.000 $1,325.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 15.000 $775.000 $445.000 $600.000 $600.000 $1,000.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $520.000 $348.000 $800.000 $12.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.250 $2.000 $10.000 $2.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $112.000 $499.000 $110.000 $150.000 $200.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $21.000 $448.000 $50.000 $200.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,800.000 $1,995.000 $2,500.000 $3,100.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $390.000 $500.000 $400.000 $100.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $650.000 $795.000 $4,000.000 $2,500.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $5,000.000 $7,800.000 $16,000.000 $25,000.000 $30,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 200.000 $29.000 $14.500 $10.000 $59.000 $25.000
CHAIN LINK FENCE (REPAIR) (6')
LF 100.000 $12.000 $10.000 $5.000 $85.000 $25.000
CHAIN LINK FENCE (REMOVE)
LF 2,000.000 $6.000 $4.250 $5.000 $5.000 $2.000
CHAIN LINK FENCE (REPAIR) (4')
LF 500.000 $12.000 $10.000 $10.000 $55.000 $25.000
CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4'
EA 8.000 $680.000 $680.000 $300.000 $1,500.000 $1,000.000
CHAIN LINK FENCE (INSTALL) (4')
LF 200.000 $20.000 $12.000 $8.000 $95.000 $25.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 200.000 $6.000 $30.000 $5.000 $10.000 $50.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 300.000 $23.000 $25.000 $26.000 $45.000 $50.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 300.000 $32.000 $25.000 $35.000 $45.000 $50.000
POTHOLE REPAIR (STANDARD)
SY 2,000.000 $65.000 $123.500 $100.000 $99.000 $150.000
EMERGENCY MOBILIZATION
EA 200.000 $65.000 $49.000 $80.000 $352.000 $1,000.000
STRIP MOWING
AC 8,970.000 $35.000 $49.500 $44.000 $45.000 $60.000
FULL - WIDTH MOWING
AC 33,056.000 $40.000 $49.500 $44.000 $45.000 $60.000
SPOT MOWING
AC 150.000 $95.000 $61.000 $47.000 $52.000 $200.000
LITTER REMOVAL
AC 183,408.000 $12.000 $9.000 $10.000 $12.210 $11.000
LITTER REMOVAL (SPOT)
AC 100.000 $50.000 $41.000 $100.000 $25.000 $100.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 4,838.400 $40.000 $48.000 $40.000 $99.000 $65.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 2,085.120 $20.000 $48.000 $40.000 $99.000 $65.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 500.000 $45.000 $19.000 $25.000 $99.000 $65.000
DEBRIS REMOVAL (DIRECT CONNECTOR)
MI 1,694.400 $40.000 $48.000 $40.000 $99.000 $65.000
CLEANING / SWEEPING (CENTER MEDIAN)
MI 3,480.000 $175.000 $185.000 $200.000 $215.000 $200.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 3,480.000 $175.000 $185.000 $200.000 $215.000 $200.000
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 895.200 $175.000 $185.000 $200.000 $215.000 $200.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 1,869.600 $175.000 $185.000 $200.000 $215.000 $200.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 100.000 $75.000 $170.000 $100.000 $250.000 $200.000
CLEANING / SWEEPING (SPOT)
MI 50.000 $300.000 $185.000 $400.000 $200.000 $200.000
CLEANING / SWEEPING (HANDWORK)
SY 10,000.000 $1.250 $1.950 $5.000 $2.000 $5.000
CLEANING / SWEEPING (DIRECT CONNECTOR)
MI 1,694.400 $175.000 $185.000 $175.000 $215.000 $200.000
GRAFFITI REMOVAL (PAINTING)
SF 120,000.000 $1.000 $0.950 $1.000 $3.000 $1.000
TREE TRIMMING AND BRUSH REMOVAL
LF 1,000.000 $25.000 $14.000 $18.000 $25.000 $50.000
DRAIN INLET CLEANING
EA 500.000 $120.000 $150.000 $130.000 $100.000 $350.000
PUMP STATION WELL CLEANING
EA 75.000 $1,800.000 $1,895.000 $2,500.000 $4,250.000 $4,000.000
BASKET AND INLET PIPE CLEANING
EA 75.000 $450.000 $325.000 $600.000 $1,250.000 $1,000.000
DOWNSPOUT CLEANING
EA 50.000 $195.000 $200.000 $150.000 $269.000 $500.000
SUMP CLEANING
EA 10.000 $375.000 $450.000 $500.000 $500.000 $2,500.000
SLOTTED DRAIN CLEANING
LF 1,000.000 $6.500 $10.000 $6.000 $25.000 $50.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 50,000.000 $15.000 $15.750 $15.000 $28.000 $19.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $35.000 $15.000 $70.000 $35.000 $100.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $30.000 $24.000 $70.000 $48.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $15.000 $35.000 $30.000 $32.000 $35.000
REALIGN EXISTING RAIL
LF 500.000 $8.000 $5.000 $6.000 $4.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 2,000.000 $40.000 $27.000 $45.000 $38.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $60.000 $45.000 $120.000 $75.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 50.000 $110.000 $100.000 $120.000 $200.000 $300.000
REALIGN POSTS
EA 3,000.000 $15.000 $5.000 $18.000 $17.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 10,000.000 $15.000 $24.000 $15.000 $21.000 $23.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 1,000.000 $55.000 $80.000 $75.000 $75.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $50.000 $19.000 $60.000 $62.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $60.000 $19.000 $60.000 $200.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 75.000 $3,000.000 $3,500.000 $3,000.000 $3,000.000 $3,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $850.000 $950.000 $1,000.000 $1,159.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 350.000 $250.000 $200.000 $300.000 $759.000 $200.000
REMOVE AND REPLACE DAT
EA 50.000 $550.000 $950.000 $1,000.000 $1,524.000 $1,500.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 250.000 $25.000 $100.000 $20.000 $43.000 $20.000
REPLACE SINGLE GDRAIL TERM POST(WOOD)
EA 50.000 $150.000 $100.000 $200.000 $175.000 $80.000
REPLACE SINGLE GDRAIL TERM POST(STEEL)
EA 50.000 $150.000 $150.000 $200.000 $280.000 $350.000
REPLACE NON-SYMMETRICAL TRANSITION
EA 5.000 $1,000.000 $299.000 $500.000 $750.000 $1,000.000
REPLACE POSTS (TL-3)
EA 2,000.000 $120.000 $124.000 $170.000 $155.000 $220.000
REPLACE POSTS (TL-4)
EA 500.000 $130.000 $150.000 $100.000 $155.000 $200.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $115.000 $200.000 $100.000 $200.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $120.000 $198.000 $10.000 $11.000 $150.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $120.000 $248.000 $400.000 $100.000 $150.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $150.000 $222.000 $10.000 $100.000 $150.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 50.000 $1,450.000 $2,000.000 $3,000.000 $1,250.000 $1,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $1,700.000 $2,490.000 $530.000 $1,250.000 $1,000.000
REPLACE CABLE (TL-3)
LF 2,000.000 $2.000 $3.000 $10.000 $9.000 $6.000
REPLACE CABLE (TL-4)
LF 1,000.000 $2.500 $2.500 $4.000 $5.000 $6.000
CHECK / RE-TENSION CABLE
EA 20.000 $250.000 $500.000 $1,000.000 $600.000 $1,000.000
POST AND CABLE FENCE (REMOVAL)
LF 2,000.000 $1.750 $3.000 $5.000 $2.000 $10.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 20.000 $110.000 $25.000 $100.000 $100.000 $50.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 2,500.000 $11.000 $11.250 $25.000 $10.000 $15.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 15.000 $115.000 $89.000 $100.000 $104.000 $100.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 200.000 $50.000 $64.000 $80.000 $55.000 $50.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 15.000 $115.000 $110.000 $100.000 $102.000 $100.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,000.000 $12.000 $10.000 $20.000 $10.000 $8.000
POST AND CABLE FENCE (REPAIR)
LF 15,000.000 $6.000 $4.750 $6.000 $6.000 $6.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $15,000.000 $13,000.000 $27,000.000 $20,000.000 $20,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 2.000 $20,000.000 $21,000.000 $15,000.000 $24,500.000 $30,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 2.000 $22,000.000 $18,500.000 $30,000.000 $34,000.000 $30,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 2.000 $22,000.000 $25,000.000 $6,000.000 $27,000.000 $25,000.000
REPAIR (TRACC)
EA 25.000 $2,500.000 $3,000.000 $5,000.000 $4,500.000 $4,000.000
REPAIR (WIDE TRACC)
EA 5.000 $2,500.000 $3,000.000 $2,500.000 $4,500.000 $4,000.000
REPAIR (REACT)
EA 10.000 $2,100.000 $2,000.000 $3,000.000 $2,500.000 $4,000.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $22,000.000 $19,000.000 $50,000.000 $27,500.000 $30,000.000
REPAIR (CATGR - FRONT SECTION)
EA 2.000 $2,800.000 $3,500.000 $4,000.000 $3,000.000 $3,525.000
REPAIR (CATGR - END SECTION)
EA 2.000 $2,800.000 $1,000.000 $2,000.000 $3,000.000 $3,525.000
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $3,000.000 $5,000.000 $4,500.000 $3,100.000 $3,525.000
REPAIR (QUAD) (N) (BAY)
EA 175.000 $1,700.000 $1,750.000 $2,000.000 $1,500.000 $1,900.000
REPAIR (QUAD) (W) (BAY)
EA 25.000 $1,600.000 $1,200.000 $2,000.000 $1,500.000 $1,900.000
REMOVE AND REPLACE (FASTRACC)
EA 15.000 $17,000.000 $20,000.000 $40,000.000 $28,500.000 $30,000.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 20.000 $750.000 $1,500.000 $1,000.000 $2,200.000 $1,500.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 20.000 $1,000.000 $1,500.000 $1,000.000 $2,200.000 $1,500.000
REMOVE AND REPLACE (SMTC) (N)
EA 3.000 $21,000.000 $15,000.000 $20,000.000 $27,000.000 $30,000.000
REPAIR (SMTC) (N)
EA 25.000 $2,200.000 $3,500.000 $3,000.000 $2,000.000 $5,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $28,000.000 $30,000.000 $25,000.000 $28,000.000 $40,000.000
REPAIR (SMTC) (W)
EA 5.000 $2,000.000 $3,000.000 $2,500.000 $5,000.000 $5,000.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 800.000 $300.000 $500.000 $400.000 $550.000 $380.000
REMOVE AND REPLACE (SHORTRACC)
EA 2.000 $7,500.000 $8,000.000 $40,000.000 $22,000.000 $13,300.000
REMOVE AND REPLACE (TAU II) (N)
EA 2.000 $24,000.000 $14,500.000 $32,000.000 $28,000.000 $26,000.000
REPAIR TAU II (N)
LF 10.000 $275.000 $250.000 $3,000.000 $3,200.000 $500.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 2.000 $17,000.000 $25,000.000 $30,000.000 $30,000.000 $30,000.000
REPAIR (QUADGUARD)(MASH)(N)
LF 500.000 $200.000 $198.000 $400.000 $200.000 $250.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 2.000 $18,000.000 $19,950.000 $30,000.000 $30,000.000 $30,000.000
REPAIR (TAU)(MASH)(N)
LF 500.000 $200.000 $220.000 $120.000 $500.000 $260.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 500.000 $30.000 $89.000 $10.000 $25.990 $75.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 500.000 $125.000 $54.000 $150.000 $200.000 $175.000
REPAIR (EXISTING METAL PED. RAIL)
LF 500.000 $100.000 $55.000 $150.000 $200.000 $175.000
REPLACE (STEEL RAIL)
LF 100.000 $150.000 $68.000 $140.000 $150.000 $175.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 200.000 $250.000 $250.000 $100.000 $600.000 $250.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 200.000 $350.000 $147.000 $60.000 $1,100.000 $250.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 50.000 $200.000 $200.000 $210.000 $500.000 $200.000
REM/REPLACE CURB
EA 150.000 $30.000 $121.000 $400.000 $200.000 $200.000
REM/REPLACE VISION STRIP
EA 250.000 $20.000 $195.000 $170.000 $200.000 $200.000
REM/REPLACE CURB TRANS END SECTION
EA 25.000 $525.000 $189.000 $215.000 $352.000 $200.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 200.000 $130.000 $47.000 $65.000 $65.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $95.000 $98.000 $15.000 $75.000 $300.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 500.000 $275.000 $325.000 $200.000 $500.000 $500.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $140.000 $50.000 $80.000 $500.000 $500.000
REPLACE SMALL RDSD SIGN SUPP & ASSEM
EA 300.000 $350.000 $400.000 $500.000 $500.000 $500.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 50.000 $22.000 $22.000 $40.000 $75.000 $500.000
TMA (STATIONARY)
DAY 5,200.000 $160.000 $1.000 $100.000 $200.000 $500.000
TMA (MOBILE OPERATION)
HR 25,000.000 $85.000 $1.000 $1.000 $40.000 $100.000
TMA (MOBILE OPERATION)
DAY 5,200.000 $170.000 $1.000 $100.000 $150.000 $300.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 100.000 $525.000 $750.000 $1,000.000 $800.000 $500.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 50.000 $210.000 $50.000 $200.000 $800.000 $500.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 150.000 $675.000 $1,000.000 $600.000 $2,500.000 $500.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 150.000 $37.000 $44.000 $200.000 $100.000 $500.000
INCIDENT MANAGEMENT (TYPE A)
HR 100.000 $135.000 $125.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE B)
HR 100.000 $200.000 $150.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE C)
HR 100.000 $350.000 $141.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE D)
HR 100.000 $500.000 $187.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE E)
HR 100.000 $575.000 $300.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE F)
HR 100.000 $190.000 $150.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE G)
HR 80.000 $95.000 $74.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE H)
HR 80.000 $130.000 $94.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE I)
HR 80.000 $220.000 $195.000 $50.000 $3,250.000 $150.000
INCIDENT MANAGEMENT (TYPE J)
HR 80.000 $380.000 $38.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE K)
HR 100.000 $135.000 $91.000 $50.000 $250.000 $150.000
INCIDENT MANAGEMENT (TYPE L)
HR 100.000 $275.000 $117.000 $50.000 $250.000 $150.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 500.000 $65.000 $25.000 $80.000 $99.000 $100.000
VACUUM CLEAN DRAIN INLETS AND RACEWAYS
CYC 8.000 $80,000.000 $22,500.000 $60,000.000 $10,000.000 $5,000.000
VACUUM CLEANING OF BRIDGE JOINTS
CYC 4.000 $28,000.000 $20,000.000 $30,000.000 $10,000.000 $20,000.000
SNOW AND ICE CONTROL (TRUCK)
HR 500.000 $100.000 $80.000 $50.000 $150.000 $250.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 500.000 $100.000 $50.000 $50.000 $55.000 $250.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 500.000 $100.000 $80.000 $50.000 $65.000 $250.000
SNOW AND ICE CONTROL SEASON
MO 10.000 $24,000.000 $71,250.000 $30,000.000 $25,000.000 $25,000.000
PERM CONC TRAFF BARRIER REPAIR
LF 50.000 $250.000 $100.000 $100.000 $1,250.000 $400.000
PERM CONC TRAFF BARRIER REPLACE
LF 50.000 $250.000 $195.000 $200.000 $1,250.000 $400.000
Totals: $18,283,425.400 $14,977,836.160 $16,258,645.800 $21,222,248.760 $24,166,002.800