REMOVING CONC (RIPRAP)
|
SY
|
337.000
|
$8.750
|
$65.000
|
$51.790
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
30.000
|
$295.000
|
$352.000
|
$532.520
|
|
|
REMOVING CONC (CTB)
|
LF
|
65.000
|
$12.000
|
$275.000
|
$60.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,594.000
|
$0.770
|
$4.200
|
$3.820
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
4,594.000
|
$0.280
|
$0.550
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
300.000
|
$11.870
|
$134.000
|
$26.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
11.000
|
$150.000
|
$230.000
|
$336.150
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
68.000
|
$250.000
|
$426.000
|
$636.570
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
21.000
|
$300.000
|
$448.000
|
$539.610
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
27.000
|
$350.000
|
$515.000
|
$744.520
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.000
|
$450.000
|
$715.000
|
$563.200
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$15,000.000
|
$62,500.000
|
$84,552.790
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$5,000.000
|
$29,050.000
|
$23,805.440
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
220.000
|
$2.320
|
$5.250
|
$4.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
220.000
|
$0.630
|
$1.100
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,710.000
|
$34.710
|
$18.700
|
$64.110
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,970.000
|
$4.600
|
$5.500
|
$14.730
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,710.000
|
$8.550
|
$5.500
|
$19.110
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
30.000
|
$150.000
|
$480.000
|
$250.000
|
|
|
PERM CTB (F-SHAPE) (TY 3)
|
LF
|
35.000
|
$300.000
|
$714.000
|
$300.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$30.000
|
$25.400
|
$31.070
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,200.000
|
$1,255.000
|
$1,288.230
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
675.000
|
$2.000
|
$2.250
|
$3.880
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
3.000
|
$350.000
|
$50.000
|
$194.210
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,700.000
|
$2,870.000
|
$3,793.470
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$170.000
|
$165.000
|
$388.410
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,540.000
|
$1,320.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,128.000
|
$660.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$6,434.000
|
$7,315.000
|
$8,000.000
|
|
|
RELOCATE RD IL ASM (CTB MOUNT)
|
EA
|
1.000
|
$1,600.000
|
$21,700.000
|
$5,395.010
|
|
|
CONDT (PVC) (SCH 40) (1 1/2")
|
LF
|
75.000
|
$15.000
|
$13.650
|
$16.150
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
140.000
|
$9.000
|
$11.400
|
$26.280
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
140.000
|
$1.890
|
$8.300
|
$3.960
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$880.000
|
$1,985.000
|
$1,854.550
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$300.000
|
$5,950.000
|
$158.890
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$420.000
|
$560.000
|
$554.860
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
583.000
|
$22.000
|
$25.150
|
$34.400
|
|
|
REFURBISH ALUMINUM SIGNS (TY G)
|
EA
|
107.000
|
$25.830
|
$9.200
|
$12.180
|
|
|
REFURBISH ALUMINUM SIGNS (TY O)
|
EA
|
155.000
|
$25.000
|
$14.700
|
$16.410
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
342.000
|
$6.500
|
$6.800
|
$7.850
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
1.000
|
$15,000.000
|
$17,600.000
|
$31,031.450
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$20,000.000
|
$22,200.000
|
$39,600.590
|
|
|
INS OH SN SUP(100 FT BRDG)
|
EA
|
1.000
|
$34,000.000
|
$49,900.000
|
$87,794.140
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
3.000
|
$35.000
|
$40.000
|
$34.890
|
|
|
REMOVAL OF CONDUIT
|
LF
|
20.000
|
$25.000
|
$19.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
70.000
|
$65.000
|
$93.000
|
$156.130
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$15,000.000
|
$7,850.000
|
$31,794.610
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
735.000
|
$2.680
|
$13.850
|
$6.180
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
1.000
|
$1,500.000
|
$1,175.000
|
$1,606.670
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
2.000
|
$650.000
|
$375.000
|
$109.960
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
510.000
|
$1.750
|
$11.200
|
$1.100
|
|
|
ITS GRND MNT CAB (TY 5) (CONF 1) (REM)
|
EA
|
1.000
|
$13,500.000
|
$1,000.000
|
$3,044.910
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
1.000
|
$10,700.000
|
$11,225.000
|
$13,608.230
|
|
|
CONDUIT (PREPARE)
|
LF
|
510.000
|
$6.000
|
$7.100
|
$2.330
|
|
|
MANHOLE (PREPARE)
|
EA
|
3.000
|
$360.000
|
$580.000
|
$463.680
|
|
|
ITS POLE (8 FT)(COSS/OSB)
|
EA
|
1.000
|
$3,100.000
|
$5,005.000
|
$6,408.060
|
|
|
TMA (STATIONARY)
|
DAY
|
51.000
|
$170.000
|
$372.000
|
$601.130
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
4.000
|
$75.000
|
$124.000
|
$75.140
|
|
Totals: |
$398,349.760
|
$659,593.700
|
$845,527.950
|