REMOVING CONC (MEDIANS)
|
SY
|
200.000
|
$52.000
|
$18.250
|
$20.000
|
$20.240
|
$40.000
|
$35.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
100.000
|
$6.000
|
$2.550
|
$20.000
|
$15.180
|
$1.300
|
$20.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
20.000
|
$65.000
|
$128.000
|
$150.000
|
$151.500
|
$150.000
|
$250.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
100.000
|
$16.000
|
$1,014.000
|
$340.000
|
$310.610
|
$450.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
5.000
|
$750.000
|
$450.000
|
$840.000
|
$896.500
|
$750.000
|
$900.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
300.000
|
$100.000
|
$1,341.000
|
$200.000
|
$1,200.000
|
$250.000
|
$3,250.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
150.000
|
$150.000
|
$308.000
|
$400.000
|
$2,000.000
|
$500.000
|
$3,500.000
|
|
|
CONC CURB (TY II)
|
LF
|
100.000
|
$16.000
|
$23.000
|
$20.000
|
$46.430
|
$8.000
|
$30.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
200.000
|
$66.000
|
$81.000
|
$50.000
|
$68.020
|
$75.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,000.000
|
$12.000
|
$19.000
|
$25.000
|
$22.500
|
$18.000
|
$40.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
$16.000
|
$19.000
|
$40.000
|
$22.500
|
$20.000
|
$45.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
50.000
|
$15.000
|
$53.000
|
$75.000
|
$62.500
|
$60.000
|
$105.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
200.000
|
$985.000
|
$1,310.000
|
$1,000.000
|
$1,500.000
|
$1,200.000
|
$1,400.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
15.000
|
$50.000
|
$737.000
|
$1,000.000
|
$875.000
|
$250.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$2.000
|
$2.150
|
$10.000
|
$2.500
|
$2.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$5.000
|
$106.000
|
$400.000
|
$125.000
|
$100.000
|
$750.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
15.000
|
$50.000
|
$20.000
|
$125.000
|
$6.250
|
$105.000
|
$100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$1,800.000
|
$2,737.000
|
$2,800.000
|
$3,250.000
|
$2,500.000
|
$3,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$200.000
|
$375.000
|
$500.000
|
$437.500
|
$450.000
|
$750.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
200.000
|
$10.000
|
$18.000
|
$20.000
|
$30.000
|
$20.000
|
$25.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
100.000
|
$5.000
|
$11.000
|
$20.000
|
$12.500
|
$20.000
|
$20.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
2,000.000
|
$1.000
|
$5.500
|
$10.000
|
$7.500
|
$3.000
|
$12.000
|
|
|
CHAIN LINK FENCE (REPAIR) (4')
|
LF
|
400.000
|
$2.000
|
$11.500
|
$15.000
|
$12.500
|
$20.000
|
$12.000
|
|
|
CHN LNK FNCE GATE(PVC CTD)(INSTL)6'X4'
|
EA
|
8.000
|
$500.000
|
$650.000
|
$600.000
|
$687.500
|
$800.000
|
$1,500.000
|
|
|
CHAIN LINK FENCE (INSTALL) (4')
|
LF
|
200.000
|
$6.000
|
$20.000
|
$15.000
|
$27.500
|
$16.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GF2
|
EA
|
300.000
|
$20.000
|
$22.000
|
$75.000
|
$31.250
|
$12.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GF2
|
EA
|
300.000
|
$20.000
|
$30.000
|
$75.000
|
$31.250
|
$12.000
|
$45.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
200.000
|
$2.000
|
$6.150
|
$20.000
|
$31.250
|
$3.000
|
$25.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
1,500.000
|
$40.000
|
$62.300
|
$50.000
|
$120.750
|
$80.000
|
$75.000
|
|
|
EMERGENCY MOBILIZATION
|
EA
|
300.000
|
$500.000
|
$63.000
|
$100.000
|
$275.000
|
$100.000
|
$3,250.000
|
|
|
STRIP MOWING
|
AC
|
8,970.000
|
$28.820
|
$37.000
|
$35.000
|
$31.500
|
$40.000
|
$55.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
32,758.000
|
$28.480
|
$41.100
|
$35.000
|
$32.200
|
$40.000
|
$53.000
|
|
|
SPOT MOWING
|
AC
|
150.000
|
$50.000
|
$90.000
|
$100.000
|
$41.600
|
$40.000
|
$100.000
|
|
|
LITTER REMOVAL
|
AC
|
176,496.000
|
$6.000
|
$10.500
|
$7.250
|
$8.420
|
$9.000
|
$12.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
100.000
|
$10.000
|
$75.000
|
$200.000
|
$58.830
|
$15.000
|
$20.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
15,436.800
|
$23.220
|
$43.750
|
$50.000
|
$92.520
|
$125.000
|
$65.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
MI
|
6,679.680
|
$23.740
|
$43.750
|
$40.000
|
$92.520
|
$125.000
|
$55.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
500.000
|
$150.000
|
$23.000
|
$300.000
|
$167.530
|
$125.000
|
$70.000
|
|
|
DEBRIS REMOVAL (DIRECT CONNECTOR)
|
MI
|
3,388.800
|
$150.000
|
$43.750
|
$30.000
|
$102.530
|
$150.000
|
$85.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
MI
|
3,204.000
|
$210.030
|
$193.500
|
$230.000
|
$127.400
|
$215.000
|
$195.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
MI
|
3,204.000
|
$129.980
|
$193.500
|
$230.000
|
$127.400
|
$215.000
|
$200.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
MI
|
818.400
|
$122.100
|
$193.500
|
$230.000
|
$127.400
|
$215.000
|
$175.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
MI
|
1,766.400
|
$190.000
|
$193.500
|
$230.000
|
$127.400
|
$215.000
|
$175.000
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
100.000
|
$160.000
|
$50.000
|
$400.000
|
$142.800
|
$112.000
|
$250.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
50.000
|
$160.000
|
$370.000
|
$400.000
|
$142.800
|
$120.000
|
$250.000
|
|
|
CLEANING / SWEEPING (DIRECT CONNECTOR)
|
MI
|
1,694.400
|
$190.000
|
$193.500
|
$230.000
|
$127.400
|
$215.000
|
$200.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
110,000.000
|
$1.000
|
$0.450
|
$1.250
|
$1.160
|
$1.000
|
$4.500
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
500.000
|
$5.000
|
$9.500
|
$20.000
|
$12.200
|
$28.000
|
$75.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
50.000
|
$250.000
|
$122.000
|
$300.000
|
$92.770
|
$135.000
|
$200.000
|
|
|
PUMP STATION WELL CLEANING
|
EA
|
35.000
|
$2,500.000
|
$2,000.000
|
$2,000.000
|
$1,855.360
|
$4,500.000
|
$3,500.000
|
|
|
BASKET AND INLET PIPE CLEANING
|
EA
|
35.000
|
$250.000
|
$500.000
|
$800.000
|
$618.450
|
$350.000
|
$2,500.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
50.000
|
$250.000
|
$237.000
|
$200.000
|
$371.070
|
$300.000
|
$200.000
|
|
|
SUMP CLEANING
|
EA
|
6.000
|
$300.000
|
$410.000
|
$800.000
|
$1,855.360
|
$1,000.000
|
$2,500.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
47,000.000
|
$12.000
|
$13.930
|
$15.000
|
$15.000
|
$12.000
|
$19.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
75.000
|
$10.000
|
$63.000
|
$100.000
|
$75.000
|
$30.000
|
$40.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
35.000
|
$10.000
|
$63.000
|
$100.000
|
$75.000
|
$25.000
|
$60.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
500.000
|
$5.000
|
$5.500
|
$8.000
|
$6.250
|
$5.000
|
$11.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
3,500.000
|
$20.000
|
$40.500
|
$40.000
|
$46.250
|
$26.000
|
$55.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
20.000
|
$40.000
|
$110.000
|
$100.000
|
$125.000
|
$34.000
|
$150.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
15.000
|
$5.000
|
$110.000
|
$150.000
|
$125.000
|
$120.000
|
$500.000
|
|
|
REALIGN POSTS
|
EA
|
2,350.000
|
$8.000
|
$15.800
|
$10.000
|
$18.750
|
$5.000
|
$50.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
13,000.000
|
$13.000
|
$14.200
|
$25.000
|
$16.250
|
$13.000
|
$50.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
1,500.000
|
$75.000
|
$71.000
|
$80.000
|
$81.250
|
$30.000
|
$90.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
5.000
|
$5.000
|
$50.000
|
$200.000
|
$50.000
|
$110.000
|
$150.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
5.000
|
$5.000
|
$60.000
|
$200.000
|
$62.500
|
$110.000
|
$150.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
65.000
|
$1,800.000
|
$2,900.000
|
$3,200.000
|
$3,312.500
|
$2,700.000
|
$3,250.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
65.000
|
$650.000
|
$906.000
|
$900.000
|
$1,075.000
|
$930.000
|
$1,500.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
370.000
|
$270.000
|
$392.500
|
$300.000
|
$450.000
|
$125.000
|
$95.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
2,000.000
|
$100.000
|
$120.000
|
$120.000
|
$137.500
|
$120.000
|
$100.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
7.000
|
$10.000
|
$110.000
|
$100.000
|
$125.000
|
$125.000
|
$250.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
10.000
|
$10.000
|
$110.000
|
$400.000
|
$125.000
|
$120.000
|
$550.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
50.000
|
$200.000
|
$2,106.000
|
$400.000
|
$2,500.000
|
$950.000
|
$550.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,300.000
|
$3.000
|
$3.250
|
$8.000
|
$3.750
|
$2.500
|
$10.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
400.000
|
$1.000
|
$1.600
|
$50.000
|
$1.880
|
$4.000
|
$10.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
5.000
|
$3.000
|
$110.000
|
$100.000
|
$125.000
|
$32.000
|
$300.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
3,500.000
|
$3.000
|
$10.600
|
$25.000
|
$12.500
|
$5.000
|
$25.000
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
15.000
|
$50.000
|
$110.000
|
$100.000
|
$125.000
|
$200.000
|
$500.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
200.000
|
$25.000
|
$48.000
|
$80.000
|
$56.250
|
$47.000
|
$85.000
|
|
|
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
|
EA
|
15.000
|
$50.000
|
$110.000
|
$100.000
|
$125.000
|
$150.000
|
$150.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
1,000.000
|
$1.000
|
$11.000
|
$10.000
|
$12.500
|
$9.000
|
$7.000
|
|
|
POST AND CABLE FENCE (REPAIR)
|
LF
|
15,000.000
|
$1.500
|
$6.350
|
$8.000
|
$7.500
|
$3.000
|
$15.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
5.000
|
$14,500.000
|
$18,500.000
|
$23,000.000
|
$19,375.000
|
$24,000.000
|
$25,000.000
|
|
|
REPAIR (TRACC)
|
EA
|
16.000
|
$1,000.000
|
$2,650.000
|
$3,500.000
|
$3,125.000
|
$3,500.000
|
$4,250.000
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
10.000
|
$35.000
|
$2,650.000
|
$4,000.000
|
$3,125.000
|
$3,500.000
|
$4,350.000
|
|
|
REPAIR (REACT)
|
EA
|
20.000
|
$1,000.000
|
$2,750.000
|
$4,000.000
|
$3,250.000
|
$850.000
|
$4,500.000
|
|
|
REMOVE AND REPLACE (NARROW QUAD)
|
EA
|
1.000
|
$13,000.000
|
$20,500.000
|
$30,000.000
|
$21,250.000
|
$14,000.000
|
$25,000.000
|
|
|
REPAIR (CATGR - FRONT SECTION)
|
EA
|
3.000
|
$2,000.000
|
$2,650.000
|
$3,500.000
|
$3,125.000
|
$5,300.000
|
$4,500.000
|
|
|
REPAIR (CATGR - END SECTION)
|
EA
|
2.000
|
$1,000.000
|
$2,650.000
|
$2,500.000
|
$3,125.000
|
$2,650.000
|
$4,500.000
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
10.000
|
$1,500.000
|
$3,370.000
|
$3,500.000
|
$4,000.000
|
$2,600.000
|
$4,500.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
250.000
|
$1,225.000
|
$1,636.000
|
$1,500.000
|
$1,725.000
|
$1,600.000
|
$1,250.000
|
|
|
REPAIR (QUAD) (W) (BAY)
|
EA
|
10.000
|
$800.000
|
$1,580.000
|
$1,700.000
|
$1,875.000
|
$2,900.000
|
$1,500.000
|
|
|
REMOVE AND REPLACE (FASTRACC)
|
EA
|
1.000
|
$13,000.000
|
$21,000.000
|
$25,000.000
|
$21,875.000
|
$12,000.000
|
$27,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
3.000
|
$18,000.000
|
$28,500.000
|
$25,000.000
|
$31,250.000
|
$21,000.000
|
$29,000.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
20.000
|
$500.000
|
$2,110.000
|
$2,000.000
|
$2,500.000
|
$700.000
|
$2,750.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
1.000
|
$18,000.000
|
$29,000.000
|
$28,000.000
|
$31,250.000
|
$34,000.000
|
$37,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
3.000
|
$500.000
|
$2,150.000
|
$2,000.000
|
$2,500.000
|
$1,200.000
|
$3,000.000
|
|
|
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
|
EA
|
850.000
|
$250.000
|
$327.000
|
$500.000
|
$375.000
|
$260.000
|
$450.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
500.000
|
$130.000
|
$158.000
|
$100.000
|
$187.500
|
$75.000
|
$35.000
|
|
|
REPAIR (EXISTING METAL PED. RAIL)
|
LF
|
500.000
|
$80.000
|
$158.000
|
$130.000
|
$187.500
|
$75.000
|
$30.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
200.000
|
$30.000
|
$101.000
|
$130.000
|
$125.000
|
$130.000
|
$75.000
|
|
|
REM/REPLACE CURB GUIDANCE SYSTEM
|
EA
|
15.000
|
$100.000
|
$200.000
|
$500.000
|
$148.270
|
$300.000
|
$140.000
|
|
|
REM/REPLACE CURB
|
EA
|
150.000
|
$100.000
|
$30.000
|
$50.000
|
$148.270
|
$150.000
|
$75.000
|
|
|
REM/REPLACE VISION STRIP
|
EA
|
400.000
|
$50.000
|
$20.000
|
$100.000
|
$38.900
|
$25.000
|
$25.000
|
|
|
REM/REPLACE CURB TRANS END SECTION
|
EA
|
30.000
|
$100.000
|
$500.000
|
$300.000
|
$103.270
|
$150.000
|
$100.000
|
|
|
REM/REPLACE DELINEATOR POST ASSEMBLY
|
EA
|
300.000
|
$75.000
|
$125.000
|
$100.000
|
$90.320
|
$75.000
|
$65.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$100.000
|
$125.000
|
$100.000
|
$120.000
|
$140.000
|
$100.000
|
|
|
REPAIR SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
800.000
|
$150.000
|
$259.500
|
$500.000
|
$234.780
|
$275.000
|
$250.000
|
|
|
RELOC SMALL RDSD SIGN SUPT & ASSEM
|
EA
|
50.000
|
$75.000
|
$133.000
|
$100.000
|
$69.060
|
$275.000
|
$650.000
|
|
|
REPLACE SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
200.000
|
$200.000
|
$344.000
|
$325.000
|
$101.290
|
$300.000
|
$750.000
|
|
|
REMV SMALL RDSD SIGN SUPP & ASSEM
|
EA
|
50.000
|
$50.000
|
$21.000
|
$50.000
|
$34.530
|
$68.000
|
$75.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
500.000
|
$150.000
|
$245.000
|
$60.000
|
$73.840
|
$60.000
|
$90.000
|
|
|
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
500.000
|
$250.000
|
$505.000
|
$1,000.000
|
$995.280
|
$730.000
|
$700.000
|
|
|
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
|
EA
|
50.000
|
$200.000
|
$206.000
|
$1,500.000
|
$690.560
|
$590.000
|
$7,000.000
|
|
|
REPL LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
150.000
|
$100.000
|
$650.000
|
$2,000.000
|
$1,665.560
|
$750.000
|
$5,500.000
|
|
|
REMV LARGE RDSD SIGN SUPP & ASSEM
|
EA
|
250.000
|
$150.000
|
$35.000
|
$300.000
|
$345.280
|
$450.000
|
$750.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
100.000
|
$600.000
|
$132.000
|
$100.000
|
$275.100
|
$175.000
|
$125.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
100.000
|
$650.000
|
$184.000
|
$125.000
|
$275.100
|
$200.000
|
$175.000
|
|
|
INCIDENT MANAGEMENT (TYPE C)
|
HR
|
200.000
|
$700.000
|
$342.000
|
$150.000
|
$275.100
|
$300.000
|
$250.000
|
|
|
INCIDENT MANAGEMENT (TYPE D)
|
HR
|
300.000
|
$800.000
|
$500.000
|
$175.000
|
$454.310
|
$350.000
|
$325.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
300.000
|
$1,100.000
|
$579.000
|
$100.000
|
$454.310
|
$350.000
|
$525.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
80.000
|
$700.000
|
$184.000
|
$150.000
|
$454.310
|
$320.000
|
$175.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
80.000
|
$600.000
|
$90.000
|
$150.000
|
$275.100
|
$140.000
|
$90.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
80.000
|
$700.000
|
$132.000
|
$150.000
|
$275.100
|
$150.000
|
$165.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
100.000
|
$1,000.000
|
$211.000
|
$200.000
|
$454.310
|
$300.000
|
$225.000
|
|
|
INCIDENT MANAGEMENT (TYPE J)
|
HR
|
100.000
|
$100.000
|
$368.000
|
$200.000
|
$767.140
|
$53.000
|
$175.000
|
|
|
INCIDENT MANAGEMENT (TYPE K)
|
HR
|
200.000
|
$500.000
|
$132.000
|
$100.000
|
$450.840
|
$100.000
|
$100.000
|
|
|
INCIDENT MANAGEMENT (TYPE L)
|
HR
|
200.000
|
$500.000
|
$265.000
|
$100.000
|
$449.800
|
$100.000
|
$175.000
|
|
|
VACUUM CLEAN DRAIN INLETS AND RACEWAYS
|
CYC
|
8.000
|
$5,500.000
|
$77,400.000
|
$8,000.000
|
$17,126.400
|
$11,000.000
|
$72,000.000
|
|
|
VACUUM CLEANING OF BRIDGE JOINTS
|
CYC
|
4.000
|
$5,000.000
|
$27,100.000
|
$10,000.000
|
$17,126.400
|
$9,500.000
|
$35,000.000
|
|
|
SNOW AND ICE CONTROL (TRUCK)
|
HR
|
1,000.000
|
$140.000
|
$100.000
|
$50.000
|
$99.370
|
$80.000
|
$115.000
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
1,000.000
|
$100.000
|
$100.000
|
$50.000
|
$84.360
|
$75.000
|
$105.000
|
|
|
SNOW AND ICE CONTROL (SPRAY RIG)
|
HR
|
500.000
|
$100.000
|
$100.000
|
$50.000
|
$89.870
|
$55.000
|
$110.000
|
|
|
SNOW AND ICE CONTROL SEASON
|
MO
|
10.000
|
$10,000.000
|
$23,570.000
|
$100,000.000
|
$20,000.000
|
$85,000.000
|
$65,000.000
|
|
Totals: |
$10,620,423.019
|
$14,068,094.000
|
$14,328,798.200
|
$14,809,990.104
|
$15,299,507.000
|
$20,792,148.400
|