PREPARING ROW
|
STA
|
190.000
|
$4,260.000
|
$14,514.000
|
$36,524.000
|
|
|
PREP ROW (TREE) (2" TO 12" DIA)
|
EA
|
380.000
|
$1,000.000
|
$172.000
|
$1,000.000
|
|
|
PREP ROW (TREE PRUNING)
|
EA
|
5.000
|
$2,000.000
|
$850.000
|
$1,026.410
|
|
|
REMOVING CONC (PAV)
|
SY
|
66.000
|
$17.000
|
$50.000
|
$37.470
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,198.000
|
$15.000
|
$18.000
|
$10.660
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,410.000
|
$15.000
|
$16.000
|
$17.260
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
5,270.000
|
$12.720
|
$17.000
|
$15.040
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,038.000
|
$25.000
|
$43.000
|
$13.230
|
|
|
REMOVING CONC (CURB)
|
LF
|
37.000
|
$3.630
|
$117.000
|
$24.120
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
255.000
|
$100.000
|
$96.000
|
$43.260
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
7,805.000
|
$10.000
|
$9.000
|
$6.910
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
52.000
|
$6.000
|
$26.000
|
$9.770
|
|
|
REMOVING CONC (MISC)
|
CY
|
5.000
|
$27.840
|
$860.000
|
$508.830
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
109,565.000
|
$6.500
|
$7.500
|
$7.090
|
|
|
RMV TRT BASE & ASPH PAV (0"-19")
|
SY
|
55.000
|
$10.000
|
$101.000
|
$47.400
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
162,285.000
|
$13.000
|
$10.000
|
$11.990
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
105.000
|
$20.000
|
$120.000
|
$109.030
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
20,771.000
|
$16.000
|
$37.000
|
$8.730
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
47,943.000
|
$10.000
|
$23.000
|
$25.660
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
89,266.000
|
$1.750
|
$4.200
|
$3.170
|
|
|
BLOCK SODDING
|
SY
|
538.000
|
$6.810
|
$6.250
|
$9.020
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
272.000
|
$0.090
|
$0.800
|
$3.350
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
88,728.000
|
$0.260
|
$0.280
|
$0.260
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
44,365.000
|
$0.210
|
$0.220
|
$0.240
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
44,365.000
|
$0.210
|
$0.220
|
$0.240
|
|
|
VEGETATIVE WATERING
|
MG
|
2,881.000
|
$25.000
|
$40.000
|
$18.650
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
86,716.000
|
$1.200
|
$1.650
|
$1.390
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY G)
|
SY
|
2,013.000
|
$3.500
|
$5.250
|
$2.680
|
|
|
PROOF ROLLING
|
HR
|
111.000
|
$120.000
|
$131.000
|
$66.970
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2 OR 5)6"
|
SY
|
539.000
|
$8.000
|
$40.000
|
$29.030
|
|
|
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
|
SY
|
127,998.000
|
$14.000
|
$16.500
|
$15.180
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
2,666.000
|
$300.000
|
$375.000
|
$322.500
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
67,335.000
|
$4.000
|
$5.700
|
$3.700
|
|
|
CEMENT
|
TON
|
6.000
|
$255.000
|
$850.000
|
$400.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
558.000
|
$5.000
|
$13.000
|
$2.400
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
25,707.000
|
$6.000
|
$4.000
|
$4.240
|
|
|
ASPH (AC-10)
|
GAL
|
18,414.000
|
$4.750
|
$4.000
|
$4.240
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
558.000
|
$195.000
|
$290.000
|
$302.160
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,468.000
|
$150.000
|
$145.000
|
$153.730
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
40,518.000
|
$4.000
|
$4.500
|
$4.770
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
463.000
|
$90.000
|
$330.000
|
$175.950
|
|
|
STRUCT EXCAV
|
CY
|
185.000
|
$150.000
|
$100.000
|
$98.610
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
758.000
|
$25.000
|
$51.000
|
$16.600
|
|
|
CEM STABIL BKFL
|
CY
|
1,751.000
|
$110.000
|
$360.000
|
$176.720
|
|
|
CUT & RESTORING PAV
|
SY
|
3,816.000
|
$150.000
|
$132.000
|
$149.820
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
45.000
|
$140.000
|
$210.000
|
$80.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,837.000
|
$210.000
|
$230.000
|
$235.620
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
34,590.000
|
$3.000
|
$2.920
|
$1.810
|
|
|
TEMPORARY SPL SHORING
|
SF
|
42,604.000
|
$25.000
|
$14.500
|
$35.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
5,232.000
|
$200.000
|
$157.000
|
$232.030
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
187.000
|
$400.000
|
$280.000
|
$400.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$600.000
|
$430.000
|
$600.000
|
|
|
CL A CONC (MISC)
|
CY
|
15.000
|
$600.000
|
$2,000.000
|
$1,563.550
|
|
|
CL A CONC (MISC)
|
SY
|
195.000
|
$235.000
|
$200.000
|
$125.000
|
|
|
CL C CONC (MISC)
|
CY
|
5.000
|
$800.000
|
$5,200.000
|
$1,292.550
|
|
|
CL A CONC (STEPS)
|
CY
|
2.000
|
$1,100.000
|
$1,620.000
|
$2,900.220
|
|
|
CL C CONC (RAC-R)
|
CY
|
20.000
|
$2,600.000
|
$1,500.000
|
$1,199.770
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
466.000
|
$520.000
|
$1,120.000
|
$588.550
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
126.000
|
$530.000
|
$1,090.000
|
$560.750
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
151.000
|
$200.000
|
$590.000
|
$208.630
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
177.000
|
$550.000
|
$1,440.000
|
$638.860
|
|
|
RAIL (TY C223)
|
LF
|
459.000
|
$180.000
|
$290.000
|
$185.690
|
|
|
RAIL (HANDRAIL)(TY D)
|
LF
|
1,430.000
|
$275.000
|
$113.000
|
$114.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
418.000
|
$320.000
|
$530.000
|
$315.900
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
217.000
|
$375.000
|
$610.000
|
$500.310
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
322.000
|
$375.000
|
$580.000
|
$346.560
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
119.000
|
$400.000
|
$830.000
|
$565.060
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
182.000
|
$460.000
|
$700.000
|
$524.180
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
312.000
|
$800.000
|
$900.000
|
$1,199.200
|
|
|
CONC BOX CULV (10 FT X 8 FT)
|
LF
|
319.000
|
$1,400.000
|
$1,000.000
|
$1,097.770
|
|
|
CONC BOX CULV (10 FT X 4 FT)
|
LF
|
180.000
|
$1,200.000
|
$2,100.000
|
$1,346.650
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
31.000
|
$100.000
|
$200.000
|
$217.940
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
10,838.000
|
$105.000
|
$120.000
|
$122.220
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,037.000
|
$160.000
|
$140.000
|
$143.380
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
2,527.000
|
$220.000
|
$200.000
|
$193.280
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,397.000
|
$230.000
|
$220.000
|
$233.850
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
545.000
|
$300.000
|
$270.000
|
$280.880
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
18.000
|
$6,000.000
|
$18,600.000
|
$8,711.270
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
9.000
|
$6,000.000
|
$21,000.000
|
$9,895.390
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
14.000
|
$6,000.000
|
$21,000.000
|
$9,834.890
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
14.000
|
$7,500.000
|
$22,000.000
|
$10,626.270
|
|
|
INLET (COMPL)(PCO)(4FT)(NONE)
|
EA
|
8.000
|
$8,000.000
|
$21,000.000
|
$9,919.250
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
6.000
|
$9,000.000
|
$22,000.000
|
$10,689.070
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
6.000
|
$9,000.000
|
$22,000.000
|
$10,644.070
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
7.000
|
$9,000.000
|
$24,000.000
|
$11,116.080
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
8.000
|
$10,500.000
|
$21,000.000
|
$10,434.070
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
5.000
|
$10,500.000
|
$24,000.000
|
$11,639.070
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
4.000
|
$10,500.000
|
$23,000.000
|
$11,584.070
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
3.000
|
$11,500.000
|
$28,000.000
|
$14,074.070
|
|
|
INLET (COMPL)(PCO)(6FT)(NONE)
|
EA
|
6.000
|
$12,000.000
|
$24,000.000
|
$11,186.170
|
|
|
INLET (COMPL)(PCO)(6FT)(LEFT)
|
EA
|
1.000
|
$12,000.000
|
$26,000.000
|
$12,844.070
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
1.000
|
$12,000.000
|
$25,000.000
|
$11,775.540
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
3.000
|
$8,000.000
|
$20,000.000
|
$9,545.820
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
2.000
|
$8,000.000
|
$22,000.000
|
$10,131.580
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
1.000
|
$8,000.000
|
$22,000.000
|
$10,130.620
|
|
|
INLET (COMPL)(PCU)(4FT)(NONE)
|
EA
|
2.000
|
$6,500.000
|
$24,000.000
|
$10,991.510
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
2.000
|
$8,000.000
|
$23,000.000
|
$10,691.510
|
|
|
INLET (COMPL)(PCU)(5FT)(NONE)
|
EA
|
2.000
|
$8,000.000
|
$24,000.000
|
$11,416.510
|
|
|
INLET (COMPL)(PCU)(5FT)(LEFT)
|
EA
|
2.000
|
$11,000.000
|
$26,000.000
|
$12,516.510
|
|
|
INLET (COMPL)(PCU)(5FT)(BOTH)
|
EA
|
1.000
|
$11,000.000
|
$27,000.000
|
$12,815.540
|
|
|
INLET (COMPL)(PSL)(SL)(4FTX4FT)
|
EA
|
2.000
|
$8,400.000
|
$4,600.000
|
$4,876.510
|
|
|
INLET (COMPL)(PSL)(SL)(5FTX5FT)
|
EA
|
6.000
|
$9,200.000
|
$4,900.000
|
$5,076.170
|
|
|
INLET (COMPL)(PSL)(SL)(8FTX8FT)
|
EA
|
1.000
|
$16,000.000
|
$9,100.000
|
$7,550.540
|
|
|
INLET (COMPL)(PSL)(RH)(4FTX4FT)
|
EA
|
11.000
|
$6,000.000
|
$19,500.000
|
$8,891.240
|
|
|
INLET (COMPL)(PSL)(RH)(5FTX5FT)
|
EA
|
8.000
|
$7,000.000
|
$22,000.000
|
$10,136.250
|
|
|
INLET (COMPL)(PSL)(RH)(6FTX6FT)
|
EA
|
3.000
|
$10,000.000
|
$30,000.000
|
$15,066.170
|
|
|
INLET (COMPL)(PSL)(RH)(8FTX8FT)
|
EA
|
1.000
|
$12,000.000
|
$39,000.000
|
$21,280.540
|
|
|
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
|
EA
|
22.000
|
$7,000.000
|
$18,800.000
|
$8,306.150
|
|
|
INLET (COMPL)(PAZD)(RC)(5FTX5FT)
|
EA
|
2.000
|
$8,500.000
|
$20,000.000
|
$9,261.510
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
19.000
|
$17,000.000
|
$23,000.000
|
$28,966.740
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
19.000
|
$6,000.000
|
$10,100.000
|
$6,823.430
|
|
|
WINGWALL (FW - S) (HW=11 FT)
|
EA
|
1.000
|
$40,000.000
|
$125,000.000
|
$49,106.410
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$70,000.000
|
$69,000.000
|
$65,180.100
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$14,000.000
|
$30,000.000
|
$14,575.690
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$18,000.000
|
$38,000.000
|
$24,023.540
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
5.000
|
$22,000.000
|
$24,000.000
|
$23,952.990
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$27,000.000
|
$44,000.000
|
$39,038.090
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$18,900.000
|
$12,187.190
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$5,000.000
|
$21,000.000
|
$4,165.450
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$700.000
|
$1,000.000
|
$1,696.020
|
|
|
REMOV STR (MANHOLE)
|
EA
|
3.000
|
$1,000.000
|
$1,840.000
|
$2,107.530
|
|
|
REMOV STR (SET)
|
EA
|
46.000
|
$500.000
|
$670.000
|
$894.180
|
|
|
REMOV STR (HEADWALL)
|
EA
|
12.000
|
$2,000.000
|
$3,600.000
|
$2,107.530
|
|
|
REMOV STR (PIPE)
|
LF
|
3,562.000
|
$25.000
|
$36.000
|
$19.280
|
|
|
REMOVE STR (RAIL)
|
LF
|
1,075.000
|
$25.000
|
$7.950
|
$14.330
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,000,000.000
|
$6,887,260.240
|
$6,168,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
60.000
|
$10,000.000
|
$18,500.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
158.000
|
$30.000
|
$36.000
|
$35.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
514.000
|
$45.000
|
$38.000
|
$37.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
290.000
|
$75.000
|
$108.000
|
$107.650
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
962.000
|
$12.000
|
$11.500
|
$11.680
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,532.000
|
$25.000
|
$19.500
|
$19.440
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,532.000
|
$7.500
|
$4.750
|
$4.740
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
100.000
|
$85.000
|
$132.000
|
$142.940
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
100.000
|
$115.000
|
$151.000
|
$90.620
|
|
|
BLADING WORK (EROSION & SEDMT CONT)
|
HR
|
100.000
|
$145.000
|
$199.000
|
$143.460
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
900.000
|
$4.000
|
$3.800
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
19,946.000
|
$3.500
|
$3.250
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
19,946.000
|
$0.700
|
$0.250
|
$0.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,715.000
|
$1.000
|
$4.250
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (6")
|
LF
|
2,715.000
|
$10.000
|
$1.000
|
$4.250
|
|
|
CONSTRUCTING DETOURS
|
SY
|
27,397.000
|
$70.000
|
$69.000
|
$61.360
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
8,730.000
|
$30.000
|
$24.000
|
$37.480
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
6,980.000
|
$33.000
|
$25.000
|
$38.560
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
800.000
|
$50.000
|
$42.000
|
$46.990
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
10,440.000
|
$6.000
|
$11.500
|
$8.850
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
14,174.000
|
$6.000
|
$9.450
|
$9.890
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,720.000
|
$8.000
|
$15.500
|
$15.740
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
8,730.000
|
$8.000
|
$13.000
|
$9.040
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
6,980.000
|
$7.000
|
$13.000
|
$8.150
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
760.000
|
$9.000
|
$19.500
|
$9.320
|
|
|
CONC CURB (TY I)
|
LF
|
44,324.000
|
$20.000
|
$16.000
|
$15.930
|
|
|
CONC CURB (TY C1)
|
LF
|
97.000
|
$85.000
|
$360.000
|
$291.290
|
|
|
CONC CURB (TY F2)
|
LF
|
187.000
|
$240.000
|
$300.000
|
$168.530
|
|
|
CONC CURB (TY F3)
|
LF
|
1,236.000
|
$160.000
|
$280.000
|
$207.380
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,153.000
|
$85.000
|
$174.000
|
$113.720
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,434.000
|
$60.000
|
$111.000
|
$45.550
|
|
|
CONC SIDEWALKS (4")
|
SY
|
22,440.000
|
$65.000
|
$65.500
|
$69.870
|
|
|
CURB RAMPS (TY 1)
|
EA
|
8.000
|
$2,200.000
|
$3,500.000
|
$2,246.820
|
|
|
CURB RAMPS (TY 2)
|
EA
|
39.000
|
$2,450.000
|
$3,500.000
|
$2,246.820
|
|
|
CURB RAMPS (TY 7)
|
EA
|
9.000
|
$2,375.000
|
$3,500.000
|
$2,542.530
|
|
|
CURB RAMPS (TY 10)
|
EA
|
10.000
|
$2,650.000
|
$3,500.000
|
$2,542.530
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$2,900.000
|
$6,900.000
|
$2,759.040
|
|
|
CURB RAMPS (TY 22)
|
EA
|
3.000
|
$2,900.000
|
$7,100.000
|
$3,664.300
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
224.000
|
$150.000
|
$158.000
|
$116.570
|
|
|
CONC MEDIAN
|
SY
|
4,921.000
|
$90.000
|
$110.000
|
$69.990
|
|
|
MTL W-BEAM GD FEN (NU-GUARD 31)
|
LF
|
20.000
|
$38.460
|
$42.000
|
$88.870
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,345.000
|
$4.000
|
$2.500
|
$2.960
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$300.000
|
$230.000
|
$444.310
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
42.000
|
$1,300.000
|
$950.000
|
$2,140.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
44.000
|
$1,200.000
|
$750.000
|
$749.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
44.000
|
$9,000.000
|
$8,000.000
|
$7,518.860
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
208.000
|
$35.000
|
$57.000
|
$40.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
208.000
|
$7.000
|
$25.000
|
$20.000
|
|
|
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
|
LF
|
54.000
|
$50.000
|
$60.000
|
$100.000
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
2.000
|
$1,500.000
|
$3,800.000
|
$2,500.000
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$3,025.000
|
$3,500.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
14.000
|
$350.000
|
$450.000
|
$378.610
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,605.000
|
$19.000
|
$14.000
|
$19.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
460.000
|
$45.000
|
$40.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
3,421.000
|
$28.000
|
$19.000
|
$27.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
920.000
|
$42.000
|
$40.000
|
$33.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
4,177.000
|
$1.900
|
$1.750
|
$1.650
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
3,286.000
|
$2.360
|
$2.450
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
44.000
|
$1,400.000
|
$1,400.000
|
$1,600.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)TP(O)
|
EA
|
5.000
|
$10,000.000
|
$5,500.000
|
$7,200.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
27.000
|
$40.000
|
$40.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
102.000
|
$700.000
|
$750.000
|
$754.190
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
26.000
|
$900.000
|
$900.000
|
$891.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$950.000
|
$1,050.000
|
$1,060.110
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T-2EXT)
|
EA
|
2.000
|
$1,300.000
|
$950.000
|
$915.730
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,200.000
|
$1,350.000
|
$1,362.990
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
7.000
|
$1,400.000
|
$1,200.000
|
$1,211.550
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
81.000
|
$130.000
|
$120.000
|
$121.150
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
949.000
|
$1.750
|
$1.950
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
668.000
|
$1.750
|
$1.950
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
8,840.000
|
$0.900
|
$1.250
|
$0.990
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
1,095.000
|
$2.000
|
$1.950
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
133,786.000
|
$0.900
|
$0.830
|
$0.780
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
10,554.000
|
$1.700
|
$1.650
|
$1.900
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
115.000
|
$3.250
|
$3.600
|
$7.600
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
3,666.000
|
$8.000
|
$7.250
|
$9.920
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
4.000
|
$175.000
|
$260.000
|
$243.760
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
4.000
|
$220.000
|
$360.000
|
$320.280
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
5,360.000
|
$0.900
|
$1.250
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
120,460.000
|
$1.000
|
$0.830
|
$0.780
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
1,117.000
|
$8.000
|
$7.250
|
$9.920
|
|
|
WK ZN PAV MRK REMOV (Y)(MED NOSE)
|
EA
|
4.000
|
$250.000
|
$160.000
|
$445.590
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,617.000
|
$1.100
|
$1.050
|
$1.240
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
140.000
|
$5.350
|
$5.700
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
5,335.000
|
$8.000
|
$10.500
|
$6.840
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
112.000
|
$200.000
|
$155.000
|
$201.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
5.000
|
$230.000
|
$210.000
|
$260.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
56.000
|
$210.000
|
$181.000
|
$230.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
53.000
|
$160.000
|
$129.000
|
$142.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
53.000
|
$250.000
|
$129.000
|
$249.000
|
|
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
|
EA
|
458.000
|
$3.480
|
$2.600
|
$4.880
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
7.000
|
$450.000
|
$260.000
|
$444.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
89,362.000
|
$0.250
|
$0.210
|
$0.390
|
|
|
PAVEMENT SEALER 8"
|
LF
|
7,617.000
|
$0.600
|
$0.260
|
$0.600
|
|
|
PAVEMENT SEALER 18"
|
LF
|
140.000
|
$1.700
|
$1.250
|
$2.130
|
|
|
PAVEMENT SEALER 24"
|
LF
|
5,335.000
|
$2.450
|
$2.600
|
$3.690
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
112.000
|
$70.000
|
$26.000
|
$77.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
56.000
|
$70.000
|
$31.000
|
$96.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
7.000
|
$200.000
|
$36.000
|
$198.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
5.000
|
$100.000
|
$36.000
|
$128.000
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
53.000
|
$35.000
|
$26.000
|
$77.000
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
53.000
|
$35.000
|
$26.000
|
$148.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
9,304.000
|
$0.710
|
$0.880
|
$0.970
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
35,025.000
|
$0.650
|
$0.880
|
$0.890
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,690.000
|
$0.710
|
$0.880
|
$0.970
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
40,343.000
|
$0.650
|
$0.880
|
$0.890
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,414.000
|
$5.000
|
$4.650
|
$6.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,035.000
|
$5.000
|
$4.650
|
$7.770
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
54,972.000
|
$0.500
|
$0.520
|
$0.590
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,732.000
|
$1.200
|
$1.050
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,434.000
|
$6.000
|
$3.200
|
$4.560
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$70.000
|
$78.000
|
$89.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$70.000
|
$78.000
|
$111.000
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
6.000
|
$200.000
|
$155.000
|
$260.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
5.000
|
$35,000.000
|
$37,000.000
|
$22,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
5.000
|
$8,000.000
|
$5,000.000
|
$8,900.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
6.000
|
$100,000.000
|
$28,000.000
|
$79,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
36.000
|
$280.000
|
$280.000
|
$315.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
19.000
|
$280.000
|
$280.000
|
$315.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
36.000
|
$280.000
|
$280.000
|
$315.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
36.000
|
$280.000
|
$280.000
|
$315.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
36.000
|
$280.000
|
$280.000
|
$315.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
19.000
|
$280.000
|
$280.000
|
$315.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
36.000
|
$610.000
|
$650.000
|
$600.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
17.000
|
$150.000
|
$155.000
|
$150.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
38.000
|
$140.000
|
$130.000
|
$120.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
5,542.000
|
$2.150
|
$2.000
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
8,882.000
|
$3.200
|
$2.750
|
$3.000
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
5,542.000
|
$1.600
|
$1.500
|
$1.500
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
3.000
|
$850.000
|
$520.000
|
$650.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
3.000
|
$7,300.000
|
$7,500.000
|
$7,000.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
3.000
|
$9,000.000
|
$2,000.000
|
$2,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$14,000.000
|
$14,600.000
|
$15,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
4.000
|
$14,750.000
|
$15,500.000
|
$15,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
$14,000.000
|
$16,500.000
|
$15,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
6.000
|
$15,000.000
|
$17,000.000
|
$15,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$35,000.000
|
$34,000.000
|
$42,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$38,000.000
|
$35,000.000
|
$42,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
2.000
|
$40,000.000
|
$36,000.000
|
$42,000.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
|
EA
|
1.000
|
$20,500.000
|
$24,000.000
|
$15,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
28.000
|
$2,500.000
|
$2,300.000
|
$2,400.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
5.000
|
$3,500.000
|
$4,600.000
|
$3,400.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
12.000
|
$3,500.000
|
$3,500.000
|
$1,837.450
|
|
|
LITTER REMOVAL
|
CYC
|
36.000
|
$2,000.000
|
$1,600.000
|
$1,024.070
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
42,191.000
|
$2.750
|
$0.890
|
$1.030
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
66,345.000
|
$85.000
|
$84.000
|
$89.770
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
70.500
|
$140.000
|
$155.000
|
$208.890
|
|
|
TACK COAT
|
GAL
|
9,982.000
|
$4.000
|
$3.250
|
$3.450
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
19,414.000
|
$105.000
|
$109.000
|
$115.840
|
|
|
SOUND WALL
|
SF
|
38,687.000
|
$50.000
|
$74.000
|
$120.620
|
|
|
FIBERGLASS SOUND WALL
|
SF
|
3,504.000
|
$60.000
|
$86.000
|
$68.990
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
8.000
|
$500.000
|
$880.000
|
$616.450
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
129,973.000
|
$2.000
|
$1.200
|
$1.970
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$13,000.000
|
$4,600.000
|
$17,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
270.000
|
$250.000
|
$570.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
102.000
|
$250.000
|
$1,030.000
|
$450.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
19.000
|
$10,000.000
|
$9,900.000
|
$10,500.000
|
|
|
RVDS(ADVANCE DETECTION ONLY)
|
EA
|
6.000
|
$11,000.000
|
$9,900.000
|
$10,500.000
|
|
|
TEMPORARY WATER MAIN
|
LS
|
1.000
|
$95,000.000
|
$271,000.000
|
$51,194.230
|
|
|
SAN SEWER(TRENCH EXCAVATION PROTECTION)
|
LF
|
2,752.000
|
$2.000
|
$9.150
|
$2.500
|
|
|
SAN SEW (PVC)(8IN)(SDR26)(DEPTH6-10)
|
LF
|
2,431.000
|
$55.000
|
$230.000
|
$113.900
|
|
|
SAN SEWER MANHOLE STRUCT(COMPL)(4'DIA)
|
EA
|
11.000
|
$10,000.000
|
$13,400.000
|
$14,660.270
|
|
|
SANITARY SEWER CLEANOUT
|
EA
|
17.000
|
$1,300.000
|
$1,460.000
|
$1,161.730
|
|
|
SAN SWR PRE-CAST MANH (COMPL) (D-HOUSE)
|
EA
|
6.000
|
$15,000.000
|
$27,000.000
|
$21,627.110
|
|
|
SAN SWR (BY-PASS PUMPING)
|
EA
|
1.000
|
$5,500.000
|
$802,000.000
|
$90,334.500
|
|
|
SAN SWR (ABANDON & RMVE PIPE) (8"-15")
|
LF
|
2,475.000
|
$8.000
|
$41.000
|
$18.450
|
|
|
SAN SWR (ABANDON MANH AND REMOVE)
|
EA
|
8.000
|
$4,800.000
|
$3,500.000
|
$2,107.530
|
|
|
POLE BRACING
|
EA
|
3.000
|
$5,000.000
|
$3,000.000
|
$7,500.000
|
|
|
SAN SEWER (4") PVC
|
LF
|
321.000
|
$55.000
|
$300.000
|
$141.210
|
|
|
SANITARY SEWER SLIP LINING
|
LF
|
275.000
|
$250.000
|
$450.000
|
$385.740
|
|
|
REMOVE FORCE MAIN
|
LF
|
3,110.000
|
$8.000
|
$29.000
|
$19.090
|
|
|
SAN SEWER LATERAL PIPE (PVC)(4")
|
EA
|
1.000
|
$1,000.000
|
$7,100.000
|
$5,687.870
|
|
|
TRENCH EXCAVATION PROTECTION LF TION)
|
LF
|
7,102.000
|
$2.500
|
$2.050
|
$2.500
|
|
|
PIPE WATER MAIN (PVC)(6")(C-900 DR-18)
|
LF
|
553.000
|
$50.000
|
$84.000
|
$91.120
|
|
|
PIPE WATER MAIN (PVC)(8")(C-900 DR-18)
|
LF
|
73.000
|
$60.000
|
$100.000
|
$185.190
|
|
|
PIPE WATER MAIN (PVC)(12")(C-900 DR-18)
|
LF
|
5,599.000
|
$115.000
|
$158.000
|
$139.490
|
|
|
GATE VALVE & BOX (COMPLETE) (6 IN)
|
EA
|
6.000
|
$2,400.000
|
$2,900.000
|
$2,212.690
|
|
|
GATE VALVE & BOX (COMPLETE) (8 IN)
|
EA
|
7.000
|
$3,200.000
|
$3,800.000
|
$3,050.830
|
|
|
GATE VALVE & BOX (COMPLETE) (12 IN)
|
EA
|
28.000
|
$5,800.000
|
$6,000.000
|
$4,854.970
|
|
|
FIRE HYDRANT WITH 6 IN VALVE AND BOX
|
EA
|
15.000
|
$6,000.000
|
$7,800.000
|
$7,339.920
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
11.700
|
$6,500.000
|
$1,310.000
|
$5,841.540
|
|
|
TIE-IN (COMPLETE) (6 IN)
|
EA
|
2.000
|
$100.000
|
$6,200.000
|
$9,236.460
|
|
|
TIE-IN (COMPLETE) (8 IN)
|
EA
|
1.000
|
$2,400.000
|
$6,500.000
|
$5,991.470
|
|
|
TIE-IN (COMPLETE) (12 IN)
|
EA
|
1.000
|
$3,600.000
|
$7,900.000
|
$9,761.680
|
|
|
FLOW ABLE BACK FL LL
|
CY
|
90.470
|
$175.000
|
$200.000
|
$296.110
|
|
|
SPLIT STEEL CASING (18") (OPEN CUT)
|
LF
|
279.000
|
$100.000
|
$360.000
|
$283.880
|
|
|
SPLIT STEEL CASING (24")
|
LF
|
171.000
|
$293.000
|
$370.000
|
$283.890
|
|
|
ABANDON AND REMOVE 8" WATER LINE
|
LF
|
750.000
|
$4.000
|
$16.500
|
$22.430
|
|
|
ABANDON AND REMOVE 12" WATER LINE
|
LF
|
6,040.000
|
$8.000
|
$16.500
|
$22.560
|
|
|
JACK AND BORE 8" STEEL CASING
|
LF
|
155.000
|
$400.000
|
$940.000
|
$427.430
|
|
|
JACK AND BORE 18" STEEL CASING
|
LF
|
8.000
|
$600.000
|
$4,800.000
|
$2,816.010
|
|
|
JACK AND BORE 24" STEEL CASING
|
LF
|
676.000
|
$750.000
|
$970.000
|
$752.030
|
|
|
3/4" METER TAP, BOX, FITTINGS & SVC RCT
|
EA
|
3.000
|
$2,250.000
|
$4,100.000
|
$3,542.260
|
|
|
1" METER TAP, BOX, FITTINGS & SVC RCT
|
EA
|
3.000
|
$2,250.000
|
$2,700.000
|
$3,591.220
|
|
|
2" METER TAP, BOX, FITTINGS & SVC RCT
|
EA
|
2.000
|
$1,500.000
|
$13,500.000
|
$10,350.720
|
|
|
1" AL R RELEASE/VACUUM VALVE
|
EA
|
3.000
|
$8,325.000
|
$6,600.000
|
$11,984.760
|
|
|
POLE BRACING
|
EA
|
6.000
|
$5,000.000
|
$3,000.000
|
$7,500.000
|
|
|
HYDROSTATIC TESTING/CHLO RI NATION
|
EA
|
8.000
|
$2,500.000
|
$3,500.000
|
$3,112.500
|
|
|
2" BLOWOFF
|
EA
|
1.000
|
$1,200.000
|
$5,400.000
|
$5,618.030
|
|
|
CARR PIPE FOR JCK, BOR, OR TUN (2")
|
LF
|
155.000
|
$30.000
|
$104.000
|
$37.710
|
|
|
CARR PIPE FOR JCK, BOR, OR TUN (6")
|
LF
|
8.000
|
$50.000
|
$170.000
|
$341.410
|
|
|
CARR PIPE FOR JCK, BOR, OR TUN (12")
|
LF
|
676.000
|
$115.000
|
$250.000
|
$116.360
|
|
|
NGP (MAIN) (4" PLASTIC W/TW) (OPEN CUT)
|
LF
|
5.000
|
$65.000
|
$820.000
|
$200.000
|
|
|
NGP (MAIN)(8" PLASTIC W/TW)(OPEN CUT)
|
LF
|
12,233.000
|
$99.000
|
$47.000
|
$104.500
|
|
|
NGP (REMOVE ABANDONED MAIN)(4")
|
LF
|
21.000
|
$53.500
|
$24.000
|
$200.000
|
|
|
NGP (REMOVE ABANDONED MAIN)(8")
|
LF
|
3,673.000
|
$80.000
|
$24.000
|
$25.000
|
|
|
NGP (LONG SERVICE)(RERUN MAIN TO MTR)
|
EA
|
1.000
|
$4,000.000
|
$13,500.000
|
$15,500.000
|
|
|
NGP(BORING)(CASING)(12" STEEL)
|
LF
|
1,912.000
|
$354.200
|
$260.000
|
$280.000
|
|
|
NGP(BORING)(8" PLASTIC W/TW)
|
LF
|
645.000
|
$580.000
|
$117.000
|
$280.000
|
|
|
NGP(INSERT)(8" PLASTIC W/TW)
|
LF
|
1,912.000
|
$99.230
|
$20.000
|
$49.000
|
|
|
SAN SWR BYPASS PUMPING
|
LS
|
1.000
|
$200,000.000
|
$516,000.000
|
$185,334.500
|
|
|
SAN SWR MANHOLE (5' DIA)
|
EA
|
1.000
|
$12,500.000
|
$56,000.000
|
$21,034.010
|
|
|
SAN SWR EXTRA DEBTH FOR 5' DIA MANHOLE
|
LF
|
15.000
|
$1,170.000
|
$2,500.000
|
$559.560
|
|
|
SAN SWR STEEL CASING (48")(OPEN CUT)
|
LF
|
46.000
|
$550.000
|
$1,170.000
|
$709.430
|
|
|
SAN SWR (30")(PVC)(ASTM F679)(6-10)
|
LF
|
55.000
|
$419.000
|
$780.000
|
$625.720
|
|
|
SAN SWR POST TELE INSP (30' & LARGER)
|
LF
|
159.000
|
$10.000
|
$20.000
|
$5.000
|
|
|
SAN SWR 30' BYPASS RD CROSSING (INSTL)
|
LF
|
34.000
|
$219.000
|
$2,500.000
|
$1,072.940
|
|
|
SAN SWR 30' BYPASS RD CROSSING(REM)
|
LF
|
34.000
|
$200.000
|
$270.000
|
$229.820
|
|
|
SAN SWR MANHOLE (4' DIA)
|
EA
|
2.000
|
$12,500.000
|
$18,700.000
|
$15,128.550
|
|
|
SAN SWR PRECAST MANHOLES (EXTRA DEPTH)
|
LF
|
5.000
|
$1,170.000
|
$1,140.000
|
$453.480
|
|
|
SAN SWR PRE TELEVISION INSP (8"-12")
|
LF
|
114.000
|
$10.000
|
$17.000
|
$5.000
|
|
|
SAN SWR POST TELEVISION INSP (8"-12")
|
LF
|
114.000
|
$10.000
|
$17.000
|
$5.000
|
|
|
SAN SWR REMOVAL OF STEEL 18" CASING
|
LF
|
24.000
|
$15.000
|
$198.000
|
$127.130
|
|
|
SAN SWR REMOVAL OF 8" SEWER LINE
|
LF
|
55.000
|
$50.000
|
$179.000
|
$55.470
|
|
|
SAN SWR REMOVE EXISTING MAN HOLE
|
EA
|
3.000
|
$5,000.000
|
$5,000.000
|
$3,069.290
|
|
|
SAN SWR (8") (SDR26 PVC)
|
LF
|
55.000
|
$156.000
|
$900.000
|
$128.930
|
|
|
SAN SWR (6") (SDR26 PVC)
|
LF
|
5.000
|
$140.000
|
$990.000
|
$293.710
|
|
|
POWER POLE BRACING
|
EA
|
1.000
|
$5,000.000
|
$3,000.000
|
$7,500.000
|
|
|
SAN SWR REMOVAL OF 30' OF SEWER LINE
|
LF
|
55.000
|
$200.000
|
$118.000
|
$55.470
|
|
|
SAN SWR 30" CONC COLLAR (INSTL)
|
CY
|
5.000
|
$500.000
|
$470.000
|
$1,168.180
|
|
|
SAN SWR STEEL CASING (18")(OPEN CUT)
|
LF
|
29.000
|
$265.000
|
$490.000
|
$401.350
|
|
|
SAN SWR REMOVAL OF 6" SEWER LINE
|
LF
|
5.000
|
$50.000
|
$75.000
|
$264.910
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
13,146.000
|
$7.000
|
$2.050
|
$2.500
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
24.900
|
$13,500.000
|
$1,310.000
|
$14,360.580
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
28.000
|
$3,000.000
|
$2,600.000
|
$1,016.860
|
|
|
TEMPORARY BLOW-OFF(COMPLETE)(2")
|
EA
|
32.000
|
$2,500.000
|
$2,800.000
|
$2,554.350
|
|
|
FLOWABLE FILL BACKFILL
|
CY
|
204.000
|
$200.000
|
$200.000
|
$296.120
|
|
|
TIE-IN (COMPLETE)(8")
|
EA
|
5.000
|
$6,500.000
|
$6,500.000
|
$5,592.630
|
|
|
ADJUST VALVE BOX
|
EA
|
15.000
|
$800.000
|
$1,400.000
|
$696.580
|
|
|
CONCRETE SADDLE
|
CY
|
101.000
|
$275.000
|
$350.000
|
$519.150
|
|
|
DUCTILE IRON PIPE (6")
|
LF
|
4.000
|
$100.000
|
$135.000
|
$365.610
|
|
|
DUCTILE IRON PIPE (12")
|
LF
|
1,498.000
|
$220.000
|
$193.000
|
$148.310
|
|
|
DUCTILE IRON PIPE (16")
|
LF
|
5,616.000
|
$300.000
|
$270.000
|
$182.180
|
|
|
RELAY SHORT SERVICE (3/4")
|
EA
|
8.000
|
$2,260.000
|
$3,000.000
|
$2,774.960
|
|
|
RELAY SHORT SERVICE (1")
|
EA
|
4.000
|
$3,200.000
|
$3,100.000
|
$2,835.150
|
|
|
RELAY SHORT SERVICE (2")
|
EA
|
4.000
|
$4,000.000
|
$5,500.000
|
$3,494.070
|
|
|
GATE VALVE & BOX (COMPLETE)(16")
|
EA
|
14.000
|
$10,000.000
|
$14,800.000
|
$11,288.110
|
|
|
NEW METER BOX
|
EA
|
22.000
|
$625.000
|
$870.000
|
$2,157.470
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
27.000
|
$6,200.000
|
$7,800.000
|
$7,144.080
|
|
|
TIE-IN (COMPLETE)(6")
|
EA
|
2.000
|
$6,000.000
|
$6,200.000
|
$10,374.040
|
|
|
TIE-IN (COMPLETE)(12")
|
EA
|
10.000
|
$7,500.000
|
$7,900.000
|
$7,744.430
|
|
|
TIE-IN (COMPLETE)(16")
|
EA
|
14.000
|
$8,500.000
|
$10,600.000
|
$8,167.940
|
|
|
GATE VALVE AND BOX (COMPLETE) (12")
|
EA
|
12.000
|
$5,000.000
|
$6,000.000
|
$4,853.950
|
|
|
RELOCATE FIRE HYDRANT
|
EA
|
1.000
|
$3,900.000
|
$8,100.000
|
$9,107.810
|
|
|
PERMANENT BLOW-OFF (COMPLETE) (2")
|
EA
|
1.000
|
$4,000.000
|
$5,400.000
|
$6,805.310
|
|
|
WATER SERVICE LINE BREAKS LEAK REPAIR
|
EA
|
2.000
|
$1,000.000
|
$8,500.000
|
$5,477.460
|
|
|
WATER MAIN BREAKS LEAK REPAIR
|
EA
|
2.000
|
$1,000.000
|
$14,500.000
|
$16,266.460
|
|
|
STEEL CASING (24") (OPEN CUT)
|
LF
|
1,023.000
|
$240.000
|
$370.000
|
$443.180
|
|
|
STEEL CASING (30")(OPEN CUT)
|
LF
|
256.000
|
$330.000
|
$500.000
|
$498.470
|
|
|
WATER MAIN REMOVAL (16" & SMALLER)
|
LF
|
8,334.000
|
$25.000
|
$16.500
|
$19.640
|
|
|
AIR RELEASE VALVE (COMPLETE)(2")
|
EA
|
1.000
|
$14,000.000
|
$9,600.000
|
$13,086.380
|
|
|
CARRIER PIPE (IN CASING) (DI) (24")
|
LF
|
103.000
|
$300.000
|
$360.000
|
$284.750
|
|
|
CARRIER PIPE (OPEN CUT) (DI) (16")
|
LF
|
256.000
|
$200.000
|
$290.000
|
$162.620
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(4 IN)
|
EA
|
5.000
|
$6,000.000
|
$16,500.000
|
$13,811.760
|
|
|
ADJUST METER BOX
|
EA
|
5.000
|
$500.000
|
$1,140.000
|
$992.370
|
|
|
24" DUCTILE IRON PIPE
|
LF
|
71.000
|
$400.000
|
$4,300.000
|
$370.590
|
|
|
RELOC EXIST METER AND NEW METER BOX
|
EA
|
21.000
|
$875.000
|
$1,140.000
|
$1,191.390
|
|
|
GATE VALVE AND BOX (COMPLETE) (8")
|
EA
|
9.000
|
$4,000.000
|
$3,800.000
|
$3,050.830
|
|
|
BUTTERFLY VALVE AND BOX (COMPL) (24")
|
EA
|
2.000
|
$24,000.000
|
$27,000.000
|
$21,815.370
|
|
|
TIE-IN (COMPLETE) (24")
|
EA
|
5.000
|
$10,000.000
|
$15,800.000
|
$10,706.040
|
|
|
STEEL CASING (42") (OPEN CUT)
|
LF
|
103.000
|
$480.000
|
$860.000
|
$805.820
|
|
|
PIPE WATER MAIN (DI) (8")
|
LF
|
1,876.000
|
$120.000
|
$132.000
|
$135.190
|
|
|
WATER MAIN REMOVAL (24")
|
LF
|
350.000
|
$60.000
|
$18.500
|
$37.420
|
|
|
SPLIT STEEL CASING (42") (OPEN CUT)
|
LF
|
17.000
|
$400.000
|
$870.000
|
$1,394.640
|
|
|
AIR RELEASE VALVE (COMPLETE) (3")
|
EA
|
1.000
|
$17,500.000
|
$16,100.000
|
$19,878.490
|
|
|
NEW 6" WATER SERVICE FOR FIRE LINES
|
EA
|
36.000
|
$100.000
|
$7,700.000
|
$166.720
|
|
|
CARRIER PIPE (OPEN CUT)(DI)(12")
|
LF
|
511.000
|
$160.000
|
$176.000
|
$147.470
|
|
|
CARRIER PIPE (OPEN CUT)(DI)(8")
|
LF
|
512.000
|
$100.000
|
$156.000
|
$106.840
|
|
|
NEW UNMETERED SERVICE 3/4"
|
EA
|
1.000
|
$2,500.000
|
$4,200.000
|
$2,898.440
|
|
Totals: |
$55,504,597.700
|
$68,941,542.240
|
$69,397,027.217
|