BEXAR VA (0915-12-687)

Items: 95

County: BEXAR
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-12-687
DBE Goal: N/A
Project: STP 2020(898)
Guaranty: N/A
Time: 176 WORKING DAYS
Engineer's Estimate: $3,755,553.50
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: CONST CURB RAMPS, SIDEWALKS, PED FY 20 PROJ1
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$3,755,553.50
$3,621,896.47
Over/Under Est: -3.56% -$133,657.03
$3,741,364.17
Over/Under Est: -0.38% -$14,189.33
Amt Left: 3.3% $119,467.70
Over/Under Est: 3.78% $141,805.80
Amt Left: 7.61% $275,462.83
Delta: -4.17% -$155,995.13
$3,994,502.26
Over/Under Est: 6.36% $238,948.76
Amt Left: 10.29% $372,605.79
Delta: -2.49% -$97,142.96
$4,408,905.75
Over/Under Est: 17.4% $653,352.25
Amt Left: 21.73% $787,009.28
Delta: -10.37% -$414,403.49

Bid Items & Bid Tabulations

95 Total 0 of 95
BEXAR  |  VA  |  SAN ANTONIO  |  0915-12-687  |  06/04/2020  |  $3,755,553.50  |  STP 2020(898)  |  CONST CURB RAMPS, SIDEWALKS, PED FY...  |  176 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JORDAN FOSTER CONSTRUCTION, LLC
J3 COMPANY, LLC
E-Z BEL CONSTRUCTION, LLC
TI-ZACK CONCRETE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
AC 1.000 $5,200.000 $36,218.960 $3,994.690 $6,500.000 $40,000.000 $100,000.000
REMOVING CONC (RIPRAP)
SY 492.000 $15.000 $15.500 $20.000 $15.000 $20.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 3,347.000 $30.000 $8.950 $16.000 $15.000 $16.000 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,185.000 $10.000 $8.050 $4.000 $10.000 $10.000 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 230.000 $15.000 $44.000 $10.000 $15.000 $20.000 $20.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 6,246.000 $20.000 $11.000 $10.000 $8.000 $15.000 $20.000
EXCAVATION (ROADWAY)
CY 272.000 $30.000 $61.000 $30.000 $30.000 $16.000 $20.000
EXCAVATION (CHANNEL)
CY 541.000 $20.000 $57.000 $20.000 $20.000 $16.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,435.000 $30.000 $43.000 $12.000 $25.000 $15.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 11,792.000 $1.500 $8.400 $7.000 $5.750 $4.000 $6.000
BLOCK SODDING
SY 11,792.000 $5.000 $5.000 $6.000 $5.750 $5.000 $6.000
VEGETATIVE WATERING
MG 183.955 $30.000 $118.000 $27.900 $45.000 $1.000 $50.000
D-GR HMA(SQ) TY-C PG76-22
TON 135.600 $115.000 $300.000 $175.000 $290.000 $150.000 $140.000
TACK COAT
GAL 105.600 $3.000 $10.000 $20.000 $8.000 $5.000 $10.000
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 228.000 $100.000 $240.000 $160.000 $55.000 $80.000 $65.000
PLANE ASPH CONC PAV(0" TO 4")
SY 877.000 $2.250 $36.000 $35.000 $4.000 $12.000 $20.000
CEM STABIL BKFL
CY 47.000 $210.000 $162.000 $100.000 $165.000 $300.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 494.000 $5.000 $2.200 $8.000 $4.000 $1.000 $10.000
CL A CONC (MISC)
SY 20.000 $550.000 $350.000 $105.000 $150.000 $75.000 $500.000
CL C CONC (MISC)
CY 209.000 $675.000 $900.000 $595.000 $750.000 $850.000 $850.000
RETAINING WALL (CAST - IN - PLACE)
SF 2,101.000 $55.000 $69.000 $32.000 $80.000 $35.000 $85.000
RIPRAP (CONC)(6 IN)
CY 362.000 $500.000 $500.000 $500.000 $425.000 $650.000 $500.000
RAIL (HANDRAIL)(TY B)
LF 2,153.000 $125.000 $71.000 $100.000 $100.000 $50.000 $100.000
CONC BOX CULV (6 FT X 3 FT)
LF 108.000 $350.000 $530.000 $500.000 $700.000 $400.000 $1,000.000
RC PIPE (CL III)(12 IN)
LF 10.000 $75.000 $230.000 $90.000 $100.000 $140.000 $85.000
RC PIPE (CL III)(24 IN)
LF 90.000 $85.000 $140.000 $120.000 $120.000 $170.000 $105.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 5.000 $4,000.000 $9,000.000 $8,000.000 $4,500.000 $4,500.000 $5,000.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 2.000 $4,500.000 $9,400.000 $8,000.000 $5,500.000 $4,500.000 $8,500.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 3.000 $5,200.000 $9,600.000 $8,000.000 $7,500.000 $5,000.000 $10,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $7,500.000 $12,400.000 $10,500.000 $12,000.000 $9,500.000 $20,000.000
GRATE & FRAME
EA 261.000 $1,250.000 $1,000.000 $1,000.000 $1,100.000 $900.000 $1,500.000
PIPE (PVC) (SCH 80) (18 IN)
LF 11.000 $75.000 $200.000 $140.000 $100.000 $170.000 $150.000
REMOV STR (BOX CULVERT)
EA 1.000 $2,000.000 $3,600.000 $9,000.000 $5,000.000 $1,500.000 $5,000.000
REMOV STR (INLET)
EA 5.000 $2,500.000 $730.000 $4,500.000 $1,250.000 $1,500.000 $1,500.000
REMOV STR (PIPE)
LF 100.000 $50.000 $48.000 $80.000 $18.000 $30.000 $30.000
REMOV STR (LARGE)
EA 1.000 $3,000.000 $1,510.000 $4,500.000 $5,000.000 $3,000.000 $5,000.000
REMOVE STR (RAIL)
LF 41.000 $250.000 $38.000 $60.000 $55.000 $10.000 $50.000
MOBILIZATION
LS 1.000 $280,000.000 $126,766.370 $370,000.000 $270,000.000 $340,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $2,500.000 $8,600.000 $8,500.000 $4,500.000 $2,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 25.000 $40.000 $30.000 $38.000 $30.000 $5.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 25.000 $12.000 $10.000 $30.000 $9.000 $5.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $30.000 $13.000 $16.000 $14.000 $5.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $2.000 $11.000 $4.000 $5.000 $20.000
SANDBAGS FOR EROSION CONTROL
EA 2,400.000 $6.000 $5.000 $6.000 $4.000 $0.100 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,600.000 $55.000 $3.250 $4.000 $3.750 $0.100 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,600.000 $2.000 $1.000 $1.000 $0.750 $0.100 $9.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 560.000 $40.000 $12.500 $35.000 $40.000 $35.000 $85.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $65.000 $104.000 $35.000 $45.000 $35.000 $95.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 560.000 $10.000 $10.500 $20.000 $12.000 $10.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 160.000 $15.000 $15.500 $20.000 $12.000 $10.000 $20.000
CONC CURB (TY I)
LF 177.000 $20.000 $24.000 $16.000 $19.000 $40.000 $35.000
CONC CURB (TY II)
LF 6,606.000 $22.000 $11.000 $16.000 $19.000 $40.000 $30.000
CONC CURB (SLOTTED)
LF 68.000 $40.000 $46.000 $40.000 $30.000 $40.000 $50.000
CONC CURB & GUTTER (ARMOR CURB)
LF 308.000 $200.000 $300.000 $160.000 $275.000 $225.000 $125.000
CONC CURB & GUTTER(VALLEY GUTTER)(36")
LF 52.000 $80.000 $54.000 $85.000 $60.000 $40.000 $80.000
DRIVEWAYS (CONC)
SY 5,302.000 $75.000 $64.000 $77.500 $80.000 $105.000 $80.000
DRIVEWAYS (ACP)
SY 4,618.000 $65.000 $40.000 $65.000 $40.000 $42.000 $40.000
CONC SIDEWALKS (4")
SY 6,986.000 $60.000 $46.000 $50.000 $55.000 $92.000 $50.000
CURB RAMPS (TY 1)
SY 33.000 $65.000 $120.000 $95.000 $150.000 $100.000 $250.000
CURB RAMPS (TY 2)
SY 246.000 $65.000 $68.000 $95.000 $150.000 $100.000 $250.000
CURB RAMPS (TY 3)
SY 62.000 $65.000 $56.000 $95.000 $150.000 $100.000 $250.000
CURB RAMPS (TY 5)
SY 87.000 $65.000 $56.000 $145.000 $200.000 $100.000 $250.000
CURB RAMPS (TY 6)
SY 24.000 $65.000 $185.000 $120.000 $150.000 $100.000 $250.000
CURB RAMPS (TY 7)
SY 52.000 $65.000 $142.000 $120.000 $150.000 $100.000 $250.000
CURB RAMPS (TY 10)
SY 31.000 $65.000 $76.000 $120.000 $150.000 $100.000 $250.000
CURB RAMPS (TY 20)
SY 8.000 $65.000 $550.000 $200.000 $200.000 $100.000 $250.000
CURB RAMPS (TY 21)
SY 29.000 $65.000 $157.000 $145.000 $200.000 $100.000 $250.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 1,787.000 $75.000 $230.000 $168.000 $275.000 $170.000 $65.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $250.000 $200.000 $350.000 $300.000 $250.000 $850.000
GROUND BOX TY D (162922)
EA 4.000 $500.000 $890.000 $541.910 $1,100.000 $800.000 $1,000.000
REMOVE GROUND BOX
EA 4.000 $200.000 $220.000 $825.060 $225.000 $50.000 $550.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 26.000 $475.000 $350.000 $175.000 $495.000 $500.000 $650.000
REMOVE SM RD SN SUP&AM
EA 2.000 $50.000 $84.000 $100.000 $100.000 $90.000 $250.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,655.000 $2.000 $1.200 $1.450 $1.200 $2.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8.000 $4.000 $5.000 $6.040 $5.000 $5.000 $10.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,124.000 $7.000 $6.000 $7.240 $6.000 $7.000 $20.000
PAVEMENT SEALER 4"
LF 1,031.000 $0.600 $0.500 $0.600 $0.500 $5.000 $1.000
PAVEMENT SEALER 8"
LF 8.000 $0.700 $2.000 $2.410 $2.000 $55.000 $5.000
PAVEMENT SEALER 24"
LF 1,124.000 $1.250 $2.450 $2.940 $2.440 $2.000 $6.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 905.000 $0.550 $2.500 $3.020 $2.500 $2.000 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8.000 $0.400 $5.000 $6.040 $5.000 $2.000 $10.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 118.000 $0.400 $5.000 $6.030 $5.000 $2.000 $1.000
ELIM EXT PAV MRK & MRKS (4")
LF 905.000 $1.250 $1.400 $1.690 $1.400 $2.000 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 781.000 $3.000 $3.650 $4.420 $3.660 $4.000 $8.000
PAV SURF PREP FOR MRK (4")
LF 1,031.000 $0.200 $0.500 $0.600 $0.500 $0.100 $1.000
PAV SURF PREP FOR MRK (8")
LF 8.000 $0.300 $1.000 $1.210 $1.000 $0.200 $5.000
PAV SURF PREP FOR MRK (24")
LF 1,124.000 $0.650 $3.000 $3.620 $3.000 $0.400 $8.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $500.000 $820.000 $1,000.000 $1,500.000 $2,500.000 $1,850.000
PED DETECT PUSH BUTTON (STANDARD)
EA 12.000 $450.000 $610.000 $800.000 $600.000 $500.000 $850.000
INSTALL OF VEHICLE DETECTORS
LF 4,000.000 $2.000 $0.180 $5.000 $8.000 $4.000 $12.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 14.000 $75.000 $76.000 $300.000 $100.000 $55.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 270.000 $72.000 $98.000 $66.000 $100.000 $55.000 $150.000
TMA (STATIONARY)
DAY 135.000 $165.000 $340.000 $156.200 $250.000 $55.000 $300.000
NGP ADJUST GAS FACILITY ACCESS COVER
EA 4.000 $225.000 $1,200.000 $750.000 $795.000 $3,000.000 $5,000.000
ADJUST VALVE BOX
EA 4.000 $1,500.000 $1,000.000 $228.100 $795.000 $110.000 $650.000
Totals: $3,755,553.500 $3,621,896.470 $3,741,364.174 $3,897,359.295 $3,994,502.255 $4,408,905.750