BEXAR VA (0915-12-577)

Items: 45

County: BEXAR
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-12-577
DBE Goal: N/A
Project: STP 2018(598)MM
Guaranty: N/A
Time: 296 WORKING DAYS
Engineer's Estimate: $3,167,698.31
Date: 04/03/2018 (8 years ago)
Contract Number: N/A
Type: INSTALL ITS DYNAMIC GUIDE SIGNS/DMS MESSAGE BOARDS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,167,698.31
$2,897,980.50
Over/Under Est: -8.51% -$269,717.81
$3,605,238.96
Over/Under Est: 13.81% $437,540.65
Amt Left: 24.41% $707,258.46
Over/Under Est: 20.74% $656,966.74
Amt Left: 31.98% $926,684.55
Delta: -6.09% -$219,426.09

Bid Items & Bid Tabulations

45 Total 0 of 45
BEXAR  |  VA  |  SAN ANTONIO  |  0915-12-577  |  04/03/2018  |  $3,167,698.31  |  STP 2018(598)MM  |  INSTL ITS DYNAMIC GUIDE SIGNS/DMS ME...  |  296 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, INC.
MICA CORPORATION
FLORIDA TRAFFIC CONTROL DEVICES, INC.
DRILL SHAFT (42 IN)
LF 168.000 $166.000 $337.190 $424.750 $456.210
DRILL SHAFT (SIGN MTS) (54 IN)
LF 588.000 $516.000 $431.930 $437.800 $631.310
RIPRAP (CONC)(CL B)
CY 46.500 $1,555.000 $725.000 $690.000 $780.970
RIPRAP (MOW STRIP)(4 IN)
CY 281.500 $380.000 $475.000 $621.000 $635.440
MOBILIZATION
LS 1.000 $357,497.000 $284,242.210 $248,200.000 $374,745.940
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $2,500.000 $4,701.710 $12,312.000 $24,209.940
MTL W-BEAM GD FEN (TIM POST)
LF 5,250.000 $20.000 $18.750 $22.550 $23.720
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 26.000 $882.000 $1,090.000 $1,030.000 $1,083.280
REMOVE METAL BEAM GUARD FENCE
LF 180.000 $1.100 $5.000 $5.750 $6.050
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $100.000 $500.000 $290.000 $302.590
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,228.000 $2,435.000 $2,795.000 $2,941.190
CONDT (PVC) (SCH 40) (2")
LF 21,793.000 $7.500 $5.370 $7.290 $11.010
CONDT (PVC) (SCH 80) (2") (BORE)
LF 3,313.000 $38.500 $36.600 $22.250 $32.590
CONDT (RM) (2")
LF 1,620.000 $24.000 $27.880 $26.500 $19.960
ELEC CONDR (NO.4) INSULATED
LF 22,814.000 $1.800 $1.890 $2.190 $1.490
ELEC CONDR (NO.2) INSULATED
LF 15,920.000 $2.450 $2.740 $2.600 $1.910
ELEC CONDR (NO.1/0) INSULATED
LF 19,722.000 $3.750 $4.510 $3.930 $3.190
GROUND BOX TY A (122311)W/APRON
EA 40.000 $824.500 $724.830 $1,235.000 $796.750
GROUND BOX TY D (162922)W/APRON
EA 59.000 $903.000 $893.070 $1,285.000 $824.910
ELC SRV TY D 120/240 060(NS)GS(N)TP(O)
EA 23.000 $5,291.000 $3,156.990 $4,220.000 $2,930.560
ALUMINUM SIGNS (TY O)
SF 6,302.250 $18.750 $20.280 $18.950 $26.630
INS OH SN SUP(30 FT BAL TEE)
EA 19.000 $25,982.040 $19,455.100 $23,950.000 $18,785.090
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 51.000 $15.000 $15.000 $18.500 $19.370
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 27.000 $16.500 $15.000 $18.500 $19.370
COMM CABLE (UNDRGRND)(22 AWG)(6 PAIR)
LF 412.000 $2.300 $4.160 $9.900 $2.270
FO CBL (6 SMF)
LF 13,641.000 $6.000 $2.300 $4.740 $7.070
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 28.000 $665.000 $1,310.000 $636.000 $342.360
CCTV FIELD EQUIPMENT (ANALOG)
EA 10.000 $9,000.000 $12,117.420 $7,982.000 $7,207.750
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $1,500.000 $2,917.280 $1,556.000 $519.670
CONDUIT (PREPARE)
LF 2,195.000 $1.760 $1.070 $5.160 $16.650
GROUND BOX (PREPARE)
EA 17.000 $132.580 $104.360 $502.000 $264.330
INSTALL DMS (POLE MTD CABINET)
EA 20.000 $9,150.000 $7,634.260 $16,861.000 $8,066.260
INSTALL DMS (FOUNDATION MTD CABINET)
EA 7.000 $12,750.000 $11,015.740 $17,324.000 $13,703.020
COAXIAL CABLE
LF 825.000 $3.000 $10.680 $70.050 $3.460
ITS RADIO (INSTALL ONLY)
EA 37.000 $2,000.000 $1,763.480 $3,180.000 $4,901.470
SPS-INS (20W) 288W (150AH) 1X50A(1)
EA 2.000 $2,067.000 $8,879.530 $14,350.000 $3,999.220
SPS-INS (20W) 288W (150AH) 1X50A(3)
EA 1.000 $2,067.000 $12,010.230 $16,735.000 $2,464.420
ITS POLE (45 FT)(REM)
EA 1.000 $2,000.000 $2,385.010 $855.000 $688.830
ITS POLE (55 FT)(90 MPH)
EA 8.000 $13,063.000 $14,852.860 $18,875.000 $22,975.390
ITS POLE (8 FT)(COSS/OSB)
EA 2.000 $5,000.000 $2,935.680 $3,433.000 $4,390.600
ITS POLE MNT CAB (TY 1)(CONF 1)
EA 2.000 $4,673.000 $4,765.170 $4,876.000 $4,950.460
TMA (STATIONARY)
DAY 60.000 $200.000 $500.000 $285.000 $726.220
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 1.000 $4,000.000 $5,280.140 $3,425.000 $2,872.420
INSTALLATION OF VE
EA 10.000 $1,250.000 $775.850 $1,321.000 $349.660
INSTALLATION OF FES
EA 46.000 $1,250.000 $841.200 $1,553.000 $349.660
Totals: $3,167,698.308 $2,897,980.500 $3,605,238.968 $3,824,665.062