Show Job Controls
Bid Cobra

BEXAR CS (0915-12-532)

Items: 54

County: BEXAR
Length: N/A
Highway: CS
District: SAN ANTONIO
Control Number: 0915-12-532
DBE Goal: N/A
Project: BR 1402(214)
Guaranty: N/A
Time: 108 WORKING DAYS
Engineer's Estimate: $1,905,785.50
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,905,785.50
1
$1,567,047.86
Over/Under Est: -17.77% -$338,737.64
Over/Under Est: -10.8% -$205,838.51
Amt Left: 8.48% $132,899.13
Over/Under Est: 19.29% $367,708.45
Amt Left: 45.08% $706,446.09
Delta: -33.74% -$573,546.96
Subcontractor Percentage Amount
HYDRO TECHNOLOGIES, INC. 6.25% $101,935.03
DIIBS SPECIALISTS, LLC 3.10% $50,559.77
Total: 9.35% $152,494.80

Bid Items & Bid Tabulations

54 Total 0 of 54
BEXAR  |  CS  |  SAN ANTONIO  |  0915-12-532  |  02/04/2022  |  $1,905,785.50  |  BR 1402(214)  |  BRIDGE MAINT  |  108 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
GIBSON & ASSOCIATES, INC.
LUCANIA CONSTRUCTION LLC
PREPARING ROW
STA 18.000 $7,000.000 $5,000.000 $900.000 $2,000.000
REMOVING CONC (RIPRAP)
CY 77.000 $96.000 $30.000 $176.000 $150.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 228.000 $15.000 $30.000 $20.000 $15.000
REMOVING CONCRETE(MOW STRIP)
LF 178.000 $5.000 $30.000 $1.000 $10.000
EXCAVATION (ROADWAY)
CY 167.000 $10.000 $50.000 $65.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 16.000 $13.000 $100.000 $100.000 $100.000
FURNISHING AND PLACING TOPSOIL (4")
SY 906.000 $1.500 $6.000 $5.500 $5.500
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 906.000 $0.500 $1.000 $1.100 $2.500
BROADCAST SEED (TEMP) (WARM)
SY 453.000 $0.500 $1.000 $1.100 $2.700
BROADCAST SEED (TEMP) (COOL)
SY 453.000 $0.500 $1.000 $1.100 $2.700
VEGETATIVE WATERING
MG 37.000 $25.000 $40.000 $100.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 906.000 $2.000 $4.000 $1.760 $4.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 20.000 $75.000 $150.000 $825.000 $100.000
PLANE ASPH CONC PAV (2")
SY 481.000 $2.000 $15.000 $15.070 $16.000
CL C CONC (RAIL FOUNDATION)
CY 2.700 $125.000 $1,800.000 $1,500.000 $600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 200.000 $290.000 $150.000 $285.000 $300.000
RIPRAP (CONC)(4 IN)
CY 77.000 $440.000 $425.000 $528.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 13.000 $490.000 $450.000 $594.000 $450.000
ELASTOMERIC BEARING (LAMINATED)
EA 140.000 $2,125.000 $425.000 $2,600.000 $2,000.000
CLEANING AND SEALING EXISTING JOINTS
LF 536.000 $65.000 $25.000 $40.000 $30.000
LATEX - MODIFIED CONC OVERLAY (2 IN)
SY 4,919.000 $105.000 $85.000 $87.000 $100.000
RAIL (TY T402)
LF 20.000 $106.000 $350.000 $800.000 $180.000
RAIL (HANDRAIL)(TY E)
LF 142.000 $100.000 $185.000 $160.000 $200.000
HYDRO-DEMOLITION (2 IN)
SY 4,919.000 $80.000 $77.000 $52.500 $130.000
MOBILIZATION
LS 1.000 $172,581.000 $135,000.000 $145,000.000 $180,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $6,000.000 $2,800.000 $1,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 80.000 $25.000 $35.000 $18.700 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 80.000 $10.000 $15.000 $2.200 $5.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,339.000 $7.500 $7.000 $6.330 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,339.000 $1.400 $3.000 $1.380 $2.500
CONC SIDEWALKS (4")
SY 322.000 $50.000 $50.000 $64.000 $52.000
MTL W-BEAM GD FEN (TIM POST)
LF 39.000 $22.000 $55.660 $55.060 $55.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,140.000 $1,284.800 $1,229.800 $1,350.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,280.000 $1,892.000 $1,424.500 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 178.000 $3.000 $3.740 $4.400 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $291.500 $220.000 $300.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $250.000 $291.500 $220.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,700.000 $3,528.800 $3,655.300 $3,500.000
ALUMINUM SIGNS (TY A)
SF 14.000 $30.000 $50.000 $100.000 $50.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 2.000 $3,200.000 $2,420.000 $2,500.000 $2,500.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 12.000 $70.000 $125.000 $50.000 $20.000
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 140.000 $3.000 $5.500 $5.500 $12.000
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 553.000 $10.500 $3.300 $3.300 $4.750
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 553.000 $0.400 $3.300 $3.300 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,212.000 $0.350 $1.650 $1.650 $1.500
REFL PAV MRKR TY II-A-A
EA 28.000 $3.000 $22.000 $22.000 $7.250
REFL PAV MRKR TY II-C-R
EA 28.000 $4.000 $22.000 $22.000 $7.250
REPAIR METAL RAIL (C4)
LF 100.000 $250.000 $105.000 $104.000 $160.000
REP STL BRIDGE MEMBER (ROCKER)
EA 7.000 $1,000.000 $5,500.000 $4,400.000 $15,000.000
CONCRETE BEAM REPAIR
EA 20.000 $1,750.000 $4,200.000 $2,500.000 $10,000.000
TACK COAT
GAL 97.000 $3.000 $8.000 $3.190 $10.000
D-GR HMA TY-C SAC-B PG70-22 (EXEMPT)
TON 54.000 $90.000 $225.000 $495.000 $200.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $220.000 $700.000 $500.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $15,000.000 $11,500.000 $10,000.000
Totals: $1,905,785.500 $1,567,047.860 $1,699,946.990 $2,273,493.950