BEXAR CS (0915-12-531)

Items: 78

County: BEXAR
Length: N/A
Highway: CS
District: SAN ANTONIO
Control Number: 0915-12-531
DBE Goal: N/A
Project: BR 1402(213)
Guaranty: N/A
Time: 116 WORKING DAYS
Engineer's Estimate: $732,326.95
Date: 01/10/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$732,326.95
$988,634.75
Over/Under Est: 35% $256,307.80
Over/Under Est: 35.78% $262,005.49
Amt Left: 0.58% $5,697.69

Bid Items & Bid Tabulations

78 Total 0 of 78
BEXAR  |  CS  |  SAN ANTONIO  |  0915-12-531  |  01/10/2020  |  $732,326.95  |  BR 1402(213)  |  BRIDGE REPL  |  116 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
E-Z BEL CONSTRUCTION, LLC
PREPARING ROW
STA 3.000 $5,000.000 $30,000.000 $15,000.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 33.000 $20.000 $25.000 $40.000
REMOVING STB BASE AND ASPH PAV(10-14")
SY 624.000 $2.500 $8.000 $16.000
EXCAVATION (ROADWAY)
CY 744.000 $10.000 $30.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 126.000 $15.000 $25.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 539.000 $1.500 $3.500 $5.000
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 539.000 $0.500 $2.250 $0.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 270.000 $0.500 $2.250 $0.500
CELL FBR MLCH SEED(TEMP)(COOL)
SY 270.000 $0.500 $2.250 $0.500
VEGETATIVE WATERING
MG 13.600 $20.000 $15.000 $60.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 539.000 $1.000 $1.500 $2.500
PROOF ROLLING
HR 12.000 $90.000 $50.000 $80.000
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
CY 250.000 $75.000 $75.000 $125.000
CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS)
CY 56.000 $55.000 $175.000 $145.000
PRIME COAT(MC-30 OR AE-P)
GAL 164.000 $5.000 $4.000 $5.000
D-GR HMA(SQ) TY-C PG70-22
TON 113.000 $80.000 $150.000 $100.000
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 90.000 $95.000 $150.000 $110.000
TACK COAT
GAL 62.000 $6.000 $4.000 $5.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 223.000 $60.000 $105.000 $120.000
STRUCT EXCAV (BOX)
CY 195.000 $10.000 $1.000 $1.000
CEM STABIL BKFL
CY 123.000 $100.000 $150.000 $180.000
TRENCH EXCAVATION PROTECTION
LF 38.000 $3.500 $1.000 $2.750
TEMPORARY SPL SHORING
SF 309.000 $20.000 $1.000 $40.000
RAIL (TY C402)
LF 126.000 $115.000 $200.000 $300.000
GABION MATTRESSES (GALV)(12 IN)
SY 92.000 $90.000 $115.000 $125.000
GABIONS (3' X 3')(GALV)
CY 46.000 $225.000 $275.000 $150.000
CONC BOX CULV (6 FT X 3 FT)
LF 239.000 $350.000 $500.000 $700.000
RC PIPE (CL III)(24 IN)
LF 38.000 $150.000 $100.000 $125.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 2.000 $5,250.000 $7,500.000 $12,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $35,000.000 $35,000.000 $15,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $12,000.000 $25,000.000 $10,000.000
MOBILIZATION
LS 1.000 $63,819.200 $90,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $8,500.000 $2,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 252.000 $20.000 $14.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 252.000 $8.000 $10.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 461.000 $4.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 461.000 $1.000 $1.000 $0.550
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 158.000 $6.000 $5.000 $20.000
CONC CURB (TY I)
LF 387.000 $10.000 $25.000 $30.000
CONC CURB & GUTTER (TY II)
LF 72.000 $25.000 $35.000 $35.000
CONC SIDEWALKS (4")
SY 256.000 $50.000 $75.000 $75.000
CURB RAMPS (TY 1)
EA 2.000 $1,500.000 $2,000.000 $2,000.000
CONDT (PVC) (SCH 40) (1")
LF 100.000 $10.000 $15.000 $20.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $600.000 $650.000 $650.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $300.000 $500.000 $400.000
REMOVE SM RD SN SUP&AM
EA 4.000 $80.000 $200.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 12.000 $50.000 $45.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $20.000 $200.000
INSTL OM ASSM (OM-3L)(FLX)GND
EA 2.000 $250.000 $220.000 $105.000
INSTL OM ASSM (OM-3R)(FLX)GND
EA 2.000 $250.000 $220.000 $105.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 60.000 $5.000 $12.000 $10.000
PAVEMENT SEALER 4"
LF 1,129.000 $0.250 $1.500 $1.000
PAVEMENT SEALER 24"
LF 60.000 $5.000 $6.000 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 563.000 $0.500 $3.000 $2.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 566.000 $0.500 $3.000 $2.750
REFL PAV MRKR TY II-A-A
EA 7.000 $3.000 $15.000 $50.000
REMOVAL OF TIMBER POLES
EA 2.000 $2,500.000 $200.000 $1,500.000
TREE AND BRUSH REMOVAL
AC 0.800 $75,000.000 $3,000.000 $10,000.000
STENCILING PERMANENT STRUCTURE NUMBERS
EA 1.000 $350.000 $200.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $8,000.000 $14,000.000
NGP (MAIN) (8" PLASTIC W/ TW)
LF 412.000 $125.000 $175.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 345.000 $5.000 $25.000 $1.000
DUCTILE IRON FITTINGS
TON 1.640 $5,000.000 $10,000.000 $1.000
HYDROSTATIC PRESSURE TEST
EA 1.000 $2,000.000 $6,500.000 $2,500.000
TEMPORARY BLOW-OFF(COMPLETE)(2")
EA 3.000 $2,000.000 $4,500.000 $2,500.000
FLOWABLE FILL BACKFILL
CY 42.000 $120.000 $210.000 $180.000
PIPE WATER MAIN (PVC)(8")
LF 14.000 $100.000 $375.000 $150.000
TIE-IN (COMPLETE)(8")
EA 1.000 $3,500.000 $4,000.000 $5,000.000
CUT AND REPLACE CONCRETE SIDEWALK
SY 16.000 $62.000 $115.000 $85.000
FIRE HYDRANT ASSEMBLY
EA 1.000 $6,000.000 $5,500.000 $6,500.000
TIE-IN (COMPLETE)(12")
EA 2.000 $5,000.000 $5,000.000 $6,500.000
AIR RELEASE VALVE (COMPLETE)(1")
EA 1.000 $3,000.000 $4,000.000 $4,000.000
PIPE WATER MAIN (PVC) (12")
LF 257.000 $120.000 $110.000 $150.000
GATE VALVE AND BOX (COMPLETE) (12")
EA 2.000 $3,000.000 $4,000.000 $3,000.000
CARRIER PIPE (OPEN CUT) (PVC) (12")
LF 74.000 $120.000 $65.000 $175.000
GROUT ABANDONMENT WATER MAIN (12")
LF 265.000 $30.000 $15.500 $40.000
STEEL CASING (30")(OPEN CUT)
LF 74.000 $200.000 $275.000 $125.000
GROUT ABANDONMENT WATER MAIN (8")
LF 50.000 $28.000 $15.500 $40.000
Totals: $732,326.950 $988,634.750 $994,332.440