Show Job Controls
Bid Cobra

BEXAR VARIOUS (0915-00-283)

Items: 124

County: BEXAR
Length: 0.0000 MILES
Highway: VARIOUS
District: SAN ANTONIO
Control Number: 0915-00-283
DBE Goal: 0.0%
Project: F 2026(703)
Guaranty: $100,000.00
Time: 392 WORKING DAYS
Engineer's Estimate: $9,327,084.54
Date: 06/02/2026 (8 days ago)
Contract Number: 6263007
Type: BRIDGE MAINTENANCE
Project ID: A00196419
Contract Type: Federal
Project Description: ADDRESS VARIOUS BRIDGE REPAIR INCLUDING SCOUR AND SLOPE FAILURE-2026
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTEN LONGORIA
CITLALI TAPIA
CARLOS ARCILA
DANNY GALLEGOS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$9,327,084.54
$4,555,821.00
Over/Under Est: -51.15% -$4,771,263.54
$4,955,888.61
Over/Under Est: -46.87% -$4,371,195.93
Amt Left: 8.78% $400,067.61
Over/Under Est: -26.49% -$2,470,380.04
Amt Left: 50.5% $2,300,883.50
Delta: -38.35% -$1,900,815.89
Over/Under Est: -22.64% -$2,111,894.82
Amt Left: 58.37% $2,659,368.72
Delta: -5.23% -$358,485.22
Over/Under Est: -19.34% -$1,803,653.54
Amt Left: 65.14% $2,967,610.00
Delta: -4.27% -$308,241.28

Bid Items & Bid Tabulations

124 Total 0 of 124
BEXAR  |  VARIOUS  |  SAN ANTONIO  |  0915-00-283  |  06/02/2026  |  $9,327,084.54  |  F 2026(703)  |  BRIDGE MAINT  |  392 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TAYLOR BRIDGE LLC
RELMCO, INC.
RAGLE CONSTRUCTION, INC.
ROY JORGENSEN ASSOCIATES, INC.
SCR CIVIL CONSTRUCTION, LLC
PREPARING ROW
STA 8.000 $4,000.000 $5,500.000 $15,000.000 $60,000.000 $4,400.000 $3,700.000
REMOV CONC (RIPRAP)
SY 782.000 $30.000 $25.000 $40.000 $15.000 $20.000 $55.000
REMOV CONC (MISC)
CY 7.000 $250.000 $1,000.000 $300.000 $700.000 $500.000 $2,800.000
EXCAV (CHANNEL)
CY 817.000 $50.000 $25.000 $40.000 $35.000 $25.000 $66.000
EMBANK (FNL)(OC)(TY C)
CY 2,926.000 $50.000 $25.000 $38.000 $35.000 $25.000 $69.000
DRILL SEED (PERM_RURAL_CLAY)
SY 2,814.000 $0.400 $1.000 $2.000 $0.700 $0.500 $1.000
DRILL SEED (TEMP_WARM_COOL)
SY 2,814.000 $0.400 $1.000 $2.000 $0.600 $0.500 $0.500
VEGETATIVE WATERING
TGL 91.000 $180.000 $25.000 $50.000 $50.000 $5.250 $73.000
SAND BACKFILL
CY 5.000 $39.600 $300.000 $80.000 $275.000 $200.000 $500.000
FLOWABLE BACKFILL
CY 449.110 $305.000 $400.000 $185.000 $295.000 $415.000 $830.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 600.000 $50.000 $5.000 $80.000 $30.000 $60.000 $80.000
CL C CONC (COLLAR)
EA 9.000 $3,233.000 $1,000.000 $1,500.000 $2,475.000 $2,000.000 $3,400.000
BLAST FINISH
SF 563.000 $4.000 $5.000 $5.300 $10.000 $10.000 $7.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 728.000 $293.000 $350.000 $175.000 $165.000 $180.000 $275.000
CONC STR REPAIR (STANDARD)
SF 60.000 $157.000 $150.000 $175.000 $195.000 $175.000 $275.000
RIPRAP (CONC)(5 IN)
CY 8.000 $621.300 $1,000.000 $600.000 $750.000 $1,000.000 $1,860.000
RIPRAP (CONC)(CL B)
CY 10.000 $810.000 $1,400.000 $600.000 $825.000 $1,000.000 $1,860.000
RIPRAP (CONC)(FLUME)
CY 3.000 $891.100 $2,500.000 $900.000 $940.000 $1,500.000 $2,000.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 170.000 $250.000 $200.000 $165.000 $190.000 $225.000 $275.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 1,606.000 $250.000 $155.000 $165.000 $190.000 $225.000 $280.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 227.000 $250.000 $155.000 $165.000 $190.000 $225.000 $280.000
BEDDING MATERIAL (3 IN)
CY 302.000 $160.000 $50.000 $30.000 $130.000 $40.000 $245.000
ELASTOMERIC BEARING (LAMINATED)
EA 19.000 $7,500.000 $2,000.000 $2,850.000 $1,250.000 $2,500.000 $2,400.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 454.000 $91.200 $100.000 $42.000 $18.000 $40.000 $45.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 185.000 $114.000 $100.000 $45.000 $23.000 $80.000 $50.000
STR STEEL (PEDESTAL)
LB 3,450.000 $100.000 $5.000 $22.000 $15.000 $14.000 $20.000
MISC NON-BRIDGE (NBIS)
LB 2.300 $100.000 $500.000 $350.000 $100.000 $36.000 $110.000
CLEAN AND PAINT EXIST STR (REF NO. 1)
EA 1.000 $24,000.000 $8,000.000 $10,070.000 $85,000.000 $11,400.000 $13,000.000
RETROFIT RAIL (TY SSTR)
LF 362.000 $260.000 $140.000 $235.000 $145.000 $225.000 $200.000
HEADER TYPE EXPANSION JOINT
CF 29.000 $680.000 $1,000.000 $465.000 $340.000 $500.000 $850.000
JOINT SEALANT
LF 232.000 $15.000 $20.000 $22.000 $28.500 $23.000 $45.000
GABION MATTRESSES (GALV)(9 IN)
SY 530.000 $117.400 $160.000 $65.000 $100.000 $210.000 $320.000
SLOT DRAIN OUTFALL (GAL STL) (12 IN)
LF 25.000 $900.000 $200.000 $250.000 $310.000 $100.000 $700.000
RAISING EXIST STRUCT
LS 2.000 $25,000.000 $35,000.000 $50,000.000 $200,000.000 $150,000.000 $30,000.000
ADJUST STL SHOES
EA 237.000 $13,255.000 $3,500.000 $1,100.000 $1,250.000 $8,000.000 $2,600.000
MOBILIZATION
LS 1.000 $888,322.390 $425,000.000 $450,000.000 $680,000.000 $750,000.000 $742,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $14,583.330 $1,500.000 $15,000.000 $16,000.000 $10,000.000 $27,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,037.000 $100.000 $100.000 $100.000 $50.000 $50.000 $70.000
TMA (STATIONARY)
DAY 542.000 $200.000 $150.000 $125.000 $350.000 $450.000 $293.000
TMA (MOBILE OPERATION)
DAY 116.000 $220.000 $1.000 $125.000 $350.000 $1.000 $800.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 81.000 $100.000 $75.000 $50.000 $117.500 $69.000 $118.000
ROCK FILTER DAMS (REMOVE)
LF 81.000 $20.000 $1.000 $25.000 $16.800 $13.000 $23.550
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000 $45.000 $25.000 $45.000 $20.640 $29.000 $29.450
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $10.000 $1.000 $18.000 $3.250 $11.000 $9.450
TEMP SEDMT CONT FENCE (INSTALL)
LF 330.000 $6.000 $5.000 $8.000 $4.000 $4.000 $5.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 330.000 $2.000 $1.000 $4.000 $0.500 $1.000 $1.200
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,780.000 $40.000 $10.000 $28.000 $55.000 $37.000 $21.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 7,240.000 $50.000 $5.000 $25.000 $55.000 $1.000 $15.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 440.000 $60.000 $7.000 $25.000 $60.000 $1.000 $15.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,780.000 $20.000 $10.000 $25.000 $11.500 $30.000 $25.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 7,240.000 $20.000 $5.000 $23.000 $11.500 $1.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 440.000 $30.000 $7.000 $23.000 $11.500 $1.000 $20.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $43.000 $100.000 $35.000 $75.000 $30.000 $200.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,000.000 $1,000.000 $800.000 $1,000.000 $1,000.000 $500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $8,500.000 $25,000.000 $8,350.000 $12,500.000 $8,500.000 $4,500.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 48.000 $50.000 $30.000 $33.000 $30.000 $50.000 $30.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 860.000 $0.350 $1.500 $1.100 $1.000 $3.000 $1.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 860.000 $0.350 $1.500 $1.100 $1.000 $3.000 $1.250
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 1,353.000 $1.000 $1.500 $1.220 $1.110 $0.010 $0.200
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 9,857.000 $0.800 $1.500 $0.970 $0.880 $0.010 $0.750
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 860.000 $1.500 $1.500 $1.370 $1.250 $5.000 $1.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,738.000 $0.800 $1.500 $0.970 $0.880 $0.010 $0.750
REFL PAV MRK TY I (W)8"(BRK)(090MIL)
LF 2,811.000 $1.500 $2.000 $2.200 $2.000 $4.500 $1.250
REFL PAV MRK TY I (W)8"(SLD)(060MIL)
LF 3,934.000 $1.000 $2.000 $1.930 $1.750 $4.500 $1.250
REFL PAV MRK TY I (W)12"(SLD)(060MIL)
LF 287.000 $2.000 $4.000 $3.850 $3.500 $8.000 $4.250
REFL PAV MRK TY I (Y)8"(SLD)(060MIL)
LF 6,999.000 $0.800 $2.000 $1.920 $1.750 $4.500 $1.000
REFL PAV MRKR TY II-C-R
EA 11.000 $4.000 $100.000 $8.800 $8.000 $30.000 $25.000
ELIM EXT PM & MRKS (6")
LF 3,660.000 $0.300 $1.500 $1.100 $1.000 $1.500 $1.250
ELIM EXT PM & MRKS (8")
LF 11,804.000 $0.800 $1.500 $1.100 $1.000 $0.010 $0.900
ELIM EXT PM & MRKS (24")
LF 287.000 $3.500 $5.000 $4.400 $4.000 $5.000 $5.000
DRIFTWOOD REMOVAL
CY 12.000 $82.000 $1,000.000 $500.000 $250.000 $200.000 $200.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.010 $13,458.100 $750,000.000 $1,000,000.000 $460,000.000 $5,000.000 $240,000.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $75.000 $1,500.000 $1,500.000 $2,500.000 $100.000 $850.000
TREE REMOVAL (18" - 24" DIA)
EA 1.000 $150.000 $1,500.000 $2,500.000 $4,000.000 $350.000 $1,800.000
REPLACE TIMBER POST W/ CONC FND
EA 1.000 $500.000 $250.000 $2,500.000 $750.000 $87.000 $600.000
REPAIR (STL PIPE PED RAIL)(PR1)
LF 5.000 $320.000 $1,000.000 $400.000 $600.000 $200.000 $500.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 911.000 $48.000 $55.000 $105.000 $30.000 $75.000 $82.000
REP STL BRIDGE MEMBER (DIAPHRAGM)
EA 4.000 $9,600.000 $5,000.000 $2,500.000 $7,500.000 $2,887.500 $3,800.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 1.000 $7,500.000 $6,000.000 $3,500.000 $7,500.000 $30,030.000 $31,500.000
REP STL BRIDGE MBR (STRAIGHTEN MEMB)
EA 2.000 $8,931.000 $50,000.000 $45,000.000 $12,000.000 $49,665.000 $51,500.000
REP STL BRIDGE MBR (WELD REPAIR)
EA 5.000 $7,500.000 $3,000.000 $1,500.000 $2,500.000 $2,772.000 $3,620.000
REP STL BRIDGE MBR (COTTER PIN OR BOLT)
EA 1.000 $1,500.000 $250.000 $500.000 $675.000 $577.500 $1,400.000
REP STL BRIDGE MEMBER(REPL RIVET/BOLT)
EA 9.000 $600.000 $500.000 $500.000 $675.000 $1,270.500 $2,100.000
ANCHOR BOLT REPL (BEARING TO PEDESTAL)
EA 2.000 $1,000.000 $1,000.000 $550.000 $1,025.000 $577.500 $1,400.000
ANCHOR BOLT REPL (OFFSET ANCHOR BOLTS)
EA 2.000 $12,000.000 $1,000.000 $550.000 $3,200.000 $9,413.250 $10,500.000
ANCHOR BOLT REPL (BEARING TO CONCRETE)
EA 5.000 $7,500.000 $1,000.000 $750.000 $2,200.000 $5,428.500 $6,400.000
TACK WELD REMOVAL
EA 37.000 $1,000.000 $50.000 $750.000 $1,200.000 $693.000 $1,500.000
REP STL BRIDGE MEMBER (HALF BEAM-1)
LS 1.000 $180,900.000 $55,000.000 $165,000.000 $150,000.000 $213,675.000 $213,000.000
REP STL BRIDGE MEMBER (HALF BEAM-2)
LS 1.000 $145,550.000 $55,000.000 $165,000.000 $150,000.000 $192,885.000 $192,000.000
REP STL BRIDGE MEMBER (GOUGE REPAIR)
EA 3.000 $10,000.000 $7,500.000 $3,500.000 $2,250.000 $20,790.000 $22,000.000
REP STL BRIDGE MEMB (HEAT STRAIGHTEN-2)
LS 3.000 $8,931.000 $75,000.000 $27,500.000 $12,000.000 $49,665.000 $69,100.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 122.000 $600.000 $400.000 $400.000 $295.000 $450.000 $400.000
SOIL DENS & RAISING CONC SLABS (HDPF)
LB 200.000 $100.000 $50.000 $200.000 $20.000 $7.000 $9.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $30,000.000 $10,000.000 $11,925.000 $25,000.000 $13,500.000 $25,900.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $44,000.000 $12,000.000 $14,575.000 $35,000.000 $16,500.000 $28,800.000
STEEL BRIDGE ZONE PAINTING REF STR #3
EA 1.000 $48,000.000 $14,000.000 $15,502.500 $30,000.000 $17,550.000 $29,900.000
STEEL BRIDGE ZONE PAINTING REF STR #4
EA 1.000 $64,000.000 $18,000.000 $21,200.000 $30,000.000 $24,000.000 $16,200.000
STEEL BRIDGE ZONE PAINTING REF STR #5
EA 1.000 $56,000.000 $22,000.000 $26,102.500 $42,000.000 $29,550.000 $41,600.000
STEEL BRIDGE ZONE PAINTING REF STR #6
EA 1.000 $80,000.000 $48,000.000 $55,385.000 $72,000.000 $62,700.000 $74,200.000
STEEL BRIDGE ZONE PAINTING REF STR #7
EA 1.000 $56,000.000 $24,000.000 $27,295.000 $30,000.000 $30,900.000 $42,950.000
STEEL BRIDGE ZONE PAINTING REF STR #8
EA 1.000 $56,000.000 $22,000.000 $24,910.000 $30,000.000 $28,200.000 $40,300.000
STEEL BRIDGE ZONE PAINTING REF STR #9
EA 1.000 $52,000.000 $18,000.000 $21,465.000 $30,000.000 $24,300.000 $36,500.000
STEEL BRIDGE ZONE PAINTING REF STR #10
EA 1.000 $44,000.000 $12,000.000 $13,515.000 $40,000.000 $15,300.000 $27,700.000
STEEL BRIDGE ZONE PAINTING REF STR #11
EA 1.000 $44,000.000 $12,000.000 $13,515.000 $40,000.000 $15,300.000 $27,700.000
STEEL BRIDGE ZONE PAINTING REF STR #12
EA 1.000 $56,000.000 $22,000.000 $26,102.500 $30,000.000 $29,550.000 $41,600.000
STEEL BRIDGE ZONE PAINTING REF STR #13
EA 1.000 $72,000.000 $34,000.000 $40,412.500 $75,000.000 $45,750.000 $57,500.000
STEEL BRIDGE ZONE PAINTING REF STR #14
EA 1.000 $32,000.000 $2,000.000 $1,855.000 $40,000.000 $2,100.000 $14,700.000
STEEL BRIDGE ZONE PAINTING REF STR #15
EA 1.000 $32,000.000 $10,000.000 $10,600.000 $50,000.000 $12,000.000 $24,400.000
REM LEAD-COATING (6 IN STRIP)
LF 619.000 $50.000 $25.000 $132.500 $148.500 $150.000 $190.000
REM LEAD-CONTAINING COATING REF STR 1
EA 1.000 $7,500.000 $12,000.000 $15,105.000 $35,000.000 $17,100.000 $29,400.000
REM LEAD-CONTAINING COATING REF STR 2
EA 1.000 $11,000.000 $18,000.000 $20,935.000 $45,000.000 $23,700.000 $35,900.000
REM LEAD-CONTAINING COATING REF STR 3
EA 1.000 $12,000.000 $18,000.000 $20,935.000 $50,000.000 $23,700.000 $35,900.000
REM LEAD-CONTAINING COATING REF STR 4
EA 1.000 $16,000.000 $24,000.000 $29,415.000 $60,000.000 $33,300.000 $45,300.000
REM LEAD-CONTAINING COATING REF STR 5
EA 1.000 $14,000.000 $30,000.000 $34,185.000 $75,000.000 $38,700.000 $50,600.000
REM LEAD-CONTAINING COATING REF STR 6
EA 1.000 $20,000.000 $55,000.000 $65,985.000 $145,000.000 $74,700.000 $85,900.000
REM LEAD-CONTAINING COATING REF STR 7
EA 1.000 $14,000.000 $26,000.000 $31,005.000 $75,000.000 $35,100.000 $47,100.000
REM LEAD-CONTAINING COATING REF STR 8
EA 1.000 $14,000.000 $26,000.000 $31,005.000 $70,000.000 $35,100.000 $47,100.000
REM LEAD-CONTAINING COATING REF STR 9
EA 1.000 $13,000.000 $24,000.000 $28,885.000 $60,000.000 $32,700.000 $44,700.000
REM LEAD-CONTAINING COATING REF STR 10
EA 1.000 $11,000.000 $16,000.000 $19,875.000 $45,000.000 $22,500.000 $34,700.000
REM LEAD-CONTAINING COATING REF STR 11
EA 1.000 $11,000.000 $16,000.000 $19,875.000 $45,000.000 $22,500.000 $34,700.000
REM LEAD-CONTAINING COATING REF STR 12
EA 1.000 $20,000.000 $28,000.000 $34,175.000 $70,000.000 $39,300.000 $51,200.000
REM LEAD-CONTAINING COATING REF STR 13
EA 1.000 $18,000.000 $36,000.000 $45,315.000 $105,000.000 $51,300.000 $62,950.000
REM LEAD-CONTAINING COATING REF STR 14
EA 1.000 $8,000.000 $5,000.000 $5,300.000 $15,000.000 $6,000.000 $18,500.000
REM LEAD-CONTAINING COATING REF STR 15
EA 1.000 $8,000.000 $14,000.000 $17,225.000 $35,000.000 $19,500.000 $31,800.000
Totals: $9,327,084.541 $4,555,821.000 $4,955,888.610 $6,856,704.500 $7,215,189.720 $7,523,431.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FORCE ACCOUNT WORK (PART) $22,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,880.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $6,480.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,760.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $87,840.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $6,000.00
Total: $141,960.00