Show Job Controls
Bid Cobra

BEXAR VA (0915-00-264)

Items: 49

County: BEXAR
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-00-264
DBE Goal: N/A
Project: STP 2023(949)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $2,594,350.00
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
ANDRES GONZALEZ
JOSE C MENDEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,594,350.00
$2,147,579.65
Over/Under Est: -17.22% -$446,770.35
$2,195,642.49
Over/Under Est: -15.37% -$398,707.51
Amt Left: 2.24% $48,062.84
$2,232,372.70
Over/Under Est: -13.95% -$361,977.30
Amt Left: 3.95% $84,793.05
Delta: -1.67% -$36,730.21
$2,995,560.25
Over/Under Est: 15.46% $401,210.25
Amt Left: 39.49% $847,980.60
Delta: -34.19% -$763,187.55
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 15.82% $344,897.64
A K FUQUAY CONSTRUCTION 3.90% $85,025.33
LONE STAR EROSION CONTROL 2.51% $54,721.43
TRP CONSTRUCTION GROUP, LLC 2.21% $48,181.02
ENVIRONMENTAL SAFETY SERVICES, INC. 0.93% $20,275.27
BARRICADES UNLIMITED 0.44% $9,592.60
K. L. DURHAM CONSTRUCTION, L.L.C. 0.35% $7,630.48
Total: 26.16% $570,323.77

Bid Items & Bid Tabulations

49 Total 0 of 49
BEXAR  |  VA  |  SAN ANTONIO  |  0915-00-264  |  06/28/2023  |  $2,594,350.00  |  STP 2023(949)HES  |  WIDEN ROAD - ADD SHOULDERS  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CAPITAL EXCAVATION COMPANY
DAN WILLIAMS COMPANY
J3 COMPANY, LLC
CK NEWBERRY, LLC
PREPARING ROW
STA 60.000 $2,600.000 $2,000.000 $1,800.000 $700.000 $1,000.000
REMOVING CONC (DRIVEWAYS)
SY 394.000 $40.000 $24.800 $25.000 $75.000 $50.000
REMOVING STAB BASE & ASPH PAV (0"-10")
SY 704.000 $20.000 $19.500 $25.000 $15.000 $30.000
EXCAVATION (ROADWAY)
CY 6,998.000 $18.000 $22.000 $17.500 $35.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 961.000 $25.000 $12.400 $35.000 $20.000 $70.000
COMPOST MANUF TOPSOIL (4")
SY 19,281.000 $5.000 $2.150 $3.250 $3.000 $4.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 19,281.000 $1.000 $0.350 $0.320 $0.400 $0.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 19,281.000 $1.000 $0.300 $0.220 $0.300 $0.250
VEGETATIVE WATERING
MG 306.000 $50.000 $36.000 $15.000 $45.000 $60.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 19,281.000 $2.000 $1.150 $1.750 $1.500 $2.000
PROOF ROLLING
HR 10.000 $200.000 $88.800 $65.000 $80.000 $125.000
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
CY 6,800.000 $80.000 $77.000 $75.000 $70.000 $105.000
PRIME COAT(MC-30 OR AE-P)
GAL 3,870.000 $7.000 $4.250 $4.000 $4.000 $7.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 5,700.000 $9.000 $4.900 $4.600 $6.000 $6.000
AGGR (TY-PB GR-4)
CY 160.000 $135.000 $320.000 $297.000 $350.000 $250.000
CUT & RESTORING PAV
SY 30.000 $150.000 $300.000 $900.000 $500.000 $750.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 696.000 $250.000 $237.000 $190.000 $225.000 $300.000
SET (TY II) (DES 1) (RCP) (3: 1) (C)
EA 1.000 $3,000.000 $1,810.000 $1,650.000 $3,000.000 $3,500.000
SET (TY II) (DES 1) (RCP) (4: 1) (C)
EA 9.000 $3,000.000 $1,810.000 $3,100.000 $3,000.000 $3,500.000
SET (TY II) (DES 1) (RCP) (4: 1) (P)
EA 42.000 $3,000.000 $1,810.000 $2,000.000 $3,000.000 $4,000.000
REMOV STR (SMALL)
EA 3.000 $5,000.000 $2,080.000 $1,500.000 $1,200.000 $5,000.000
MOBILIZATION
LS 1.000 $235,850.000 $200,000.000 $210,000.000 $180,000.000 $280,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $3,040.000 $15,000.000 $4,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 36.000 $50.000 $48.600 $45.000 $40.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 36.000 $25.000 $11.350 $10.500 $25.000 $30.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 780.000 $85.000 $64.200 $59.000 $65.000 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 780.000 $15.000 $14.850 $14.000 $25.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,997.000 $5.000 $3.800 $3.500 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,997.000 $2.000 $0.250 $0.250 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 399.000 $10.000 $8.450 $8.000 $6.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 399.000 $5.000 $1.100 $1.000 $1.000 $3.000
DRIVEWAYS (CONC)
SY 399.000 $120.000 $189.000 $115.000 $150.000 $150.000
DRIVEWAYS (ACP)(TYPE 1)
SY 776.000 $80.000 $88.100 $40.000 $45.000 $100.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 26.000 $2,000.000 $380.000 $310.000 $450.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $800.000 $780.000 $700.000 $800.000 $1,600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $950.000 $960.000 $810.000 $900.000 $1,800.000
REMOVE SM RD SN SUP&AM
EA 8.000 $150.000 $103.000 $125.000 $100.000 $300.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 6.000 $80.000 $61.000 $95.000 $100.000 $225.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 12,000.000 $2.000 $0.750 $0.700 $0.750 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,000.000 $2.000 $0.750 $0.700 $0.750 $1.000
PAVEMENT SEALER 4"
LF 11,698.000 $1.000 $0.300 $0.300 $0.500 $0.500
PAVEMENT SEALER 6"
LF 11,696.000 $1.000 $0.400 $0.350 $0.500 $0.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 11,696.000 $1.000 $0.950 $0.900 $1.000 $1.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,698.000 $1.000 $0.750 $0.700 $0.750 $1.250
D-GR HMA TY-D SAC-B PG70-22
TON 2,190.000 $130.000 $115.000 $120.000 $120.000 $140.000
TACK COAT
GAL 1,900.000 $6.000 $3.700 $3.500 $4.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $11,300.000 $20,000.000 $2,500.000 $25,000.000
TMA (STATIONARY)
DAY 105.000 $2.000 $340.000 $175.000 $350.000 $325.000
TMA (MOBILE OPERATION)
HR 80.000 $225.000 $93.500 $65.000 $600.000 $25.000
Totals: $2,594,350.000 $2,147,579.650 $2,195,642.490 $2,232,372.700 $2,995,560.250