Show Job Controls
Bid Cobra

BEXAR CS (0915-00-252)

Items: 53

County: BEXAR
Length: N/A
Highway: CS
District: SAN ANTONIO
Control Number: 0915-00-252
DBE Goal: N/A
Project: STP 2023(490)TAPS
Guaranty: N/A
Time: 280 WORKING DAYS
Engineer's Estimate: $1,463,853.50
Date: 10/06/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
FRANCES MERECKA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$1,463,853.50
$1,244,334.00
Over/Under Est: -15% -$219,519.50
$1,245,883.54
Over/Under Est: -14.89% -$217,969.96
Amt Left: 0.12% $1,549.54
Over/Under Est: -12.07% -$176,639.50
Amt Left: 3.45% $42,880.00
Delta: -3.32% -$41,330.46
$1,471,539.07
Over/Under Est: 0.53% $7,685.57
Amt Left: 18.26% $227,205.07
Delta: -14.32% -$184,325.07
$1,478,847.40
Over/Under Est: 1.02% $14,993.90
Amt Left: 18.85% $234,513.40
Delta: -0.50% -$7,308.33
Over/Under Est: 22.82% $334,077.40
Amt Left: 44.49% $553,596.90
Delta: -21.58% -$319,083.50
$1,805,298.00
Over/Under Est: 23.33% $341,444.50
Amt Left: 45.08% $560,964.00
Delta: -0.41% -$7,367.10
Subcontractor Percentage Amount
A K FUQUAY CONSTRUCTION 8.27% $102,906.42
RDZ PAVING, LLC 4.45% $55,372.86
BARRICADES UNLIMITED 2.31% $28,744.12
TRP CONSTRUCTION GROUP, LLC 1.55% $19,287.18
KING GEORGE TRAFFIC SOLUTIONS LLC 0.82% $10,203.54
Total: 17.40% $216,514.12

Bid Items & Bid Tabulations

53 Total 0 of 53
BEXAR  |  CS  |  SAN ANTONIO  |  0915-00-252  |  10/06/2023  |  $1,463,853.50  |  STP 2023(490)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  280 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
ACEE CONSTRUCTION LLC.
D&S CONCRETE CONTRACTORS LLC
DUNN SERVICES, INC.
STX CIVIL
MYERS CONCRETE CONSTRUCTION, LP
ENCINO LANDSCAPE, INC.
REMOVING CONC (SIDEWALKS)
SY 267.000 $12.000 $25.000 $17.500 $40.000 $22.500 $16.000 $43.000 $25.000
REMOVING CONC (DRIVEWAYS)
SY 729.000 $30.000 $20.000 $11.500 $40.000 $24.800 $20.000 $37.000 $25.000
REMOVING CONC (CURB)
LF 45.000 $6.000 $15.000 $10.500 $15.000 $22.750 $7.000 $45.000 $15.000
REMOVING STAB BASE AND ASPH PAV (2"-8")
SY 118.000 $25.000 $20.000 $5.750 $20.000 $10.790 $11.000 $70.000 $15.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 455.000 $25.000 $25.000 $15.000 $35.000 $16.850 $29.000 $66.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 194.000 $36.000 $40.000 $17.500 $40.000 $30.100 $32.000 $105.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 8,072.000 $7.000 $4.000 $4.000 $4.000 $3.990 $5.000 $12.000 $3.000
BLOCK SODDING
SY 8,072.000 $7.000 $6.000 $5.550 $8.000 $8.950 $8.000 $9.000 $6.000
FERTILIZER
TON 7.700 $1,120.000 $1,500.000 $1,571.850 $2,500.000 $2,500.000 $2,227.000 $2,277.000 $2,000.000
VEGETATIVE WATERING
MG 126.000 $32.000 $120.000 $135.000 $50.000 $25.000 $40.000 $94.000 $30.000
CL A CONC (MISC)
CY 9.500 $1,550.000 $1,250.000 $658.200 $900.000 $1,500.000 $2,187.000 $776.000 $2,000.000
RIPRAP (CONC)(5 IN)
CY 18.000 $700.000 $500.000 $495.000 $1,000.000 $665.000 $836.000 $597.000 $1,000.000
STR STEEL (MISC NON - BRIDGE)
LB 2,515.000 $26.000 $25.000 $10.000 $8.000 $22.100 $13.000 $21.000 $20.000
RAIL (HANDRAIL)(TY B)
LF 48.000 $225.000 $155.000 $197.700 $150.000 $92.770 $244.000 $248.000 $200.000
RAIL (TY PR11)
LF 48.000 $182.000 $180.000 $295.800 $200.000 $98.920 $336.000 $342.000 $250.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 15.000 $991.000 $1,250.000 $400.000 $450.000 $1,200.000 $1,116.000 $1,629.000 $2,000.000
RC PIPE (CL IV)(18 IN)
LF 40.000 $124.000 $120.000 $65.000 $300.000 $111.000 $149.000 $170.000 $200.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 2.000 $17,000.000 $7,000.000 $11,500.000 $5,000.000 $23,000.000 $17,657.000 $13,773.000 $15,000.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $18,000.000 $11,500.000 $7,500.000 $2,500.000 $8,600.000 $17,541.000 $18,825.000 $6,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $3,500.000 $1,850.000 $1,446.900 $3,000.000 $1,663.720 $1,847.000 $5,873.000 $2,000.000
CLEAN EXIST CULVERTS
EA 1.000 $4,100.000 $3,500.000 $2,750.000 $3,500.000 $2,800.000 $3,292.000 $3,097.000 $5,000.000
REMOV STR (WINGWALL)
EA 1.000 $4,700.000 $2,500.000 $1,100.000 $2,500.000 $2,192.950 $2,320.000 $2,444.000 $2,000.000
MOBILIZATION
LS 1.000 $133,733.000 $67,400.000 $115,000.000 $120,000.000 $130,000.000 $130,000.000 $149,789.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $9,000.000 $2,700.000 $3,250.000 $3,000.000 $6,300.000 $5,636.000 $7,597.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 36.000 $120.000 $70.000 $115.300 $55.000 $86.260 $163.000 $114.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 36.000 $25.000 $10.000 $19.650 $10.000 $16.010 $28.000 $23.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,234.000 $4.500 $7.000 $3.700 $6.000 $4.150 $5.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,234.000 $1.500 $2.000 $0.350 $1.000 $1.800 $1.000 $2.000 $1.000
CONC CURB (TY II)
LF 141.000 $46.000 $50.000 $26.750 $30.000 $46.460 $33.000 $52.000 $20.000
INTERSECTIONS (ACP)
SY 530.000 $61.000 $55.000 $75.000 $80.000 $65.850 $67.000 $109.000 $100.000
DRIVEWAYS (CONC)
SY 855.000 $131.000 $125.000 $105.000 $100.000 $121.500 $103.000 $108.000 $160.000
DRIVEWAYS (ACP)
SY 284.000 $70.000 $65.000 $75.000 $80.000 $72.170 $82.000 $150.000 $100.000
CONC SIDEWALKS (4")
SY 2,880.000 $80.000 $70.000 $79.650 $90.000 $86.590 $89.000 $83.000 $140.000
CONC SIDEWALKS (6")
SY 2,366.000 $74.000 $80.000 $102.050 $98.000 $93.250 $100.000 $97.000 $160.000
CURB RAMPS (TY 1)
EA 1.000 $2,100.000 $3,000.000 $1,850.000 $1,000.000 $2,400.000 $2,231.000 $2,931.000 $2,500.000
CURB RAMPS (TY 2)
EA 7.000 $2,200.000 $2,750.000 $1,750.000 $900.000 $2,600.000 $3,719.000 $2,938.000 $2,500.000
CURB RAMPS (TY 7)
EA 33.000 $2,100.000 $2,500.000 $1,950.000 $1,000.000 $3,000.000 $2,008.000 $2,981.000 $2,500.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 1.000 $900.000 $1,000.000 $492.100 $200.000 $526.420 $476.000 $3,191.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $775.000 $900.000 $695.650 $600.000 $794.580 $1,116.000 $1,138.000 $700.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 14.000 $659.000 $700.000 $614.250 $200.000 $703.920 $893.000 $911.000 $500.000
REMOVE SM RD SN SUP&AM
EA 24.000 $175.000 $150.000 $110.250 $100.000 $134.980 $149.000 $152.000 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $160.000 $110.000 $97.150 $250.000 $99.200 $112.000 $114.000 $200.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 67.000 $4.000 $3.000 $2.650 $15.000 $1.770 $4.000 $5.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 596.000 $11.000 $10.000 $7.850 $20.000 $11.610 $18.000 $18.000 $25.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 4.000 $66.000 $60.000 $57.750 $300.000 $71.000 $126.000 $129.000 $300.000
PAVEMENT SEALER 8"
LF 67.000 $1.500 $2.000 $1.050 $1.000 $0.630 $6.000 $6.000 $2.000
PAVEMENT SEALER 24"
LF 596.000 $2.600 $3.000 $2.100 $5.000 $4.090 $3.000 $3.000 $3.000
ELIM EXT PAV MRK & MRKS (24")
LF 321.000 $5.500 $6.000 $5.250 $5.000 $5.240 $6.000 $6.000 $5.000
PAV SURF PREP FOR MRK (8")
LF 67.000 $0.500 $1.000 $0.550 $3.000 $0.270 $1.000 $1.000 $2.000
PAV SURF PREP FOR MRK (24")
LF 441.000 $2.000 $2.000 $1.050 $6.000 $1.830 $2.000 $2.000 $3.000
TREE TRIMMING AND BRUSH REMOVAL
LF 140.000 $47.110 $50.000 $10.000 $50.000 $65.000 $37.000 $228.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $7,500.000 $15,000.000 $11,000.000 $8,000.000 $10,467.000 $31,513.000 $10,000.000
TMA (STATIONARY)
DAY 93.000 $266.000 $550.000 $400.000 $300.000 $325.000 $446.000 $379.000 $200.000
Totals: $1,463,853.500 $1,244,334.000 $1,245,883.545 $1,287,214.000 $1,471,539.070 $1,478,847.400 $1,797,930.900 $1,805,298.000