|
|
PREPARING ROW
|
STA
|
54.000
|
$608.130
|
$1,500.000
|
$800.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,156.000
|
$49.000
|
$20.000
|
$11.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
87.000
|
$16.000
|
$20.000
|
$50.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,360.000
|
$5.000
|
$20.000
|
$3.500
|
|
|
REMOVE CONC (MISC)
|
EA
|
1.000
|
$2,500.500
|
$2,500.000
|
$15,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
1,860.000
|
$5.700
|
$5.000
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,216.000
|
$18.000
|
$15.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
1,653.000
|
$17.000
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
7,222.000
|
$5.910
|
$15.000
|
$20.000
|
|
|
BLADING
|
HR
|
22.000
|
$85.000
|
$100.000
|
$100.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
25,144.000
|
$1.500
|
$4.000
|
$3.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
39,831.000
|
$0.150
|
$0.150
|
$0.230
|
|
|
VEGETATIVE WATERING
|
MG
|
100.240
|
$28.000
|
$40.000
|
$30.000
|
|
|
PROOF ROLLING
|
HR
|
28.000
|
$80.000
|
$100.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,223.000
|
$55.000
|
$58.000
|
$55.000
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
1,026.000
|
$75.860
|
$58.000
|
$64.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
1,544.000
|
$4.000
|
$3.494
|
$5.000
|
|
|
ASPH (RC-250)
|
GAL
|
9,483.000
|
$4.610
|
$4.830
|
$4.500
|
|
|
AGGR (TY-B GR-4)
|
CY
|
276.000
|
$68.000
|
$129.000
|
$72.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
3,111.000
|
$74.300
|
$80.000
|
$80.000
|
|
|
TACK COAT
|
GAL
|
558.000
|
$3.250
|
$3.220
|
$2.780
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
251.000
|
$120.000
|
$268.750
|
$173.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
13,599.000
|
$1.000
|
$1.070
|
$1.750
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
11,093.000
|
$1.500
|
$1.610
|
$2.500
|
|
|
CEM STABIL BKFL
|
CY
|
10.000
|
$190.000
|
$150.000
|
$234.010
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
25.000
|
$449.000
|
$645.000
|
$800.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
11.000
|
$263.000
|
$252.620
|
$350.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
21.000
|
$888.000
|
$2,500.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
164.000
|
$393.000
|
$450.000
|
$500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
47.000
|
$115.000
|
$150.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
23.000
|
$471.000
|
$450.000
|
$625.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
14.000
|
$77.500
|
$68.000
|
$135.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
433.000
|
$125.000
|
$60.000
|
$128.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$4,200.000
|
$6,750.000
|
$5,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
1.000
|
$8,000.000
|
$7,250.000
|
$6,500.000
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
2.000
|
$3,300.000
|
$8,750.000
|
$8,500.000
|
|
|
SET (TY II) (18 IN) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$800.000
|
$1,500.000
|
$2,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,485.000
|
$1,500.000
|
$3,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,300.000
|
$1,500.000
|
$3,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$204,372.800
|
$250,000.000
|
$275,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,271.000
|
$8,500.000
|
$6,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 5)
|
LF
|
183.000
|
$48.750
|
$36.330
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
183.000
|
$9.500
|
$5.160
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
610.000
|
$25.000
|
$17.730
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
610.000
|
$3.860
|
$5.370
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,160.000
|
$2.500
|
$2.520
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,160.000
|
$0.750
|
$0.370
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
200.000
|
$7.000
|
$7.360
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$1.500
|
$0.860
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
6,231.000
|
$21.000
|
$40.000
|
$33.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,321.000
|
$6.000
|
$10.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
5,811.000
|
$8.000
|
$12.000
|
$15.250
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
80.000
|
$10.000
|
$12.000
|
$100.000
|
|
|
CONC CURB (TY I)
|
LF
|
1,332.000
|
$12.000
|
$25.000
|
$10.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
198.000
|
$40.000
|
$55.000
|
$84.000
|
|
|
CONC MEDIAN
|
SY
|
307.000
|
$79.000
|
$70.000
|
$80.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
490.000
|
$20.500
|
$27.220
|
$30.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,330.000
|
$1,617.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
290.000
|
$1.750
|
$2.360
|
$2.500
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$176.890
|
$291.500
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,500.000
|
$2,849.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$210.450
|
$291.500
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
10.000
|
$720.000
|
$750.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
15.000
|
$558.000
|
$700.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
12.000
|
$5,936.000
|
$7,500.000
|
$8,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$164.000
|
$350.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$575.000
|
$350.000
|
$650.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$5,300.000
|
$800.000
|
$3,000.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
40.000
|
$11.000
|
$26.870
|
$20.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
80.000
|
$9.250
|
$26.870
|
$22.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
100.000
|
$37.000
|
$69.870
|
$58.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
125.000
|
$1.250
|
$1.230
|
$2.200
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
250.000
|
$1.250
|
$1.230
|
$2.200
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$794.000
|
$1,075.000
|
$1,300.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
1.000
|
$1,400.000
|
$1,290.000
|
$1,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
1.000
|
$31.000
|
$29.020
|
$35.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
950.000
|
$29.000
|
$30.100
|
$33.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
384.000
|
$28.990
|
$30.100
|
$33.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$555.000
|
$709.500
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$538.000
|
$838.500
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
14.000
|
$320.970
|
$612.750
|
$440.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$630.000
|
$650.370
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$88.000
|
$48.370
|
$115.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$35,000.000
|
$19,296.250
|
$25,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$12,000.000
|
$9,675.000
|
$20,000.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
3.000
|
$986.000
|
$994.370
|
$2,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
4.000
|
$37.040
|
$21.500
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
6.000
|
$27.800
|
$21.500
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,416.000
|
$0.350
|
$0.320
|
$0.850
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
6,355.000
|
$0.250
|
$0.320
|
$0.850
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
2,537.000
|
$0.250
|
$0.430
|
$1.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
668.000
|
$2.250
|
$3.220
|
$4.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
17.000
|
$7.000
|
$7.520
|
$9.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
4,748.000
|
$0.250
|
$0.320
|
$0.850
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
42.000
|
$1.250
|
$1.070
|
$2.250
|
|
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
|
LF
|
81.000
|
$0.450
|
$1.070
|
$2.300
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
66.000
|
$1.000
|
$2.150
|
$4.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,106.000
|
$0.750
|
$0.720
|
$1.050
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
450.000
|
$3.250
|
$2.680
|
$4.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
560.000
|
$6.500
|
$5.370
|
$9.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$145.000
|
$150.500
|
$140.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
10.000
|
$265.000
|
$215.000
|
$232.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
4.000
|
$275.000
|
$236.500
|
$230.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$375.000
|
$261.220
|
$430.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
15.000
|
$160.000
|
$147.270
|
$285.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
1.000
|
$1,100.000
|
$1,290.000
|
$975.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
230.000
|
$0.700
|
$1.070
|
$1.250
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
105.000
|
$6.000
|
$6.450
|
$9.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
13,041.000
|
$0.200
|
$0.140
|
$0.140
|
|
|
PAVEMENT SEALER 6"
|
LF
|
2,924.000
|
$0.200
|
$0.230
|
$0.280
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,579.000
|
$1.050
|
$0.390
|
$0.410
|
|
|
PAVEMENT SEALER 12"
|
LF
|
360.000
|
$1.500
|
$1.290
|
$2.250
|
|
|
PAVEMENT SEALER 24"
|
LF
|
665.000
|
$2.500
|
$2.620
|
$5.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
6.000
|
$53.500
|
$67.720
|
$58.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
15.000
|
$57.000
|
$67.720
|
$58.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
10.000
|
$84.000
|
$104.270
|
$58.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
4.000
|
$102.500
|
$132.220
|
$58.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$118.000
|
$158.020
|
$58.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
1.000
|
$680.000
|
$483.750
|
$458.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,210.000
|
$0.390
|
$0.530
|
$0.850
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,494.000
|
$0.350
|
$0.530
|
$0.850
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,734.000
|
$0.500
|
$0.806
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,214.000
|
$0.300
|
$0.530
|
$0.850
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
1,050.000
|
$0.900
|
$5.370
|
$4.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
170.000
|
$0.750
|
$12.900
|
$4.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
28.000
|
$11.380
|
$8.600
|
$17.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
182.000
|
$3.250
|
$3.580
|
$5.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
424.000
|
$3.250
|
$3.580
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,804.000
|
$0.340
|
$0.320
|
$0.550
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,982.000
|
$0.750
|
$0.640
|
$0.850
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
715.000
|
$1.000
|
$1.070
|
$1.200
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
2,542.000
|
$2.000
|
$1.290
|
$1.700
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
502.000
|
$5.500
|
$3.220
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$67.500
|
$55.900
|
$58.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
7.000
|
$70.500
|
$55.900
|
$58.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
1.000
|
$565.000
|
$376.250
|
$450.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
65.000
|
$0.980
|
$5.370
|
$1.200
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
138.000
|
$106.810
|
$102.120
|
$175.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
3,202.000
|
$80.000
|
$86.000
|
$88.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
148.000
|
$81.000
|
$300.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
148.000
|
$194.000
|
$300.000
|
$285.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$140.000
|
$300.000
|
$285.000
|
|
Totals: |
$2,172,495.010
|
$2,764,874.710
|
$2,809,570.270
|