BEXAR VA (0915-00-220)

Items: 41

County: BEXAR
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-00-220
DBE Goal: N/A
Project: STP 1902(062)
Guaranty: N/A
Time: 126 WORKING DAYS
Engineer's Estimate: $1,907,006.20
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,907,006.20
$2,393,563.50
Over/Under Est: 25.51% $486,557.30
$2,526,361.00
Over/Under Est: 32.48% $619,354.80
Amt Left: 5.55% $132,797.50
$2,817,323.00
Over/Under Est: 47.74% $910,316.80
Amt Left: 17.7% $423,759.50
Delta: -11.52% -$290,962.00

Bid Items & Bid Tabulations

41 Total 0 of 41
BEXAR  |  VA  |  SAN ANTONIO  |  0915-00-220  |  06/04/2019  |  $1,907,006.20  |  STP 1902(062)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  126 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 389.000 $9.000 $15.000 $15.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 1,511.000 $12.750 $22.000 $15.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 1,779.000 $7.100 $10.000 $10.000 $20.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 1,141.000 $15.000 $15.000 $10.000 $20.000
REMOVING STAB BASE & ASPH PAV (12")
SY 4,993.000 $8.500 $15.000 $15.000 $20.000
COMPOST MANUF TOPSOIL
CY 500.000 $30.000 $40.000 $50.000 $60.000
BROADCAST SEED (TEMP) (WARM)
SY 10,000.000 $0.100 $0.200 $0.300 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 10,000.000 $0.100 $0.200 $0.300 $1.000
VEGETATIVE WATERING
MG 6.500 $17.500 $1.000 $200.000 $500.000
RIPRAP (CONC)(4 IN)
CY 735.000 $350.000 $650.000 $40.000 $450.000
RAIL (HANDRAIL)(TY A)
LF 344.000 $65.000 $85.000 $100.000 $185.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 17.000 $6,000.000 $4,000.000 $6,000.000 $8,500.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 17.000 $6,000.000 $2,000.000 $3,000.000 $6,500.000
ADJUSTING MANHOLES (SANITARY)
EA 5.000 $3,500.000 $500.000 $1,500.000 $2,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $425.000 $250.000 $500.000 $1,500.000
MOBILIZATION
LS 1.000 $166,102.000 $175,000.000 $200,000.000 $280,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,500.000 $1,000.000 $5,000.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,000.000 $20.000 $0.100 $30.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 2,000.000 $7.000 $0.100 $10.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,000.000 $7.000 $0.100 $2.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,000.000 $0.600 $0.100 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5,000.000 $7.000 $0.100 $7.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,000.000 $1.000 $0.100 $1.000 $9.000
CONC CURB (TY I)
LF 4,698.000 $8.000 $30.000 $15.000 $28.000
CONC CURB (TY C2)
LF 431.000 $108.000 $110.000 $200.000 $28.000
DRIVEWAYS (CONC)
SY 1,608.000 $75.000 $90.000 $100.000 $85.000
DRIVEWAYS (ACP)
SY 4,569.000 $35.000 $45.000 $80.000 $45.000
CONC SIDEWALKS (6")
SY 8,772.000 $50.000 $90.000 $100.000 $58.000
CURB RAMPS (TY 2)
SY 169.000 $120.000 $100.000 $120.000 $200.000
CURB RAMPS (TY 5)
SY 29.000 $140.000 $100.000 $120.000 $200.000
CURB RAMPS (TY 7)
SY 64.000 $125.000 $100.000 $120.000 $200.000
CURB RAMPS (TY 10)
SY 305.000 $130.000 $100.000 $120.000 $200.000
CURB RAMPS (TY 21)
SY 4.000 $200.000 $100.000 $120.000 $200.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $220.000 $150.000 $500.000 $850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 26.000 $390.000 $150.000 $500.000 $650.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 2.000 $15.000 $150.000 $500.000 $100.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,848.000 $5.600 $11.000 $10.000 $10.000
PAVEMENT SEALER 24"
LF 1,848.000 $2.500 $2.500 $5.000 $10.000
ELIM EXT PAV MRK & MRKS (24")
LF 916.000 $3.000 $6.500 $6.000 $10.000
PAV SURF PREP FOR MRK (24")
LF 1,848.000 $1.750 $1.000 $5.000 $10.000
TMA (STATIONARY)
DAY 185.000 $185.000 $1.000 $400.000 $400.000
Totals: $1,907,006.200 $2,393,563.500 $2,526,361.000 $2,817,323.000