Show Job Controls
Bid Cobra

BEXAR VA (0915-00-200)

Items: 20

County: BEXAR
Length: N/A
Highway: VA
District: SAN ANTONIO
Control Number: 0915-00-200
DBE Goal: N/A
Project: C 915-00-200
Guaranty: N/A
Time: 144 WORKING DAYS
Engineer's Estimate: $639,148.84
Date: 05/05/2021 (5 years ago)
Contract Number: N/A
Type: INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (7)
E
Engineer's Estimate
$639,148.84
$477,879.25
Over/Under Est: -25.23% -$161,269.59
Over/Under Est: -9.73% -$62,205.40
Amt Left: 20.73% $99,064.19
Over/Under Est: -7.51% -$48,007.59
Amt Left: 23.7% $113,262.00
Delta: -2.46% -$14,197.81
Over/Under Est: -3.17% -$20,266.64
Amt Left: 29.51% $141,002.95
Delta: -4.69% -$27,740.95
Over/Under Est: 1.7% $10,851.16
Amt Left: 36.02% $172,120.75
Delta: -5.03% -$31,117.80
Over/Under Est: 15.44% $98,696.51
Amt Left: 54.4% $259,966.10
Delta: -13.51% -$87,845.35
Over/Under Est: 28.88% $184,576.16
Amt Left: 72.37% $345,845.75
Delta: -11.64% -$85,879.65

Bid Items & Bid Tabulations

20 Total 0 of 20
BEXAR  |  VA  |  SAN ANTONIO  |  0915-00-200  |  05/05/2021  |  $639,148.84  |  C 915-00-200  |  INSTL ADVANCED TRAF MGT SYSTEM  |  144 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THIRD COAST SERVICES LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
LIGHT IT UP ELECTRIC
THE LEVY COMPANY, INC.
F & W ELECTRICAL CONTRACTORS, INC.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
E-Z BEL CONSTRUCTION, LLC
DRILL SHAFT (48 IN)
LF 225.000 $360.000 $415.000 $660.520 $450.000 $398.090 $520.000 $449.930 $455.000
RIPRAP (CONC)(4 IN)
CY 11.250 $525.000 $325.000 $1,396.100 $625.000 $1,022.220 $1,000.000 $1,267.500 $950.000
MOBILIZATION
LS 1.000 $54,027.000 $48,000.000 $48,276.830 $45,000.000 $61,888.220 $18,414.500 $74,369.010 $82,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $2,500.000 $1,421.910 $2,110.000 $2,981.970 $4,900.000 $4,776.990 $7,300.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 270.000 $3.500 $4.000 $10.820 $7.250 $6.300 $6.500 $5.530 $2.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 270.000 $1.100 $1.000 $3.090 $2.450 $3.160 $10.000 $0.550 $1.000
CONDT (PVC) (SCH 40) (2")
LF 3,230.000 $8.450 $9.500 $11.340 $9.000 $10.600 $6.800 $13.790 $16.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 930.000 $25.000 $16.000 $18.640 $35.000 $31.910 $25.000 $34.210 $49.000
ELEC CONDR (NO.6) INSULATED
LF 570.000 $1.590 $1.600 $1.780 $1.600 $1.530 $1.950 $2.180 $1.750
ELEC CONDR (NO.4) INSULATED
LF 11,310.000 $2.250 $1.900 $2.070 $1.900 $2.000 $2.500 $2.600 $2.000
GROUND BOX TY A (122311)W/APRON
EA 21.000 $1,100.000 $750.000 $771.140 $850.000 $718.830 $915.000 $1,036.750 $850.000
GROUND BOX TY D (162922)W/APRON
EA 9.000 $1,200.000 $800.000 $867.410 $1,000.000 $952.430 $975.000 $1,119.550 $1,000.000
ELC SRV TY D 120/240 060(NS)SS(N)GC(O)
EA 7.000 $7,100.000 $5,200.000 $4,832.430 $4,500.000 $5,364.770 $5,485.000 $7,616.880 $7,000.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 9.000 $9,000.000 $600.000 $740.940 $7,525.000 $6,549.800 $8,115.000 $8,032.000 $10,000.000
CCTV MOUNT (POLE)
EA 9.000 $931.810 $175.000 $487.500 $380.000 $261.370 $2,195.000 $506.500 $500.000
ITS RADIO (DUAL)(2.4 GHZ/5 GHZ)-I-U
EA 2.000 $2,845.000 $4,000.000 $3,631.860 $3,705.000 $4,362.460 $4,900.000 $4,835.000 $4,500.000
SPS-INS (20W) 288W (150AH) 1X50A(2)
EA 2.000 $8,200.000 $4,500.000 $9,454.050 $3,500.000 $3,452.890 $10,000.000 $2,992.500 $3,100.000
ITS POLE (60 FT)(110 MPH)
EA 9.000 $14,500.000 $12,892.000 $14,263.230 $14,500.000 $16,409.080 $15,245.000 $15,754.250 $22,000.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 9.000 $5,000.000 $4,202.000 $4,190.610 $4,125.000 $4,574.490 $4,500.000 $5,633.000 $4,500.000
ITS RVSD (DC & WWA) (INSTALL ONLY)
EA 9.000 $500.000 $429.000 $917.880 $2,300.000 $1,346.820 $1,500.000 $2,910.000 $1,900.000
Totals: $639,148.840 $477,879.250 $576,943.445 $591,141.250 $618,882.205 $650,000.000 $737,845.355 $823,725.000