|
|
PREPARING ROW
|
STA
|
253.000
|
$10,000.000
|
$10,118.060
|
$45,000.000
|
$72,233.090
|
$23,160.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-11")
|
SY
|
52,324.000
|
$2.680
|
$2.830
|
$3.280
|
$4.190
|
$1.850
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
261,466.000
|
$7.500
|
$3.410
|
$1.300
|
$3.720
|
$2.300
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
731,871.000
|
$11.000
|
$8.000
|
$13.000
|
$14.250
|
$6.650
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,104,395.000
|
$14.000
|
$20.000
|
$4.500
|
$2.360
|
$2.450
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
39,527.000
|
$40.000
|
$30.000
|
$20.000
|
$47.220
|
$91.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
334,347.000
|
$1.630
|
$1.970
|
$2.500
|
$1.470
|
$1.800
|
|
|
BLOCK SODDING
|
SY
|
334,347.000
|
$2.910
|
$3.360
|
$3.360
|
$3.430
|
$3.700
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
196,675.000
|
$0.110
|
$0.100
|
$0.100
|
$0.100
|
$0.080
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
196,675.000
|
$0.010
|
$0.100
|
$0.100
|
$0.100
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
5,768.000
|
$10.250
|
$32.000
|
$15.000
|
$14.350
|
$23.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
118,953.000
|
$36.000
|
$17.000
|
$31.440
|
$28.090
|
$30.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
3,511.000
|
$150.000
|
$50.000
|
$1.000
|
$151.960
|
$194.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
234,197.000
|
$4.000
|
$1.000
|
$0.010
|
$3.400
|
$1.850
|
|
|
CEMENT
|
TON
|
4,690.000
|
$140.000
|
$105.560
|
$124.500
|
$126.740
|
$153.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
400,562.000
|
$2.500
|
$1.380
|
$1.720
|
$3.470
|
$1.250
|
|
|
PRIME COAT (MC-30)
|
GAL
|
70,133.000
|
$3.600
|
$4.120
|
$3.450
|
$4.160
|
$3.650
|
|
|
AGGR(TY-D GR-5 SAC-B)
|
CY
|
6.000
|
$150.000
|
$126.500
|
$74.020
|
$127.780
|
$78.000
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
217.000
|
$5.000
|
$28.600
|
$4.930
|
$28.890
|
$5.200
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
67,785.000
|
$55.000
|
$51.220
|
$60.000
|
$53.000
|
$65.000
|
|
|
D-GR HMA TY-C PG64-22
|
TON
|
29,761.000
|
$62.000
|
$64.630
|
$62.000
|
$68.000
|
$67.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
22,336.000
|
$60.000
|
$64.530
|
$65.000
|
$70.000
|
$69.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
29,379.000
|
$105.000
|
$82.530
|
$100.000
|
$88.000
|
$104.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(24")
|
SY
|
500.000
|
$135.000
|
$155.820
|
$90.000
|
$113.740
|
$230.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
4,805.000
|
$1.000
|
$3.300
|
$2.000
|
$2.920
|
$1.550
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
61.000
|
$3.000
|
$10.170
|
$7.000
|
$49.360
|
$67.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
391,874.000
|
$48.000
|
$52.520
|
$46.000
|
$44.000
|
$54.500
|
|
|
STRUCT EXCAV
|
CY
|
39,527.000
|
$10.000
|
$7.000
|
$3.500
|
$15.480
|
$7.050
|
|
|
CEM STABIL BKFL
|
CY
|
3,219.000
|
$80.000
|
$80.000
|
$115.000
|
$87.630
|
$133.000
|
|
|
CUT & RESTORING PAV
|
SY
|
3,474.000
|
$90.000
|
$58.350
|
$53.240
|
$104.060
|
$24.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
40.000
|
$70.000
|
$66.850
|
$73.310
|
$104.000
|
$96.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
201.000
|
$130.000
|
$120.000
|
$150.000
|
$350.000
|
$102.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
60,182.000
|
$3.000
|
$1.370
|
$6.000
|
$1.080
|
$3.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
203,223.000
|
$17.000
|
$20.000
|
$10.000
|
$22.000
|
$5.800
|
|
|
ROCK NAIL ANCHORS
|
LF
|
55,100.000
|
$15.000
|
$50.000
|
$14.200
|
$20.000
|
$15.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
5,862.000
|
$150.000
|
$111.870
|
$180.000
|
$145.500
|
$136.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
2,127.000
|
$200.000
|
$180.300
|
$220.000
|
$166.980
|
$164.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
2,246.000
|
$290.000
|
$250.000
|
$240.000
|
$216.420
|
$250.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
8,254.000
|
$250.000
|
$300.000
|
$320.000
|
$257.480
|
$300.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
147.000
|
$125.000
|
$25.000
|
$161.000
|
$162.940
|
$163.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
73.000
|
$375.000
|
$125.480
|
$620.000
|
$596.100
|
$590.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
430.000
|
$270.000
|
$96.920
|
$220.000
|
$202.410
|
$210.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
44.000
|
$250.000
|
$96.920
|
$360.000
|
$352.200
|
$360.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
312.000
|
$270.000
|
$96.920
|
$359.000
|
$363.330
|
$370.000
|
|
|
DRILL SHAFT (SIGN MTS) (60 IN)
|
LF
|
777.000
|
$520.000
|
$590.110
|
$450.000
|
$342.060
|
$800.000
|
|
|
CORE HOLE
|
EA
|
281.000
|
$500.000
|
$200.000
|
$550.000
|
$500.000
|
$310.000
|
|
|
CL A CONC (MISC)
|
CY
|
54.000
|
$733.320
|
$473.240
|
$800.000
|
$450.000
|
$250.000
|
|
|
CL C CONC (ABUT)
|
CY
|
733.600
|
$850.000
|
$651.820
|
$835.300
|
$776.280
|
$720.000
|
|
|
CL C CONC (CAP)
|
CY
|
2,005.600
|
$650.000
|
$700.000
|
$579.250
|
$615.590
|
$690.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
610.400
|
$600.000
|
$998.740
|
$730.970
|
$920.190
|
$820.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
831.900
|
$900.000
|
$857.450
|
$1,151.240
|
$1,119.880
|
$1,140.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
384.700
|
$540.000
|
$890.790
|
$698.280
|
$828.650
|
$870.000
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
266.400
|
$500.000
|
$548.120
|
$1,234.980
|
$554.750
|
$790.000
|
|
|
CL C CONC (COPING)
|
CY
|
2.000
|
$700.000
|
$3,106.060
|
$1,200.000
|
$500.000
|
$1,090.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
826.000
|
$400.000
|
$375.070
|
$366.340
|
$346.560
|
$340.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
2,593.500
|
$890.000
|
$876.320
|
$638.300
|
$666.850
|
$700.000
|
|
|
CL C CONC (MISC)
|
CY
|
96.400
|
$750.000
|
$600.110
|
$800.000
|
$650.000
|
$520.000
|
|
|
REINF CONC SLAB
|
SF
|
229,171.000
|
$15.000
|
$12.810
|
$13.820
|
$12.000
|
$14.000
|
|
|
APPROACH SLAB
|
CY
|
1,649.600
|
$375.000
|
$500.000
|
$389.770
|
$317.190
|
$380.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
651,517.000
|
$35.000
|
$31.320
|
$47.500
|
$36.700
|
$53.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
300.000
|
$35.000
|
$37.680
|
$52.000
|
$55.000
|
$53.000
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
39,381.000
|
$50.000
|
$20.000
|
$49.500
|
$40.000
|
$45.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
14,811.000
|
$60.000
|
$67.930
|
$70.000
|
$65.000
|
$53.000
|
|
|
RETAINING WALL (ROCK NAILED)(FACIA)
|
SF
|
65,061.000
|
$35.000
|
$65.000
|
$45.600
|
$45.000
|
$36.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,451.760
|
$105.000
|
$115.810
|
$105.000
|
$116.680
|
$134.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
25,015.170
|
$110.000
|
$116.350
|
$110.000
|
$115.290
|
$130.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,403.840
|
$110.000
|
$115.120
|
$120.000
|
$119.490
|
$144.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,431.000
|
$400.000
|
$281.450
|
$286.000
|
$284.260
|
$300.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
7,374.000
|
$350.000
|
$300.000
|
$286.000
|
$284.260
|
$300.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
210.750
|
$380.000
|
$300.000
|
$302.000
|
$309.640
|
$420.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
6,253.000
|
$90.000
|
$119.200
|
$50.000
|
$102.470
|
$117.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
58.000
|
$600.000
|
$330.460
|
$322.000
|
$309.640
|
$390.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
808.000
|
$380.000
|
$375.000
|
$332.000
|
$329.950
|
$420.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
8,820.000
|
$1.500
|
$5.910
|
$10.000
|
$1.850
|
$4.700
|
|
|
RAIL (TY SSTR)
|
LF
|
54,427.000
|
$40.000
|
$40.600
|
$45.000
|
$35.000
|
$42.000
|
|
|
RAIL (TY C402)
|
LF
|
10,722.000
|
$165.000
|
$90.230
|
$120.000
|
$90.000
|
$133.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
13,228.000
|
$45.000
|
$35.910
|
$45.000
|
$33.000
|
$48.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
1,538.200
|
$80.000
|
$84.340
|
$81.000
|
$78.170
|
$75.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
409.000
|
$40.000
|
$48.050
|
$58.720
|
$20.000
|
$41.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
3,583.000
|
$60.000
|
$52.130
|
$55.140
|
$21.000
|
$52.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
491.000
|
$90.000
|
$56.210
|
$59.900
|
$25.000
|
$57.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
204.000
|
$100.000
|
$55.930
|
$65.250
|
$35.000
|
$86.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
359.000
|
$130.000
|
$60.230
|
$69.490
|
$45.000
|
$75.000
|
|
|
CMP (GAL STL 42 IN)
|
LF
|
229.000
|
$85.000
|
$28.750
|
$72.940
|
$50.000
|
$82.000
|
|
|
CMP (GAL STL 72 IN)
|
LF
|
24.000
|
$200.000
|
$176.940
|
$149.920
|
$200.000
|
$230.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
2,460.000
|
$190.000
|
$180.560
|
$228.330
|
$250.000
|
$230.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,841.000
|
$275.000
|
$242.730
|
$281.310
|
$300.000
|
$320.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
652.000
|
$250.000
|
$285.880
|
$313.770
|
$375.000
|
$360.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,595.000
|
$255.000
|
$271.020
|
$316.120
|
$375.000
|
$440.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
1,418.000
|
$340.000
|
$320.000
|
$397.140
|
$450.000
|
$240.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
60.000
|
$490.000
|
$431.660
|
$268.130
|
$450.000
|
$600.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
2,488.000
|
$400.000
|
$563.040
|
$588.590
|
$700.000
|
$610.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
36.000
|
$60.000
|
$204.130
|
$71.790
|
$110.000
|
$132.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24,545.000
|
$70.000
|
$90.000
|
$75.170
|
$80.000
|
$71.000
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
213.000
|
$100.000
|
$92.050
|
$56.040
|
$85.000
|
$63.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
7,459.000
|
$85.000
|
$150.000
|
$97.410
|
$110.000
|
$115.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
5,650.000
|
$115.000
|
$200.000
|
$132.400
|
$140.000
|
$118.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
124.000
|
$200.000
|
$157.620
|
$161.470
|
$185.000
|
$117.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
44.000
|
$200.000
|
$260.130
|
$187.420
|
$190.000
|
$200.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
1,224.000
|
$75.000
|
$105.560
|
$106.150
|
$110.000
|
$142.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
440.000
|
$90.000
|
$131.330
|
$120.210
|
$140.000
|
$157.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
1,455.000
|
$125.000
|
$350.000
|
$205.170
|
$220.000
|
$210.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
102.000
|
$150.000
|
$103.380
|
$117.150
|
$140.000
|
$183.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 5)
|
LF
|
36.000
|
$185.000
|
$238.830
|
$203.310
|
$270.000
|
$260.000
|
|
|
RC PIPE (ELLIP)(CL III)(DES 6)
|
LF
|
622.000
|
$250.000
|
$300.000
|
$390.800
|
$275.000
|
$240.000
|
|
|
RC PIPE (CL IV)(27 IN)
|
LF
|
109.000
|
$139.000
|
$110.460
|
$184.180
|
$220.000
|
$84.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
32.000
|
$3,900.000
|
$3,090.780
|
$3,668.520
|
$3,500.000
|
$3,400.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
21.000
|
$4,000.000
|
$4,701.990
|
$4,375.520
|
$4,200.000
|
$4,200.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
39.000
|
$5,000.000
|
$5,521.820
|
$5,241.520
|
$5,000.000
|
$5,300.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
3.000
|
$4,500.000
|
$3,945.730
|
$3,223.530
|
$3,000.000
|
$2,800.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$3,600.000
|
$3,346.220
|
$3,283.500
|
$2,400.000
|
$2,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
1.000
|
$5,201.000
|
$3,399.760
|
$4,039.500
|
$2,800.000
|
$3,700.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
30.000
|
$4,500.000
|
$4,276.470
|
$4,743.520
|
$4,200.000
|
$4,400.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
5.000
|
$4,700.000
|
$3,185.010
|
$5,322.560
|
$4,500.000
|
$4,400.000
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
3.000
|
$5,500.000
|
$5,811.240
|
$6,658.180
|
$6,000.000
|
$7,000.000
|
|
|
INLET (COMPL)(POD)(FG)(4FTX4FT)
|
EA
|
1.000
|
$2,000.000
|
$5,128.780
|
$4,661.460
|
$4,000.000
|
$5,400.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
4.000
|
$4,500.000
|
$3,044.740
|
$3,613.560
|
$4,800.000
|
$4,800.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
1.000
|
$5,800.000
|
$5,373.500
|
$5,631.500
|
$6,000.000
|
$6,300.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
5.000
|
$4,200.000
|
$3,630.550
|
$4,359.520
|
$4,000.000
|
$4,600.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
4.000
|
$4,500.000
|
$4,833.200
|
$4,565.560
|
$4,500.000
|
$4,700.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
43.000
|
$4,600.000
|
$4,585.170
|
$4,639.520
|
$4,300.000
|
$4,700.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
8.000
|
$4,200.000
|
$4,874.920
|
$4,479.520
|
$4,600.000
|
$5,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
14.000
|
$3,800.000
|
$3,903.200
|
$4,131.520
|
$4,000.000
|
$4,400.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
78.000
|
$4,500.000
|
$3,555.800
|
$4,755.520
|
$4,200.000
|
$5,400.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
9.000
|
$5,500.000
|
$5,455.820
|
$5,280.580
|
$5,000.000
|
$6,300.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
4.000
|
$9,000.000
|
$12,823.770
|
$4,857.740
|
$8,000.000
|
$6,100.000
|
|
|
INLET (COMPL)(RWI)(TY I)
|
EA
|
80.000
|
$4,000.000
|
$4,720.180
|
$4,672.610
|
$7,500.000
|
$6,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$6,900.000
|
$4,871.590
|
$5,455.550
|
$3,000.000
|
$7,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$6,950.000
|
$6,443.460
|
$5,955.470
|
$3,300.000
|
$7,500.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 54 IN)
|
EA
|
1.000
|
$7,200.000
|
$8,224.310
|
$5,542.750
|
$5,000.000
|
$7,600.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$8,000.000
|
$8,121.320
|
$8,194.630
|
$6,500.000
|
$9,200.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
2.000
|
$16,000.000
|
$10,734.100
|
$12,580.260
|
$25,000.000
|
$42,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
4.000
|
$38,600.000
|
$26,502.770
|
$22,541.450
|
$30,000.000
|
$23,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
4.000
|
$9,000.000
|
$6,824.430
|
$5,852.690
|
$3,500.000
|
$12,800.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$8,500.000
|
$7,240.390
|
$14,859.400
|
$8,000.000
|
$16,600.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
3.000
|
$12,000.000
|
$10,542.110
|
$10,889.810
|
$10,000.000
|
$15,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
4.000
|
$16,000.000
|
$13,198.890
|
$12,555.920
|
$11,000.000
|
$16,200.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$20,000.000
|
$16,286.630
|
$18,319.560
|
$15,000.000
|
$16,400.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$20,500.000
|
$21,310.210
|
$24,560.860
|
$16,000.000
|
$19,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 6 FT)(3:1)(C)
|
EA
|
4.000
|
$8,200.000
|
$5,373.500
|
$5,962.110
|
$4,000.000
|
$18,900.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
1.000
|
$5,300.000
|
$16,128.170
|
$6,572.880
|
$10,000.000
|
$19,700.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$900.000
|
$1,186.490
|
$1,003.590
|
$500.000
|
$1,330.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
21.000
|
$1,150.000
|
$1,194.570
|
$1,200.140
|
$1,000.000
|
$1,450.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,300.000
|
$257.010
|
$1,200.110
|
$1,000.000
|
$1,420.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
66.000
|
$1,700.000
|
$1,192.200
|
$1,200.140
|
$1,000.000
|
$1,420.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,100.000
|
$1,061.590
|
$1,515.780
|
$2,500.000
|
$2,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
11.000
|
$2,200.000
|
$1,192.930
|
$1,601.080
|
$2,500.000
|
$2,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,800.000
|
$1,404.760
|
$2,226.460
|
$3,000.000
|
$2,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,500.000
|
$1,658.090
|
$2,610.930
|
$3,000.000
|
$2,400.000
|
|
|
SET (TY II) (DES 1) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,600.000
|
$327.120
|
$1,200.170
|
$1,000.000
|
$1,440.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
2.000
|
$3,000.000
|
$2,766.800
|
$4,095.100
|
$2,200.000
|
$3,200.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
246.000
|
$50.000
|
$38.490
|
$54.100
|
$40.000
|
$35.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
40.000
|
$50.000
|
$78.910
|
$66.540
|
$45.000
|
$139.000
|
|
|
REMOV STR (INLET)
|
EA
|
22.000
|
$650.000
|
$903.890
|
$451.380
|
$1,500.000
|
$630.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
3.000
|
$1,500.000
|
$1,212.750
|
$458.030
|
$1,500.000
|
$760.000
|
|
|
REMOV STR (SET)
|
EA
|
61.000
|
$400.000
|
$243.790
|
$452.050
|
$200.000
|
$360.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
9.000
|
$1,500.000
|
$824.580
|
$1,162.460
|
$1,500.000
|
$1,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
24.000
|
$1,750.000
|
$809.910
|
$585.580
|
$2,000.000
|
$1,480.000
|
|
|
REMOV STR (PIPE)
|
LF
|
5,913.000
|
$16.000
|
$8.120
|
$15.540
|
$20.000
|
$16.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2,501.000
|
$44.000
|
$19.820
|
$25.000
|
$30.000
|
$26.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
576.000
|
$40.000
|
$35.820
|
$35.000
|
$75.000
|
$28.000
|
|
|
REMOVE STR (GABION)
|
LF
|
50.000
|
$65.000
|
$77.530
|
$54.000
|
$25.000
|
$23.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$13,456,500.000
|
$8,000,000.000
|
$15,700,000.000
|
$18,313,529.020
|
$20,510,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
48.000
|
$25,000.000
|
$20,000.000
|
$50,000.000
|
$19,762.410
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
505.000
|
$28.630
|
$20.000
|
$27.780
|
$28.280
|
$20.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
385.000
|
$52.000
|
$48.000
|
$81.290
|
$47.570
|
$49.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
607.000
|
$30.730
|
$25.000
|
$28.080
|
$32.690
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,497.000
|
$9.270
|
$8.000
|
$15.690
|
$7.140
|
$8.100
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
4,662.000
|
$23.320
|
$11.000
|
$24.270
|
$17.480
|
$11.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
4,662.000
|
$7.860
|
$2.000
|
$9.820
|
$7.140
|
$2.050
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
168.000
|
$71.080
|
$71.610
|
$102.640
|
$47.600
|
$70.000
|
|
|
SANDBAGS FOR EROSION CONTROL (6")
|
LF
|
2,657.500
|
$4.400
|
$6.000
|
$8.670
|
$5.100
|
$6.100
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
31,984.000
|
$2.370
|
$2.000
|
$2.700
|
$2.400
|
$1.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
31,984.000
|
$0.690
|
$0.600
|
$0.800
|
$0.260
|
$0.610
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
7,289.000
|
$4.570
|
$3.250
|
$5.050
|
$3.570
|
$3.300
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,289.000
|
$1.080
|
$1.000
|
$0.560
|
$1.020
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
59,191.000
|
$50.000
|
$46.590
|
$37.020
|
$38.390
|
$34.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
11,160.000
|
$20.000
|
$6.880
|
$5.450
|
$16.740
|
$34.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
3,820.000
|
$20.000
|
$8.170
|
$34.610
|
$12.910
|
$36.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$20.000
|
$27.410
|
$48.980
|
$23.120
|
$72.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
30,570.000
|
$6.000
|
$4.080
|
$4.500
|
$4.260
|
$2.450
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,660.000
|
$6.000
|
$6.670
|
$7.950
|
$5.990
|
$5.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
620.000
|
$6.000
|
$9.660
|
$12.020
|
$9.200
|
$5.500
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
10,980.000
|
$6.000
|
$5.070
|
$6.480
|
$3.400
|
$4.700
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
3,820.000
|
$6.000
|
$7.420
|
$9.100
|
$4.610
|
$4.450
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$6.000
|
$10.440
|
$12.940
|
$5.440
|
$9.200
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
20,023.000
|
$50.000
|
$40.550
|
$57.060
|
$41.410
|
$64.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
2,255.000
|
$145.000
|
$296.270
|
$79.270
|
$133.770
|
$210.000
|
|
|
PERM CTB (SGL SLOPE) (TY 4) (42 )
|
LF
|
750.000
|
$110.000
|
$151.560
|
$138.160
|
$126.280
|
$157.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
20,885.000
|
$60.000
|
$53.950
|
$48.500
|
$51.850
|
$58.000
|
|
|
CONC CURB (TY I)
|
LF
|
59,824.000
|
$8.400
|
$5.760
|
$5.750
|
$5.840
|
$7.000
|
|
|
CONC CURB (TY C1)
|
LF
|
538.000
|
$60.000
|
$66.470
|
$55.000
|
$56.800
|
$53.000
|
|
|
CONC CURB (TY F1)
|
LF
|
90.000
|
$70.000
|
$113.450
|
$80.000
|
$88.410
|
$99.000
|
|
|
CONC CURB (TY F2)
|
LF
|
321.000
|
$120.000
|
$116.650
|
$90.000
|
$100.980
|
$110.000
|
|
|
CONC CURB (TY F3)
|
LF
|
579.000
|
$170.000
|
$201.930
|
$125.000
|
$138.120
|
$174.000
|
|
|
CONC CURB (TY C2)
|
LF
|
1,078.000
|
$90.000
|
$99.100
|
$87.000
|
$94.160
|
$90.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
9,607.000
|
$50.000
|
$69.510
|
$71.220
|
$62.850
|
$67.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
28,278.000
|
$45.000
|
$35.630
|
$35.000
|
$36.820
|
$49.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
1,114.000
|
$55.000
|
$37.970
|
$37.000
|
$38.850
|
$62.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
19.000
|
$1,500.000
|
$1,029.910
|
$1,000.000
|
$1,015.230
|
$1,400.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
21.000
|
$1,500.000
|
$1,029.920
|
$1,000.000
|
$1,015.230
|
$1,750.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$2,100.000
|
$1,029.910
|
$1,000.000
|
$1,015.230
|
$2,900.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
6.000
|
$1,500.000
|
$1,029.910
|
$1,000.000
|
$1,015.230
|
$2,300.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
17.000
|
$1,500.000
|
$1,029.930
|
$1,000.000
|
$1,015.230
|
$2,300.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
16.000
|
$1,200.000
|
$1,029.930
|
$1,000.000
|
$1,015.230
|
$2,200.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,411.000
|
$20.000
|
$20.800
|
$20.800
|
$22.230
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
21.000
|
$1,600.000
|
$1,560.050
|
$1,560.000
|
$1,489.040
|
$1,500.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
1.000
|
$800.000
|
$905.030
|
$905.000
|
$923.000
|
$930.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$650.000
|
$525.020
|
$525.000
|
$683.320
|
$690.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$900.000
|
$895.030
|
$895.000
|
$1,060.680
|
$1,070.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,501.000
|
$1.500
|
$2.500
|
$1.500
|
$1.020
|
$1.050
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$150.000
|
$125.000
|
$125.000
|
$127.490
|
$128.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
19,505.000
|
$6.000
|
$5.000
|
$5.000
|
$5.000
|
$3.900
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
26.000
|
$800.000
|
$975.030
|
$975.000
|
$509.940
|
$490.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$200.000
|
$225.010
|
$225.000
|
$152.980
|
$154.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
25.000
|
$2,505.000
|
$2,635.080
|
$2,635.000
|
$2,789.390
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
39.000
|
$10,000.000
|
$9,000.000
|
$14,183.330
|
$16,008.280
|
$14,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
43.000
|
$1,200.000
|
$1,034.610
|
$1,500.000
|
$1,529.830
|
$1,540.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
21.000
|
$600.000
|
$489.850
|
$750.000
|
$764.920
|
$770.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
1,382.000
|
$25.000
|
$23.950
|
$30.000
|
$26.090
|
$23.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
46,255.000
|
$20.000
|
$20.110
|
$28.610
|
$12.650
|
$21.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
11.000
|
$582.500
|
$255.010
|
$255.000
|
$258.070
|
$260.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
57.000
|
$1,700.000
|
$1,135.030
|
$1,135.000
|
$1,148.690
|
$1,170.000
|
|
|
IN RD IL (TY SP) 28S-8 (250W EQ) LED
|
EA
|
4.000
|
$2,600.000
|
$3,098.090
|
$3,098.000
|
$3,135.360
|
$3,200.000
|
|
|
IN RD IL (TY SP) 48S-8 (400W EQ) LED
|
EA
|
51.000
|
$3,100.000
|
$3,480.110
|
$3,480.000
|
$3,521.960
|
$3,600.000
|
|
|
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
|
EA
|
97.000
|
$4,399.000
|
$4,456.140
|
$4,456.000
|
$4,509.730
|
$4,600.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
42.000
|
$3,313.000
|
$3,031.090
|
$3,031.000
|
$3,067.550
|
$3,100.000
|
|
|
IN RD IL (TY SA) 50T-8-8 (400W EQ) LED
|
EA
|
1.000
|
$4,562.000
|
$3,930.120
|
$3,930.000
|
$3,977.390
|
$4,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
51,826.000
|
$9.000
|
$10.560
|
$10.560
|
$10.690
|
$11.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
2,230.000
|
$18.000
|
$16.320
|
$16.320
|
$16.520
|
$17.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
46,610.000
|
$25.000
|
$10.400
|
$14.690
|
$14.870
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
585.000
|
$9.000
|
$20.930
|
$20.930
|
$21.180
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
13,185.000
|
$21.500
|
$18.680
|
$18.680
|
$18.910
|
$19.500
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
2,455.000
|
$14.000
|
$16.620
|
$16.620
|
$16.820
|
$17.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
12,805.000
|
$30.000
|
$21.230
|
$21.230
|
$21.490
|
$22.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
1,090.000
|
$19.000
|
$31.440
|
$31.440
|
$31.820
|
$32.000
|
|
|
CONDT (RM) (2")
|
LF
|
80.000
|
$28.000
|
$26.700
|
$26.700
|
$27.020
|
$28.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
31,605.000
|
$1.000
|
$0.780
|
$0.780
|
$0.790
|
$0.800
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
2,425.000
|
$1.000
|
$1.000
|
$1.000
|
$1.010
|
$1.050
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
5,265.000
|
$1.100
|
$1.000
|
$1.000
|
$1.010
|
$1.050
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
25,260.000
|
$1.250
|
$1.100
|
$1.100
|
$1.110
|
$1.150
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
68,295.000
|
$1.500
|
$1.220
|
$1.220
|
$1.230
|
$1.250
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
37,315.000
|
$1.250
|
$1.250
|
$1.250
|
$1.270
|
$1.300
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
55,905.000
|
$1.350
|
$1.370
|
$1.370
|
$1.390
|
$1.400
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
15,815.000
|
$1.750
|
$1.490
|
$1.490
|
$1.510
|
$1.550
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
40,900.000
|
$1.900
|
$1.580
|
$1.580
|
$1.600
|
$1.650
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
3,710.000
|
$2.000
|
$2.300
|
$2.300
|
$2.330
|
$2.350
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
7,420.000
|
$2.500
|
$2.410
|
$2.410
|
$2.440
|
$2.500
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
11,310.000
|
$2.000
|
$1.650
|
$1.650
|
$1.670
|
$1.700
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
81.000
|
$860.000
|
$1,188.040
|
$1,188.000
|
$1,202.320
|
$1,220.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
4.000
|
$900.000
|
$1,201.040
|
$1,201.000
|
$1,215.480
|
$1,240.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
46.000
|
$735.000
|
$868.030
|
$868.000
|
$878.470
|
$890.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
36.000
|
$950.000
|
$1,204.040
|
$1,204.000
|
$1,218.520
|
$1,240.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)PS(U)
|
EA
|
1.000
|
$5,658.000
|
$7,854.240
|
$7,845.000
|
$7,939.590
|
$8,100.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
|
EA
|
5.000
|
$5,750.000
|
$6,591.200
|
$6,591.000
|
$6,670.470
|
$6,800.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$5,715.000
|
$7,201.220
|
$7,201.000
|
$7,287.830
|
$7,400.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
4.000
|
$5,430.000
|
$6,050.180
|
$6,050.000
|
$6,122.950
|
$6,200.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
|
EA
|
1.000
|
$5,100.000
|
$6,880.210
|
$6,880.000
|
$6,962.960
|
$7,100.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
9.000
|
$5,000.000
|
$6,540.200
|
$6,540.000
|
$6,618.860
|
$6,700.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
90.000
|
$30.000
|
$21.700
|
$43.000
|
$21.960
|
$22.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
738.000
|
$22.500
|
$30.950
|
$30.000
|
$31.320
|
$31.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
8,306.000
|
$22.000
|
$21.900
|
$22.000
|
$22.160
|
$22.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
116.000
|
$470.000
|
$434.640
|
$407.000
|
$443.270
|
$410.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
6.000
|
$535.000
|
$506.900
|
$438.000
|
$516.960
|
$440.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
204.000
|
$530.000
|
$496.320
|
$462.000
|
$506.170
|
$470.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$640.000
|
$671.670
|
$658.000
|
$685.010
|
$670.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
8.000
|
$780.000
|
$649.080
|
$721.000
|
$661.970
|
$730.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
12.000
|
$955.000
|
$779.800
|
$927.000
|
$795.290
|
$940.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
12.000
|
$1,550.000
|
$1,777.270
|
$1,635.000
|
$1,812.570
|
$1,660.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
68.000
|
$2,590.000
|
$2,730.220
|
$1,850.000
|
$2,784.440
|
$1,880.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$280.000
|
$125.000
|
$75.000
|
$127.490
|
$76.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
228.000
|
$85.000
|
$65.000
|
$275.000
|
$66.290
|
$280.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
4,226.000
|
$5.800
|
$4.350
|
$5.020
|
$5.080
|
$5.050
|
|
|
REMOVE LRSA
|
EA
|
6.000
|
$840.000
|
$509.020
|
$509.000
|
$515.140
|
$510.000
|
|
|
INS OH SN SUP(25 FT CANT)(SPAN ONLY)
|
EA
|
3.000
|
$10,500.000
|
$13,033.400
|
$13,033.000
|
$13,190.150
|
$13,200.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
4.000
|
$28,000.000
|
$30,300.920
|
$35,355.000
|
$35,781.300
|
$36,000.000
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$12,450.000
|
$14,245.430
|
$14,245.000
|
$14,416.760
|
$14,400.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$11,425.000
|
$14,756.450
|
$14,756.000
|
$14,933.920
|
$14,900.000
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
15.000
|
$15,325.000
|
$15,716.480
|
$15,716.000
|
$15,905.500
|
$15,900.000
|
|
|
INS OH SN SUP(75 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$28,800.000
|
$31,500.960
|
$45,142.000
|
$45,686.310
|
$46,000.000
|
|
|
INS OH SN SUP(80 FT BRDG)(SPAN ONLY)
|
EA
|
3.000
|
$32,315.000
|
$34,001.040
|
$47,208.000
|
$47,777.220
|
$48,000.000
|
|
|
INS OH SN SUP(85 FT BRDG)(SPAN ONLY)
|
EA
|
4.000
|
$36,540.000
|
$36,501.110
|
$49,447.000
|
$50,043.210
|
$50,000.000
|
|
|
INS OH SN SUP(95 FT BRDG)(SPAN ONLY)
|
EA
|
3.000
|
$36,000.000
|
$38,701.180
|
$52,588.000
|
$53,222.090
|
$53,000.000
|
|
|
INS OH SN SUP(100 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$38,500.000
|
$43,201.320
|
$55,487.000
|
$56,156.040
|
$56,000.000
|
|
|
INS OH SN SUP(170 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$40,000.000
|
$86,702.640
|
$102,400.000
|
$103,634.700
|
$103,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$8,400.000
|
$2,800.090
|
$4,404.000
|
$4,457.100
|
$4,400.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
5.000
|
$695.000
|
$550.020
|
$627.000
|
$634.560
|
$630.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BR)
|
EA
|
13.000
|
$63.000
|
$42.750
|
$65.000
|
$43.600
|
$44.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF(BR)
|
EA
|
10.000
|
$85.000
|
$75.000
|
$65.000
|
$76.490
|
$77.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)SRF
|
EA
|
8.000
|
$83.000
|
$75.000
|
$65.000
|
$76.490
|
$77.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
3.000
|
$73.000
|
$42.950
|
$65.000
|
$43.800
|
$44.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
239.000
|
$65.000
|
$45.350
|
$65.000
|
$46.250
|
$47.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
40.000
|
$67.000
|
$44.100
|
$65.000
|
$44.980
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
64.000
|
$78.000
|
$75.000
|
$65.000
|
$76.490
|
$77.000
|
|
|
INSTL OM ASSM (OM-3C)(FLX)SRF
|
EA
|
7.000
|
$255.000
|
$195.010
|
$65.000
|
$198.880
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
32.000
|
$28.000
|
$16.950
|
$17.000
|
$17.290
|
$17.500
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
64.000
|
$25.000
|
$16.950
|
$17.000
|
$17.290
|
$17.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
189.000
|
$29.000
|
$10.850
|
$12.000
|
$11.070
|
$11.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
23.000
|
$31.000
|
$10.850
|
$12.000
|
$11.070
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
1,089.000
|
$3.000
|
$6.000
|
$6.000
|
$6.090
|
$2.950
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
320.000
|
$0.600
|
$1.700
|
$1.700
|
$1.730
|
$3.050
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
247.000
|
$0.800
|
$1.700
|
$1.700
|
$1.730
|
$3.050
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,262.000
|
$0.600
|
$1.700
|
$1.700
|
$1.730
|
$0.510
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,787.000
|
$0.550
|
$1.700
|
$1.700
|
$1.730
|
$0.510
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,665.000
|
$1.100
|
$0.810
|
$1.300
|
$1.000
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
548.000
|
$1.300
|
$0.150
|
$1.500
|
$1.000
|
$1.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
5,125.000
|
$0.800
|
$0.380
|
$0.380
|
$0.390
|
$0.410
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
2,353.000
|
$1.000
|
$0.650
|
$0.650
|
$0.660
|
$0.680
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
80,145.000
|
$0.800
|
$0.650
|
$0.650
|
$0.660
|
$0.680
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
2,000.000
|
$2.250
|
$3.000
|
$3.000
|
$3.050
|
$2.400
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
4,115.000
|
$2.850
|
$3.000
|
$3.000
|
$3.050
|
$2.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
9,450.000
|
$5.500
|
$5.000
|
$5.000
|
$5.080
|
$5.100
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
261.000
|
$105.000
|
$75.000
|
$75.000
|
$76.140
|
$84.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
47.000
|
$175.000
|
$105.000
|
$105.000
|
$106.600
|
$159.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
39.000
|
$189.000
|
$115.000
|
$115.000
|
$116.750
|
$230.000
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
|
EA
|
15.000
|
$250.000
|
$125.000
|
$125.000
|
$126.900
|
$240.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$202.000
|
$135.000
|
$135.000
|
$137.060
|
$460.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
298.000
|
$125.000
|
$110.000
|
$110.000
|
$111.680
|
$111.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
89.000
|
$275.000
|
$65.000
|
$65.000
|
$65.990
|
$280.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
86.000
|
$31.000
|
$24.000
|
$24.000
|
$24.370
|
$34.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
715.000
|
$0.750
|
$0.650
|
$0.650
|
$0.660
|
$0.750
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
2,212.000
|
$4.000
|
$5.000
|
$5.000
|
$5.080
|
$5.100
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
8.000
|
$200.000
|
$650.020
|
$650.000
|
$659.900
|
$340.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
131,290.000
|
$0.100
|
$0.040
|
$0.040
|
$0.040
|
$0.100
|
|
|
PAVEMENT SEALER 6"
|
LF
|
99,245.000
|
$0.150
|
$0.060
|
$0.060
|
$0.060
|
$0.180
|
|
|
PAVEMENT SEALER 8"
|
LF
|
18,990.000
|
$0.300
|
$0.080
|
$0.080
|
$0.080
|
$0.380
|
|
|
PAVEMENT SEALER 12"
|
LF
|
6,115.000
|
$0.900
|
$0.200
|
$0.200
|
$0.200
|
$1.150
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
26.000
|
$32.000
|
$10.000
|
$10.000
|
$10.150
|
$64.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
24.000
|
$40.000
|
$10.000
|
$10.000
|
$10.150
|
$64.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$108.000
|
$15.000
|
$15.000
|
$15.230
|
$129.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
89.000
|
$187.000
|
$15.000
|
$15.000
|
$15.230
|
$90.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
43,930.000
|
$0.350
|
$0.440
|
$0.440
|
$0.450
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
240,655.000
|
$0.300
|
$0.440
|
$0.440
|
$0.450
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
59,600.000
|
$0.300
|
$0.440
|
$0.440
|
$0.450
|
$0.350
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
65,445.000
|
$0.450
|
$0.440
|
$0.440
|
$0.450
|
$0.690
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
84,110.000
|
$0.800
|
$0.480
|
$0.480
|
$0.490
|
$1.100
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
234,217.000
|
$0.550
|
$0.440
|
$0.440
|
$0.450
|
$0.690
|
|
REFL PAV MRKR TY I-C
|
EA
|
105.000
|
$2.950
|
$3.000
|
$3.000
|
$3.050
|
$4.050
|
|
REFL PAV MRKR TY I-R
|
EA
|
252.000
|
$7.500
|
$3.000
|
$3.000
|
$3.050
|
$6.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
708.000
|
$2.700
|
$3.500
|
$3.500
|
$3.550
|
$4.050
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
5,103.000
|
$3.100
|
$3.500
|
$3.500
|
$3.550
|
$2.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
17,888.000
|
$0.500
|
$0.160
|
$0.160
|
$0.160
|
$0.300
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
378.000
|
$0.800
|
$0.320
|
$0.320
|
$0.320
|
$2.050
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
101.000
|
$4.000
|
$10.000
|
$10.000
|
$10.150
|
$4.050
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$60.000
|
$12.000
|
$12.000
|
$12.190
|
$102.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
131,290.000
|
$0.100
|
$0.020
|
$0.020
|
$0.020
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
99,245.000
|
$0.100
|
$0.040
|
$0.040
|
$0.040
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
18,990.000
|
$0.200
|
$0.060
|
$0.060
|
$0.060
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
6,115.000
|
$0.400
|
$0.080
|
$0.080
|
$0.080
|
$0.510
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
26.000
|
$16.000
|
$2.000
|
$2.000
|
$2.030
|
$36.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
24.000
|
$22.000
|
$5.000
|
$5.000
|
$5.080
|
$36.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
89.000
|
$8.750
|
$5.000
|
$5.000
|
$5.080
|
$56.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
2,151.000
|
$0.800
|
$0.250
|
$0.250
|
$0.250
|
$0.050
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
5.000
|
$27,000.000
|
$40,096.220
|
$40,095.000
|
$40,578.450
|
$41,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
8.000
|
$4,200.000
|
$5,337.160
|
$5,337.000
|
$5,401.350
|
$5,500.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
5.000
|
$48,200.000
|
$107,108.260
|
$107,105.000
|
$108,396.430
|
$110,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
51.000
|
$240.000
|
$257.010
|
$257.000
|
$260.100
|
$260.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
35.000
|
$245.000
|
$303.010
|
$303.000
|
$306.650
|
$310.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
51.000
|
$255.000
|
$257.010
|
$257.000
|
$260.100
|
$260.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
22.000
|
$240.000
|
$353.010
|
$353.000
|
$357.260
|
$360.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
51.000
|
$245.000
|
$257.010
|
$257.000
|
$260.100
|
$260.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
19.000
|
$230.000
|
$376.010
|
$376.000
|
$380.530
|
$390.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
54.000
|
$610.000
|
$322.010
|
$322.000
|
$325.880
|
$330.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
54.000
|
$85.000
|
$81.000
|
$81.000
|
$81.980
|
$83.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
13.000
|
$95.000
|
$85.000
|
$85.000
|
$86.020
|
$88.000
|
|
|
BACK PLATE (12")(5 SEC)
|
EA
|
3.000
|
$110.000
|
$92.000
|
$92.000
|
$93.110
|
$95.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
19,820.000
|
$1.450
|
$1.650
|
$1.650
|
$1.670
|
$1.700
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
23,915.000
|
$2.200
|
$3.050
|
$3.050
|
$3.090
|
$3.150
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
19,430.000
|
$1.200
|
$1.050
|
$1.050
|
$1.060
|
$1.100
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,140.000
|
$255.010
|
$255.000
|
$258.070
|
$260.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$5,125.000
|
$5,873.180
|
$5,873.000
|
$5,943.810
|
$6,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
1.000
|
$4,600.000
|
$5,144.160
|
$5,144.000
|
$5,206.020
|
$5,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
2.000
|
$5,600.000
|
$6,232.190
|
$6,323.000
|
$6,399.240
|
$6,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
2.000
|
$6,560.000
|
$7,061.220
|
$7,061.000
|
$7,146.140
|
$7,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
2.000
|
$6,400.000
|
$6,935.210
|
$6,935.000
|
$7,018.620
|
$7,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
4.000
|
$7,110.000
|
$7,911.240
|
$7,911.000
|
$8,006.390
|
$8,200.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
4.000
|
$6,900.000
|
$6,855.210
|
$6,855.000
|
$6,937.660
|
$7,100.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
10.000
|
$7,950.000
|
$7,989.240
|
$7,989.000
|
$8,085.330
|
$8,200.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$6,330.000
|
$7,669.230
|
$7,669.000
|
$7,761.470
|
$7,900.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$7,900.000
|
$8,833.270
|
$8,833.000
|
$8,939.510
|
$9,100.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
40.000
|
$1,900.000
|
$1,094.030
|
$1,904.000
|
$1,926.960
|
$1,960.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
53.000
|
$890.000
|
$667.020
|
$667.000
|
$675.040
|
$690.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
5.000
|
$3,445.000
|
$2,565.080
|
$2,565.000
|
$2,595.930
|
$2,600.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
12.000
|
$4,000.000
|
$4,000.120
|
$6,000.000
|
$1,577.920
|
$2,700.000
|
|
|
LITTER REMOVAL
|
CYC
|
12.000
|
$2,250.000
|
$2,839.890
|
$5,000.000
|
$1,109.350
|
$2,000.000
|
|
|
CAM (ASPHALT) PG(76-22)
|
TON
|
3.000
|
$115.000
|
$113.000
|
$246.720
|
$120.000
|
$260.000
|
|
|
CAM (AGGREGATE)
|
TON
|
55.000
|
$100.000
|
$100.040
|
$246.720
|
$130.000
|
$260.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,000.000
|
$11,525.140
|
$5,412.500
|
$17,320.000
|
$11,800.000
|
|
|
VIVDS TEMPORARY
|
EA
|
5.000
|
$13,000.000
|
$21,484.650
|
$21,484.000
|
$21,743.050
|
$22,000.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
7,605.000
|
$3.000
|
$2.540
|
$2.540
|
$2.570
|
$2.600
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
25,910.000
|
$4.000
|
$2.040
|
$2.040
|
$2.060
|
$2.100
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
7.000
|
$2,500.000
|
$1,685.050
|
$1,685.000
|
$1,705.320
|
$1,740.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
11.000
|
$1,600.000
|
$1,005.030
|
$1,005.000
|
$1,017.120
|
$1,040.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
57.000
|
$180.000
|
$66.500
|
$66.500
|
$67.300
|
$69.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
1.000
|
$5,400.000
|
$4,717.140
|
$4,717.000
|
$4,773.880
|
$4,900.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
1.000
|
$20,000.000
|
$11,156.340
|
$11,156.000
|
$11,290.510
|
$11,500.000
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
5.000
|
$13,400.000
|
$8,810.270
|
$8,810.000
|
$8,916.230
|
$9,100.000
|
|
|
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
|
LF
|
15,135.000
|
$8.000
|
$9.000
|
$9.000
|
$9.140
|
$9.250
|
|
|
RADAR PRESENCE DETECTOR
|
EA
|
28.000
|
$6,200.000
|
$6,009.180
|
$6,009.000
|
$6,081.450
|
$6,200.000
|
|
|
RADAR PRESENCE DETECTOR COMM CABLE
|
LF
|
15,640.000
|
$3.450
|
$3.020
|
$3.020
|
$3.060
|
$3.100
|
|
|
CONDUIT (PREPARE)
|
LF
|
255.000
|
$2.500
|
$1.700
|
$1.700
|
$1.720
|
$1.750
|
|
|
MANHOLE (PREPARE)
|
EA
|
2.000
|
$290.000
|
$453.010
|
$453.000
|
$458.460
|
$470.000
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
4.000
|
$13,200.000
|
$21,973.670
|
$21,973.000
|
$22,237.940
|
$23,000.000
|
|
|
RADAR VEHICLE SENSING DEVICE
|
EA
|
5.000
|
$11,000.000
|
$12,155.370
|
$12,155.000
|
$12,301.560
|
$12,500.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
4.000
|
$18,000.000
|
$17,800.540
|
$6,500.000
|
$11,907.500
|
$9,300.000
|
|
|
RADAR ADVANCED DETECTION DEVICE
|
EA
|
10.000
|
$7,100.000
|
$5,662.170
|
$5,662.000
|
$5,730.270
|
$5,800.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
1.000
|
$10,000.000
|
$11,797.360
|
$11,797.000
|
$11,939.240
|
$12,200.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
2.000
|
$12,500.000
|
$12,980.400
|
$12,980.000
|
$13,136.510
|
$13,400.000
|
|
|
ITS POLE (8 FT)(COSS/OSB)
|
EA
|
2.000
|
$5,000.000
|
$3,070.090
|
$3,070.000
|
$3,107.020
|
$34,000.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
7.000
|
$8,400.000
|
$5,660.170
|
$5,660.000
|
$5,728.250
|
$5,800.000
|
|
|
AUTO PORT SMRT TRF MONITOR SYS
|
DAY
|
1,172.000
|
$250.000
|
$185.010
|
$200.260
|
$202.290
|
$185.000
|
|
|
INS LED WW SGN W/BASIC SOL PWR KIT
|
EA
|
18.000
|
$1,550.000
|
$3,183.100
|
$3,183.000
|
$3,221.380
|
$3,300.000
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
5.000
|
$3,000.000
|
$2,395.070
|
$2,395.000
|
$2,423.880
|
$2,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
214.000
|
$250.000
|
$369.010
|
$378.880
|
$270.630
|
$280.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
44.000
|
$5,810.000
|
$2,970.090
|
$2,970.000
|
$3,005.810
|
$3,100.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366048)W/APRN
|
EA
|
8.000
|
$8,700.000
|
$4,324.130
|
$4,324.000
|
$4,376.140
|
$4,500.000
|
|
|
ADJUST GAS FACILITY ACCESS COVER
|
EA
|
12.000
|
$325.000
|
$250.010
|
$252.750
|
$252.530
|
$250.000
|
|
|
NGP (MAIN) (12" STEEL) (OPEN CUT)
|
LF
|
12.000
|
$500.040
|
$2,078.610
|
$2,101.380
|
$2,099.550
|
$2,100.000
|
|
|
NGP (MAIN)(8" PLASTIC W/TW)
|
LF
|
19,232.000
|
$113.890
|
$51.300
|
$51.860
|
$51.820
|
$52.000
|
|
|
NGP BORING (6" PLASTIC W/TW)
|
LF
|
1,207.000
|
$160.940
|
$143.250
|
$144.820
|
$144.700
|
$145.000
|
|
|
NGP BORING (8" PLASTIC W/TW)
|
LF
|
1,482.000
|
$175.410
|
$172.650
|
$174.550
|
$174.390
|
$175.000
|
|
|
NGP (SERVICE)(SHORTEN TO NEW MAIN)
|
EA
|
4.000
|
$2,000.180
|
$2,332.070
|
$2,357.620
|
$2,355.560
|
$2,400.000
|
|
|
NGP MOBILIZATION
|
LS
|
1.000
|
$25,000.000
|
$30,000.910
|
$30,329.520
|
$30,303.030
|
$30,000.000
|
|
|
NGP(MAIN)(PLSTIC W/TRCER)(2")(OPEN CUT)
|
LF
|
227.000
|
$55.100
|
$33.700
|
$34.070
|
$34.040
|
$34.000
|
|
|
NGP(MAIN)(PLSTIC W/TRCER)(4")(OPEN CUT)
|
LF
|
381.000
|
$79.660
|
$45.650
|
$46.150
|
$46.110
|
$46.000
|
|
|
NGP(MAIN)PLSTIC W/TRCER)(6")(OPEN CUT)
|
LF
|
1,917.000
|
$74.530
|
$49.250
|
$49.790
|
$49.750
|
$50.000
|
|
|
GROUT ABANDONMENT GAS MAIN (4" PLASTIC)
|
LF
|
1,392.000
|
$20.000
|
$7.100
|
$7.180
|
$7.170
|
$7.200
|
|
|
GROUT ABANDONMENT GAS MAIN (12" STEEL)
|
LF
|
62.000
|
$30.000
|
$98.450
|
$99.530
|
$99.440
|
$100.000
|
|
|
GROUT ABANDONMENT GAS MAIN (6 )
|
LF
|
20,374.000
|
$25.000
|
$9.950
|
$10.060
|
$10.050
|
$10.000
|
|
|
JELLY FISH FILTER
|
EA
|
15.000
|
$255,333.340
|
$81,750.360
|
$88,262.850
|
$199,610.190
|
$123,330.000
|
|
|
4" DUCTILE IRON PIPE
|
LF
|
7.000
|
$75.000
|
$226.610
|
$222.220
|
$242.570
|
$190.000
|
|
|
8" DUCTILE IRON PIPE
|
LF
|
33.000
|
$85.000
|
$185.410
|
$181.820
|
$198.470
|
$190.000
|
|
|
12" DUCTILE IRON PIPE
|
LF
|
1,526.000
|
$115.000
|
$107.120
|
$105.050
|
$114.670
|
$200.000
|
|
|
16" DUCTILE IRON PIPE
|
LF
|
2,895.000
|
$145.000
|
$129.270
|
$126.770
|
$138.380
|
$230.000
|
|
|
20" DUCTILE IRON PIPE
|
LF
|
5.000
|
$145.000
|
$442.910
|
$434.340
|
$474.120
|
$420.000
|
|
|
24" DUCTILE IRON PIPE
|
LF
|
6,329.000
|
$195.000
|
$195.710
|
$191.920
|
$209.500
|
$280.000
|
|
|
RELAY 3/4" SHORT SERVICE
|
EA
|
1.000
|
$779.400
|
$3,718.410
|
$3,646.460
|
$3,980.410
|
$1,700.000
|
|
|
RELAY 1" SHORT SERVICE
|
EA
|
1.000
|
$1,247.300
|
$3,300.100
|
$3,333.330
|
$3,638.600
|
$1,750.000
|
|
|
NEW 1" SHORT SERVICE
|
EA
|
3.000
|
$1,750.000
|
$3,429.100
|
$3,333.330
|
$3,671.680
|
$1,600.000
|
|
|
RELOCATE 3/4" SHORT SERVICE
|
EA
|
2.000
|
$1,150.500
|
$7,725.220
|
$7,575.760
|
$8,269.540
|
$1,500.000
|
|
|
RELOCATE 1" SHORT SERVICE
|
EA
|
4.000
|
$1,391.700
|
$3,275.090
|
$3,212.120
|
$3,506.290
|
$1,600.000
|
|
|
RELOCATE 1 1/2" SHORT SERVICE
|
EA
|
2.000
|
$1,546.400
|
$4,171.120
|
$4,090.910
|
$4,465.560
|
$1,750.000
|
|
|
RELOCATE 2" SHORT SERVICE
|
EA
|
2.000
|
$1,930.400
|
$4,367.330
|
$4,282.830
|
$4,675.050
|
$1,850.000
|
|
|
ADJUST VALVE BOX
|
EA
|
5.000
|
$553.700
|
$607.720
|
$595.960
|
$650.540
|
$550.000
|
|
|
GATE VALVE & BOX (COMPLETE) (4 IN)
|
EA
|
1.000
|
$1,044.700
|
$999.130
|
$979.800
|
$1,069.530
|
$1,600.000
|
|
|
GATE VALVE & BOX (COMPLETE) (8 IN)
|
EA
|
1.000
|
$1,400.000
|
$1,678.950
|
$1,646.460
|
$1,797.250
|
$1,800.000
|
|
|
GATE VALVE & BOX (COMPLETE) (12 IN)
|
EA
|
18.000
|
$2,763.890
|
$3,079.790
|
$3,020.200
|
$3,296.790
|
$4,700.000
|
|
|
GATE VALVE & BOX (COMPLETE) (16 IN)
|
EA
|
16.000
|
$8,236.360
|
$7,606.770
|
$7,459.600
|
$8,142.740
|
$10,500.000
|
|
|
NEW METER BOX
|
EA
|
33.000
|
$2,750.000
|
$339.910
|
$333.330
|
$363.860
|
$750.000
|
|
|
BUTTERFLY VALVE AND BOX (COMPL)(24 IN)
|
EA
|
28.000
|
$18,500.000
|
$18,643.540
|
$18,282.830
|
$19,957.160
|
$20,000.000
|
|
|
RELOCATE EXIST METER & NEW METER BOX
|
EA
|
30.000
|
$402.000
|
$566.520
|
$555.560
|
$606.430
|
$1,800.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
32.000
|
$4,750.000
|
$4,583.630
|
$4,494.950
|
$4,906.590
|
$5,500.000
|
|
|
RELOCATE FIRE HYDRANT
|
EA
|
1.000
|
$7,237.100
|
$6,489.190
|
$6,363.640
|
$6,946.420
|
$2,100.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
60.500
|
$9,300.000
|
$13,596.390
|
$13,333.330
|
$14,554.390
|
$14,000.000
|
|
|
TIE-IN (COMPLETE) (4 IN)
|
EA
|
1.000
|
$885.200
|
$5,139.850
|
$5,040.400
|
$5,502.000
|
$3,100.000
|
|
|
TIE-IN (COMPLETE) (8 IN)
|
EA
|
1.000
|
$2,750.000
|
$6,489.190
|
$6,363.640
|
$6,946.420
|
$4,500.000
|
|
|
TIE-IN (COMPLETE) (12 IN)
|
EA
|
3.000
|
$3,700.000
|
$6,798.200
|
$6,666.670
|
$7,267.560
|
$6,500.000
|
|
|
TIE-IN (COMPLETE) (16 IN)
|
EA
|
6.000
|
$8,500.000
|
$7,416.210
|
$7,272.730
|
$7,938.760
|
$13,500.000
|
|
|
TIE-IN (COMPLETE) (20 IN)
|
EA
|
1.000
|
$16,500.000
|
$14,214.410
|
$13,939.390
|
$15,215.960
|
$22,000.000
|
|
|
TIE-IN (COMPLETE) (24 IN)
|
EA
|
17.000
|
$19,000.000
|
$15,862.460
|
$15,555.560
|
$16,980.130
|
$25,000.000
|
|
|
HYDROSTATIC TEST
|
EA
|
19.000
|
$3,000.000
|
$4,398.230
|
$4,313.130
|
$4,708.130
|
$3,500.000
|
|
|
PERMANENT BLOW-OFF (COMPLETE)(2 IN)
|
EA
|
3.000
|
$3,150.000
|
$4,254.020
|
$4,171.720
|
$4,553.760
|
$2,800.000
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(2 IN)
|
EA
|
11.000
|
$1,900.000
|
$1,668.650
|
$1,636.360
|
$1,786.220
|
$2,500.000
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(4 IN)
|
EA
|
23.000
|
$3,850.000
|
$8,961.260
|
$8,787.880
|
$9,592.670
|
$4,900.000
|
|
|
AIR RELEASE VALVE (COMPLETE) (1 IN)
|
EA
|
5.000
|
$2,100.000
|
$3,419.700
|
$3,353.540
|
$3,660.650
|
$3,100.000
|
|
|
AIR RELEASE VALVE (COMPLETE) (2 IN)
|
EA
|
8.000
|
$3,750.000
|
$4,738.140
|
$4,646.470
|
$5,071.990
|
$4,400.000
|
|
|
RELOCATE EXIST AIR RELEASE ASSEMBLY
|
EA
|
1.000
|
$553.000
|
$4,738.140
|
$4,646.460
|
$5,071.990
|
$3,500.000
|
|
|
WTR (JACK, BORE OR TUNNEL) (24 IN)
|
LF
|
170.000
|
$372.000
|
$576.820
|
$565.660
|
$617.460
|
$600.000
|
|
|
WTR (JACK, BORE OR TUNNEL) (30 IN)
|
LF
|
226.000
|
$372.000
|
$566.520
|
$555.560
|
$606.430
|
$650.000
|
|
|
WTR (JACK, BORE OR TUNNEL) (42 IN)
|
LF
|
880.000
|
$550.000
|
$880.030
|
$585.860
|
$639.510
|
$710.000
|
|
|
CARRIER PIPE (IN CASING) (DI) (12 IN)
|
LF
|
170.000
|
$75.200
|
$60.260
|
$59.090
|
$64.510
|
$220.000
|
|
|
CARRIER PIPE (IN CASING) (DI) (16 IN)
|
LF
|
226.000
|
$145.000
|
$87.550
|
$85.860
|
$93.720
|
$260.000
|
|
|
CARRIER PIPE (IN CASING) (DI) (24 IN)
|
LF
|
880.000
|
$195.000
|
$143.170
|
$140.400
|
$153.260
|
$340.000
|
|
|
CARRIER PIPE (OPEN CUT) (DI) (16 IN)
|
LF
|
310.000
|
$130.000
|
$87.550
|
$85.860
|
$93.720
|
$360.000
|
|
|
CARRIER PIPE (OPEN CUT) (DI) (24 IN)
|
LF
|
1,228.000
|
$202.800
|
$143.170
|
$140.400
|
$153.260
|
$340.000
|
|
|
STEEL CASING (24 IN) (BORE)
|
LF
|
170.000
|
$135.000
|
$92.700
|
$90.910
|
$99.230
|
$230.000
|
|
|
STEEL CASING (30 IN) (BORE)
|
LF
|
226.000
|
$155.000
|
$123.600
|
$121.210
|
$132.310
|
$260.000
|
|
|
STEEL CASING (42 IN) (BORE)
|
LF
|
880.000
|
$195.000
|
$216.310
|
$212.120
|
$231.550
|
$350.000
|
|
|
STEEL CASING (30 IN) (OPEN CUT)
|
LF
|
310.000
|
$155.000
|
$154.500
|
$151.520
|
$165.390
|
$290.000
|
|
|
STEEL CASING (42 IN) (OPEN CUT)
|
LF
|
1,228.000
|
$195.000
|
$329.610
|
$323.230
|
$352.830
|
$370.000
|
|
|
CONCRETE CRADLE FOR WATERLINE
|
CY
|
2.000
|
$214.250
|
$1,071.230
|
$1,050.510
|
$1,146.710
|
$1,500.000
|
|
|
CONCRETE SADDLE FOR WATERLINE
|
CY
|
2.000
|
$214.250
|
$1,071.230
|
$1,050.510
|
$1,146.710
|
$1,650.000
|
|
|
CONCRETE CAP FOR WATERLINE
|
CY
|
8.000
|
$214.250
|
$885.830
|
$868.690
|
$948.240
|
$1,250.000
|
|
|
GROUT ABANDONMENT WATER MAIN (8 IN)
|
LF
|
242.000
|
$15.000
|
$25.750
|
$25.250
|
$27.570
|
$20.000
|
|
|
GROUT ABANDONMENT WATER MAIN (12 IN)
|
LF
|
1,748.000
|
$20.000
|
$27.810
|
$27.270
|
$29.770
|
$27.000
|
|
|
GROUT ABANDONMENT WATER MAIN (16 IN)
|
LF
|
2,393.000
|
$27.500
|
$30.900
|
$30.300
|
$33.080
|
$32.000
|
|
|
GROUT ABANDONMENT WATER MAIN (20 IN)
|
LF
|
147.000
|
$35.000
|
$36.050
|
$35.350
|
$38.590
|
$42.000
|
|
|
GROUT ABANDONMENT WATER MAIN (24 IN)
|
LF
|
4,449.000
|
$50.000
|
$42.230
|
$41.410
|
$45.210
|
$65.000
|
|
|
SRV LINE BRK & LEAK REPAIR (ALL SIZES)
|
EA
|
1.000
|
$860.000
|
$5,974.170
|
$5,858.590
|
$6,395.110
|
$4,100.000
|
|
|
8" MAIN BREAK REPAIR
|
EA
|
1.000
|
$2,402.600
|
$8,240.240
|
$8,080.810
|
$8,820.840
|
$2,800.000
|
|
|
12" MAIN BREAK/LEAK REPAIR
|
EA
|
1.000
|
$2,942.570
|
$8,549.250
|
$8,383.840
|
$9,151.630
|
$5,100.000
|
|
|
24" MAIN BREAK/LEAK REPAIR
|
EA
|
1.000
|
$4,161.430
|
$16,171.470
|
$15,858.590
|
$17,310.910
|
$22,000.000
|
|
|
SAN SWR (8 IN)(PVC)(ASTM D2241)
|
LF
|
145.000
|
$100.000
|
$85.490
|
$83.840
|
$99.050
|
$185.000
|
|
|
SAN SWR MH (TY1)(48" DIA)
|
EA
|
2.000
|
$7,000.000
|
$5,356.150
|
$5,252.530
|
$6,205.330
|
$8,500.000
|
|
|
SAN SWR MH (TY1)(48" DIA)(DROP)
|
EA
|
1.000
|
$7,500.000
|
$23,690.680
|
$23,232.320
|
$27,446.620
|
$12,900.000
|
|
|
SAN SWR MH (TY1)(48" DIA)(DOGHOUSE)
|
EA
|
3.000
|
$6,200.000
|
$13,184.380
|
$12,929.290
|
$15,274.640
|
$12,700.000
|
|
|
SAN SWR PRECAST MH (EXT DEPTH)(48"DIA)
|
LF
|
54.000
|
$550.000
|
$669.520
|
$656.570
|
$775.670
|
$550.000
|
|
|
SAN SWR (JACK, BORE OR TUNNEL)(24 IN)
|
LF
|
200.000
|
$485.000
|
$473.810
|
$464.650
|
$548.930
|
$600.000
|
|
|
SAN SWR CARRIER PIPE IN CAS(PVC)(8 IN)
|
LF
|
400.000
|
$85.000
|
$33.990
|
$33.330
|
$39.380
|
$140.000
|
|
|
SAN SWR CARRIER PIPE IN CAS(PVC)(18 IN)
|
LF
|
146.000
|
$120.000
|
$113.300
|
$111.110
|
$131.270
|
$250.000
|
|
|
SAN SWR CASING OP CUT(STEEL-SPLIT)(16")
|
LF
|
170.000
|
$160.000
|
$154.500
|
$151.520
|
$179.000
|
$350.000
|
|
|
SAN SWR CASING OP CUT(STEEL-SPLIT)(30")
|
LF
|
145.000
|
$180.000
|
$391.410
|
$383.840
|
$453.470
|
$450.000
|
|
|
SAN SWR CASING OP CUT (STEEL)(24 IN)
|
LF
|
187.000
|
$165.000
|
$463.510
|
$454.550
|
$537.000
|
$230.000
|
|
|
SAN SWR JK BOR TUN PIPE (24 IN)(STEEL)
|
LF
|
200.000
|
$330.000
|
$92.700
|
$90.910
|
$107.400
|
$230.000
|
|
|
SAN SEW (LATERAL)(6")
|
LF
|
150.000
|
$95.000
|
$576.820
|
$565.660
|
$668.270
|
$200.000
|
|
|
SAN SEW CLEANOUT
|
EA
|
2.000
|
$585.000
|
$370.810
|
$363.640
|
$429.600
|
$750.000
|
|
|
VERTICAL STACK
|
LF
|
1.000
|
$80.000
|
$1,081.530
|
$1,060.610
|
$1,253.000
|
$850.000
|
|
|
CONC ENCASE, CRADLE, SADDLE & COLLAR
|
CY
|
1.800
|
$550.000
|
$1,246.340
|
$1,222.220
|
$1,443.930
|
$1,500.000
|
|
|
SAN SWR BYPASS PUMPING
|
LS
|
1.000
|
$45,000.000
|
$51,501.490
|
$50,505.050
|
$59,666.570
|
$150,000.000
|
|
|
SAN SEW PRE TELEVISION INSP
|
LF
|
943.000
|
$3.000
|
$4.120
|
$4.040
|
$4.770
|
$10.000
|
|
|
SAN SEW POST TELEVISION INSP
|
LF
|
1,596.000
|
$3.000
|
$8.240
|
$8.080
|
$9.550
|
$8.000
|
|
|
GROUT ABANDONMENT SEWER LATERAL (6 IN)
|
LF
|
147.000
|
$5.000
|
$28.840
|
$28.280
|
$33.410
|
$20.000
|
|
|
GROUT ABANDONMENT SEWER MAIN (8 IN)
|
LF
|
422.000
|
$5.000
|
$24.720
|
$24.240
|
$28.640
|
$20.000
|
|
Totals: |
$187,123,689.300
|
$178,383,491.799
|
$188,494,175.440
|
$192,773,987.245
|
$195,332,339.850
|