BEXAR IH 10 (0072-12-198)

Items: 148

County: BEXAR
Length: N/A
Highway: IH 10
District: SAN ANTONIO
Control Number: 0072-12-198
DBE Goal: N/A
Project: NH 2018(862)
Guaranty: N/A
Time: 98 WORKING DAYS
Engineer's Estimate: $1,453,745.28
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: INTERSECTION AND OPERATIONAL IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,453,745.28
$1,598,613.31
Over/Under Est: 9.97% $144,868.03
Over/Under Est: 16.9% $245,702.81
Amt Left: 6.31% $100,834.78
Over/Under Est: 21.38% $310,876.53
Amt Left: 10.38% $166,008.50
Delta: -3.83% -$65,173.72
Over/Under Est: 22.23% $323,131.92
Amt Left: 11.15% $178,263.89
Delta: -0.69% -$12,255.39
$1,982,662.41
Over/Under Est: 36.38% $528,917.13
Amt Left: 24.02% $384,049.10
Delta: -11.58% -$205,785.21
Over/Under Est: 41.3% $600,426.17
Amt Left: 28.5% $455,558.14
Delta: -3.61% -$71,509.04

Bid Items & Bid Tabulations

148 Total 0 of 148
BEXAR  |  IH 10  |  SAN ANTONIO  |  0072-12-198  |  05/01/2018  |  $1,453,745.28  |  NH 2018(862)  |  INTERS AND OPERATIONAL IMPRVS  |  98 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
CURRAN CONTRACTING COMPANY
E-Z BEL CONSTRUCTION, LLC
CAPITAL EXCAVATION COMPANY
RELMCO, INC.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
AC 1.000 $10,000.000 $10,000.000 $13,696.850 $15,000.000 $5,000.000 $75,000.000 $15,000.000
REMOVING CONC (RIPRAP)
SY 134.000 $12.500 $12.000 $16.500 $5.000 $8.000 $25.000 $20.000
REMOVING CONC (MEDIANS)
SY 97.000 $31.000 $15.000 $22.950 $12.000 $30.000 $25.000 $28.000
REMOVING CONC (SIDEWALKS)
SY 129.000 $18.000 $7.000 $10.250 $5.000 $12.000 $25.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 74.000 $14.000 $12.000 $15.900 $5.000 $35.000 $30.000 $18.000
REMOVING CONC (CURB)
LF 754.000 $5.000 $3.000 $2.000 $5.000 $8.000 $20.000 $3.500
REMOVING CONC (WHEELCHAIR RAMP)
SY 101.000 $27.500 $12.000 $16.200 $5.000 $12.000 $20.000 $26.000
REMOVING CONC (COPING)
LF 416.000 $16.000 $8.000 $42.400 $15.000 $30.000 $40.000 $26.000
REMOVE CONC (RAIL)
LF 416.000 $12.750 $8.000 $55.400 $15.000 $30.000 $40.000 $30.000
REMOVING CONC (PAVERS)
SY 66.000 $9.000 $15.000 $48.200 $10.000 $11.000 $30.000 $85.000
REMOVING STAB BASE AND ASPH PAV (3")
SY 17,240.000 $2.500 $2.500 $4.900 $4.000 $3.000 $2.200 $4.500
EXCAVATION (ROADWAY)
CY 350.000 $10.000 $20.000 $15.650 $25.000 $30.000 $30.000 $23.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 100.000 $9.500 $50.000 $4.700 $20.000 $30.000 $25.000 $16.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,983.000 $7.500 $32.000 $36.850 $50.000 $20.000 $22.000 $48.000
COMPOST MANUF TOPSOIL (4")
SY 296.000 $1.500 $11.000 $4.000 $4.500 $10.000 $5.000 $6.000
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 296.000 $0.500 $2.600 $2.700 $3.000 $2.500 $5.000 $3.500
DRILL SEEDING (TEMP) (WARM)
SY 296.000 $0.200 $2.550 $2.100 $3.000 $2.550 $5.000 $2.300
FERTILIZER
AC 0.060 $640.000 $1,650.000 $1,061.650 $2,000.000 $1,600.000 $1,760.000 $1,200.000
VEGETATIVE WATERING
MG 7.000 $17.000 $15.000 $51.750 $35.000 $295.000 $50.000 $65.000
D-GR HMA TY-B PG70-22
TON 1,124.000 $60.000 $65.000 $63.500 $95.000 $70.000 $74.800 $85.000
D-GR HMA TY-C SAC-A PG70-22
TON 3,550.000 $65.000 $72.000 $66.150 $90.000 $75.000 $80.300 $85.000
CONC PVMT (CONT REINF-CRCP) (HES) (8")
SY 100.000 $66.000 $120.000 $112.350 $100.000 $115.000 $125.000 $165.000
CEM STABIL BKFL
CY 22.000 $40.000 $130.000 $143.400 $200.000 $200.000 $150.000 $125.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 14.000 $290.000 $305.000 $318.500 $350.000 $303.030 $322.500 $350.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $425.000 $405.000 $424.700 $600.000 $404.040 $430.000 $465.000
RETAINING WALL (MSE)
SF 4,085.000 $45.000 $35.000 $42.350 $45.000 $58.500 $70.000 $50.000
CONCRETE PAINT FINISH
SF 5,069.000 $0.400 $1.100 $0.350 $0.600 $1.070 $2.150 $0.300
RIPRAP (CONC)(5 IN)
CY 331.000 $360.000 $325.000 $313.650 $120.000 $355.000 $375.000 $715.000
RIPRAP (CONC) (CL B) (4")
CY 11.000 $430.000 $400.000 $747.700 $120.000 $420.000 $400.000 $725.000
RIPRAP (CONC) (CL B) (6")
CY 9.000 $341.000 $450.000 $564.350 $160.000 $390.000 $400.000 $850.000
RAIL (TY T551)
LF 416.000 $47.000 $58.000 $95.550 $105.000 $70.000 $75.000 $80.000
RC PIPE (CL III)(18 IN)
LF 58.000 $58.000 $120.000 $98.400 $70.000 $119.000 $65.000 $115.000
INLET (COMPL)(DROP)(TY 3)
EA 1.000 $6,700.000 $4,500.000 $7,462.100 $6,500.000 $4,620.580 $3,500.000 $5,500.000
INLET (COMPL) (TRAFFIC) (TY X - 1)
EA 2.000 $5,500.000 $5,000.000 $7,912.800 $7,000.000 $4,866.170 $6,500.000 $5,000.000
ADJUSTING MANHOLES (SANITARY)
EA 1.000 $3,800.000 $1,200.000 $3,595.050 $2,000.000 $2,161.140 $950.000 $1,500.000
ADJUSTING INLET (CAP)
EA 3.000 $1,500.000 $1,250.000 $3,463.350 $2,000.000 $1,739.960 $950.000 $3,000.000
MOBILIZATION
LS 1.000 $127,982.460 $150,000.000 $123,000.000 $125,000.000 $200,000.000 $150,000.000 $171,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $9,500.000 $5,160.500 $5,000.000 $7,500.000 $12,500.000 $1,900.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 20.000 $24.000 $45.000 $30.650 $50.000 $45.000 $49.500 $30.000
ROCK FILTER DAMS (REMOVE)
LF 20.000 $8.000 $10.000 $26.550 $10.000 $10.400 $11.440 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $15.000 $14.500 $26.050 $15.000 $14.140 $15.550 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $5.500 $5.500 $6.050 $10.000 $5.600 $6.160 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 150.000 $4.000 $6.000 $4.250 $5.000 $5.200 $5.720 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $1.000 $1.000 $2.100 $1.500 $1.000 $1.100 $2.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 740.000 $15.000 $20.000 $21.600 $30.000 $10.570 $50.000 $30.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,280.000 $28.000 $18.500 $20.750 $25.000 $11.740 $25.000 $25.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $25.000 $25.000 $43.200 $28.000 $18.420 $25.000 $25.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $12.000 $4.000 $20.750 $30.000 $13.070 $100.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 740.000 $4.000 $6.000 $9.900 $16.000 $10.570 $12.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,280.000 $7.000 $5.000 $9.150 $16.000 $11.740 $12.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $8.000 $10.000 $38.350 $16.000 $18.420 $12.000 $10.000
CONC CURB (MONO) (TY II)
LF 231.000 $12.500 $20.000 $22.400 $25.000 $13.080 $19.000 $30.000
CONC CURB (TY IV)
LF 526.000 $15.000 $22.000 $19.050 $20.000 $26.340 $20.000 $20.000
CONC SIDEWALKS (4")
SY 144.000 $41.000 $45.000 $38.500 $70.000 $72.110 $55.000 $70.000
CURB RAMPS (TY 1)
EA 4.000 $1,342.000 $1,000.000 $1,643.900 $1,600.000 $1,252.880 $1,500.000 $2,200.000
CURB RAMPS (TY 2)
EA 3.000 $1,283.000 $1,000.000 $1,888.400 $1,800.000 $1,622.030 $1,500.000 $2,400.000
CURB RAMPS (TY 10)
EA 3.000 $1,904.000 $1,000.000 $2,032.400 $1,600.000 $2,961.920 $1,500.000 $2,400.000
CURB RAMPS (TY 20)
EA 1.000 $2,065.000 $1,500.000 $3,344.850 $1,800.000 $3,328.100 $1,500.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 154.000 $1.000 $5.000 $16.850 $7.500 $8.000 $4.000 $6.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $8,760.000 $5,000.000 $5,215.250 $20,000.000 $15,000.000 $10,000.000 $10,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $510.000 $500.000 $397.100 $2,000.000 $5,000.000 $1,500.000 $1,500.000
CONDT (PVC) (SCH 40) (2")
LF 290.000 $9.630 $15.000 $14.850 $10.000 $14.140 $15.050 $16.200
CONDT (PVC) (SCH 40) (3")
LF 35.000 $15.750 $17.000 $17.000 $12.000 $16.160 $17.200 $18.500
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 1,530.000 $14.870 $17.000 $17.000 $17.000 $16.160 $17.200 $18.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 360.000 $21.730 $31.000 $31.850 $35.000 $30.300 $32.250 $35.000
CONDT (PVC) (SCH 80) (3")
LF 170.000 $21.000 $17.000 $17.000 $17.000 $16.160 $17.200 $18.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 250.000 $52.000 $36.000 $37.150 $38.000 $35.350 $37.620 $40.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 90.000 $28.490 $41.000 $42.450 $42.000 $40.400 $43.000 $46.000
CONDT (RM) (2")
LF 80.000 $30.040 $19.000 $19.100 $25.000 $18.180 $19.350 $20.000
ELEC CONDR (NO.14) INSULATED
LF 855.000 $0.950 $0.750 $0.750 $1.250 $0.710 $0.750 $0.800
ELEC CONDR (NO.8) BARE
LF 190.000 $1.100 $1.000 $1.000 $1.500 $0.960 $1.020 $1.100
ELEC CONDR (NO.4) INSULATED
LF 325.000 $1.860 $1.500 $1.550 $2.250 $1.460 $1.550 $1.700
GROUND BOX TY D (162922)
EA 5.000 $875.000 $900.000 $939.600 $800.000 $893.940 $951.370 $1,000.000
GROUND BOX TY D (162922)W/APRON
EA 3.000 $942.710 $900.000 $939.600 $1,000.000 $893.940 $951.370 $1,000.000
REMOVE GROUND BOX
EA 3.000 $215.000 $150.000 $143.350 $150.000 $136.360 $145.120 $160.000
TIMBER POLE (CL 2) 40 FT
EA 5.000 $1,665.250 $1,300.000 $1,274.050 $850.000 $1,212.120 $1,290.000 $1,400.000
TIMBER POLE (CL 2) 50 FT
EA 1.000 $1,707.860 $1,600.000 $1,592.550 $950.000 $1,515.150 $1,612.500 $1,750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $395.000 $450.000 $468.900 $500.000 $451.000 $494.500 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $475.000 $500.000 $537.700 $575.000 $507.500 $591.250 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $715.000 $700.000 $727.400 $800.000 $660.000 $827.750 $800.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 8.000 $1,410.000 $2,000.000 $1,636.050 $1,000.000 $1,924.240 $2,047.870 $1,800.000
REMOVE SM RD SN SUP&AM
EA 1.000 $62.000 $100.000 $159.250 $75.000 $80.000 $48.370 $175.000
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
EA 4.000 $1,850.000 $5,500.000 $2,802.900 $1,000.000 $4,803.030 $5,111.620 $3,000.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 900.000 $0.600 $0.710 $0.750 $0.750 $0.700 $0.750 $0.800
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 373.000 $0.800 $0.710 $0.750 $0.750 $0.700 $0.750 $0.800
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 565.000 $0.550 $0.710 $0.750 $0.750 $0.700 $0.750 $0.800
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 3,065.000 $1.100 $1.210 $1.250 $1.250 $1.200 $1.290 $1.400
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 217.000 $9.500 $5.100 $5.300 $5.500 $5.000 $5.370 $5.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,143.000 $0.550 $0.710 $0.750 $0.750 $0.700 $0.750 $0.800
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 126.000 $0.750 $1.100 $1.050 $1.200 $1.000 $1.075 $1.150
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,125.000 $0.750 $0.710 $0.750 $0.750 $0.700 $0.750 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 445.000 $5.500 $5.500 $5.300 $5.500 $5.000 $5.370 $5.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 17.000 $96.000 $110.000 $106.150 $120.000 $100.000 $107.500 $116.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $182.000 $210.000 $212.350 $225.000 $200.000 $215.000 $230.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 3.000 $192.000 $215.000 $226.150 $250.000 $213.000 $228.970 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 20.000 $110.000 $110.000 $115.750 $150.000 $109.000 $117.170 $125.000
PAVEMENT SEALER 4"
LF 1,803.000 $0.150 $0.210 $0.200 $0.250 $0.200 $0.210 $0.250
PAVEMENT SEALER 8"
LF 4,125.000 $0.400 $0.410 $0.400 $0.500 $0.400 $0.430 $0.500
PAVEMENT SEALER 24"
LF 445.000 $2.250 $3.100 $3.200 $3.500 $3.000 $3.220 $3.500
PAVEMENT SEALER (ARROW)
EA 17.000 $56.000 $64.000 $66.900 $60.000 $63.000 $67.720 $75.000
PAVEMENT SEALER (WORD)
EA 20.000 $57.000 $64.000 $66.900 $60.000 $63.000 $67.720 $75.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $71.000 $98.000 $103.000 $100.000 $97.000 $104.270 $115.000
PAVEMENT SEALER (UTURN ARROW)
EA 3.000 $90.000 $114.000 $119.950 $125.000 $113.000 $121.470 $130.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 522.000 $0.350 $1.510 $1.600 $1.750 $1.500 $1.610 $1.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,155.000 $0.300 $1.510 $1.600 $1.750 $1.500 $1.610 $1.750
REFL PAV MRKR TY II-C-R
EA 228.000 $3.300 $3.100 $3.200 $3.500 $3.000 $3.220 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 2,200.000 $0.500 $0.550 $0.550 $0.600 $0.500 $0.530 $0.600
ELIM EXT PAV MRK & MRKS (8")
LF 2,748.000 $0.800 $1.100 $1.050 $1.200 $1.000 $1.070 $1.150
ELIM EXT PAV MRK & MRKS (24")
LF 112.000 $4.000 $4.500 $4.250 $4.500 $4.000 $4.300 $5.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,500.000 $5,000.000 $5,308.600 $2,500.000 $10,101.010 $5,375.000 $5,800.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $670.000 $12,000.000 $10,617.250 $18,000.000 $10,101.010 $10,750.000 $11,500.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $250.000 $221.000 $233.600 $225.000 $222.220 $236.500 $255.000
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $250.000 $221.000 $233.600 $225.000 $222.220 $236.500 $255.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $250.000 $221.000 $233.600 $225.000 $222.220 $236.500 $255.000
VEH SIG SEC (12")LED(YEL ARW)
EA 6.000 $250.000 $221.000 $233.600 $225.000 $222.220 $236.500 $255.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $250.000 $221.000 $233.600 $225.000 $222.220 $236.500 $255.000
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $250.000 $221.000 $233.600 $225.000 $222.220 $236.500 $255.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $530.000 $810.000 $849.400 $400.000 $808.080 $860.000 $925.000
BACK PLATE (12")(3 SEC)
EA 14.000 $80.000 $76.000 $79.650 $100.000 $75.760 $80.620 $87.000
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 2,078.000 $1.650 $1.550 $1.600 $1.500 $1.520 $1.610 $2.000
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
LF 3,118.000 $0.900 $1.400 $1.450 $1.250 $1.360 $1.450 $2.000
INS TRF SIG PL AM (S)STR(TY A)
EA 1.000 $1,950.000 $4,500.000 $4,246.900 $5,000.000 $4,040.400 $4,300.000 $4,600.000
INS TRF SIG PL AM(S)2 ARM(55-40')
EA 1.000 $18,000.000 $30,000.000 $30,259.100 $30,000.000 $28,787.880 $30,637.500 $33,000.000
PED POLE ASSEMBLY
EA 3.000 $1,475.000 $1,900.000 $1,937.650 $750.000 $1,843.430 $1,961.870 $2,100.000
PEDESTRIAN PUSH BUTTON POLE
EA 6.000 $1,650.000 $1,900.000 $1,937.650 $1,250.000 $1,843.440 $1,961.870 $2,100.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $890.000 $950.000 $1,003.350 $850.000 $954.550 $1,015.870 $1,100.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $2,850.000 $4,500.000 $4,315.900 $3,000.000 $4,106.060 $4,369.870 $4,700.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 10.000 $510.000 $155.000 $159.250 $100.000 $151.520 $161.250 $175.000
MEMBRANE UNDERSEAL
GAL 5,386.000 $5.820 $0.000 $0.000 $0.010 $0.000 $0.000 $2.700
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $90.000 $100.000 $79.650 $110.000 $75.000 $135.000 $175.000
ITS COM CBL (UNDRGRND)(22 AWG/6 PR)
LF 985.000 $2.320 $7.200 $7.600 $7.000 $7.220 $7.680 $8.500
ITS COM CBL (UNDRGRND)(22 AWG/25 PR)
LF 685.000 $4.490 $9.000 $9.450 $9.000 $8.990 $9.560 $10.300
FO CBL (144 SMF)(AERIAL)
LF 1,140.000 $9.250 $10.300 $10.900 $12.000 $10.350 $11.010 $12.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 2.000 $2,619.000 $4,500.000 $4,246.900 $3,500.000 $4,040.410 $4,300.000 $4,700.000
REMOVE FIBER OPTIC CABLE
LF 1,140.000 $1.880 $1.760 $1.850 $1.250 $1.770 $1.880 $2.000
RADAR PRESENCE DETECTOR
EA 6.000 $6,700.000 $7,000.000 $7,065.750 $7,500.000 $6,722.220 $7,154.120 $7,700.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 3,015.000 $3.100 $2.760 $2.900 $2.500 $2.780 $2.950 $3.200
CONDUIT (PREPARE)
LF 775.000 $1.850 $5.100 $5.300 $3.000 $5.050 $5.370 $5.850
GROUND BOX (PREPARE)
EA 7.000 $135.000 $320.000 $334.450 $250.000 $318.180 $338.620 $365.000
RADAR ADVANCED DETECTION DEVICE
EA 4.000 $7,250.000 $7,500.000 $7,065.750 $7,500.000 $6,722.220 $7,154.120 $7,700.000
ITS RADIO (INSTALL ONLY)
EA 2.000 $2,795.730 $2,300.000 $2,229.600 $2,500.000 $2,121.210 $2,257.500 $2,450.000
REMOVE EXISTING LANE CONTROL SYSTEM
EA 1.000 $5,986.000 $2,000.000 $1,863.300 $3,500.000 $1,772.730 $1,886.620 $2,100.000
REMOVE EXIST FIBER HUB
EA 1.000 $2,925.000 $3,800.000 $3,716.050 $2,000.000 $3,535.350 $3,762.500 $4,100.000
ETHERNET SWITCH (INSTALL ONLY)
EA 2.000 $894.330 $700.000 $690.100 $1,000.000 $656.570 $698.750 $755.000
TERMINAL SERVER (INSTALL ONLY)
EA 1.000 $753.410 $700.000 $690.100 $1,000.000 $656.570 $698.750 $755.000
TMA (MOBILE OPERATION)
DAY 25.000 $175.000 $400.000 $577.050 $350.000 $460.000 $750.000 $330.000
1
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 5,386.000 $4.000 $2.650 $3.100 $3.250 $2.750 $3.000 $0.000
1
AGGR (TY-B GR-5)
CY 140.000 $70.000 $80.000 $95.550 $90.000 $80.000 $75.000 $0.000
Totals: $1,485,091.800 $1,598,613.310 $1,699,448.099 $1,764,621.810 $1,776,877.200 $1,982,662.410 $2,054,171.450