Show Job Controls
Bid Cobra

BEXAR IH 10 (0025-02-216)

Items: 65

County: BEXAR
Length: N/A
Highway: IH 10
District: SAN ANTONIO
Control Number: 0025-02-216
DBE Goal: N/A
Project: C 25-2-216
Guaranty: N/A
Time: 183 WORKING DAYS
Engineer's Estimate: $6,315,722.65
Date: 07/10/2018 (7 years ago)
Contract Number: N/A
Type: UPGRADE ILLUMINATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$6,315,722.65
Over/Under Est: -2.34% -$147,813.31
$6,259,230.72
Over/Under Est: -0.89% -$56,491.93
Amt Left: 1.48% $91,321.38
$6,576,928.60
Over/Under Est: 4.14% $261,205.95
Amt Left: 6.63% $409,019.26
Delta: -5.08% -$317,697.88

Bid Items & Bid Tabulations

65 Total 0 of 65
BEXAR  |  IH 10  |  SAN ANTONIO  |  0025-02-216  |  07/10/2018  |  $6,315,722.65  |  C 25-2-216  |  UPGRADE ILLUM  |  183 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
THE LEVY COMPANY, INC.
MICA CORPORATION
PREPARING ROW
STA 50.000 $1,000.000 $824.750 $449.940 $791.100
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 250.000 $12.000 $32.980 $92.000 $131.250
BLOCK SODDING
SY 3,246.000 $5.000 $4.900 $4.950 $4.160
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 4,500.000 $0.250 $0.240 $0.170 $0.200
VEGETATIVE WATERING
MG 120.900 $35.000 $54.750 $278.070 $85.720
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,125.000 $1.500 $1.650 $1.650 $1.520
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 1,361.000 $3.500 $33.050 $23.120 $21.000
DRILL SHAFT (HIGH MAST POLE) (54 IN)
LF 136.000 $390.000 $442.500 $396.970 $311.600
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 680.000 $420.000 $520.250 $457.100 $377.650
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 20.000 $225.000 $157.250 $180.360 $126.950
RIPRAP (CONC)(CL B)
CY 1,774.000 $400.000 $334.960 $298.970 $441.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,465.000 $400.000 $378.960 $340.210 $454.650
RAIL (TY T631)
LF 200.000 $70.000 $72.980 $65.000 $69.150
MOBILIZATION
LS 1.000 $588,235.000 $602,195.750 $358,315.500 $498,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $15,000.000 $17,642.710 $18,353.420 $26,320.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 45.000 $28.000 $30.250 $27.000 $31.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 347.000 $30.000 $31.840 $28.450 $36.900
ROCK FILTER DAMS (REMOVE)
LF 392.000 $7.000 $6.050 $5.000 $6.300
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $20.000 $16.330 $14.350 $17.170
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $6.000 $6.600 $5.500 $6.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,540.000 $2.000 $2.200 $2.000 $2.470
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,540.000 $0.450 $0.280 $0.250 $0.260
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 27,151.000 $4.000 $3.520 $3.250 $3.360
BIODEG EROSN CONT LOGS (REMOVE)
LF 27,151.000 $0.800 $0.830 $0.750 $0.790
MTL W-BEAM GD FEN (TIM POST)
LF 26,475.000 $19.000 $16.220 $20.400 $25.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 22.000 $1,600.000 $1,676.950 $1,560.000 $1,600.200
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 34.000 $900.000 $1,017.480 $895.000 $1,144.500
MTL BM GD FEN TRANS (NON - SYM)
EA 19.000 $800.000 $780.980 $705.000 $740.250
REMOVE METAL BEAM GUARD FENCE
LF 26,475.000 $2.000 $1.650 $1.500 $1.050
REMOVE TERMINAL ANCHOR SECTION
EA 34.000 $200.000 $140.780 $125.000 $131.250
GUARDRAIL END TREATMENT (INSTALL)
EA 36.000 $2,300.000 $1,913.980 $2,635.000 $1,821.750
GUARDRAIL END TREATMENT (REMOVE)
EA 36.000 $300.000 $225.480 $225.000 $210.000
REMOVE RD IL ASM (BRIDGE MOUNT)
EA 80.000 $300.000 $219.000 $647.810 $438.350
REMOVE RD IL ASM (SHOE-BASE)
EA 14.000 $350.000 $219.000 $328.000 $438.350
REMOVE RD IL ASM (TRANS-BASE)
EA 357.000 $230.000 $219.000 $737.000 $552.700
REPLACE LUMINAIRE W/LED (150W EQ)
EA 4.000 $1,200.000 $478.900 $444.090 $505.900
REPLACE LUMINAIRE W/LED (250W EQ)
EA 8.000 $1,000.000 $524.900 $447.240 $625.600
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 56.000 $1,300.000 $617.150 $1,349.050 $1,055.100
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 2.000 $3,500.000 $3,354.650 $3,154.870 $3,083.000
HI MST IL POLE (125 FT)( 80 MPH)
EA 6.000 $18,000.000 $22,679.300 $22,868.130 $20,162.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 8.000 $24,000.000 $26,751.450 $26,123.460 $23,050.000
HI MST IL POLE (175 FT)( 80 MPH)
EA 20.000 $35,000.000 $32,035.700 $32,106.320 $28,356.000
CONDT (PVC) (SCH 40) (2")
LF 12,656.000 $6.500 $7.900 $6.170 $6.530
CONDT (PVC) (SCH 40) (2") (BORE)
LF 5,174.000 $22.000 $21.100 $31.710 $18.150
CONDT (PVC) (SCH 80) (2") (BORE)
LF 4,133.000 $30.000 $21.490 $31.110 $16.020
CONDT (PVC) (SCH 80) (3") (BORE)
LF 465.000 $45.000 $23.330 $28.530 $10.070
CONDT (RM) (1")
LF 4,585.000 $21.000 $17.450 $26.670 $24.630
ELEC CONDR (NO.12) BARE
LF 4,990.000 $1.000 $0.960 $0.980 $0.750
ELEC CONDR (NO.12) INSULATED
LF 10,012.000 $1.100 $0.960 $0.910 $0.750
ELEC CONDR (NO.8) BARE
LF 1,591.000 $0.950 $1.050 $0.980 $1.000
ELEC CONDR (NO.8) INSULATED
LF 14,256.000 $1.100 $1.150 $0.940 $1.100
ELEC CONDR (NO.6) BARE
LF 20,432.000 $1.100 $1.190 $1.220 $1.130
ELEC CONDR (NO.6) INSULATED
LF 41,146.000 $1.150 $1.290 $1.180 $1.240
GROUND BOX TY D (162922)
EA 34.000 $700.000 $890.200 $602.660 $669.250
GROUND BOX TY D (162922)W/APRON
EA 179.000 $880.000 $890.200 $780.030 $1,106.800
REMOVE ELECTRICAL SERVICES
EA 10.000 $300.000 $876.000 $149.770 $210.000
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
EA 1.000 $7,000.000 $6,061.900 $5,905.690 $6,332.000
ELC SRV TY A 240/480 100(NS)SS(E)TP(O)
EA 13.000 $5,000.000 $6,052.700 $4,396.130 $5,369.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 254.000 $25.000 $17.030 $16.500 $13.650
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 94.000 $35.000 $17.030 $16.500 $13.650
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,000.000 $137.250 $12,413.700 $5,946.000
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
EA 3.000 $27,000.000 $25,375.000 $26,403.730 $19,399.100
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 26.000 $24,000.000 $25,720.000 $26,480.670 $19,266.000
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
EA 5.000 $24,000.000 $26,525.000 $26,403.730 $19,095.000
TMA (STATIONARY)
DAY 227.000 $150.000 $219.750 $207.910 $998.760
Totals: $6,315,722.650 $6,167,909.345 $6,259,230.723 $6,576,928.608