Bid Cobra

BEXAR US 90 (0024-08-135)

Items: 109

County: BEXAR
Length: N/A
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-08-135
DBE Goal: N/A
Project: NH 2020(676)
Guaranty: N/A
Time: 138 WORKING DAYS
Engineer's Estimate: $5,061,246.81
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: BASE REPAIR, MILL, INLAY & PV MRKS ON FRONTAGE RDS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,061,246.81
$4,775,401.10
Over/Under Est: -5.65% -$285,845.71
Over/Under Est: -3.57% -$180,501.90
Amt Left: 2.21% $105,343.81
Over/Under Est: -0.83% -$41,842.00
Amt Left: 5.11% $244,003.71
Delta: -2.84% -$138,659.90
Over/Under Est: 16.86% $853,101.09
Amt Left: 23.85% $1,138,946.80
Delta: -17.83% -$894,943.09
$5,940,437.55
Over/Under Est: 17.37% $879,190.74
Amt Left: 24.4% $1,165,036.45
Delta: -0.44% -$26,089.65

Bid Items & Bid Tabulations

109 Total 0 of 109
BEXAR  |  US 90  |  SAN ANTONIO  |  0024-08-135  |  03/05/2020  |  $5,061,246.81  |  NH 2020(676)  |  BASE REPAIR, MILL, INLAY & PV MRKS O...  |  138 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
CLARK CONSTRUCTION OF TEXAS, INC.
LONE STAR PAVING COMPANY
DEAN WORD COMPANY, LTD.
AUSTIN MATERIALS, LLC
PREPARING ROW
STA 179.300 $1,643.500 $175.000 $50.000 $150.000 $384.510 $280.000
REMOVING CONCRETE(MOW STRIP)
LF 520.000 $7.400 $7.750 $29.000 $10.000 $12.780 $15.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 86.000 $9.000 $325.000 $52.500 $9.000 $48.020 $200.000
BLOCK SODDING
SY 3,909.000 $3.200 $6.000 $9.000 $5.000 $5.824 $5.250
VEGETATIVE WATERING
MG 62.000 $21.500 $170.000 $240.000 $50.000 $49.550 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 8,992.000 $36.500 $31.000 $35.820 $40.000 $37.184 $34.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 30,239.000 $41.500 $41.000 $42.810 $51.000 $45.644 $41.000
PLANE ASPH CONC PAV (2")
SY 146,738.000 $1.050 $1.500 $1.100 $1.000 $2.017 $2.500
RIPRAP (MOW STRIP)(4 IN)
CY 514.000 $410.000 $440.000 $425.000 $450.000 $545.400 $500.000
CLEANING EXISTING JOINTS
LF 804.000 $9.000 $8.850 $23.340 $5.000 $5.200 $5.100
HEADER TYPE EXPANSION JOINT
CF 68.000 $350.000 $750.000 $691.220 $875.000 $847.600 $820.000
JOINT SEALANT
LF 804.000 $15.000 $15.500 $17.680 $10.000 $10.400 $10.500
MOBILIZATION
LS 1.000 $456,203.350 $180,000.000 $260,000.690 $100,000.000 $607,305.099 $591,700.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,275.000 $4,500.000 $1,700.000 $20,000.000 $4,878.645 $65,000.000
SANDBAGS FOR EROSION CONTROL
EA 16.000 $6.500 $6.000 $16.240 $50.000 $6.760 $6.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 11,714.000 $4.050 $4.500 $1.790 $4.000 $4.420 $4.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 11,714.000 $0.600 $1.000 $1.080 $0.980 $0.780 $1.050
MTL W-BEAM GD FEN (TIM POST)
LF 10,453.000 $20.150 $21.300 $20.250 $18.000 $18.980 $24.500
TERMINAL ANCHOR SECTION
EA 1.000 $1,875.080 $1,100.000 $1,000.000 $1,000.000 $826.800 $780.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,850.000 $1,800.000 $1,950.000 $1,790.000 $2,268.200 $1,650.000
SHORT RADIUS
LF 25.000 $38.000 $27.000 $25.000 $25.000 $34.320 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 31.000 $877.500 $1,385.000 $1,250.000 $1,350.000 $910.000 $1,000.000
MTL BEAM GD FEN TRANS (TL2) 28"
EA 6.000 $1,500.000 $665.000 $600.000 $650.000 $728.000 $785.000
MTL BM GD FEN TRANS (31"-28")
EA 6.000 $500.000 $555.000 $500.000 $540.000 $728.000 $805.000
REMOVE METAL BEAM GUARD FENCE
LF 9,500.000 $1.400 $2.200 $2.000 $2.000 $1.040 $2.550
REMOVE TERMINAL ANCHOR SECTION
EA 38.000 $135.000 $220.000 $200.000 $210.000 $140.400 $155.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $200.000 $220.000 $200.000 $210.000 $145.600 $202.000
GUARDRAIL END TREATMENT (INSTALL)
EA 34.000 $2,415.000 $2,800.000 $2,600.000 $2,775.000 $2,548.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 22.000 $200.000 $220.000 $200.000 $215.000 $171.600 $255.000
ALUMINUM SIGNS (TY A)
SF 8.000 $30.000 $15.500 $13.000 $15.000 $13.520 $13.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $500.000 $490.000 $506.500 $480.000 $462.800 $510.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $550.000 $540.000 $655.450 $525.000 $508.560 $670.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 13.000 $500.000 $550.000 $584.630 $530.000 $516.880 $595.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $700.000 $590.000 $657.180 $580.000 $553.280 $665.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 5.000 $500.000 $540.000 $525.150 $540.000 $509.600 $530.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 3.000 $550.000 $600.000 $631.650 $800.000 $564.720 $635.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 2.000 $650.000 $650.000 $601.750 $800.000 $609.440 $605.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $750.000 $860.000 $851.210 $850.000 $806.000 $855.000
REMOVE SM RD SN SUP&AM
EA 30.000 $85.000 $88.000 $85.000 $84.000 $83.200 $87.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 71.000 $20.500 $64.000 $16.750 $15.000 $18.720 $38.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 83.000 $17.000 $64.000 $16.750 $15.000 $18.720 $38.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 9,545.000 $0.650 $0.400 $0.650 $0.440 $0.416 $0.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 21,283.000 $0.600 $0.400 $0.650 $0.440 $0.416 $0.400
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 6,121.000 $1.300 $1.000 $1.300 $1.000 $1.040 $1.050
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 857.000 $7.800 $4.500 $6.500 $3.500 $4.680 $4.550
WK ZN PAV MRK REMOV (W)(ARROW)
EA 33.000 $150.000 $150.000 $65.000 $155.000 $156.000 $155.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 7.000 $250.000 $250.000 $85.000 $270.000 $260.000 $255.000
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 6.000 $785.000 $550.000 $500.000 $585.000 $572.000 $555.000
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 9.000 $785.000 $550.000 $750.000 $585.000 $572.000 $555.000
WK ZN PAV MRK REMOV (W)(UTURN ARROW)
EA 4.000 $405.000 $300.000 $95.000 $320.000 $312.000 $310.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 37.000 $150.000 $150.000 $125.000 $535.000 $156.000 $155.000
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 78.000 $37.500 $44.000 $25.000 $150.000 $45.760 $45.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 30,222.000 $0.550 $0.400 $0.650 $0.440 $0.416 $0.400
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 3,634.000 $1.200 $1.000 $0.650 $1.000 $1.040 $1.050
WK ZN PAV MRK REMOV (Y)8"(SLD)
LF 553.000 $1.400 $1.000 $1.300 $1.000 $1.040 $1.050
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 113.000 $6.000 $5.000 $6.500 $5.000 $5.200 $5.250
WK ZN PAV MRK REMOV (Y)(MED NOSE)
EA 3.000 $300.000 $300.000 $300.000 $325.000 $312.000 $305.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,314.000 $1.250 $1.000 $1.000 $1.250 $1.434 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,121.000 $0.850 $0.670 $0.950 $0.740 $0.697 $0.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 857.000 $6.000 $5.000 $5.500 $5.000 $5.200 $5.250
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 33.000 $115.000 $137.000 $95.000 $145.000 $142.480 $140.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 7.000 $185.000 $179.000 $125.000 $185.000 $186.160 $180.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 4.000 $200.000 $233.000 $125.000 $245.000 $242.320 $235.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 1.000 $270.000 $377.000 $250.000 $400.000 $392.080 $385.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 37.000 $145.000 $148.000 $165.000 $150.000 $153.920 $150.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 6.000 $780.000 $1,100.000 $450.000 $1,125.000 $1,144.000 $1,150.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 9.000 $750.000 $1,100.000 $750.000 $1,125.000 $1,144.000 $1,150.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 78.000 $35.000 $44.000 $25.000 $45.000 $45.760 $46.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 553.000 $1.200 $0.700 $0.950 $0.780 $0.728 $0.750
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 113.000 $5.700 $5.000 $5.500 $5.000 $5.200 $5.250
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 3.000 $300.000 $344.000 $450.000 $375.000 $357.760 $350.000
PAVEMENT SEALER 4"
LF 61,050.000 $0.100 $0.120 $0.200 $0.130 $0.125 $0.120
PAVEMENT SEALER 6"
LF 3,634.000 $0.170 $0.200 $0.300 $0.220 $0.208 $0.200
PAVEMENT SEALER 8"
LF 6,674.000 $0.350 $0.370 $0.400 $0.410 $0.385 $0.400
PAVEMENT SEALER 24"
LF 970.000 $2.300 $2.440 $3.250 $2.000 $2.538 $2.500
PAVEMENT SEALER (ARROW)
EA 33.000 $36.000 $63.000 $65.000 $65.000 $65.520 $65.000
PAVEMENT SEALER (WORD)
EA 37.000 $40.000 $63.000 $75.000 $65.000 $65.520 $65.000
PAVEMENT SEALER (MED NOSE)
EA 3.000 $110.000 $188.000 $250.000 $190.000 $195.520 $190.000
PAVEMENT SEALER (DBL ARROW)
EA 7.000 $70.000 $110.000 $85.000 $120.000 $114.400 $115.000
PAVEMENT SEALER (UTURN ARROW)
EA 4.000 $50.000 $150.000 $95.000 $150.000 $156.000 $155.000
PAVEMENT SEALER (LNDP ARROW)
EA 1.000 $105.000 $150.000 $125.000 $150.000 $156.000 $155.000
PAVEMENT SEALER (ENTR GORE)
EA 6.000 $280.000 $300.000 $200.000 $325.000 $312.000 $305.000
PAVEMENT SEALER (EXIT GORE)
EA 9.000 $280.000 $300.000 $400.000 $325.000 $312.000 $305.000
PAVEMENT SEALER (YLD TRI)
EA 78.000 $16.000 $22.000 $20.000 $20.000 $22.880 $22.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 9,545.000 $0.370 $0.340 $0.350 $0.380 $0.354 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 21,283.000 $0.300 $0.330 $0.350 $0.370 $0.343 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 30,222.000 $0.300 $0.330 $0.350 $0.370 $0.343 $0.350
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 3,634.000 $0.500 $0.550 $0.450 $0.610 $0.572 $0.600
REFL PAV MRKR TY I-C
EA 263.000 $3.250 $3.000 $5.000 $3.000 $3.120 $3.250
REFL PAV MRKR TY II-A-A
EA 93.000 $2.800 $3.000 $5.000 $3.000 $3.120 $3.250
REFL PAV MRKR TY II-C-R
EA 825.000 $3.500 $3.000 $5.000 $3.000 $3.120 $3.250
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 1.000 $11,200.000 $31,000.000 $28,500.000 $29,000.000 $29,640.000 $30,000.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $15,000.000 $2,675.000 $2,420.000 $2,500.000 $2,516.800 $2,500.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $650.000 $875.000 $790.000 $850.000 $821.600 $800.000
PED POLE ASSEMBLY
EA 1.000 $1,900.000 $785.000 $710.000 $750.000 $738.400 $725.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $820.000 $480.000 $435.000 $475.000 $452.400 $440.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 7.000 $60.000 $27.000 $25.000 $25.000 $26.000 $26.000
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $600.000 $375.000 $340.000 $360.000 $353.600 $345.000
REMOVAL OF SIGNAL POLE ASSM
EA 1.000 $4,000.000 $4,250.000 $3,850.000 $4,175.000 $4,004.000 $4,000.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 6.000 $300.000 $145.000 $130.000 $135.000 $135.200 $135.000
INSTALL PED POLE ASSM W/O FOUNDATION
EA 1.000 $700.000 $665.000 $600.000 $650.000 $624.000 $605.000
SP MIXES SP-C SAC-B PG70-22
TON 16,875.000 $78.000 $83.000 $88.070 $80.000 $100.972 $80.000
UNDERSEAL COURSE
GAL 29,348.000 $3.000 $3.000 $3.250 $3.650 $7.506 $4.000
STENCILING PERMANENT STRUCTURE NUMBERS
EA 4.000 $1,500.000 $200.000 $250.000 $900.000 $540.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 138.000 $100.000 $75.000 $75.000 $95.000 $81.000 $65.000
TMA (STATIONARY)
DAY 163.000 $191.000 $200.000 $205.000 $25.000 $237.600 $250.000
TMA (MOBILE OPERATION)
DAY 18.000 $200.000 $200.000 $300.000 $275.000 $486.000 $300.000
RVDS(PRESENCE DETECTION ONLY)
EA 12.000 $5,965.000 $7,400.000 $6,700.000 $6,775.000 $6,968.000 $6,850.000
RVDS(ADVANCE DETECTION ONLY)
EA 8.000 $6,730.000 $9,000.000 $8,200.000 $8,300.000 $8,528.000 $8,350.000
Totals: $5,061,246.810 $4,775,401.100 $4,880,744.910 $5,019,404.810 $5,914,348.003 $5,940,437.550