BEXAR US 90 (0024-07-069)

Items: 105

County: BEXAR
Length: N/A
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-07-069
DBE Goal: 400.0%
Project: STP 2024(782)HES
Guaranty: N/A
Time: 307 WORKING DAYS
Engineer's Estimate: $8,187,290.85
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
CARLOS ARCILA
DANNY GALLEGOS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$8,187,290.85
$6,869,481.90
Over/Under Est: -16.1% -$1,317,808.95
$7,731,174.28
Over/Under Est: -5.57% -$456,116.57
Amt Left: 12.54% $861,692.38
Over/Under Est: 0.34% $27,513.15
Amt Left: 19.58% $1,345,322.10
Delta: -6.26% -$483,629.72
Over/Under Est: 7.85% $642,417.13
Amt Left: 28.54% $1,960,226.08
Delta: -7.49% -$614,903.98
Over/Under Est: 9.55% $781,709.15
Amt Left: 30.56% $2,099,518.10
Delta: -1.58% -$139,292.02
Over/Under Est: 19.41% $1,588,897.26
Amt Left: 42.31% $2,906,706.21
Delta: -9.00% -$807,188.11
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 9.10% $696,329.80
BEAIRD DRILLING SERVICES, INC. 3.86% $295,366.27
FRANK JR REINFORCEMENT LLC 2.36% $180,586.63
LONE STAR EROSION CONTROL 2.08% $159,161.10
A3 CONSTRUCTION INC. 0.95% $72,693.77
STRATA FOUNDATION DRILLING, LLC 0.92% $70,398.18
FLASHER EQUIPMENT COMPANY 0.48% $36,729.48
EGGEMEYER LAND CLEARING, LLC 0.23% $17,599.54
A K FUQUAY CONSTRUCTION 0.15% $11,477.96
SCOTT DERR PAINTING CO, LLC 0.09% $6,886.78
MONTELONGO'S CONCRETE 0.00% $0.00
HOUSTON SAWING & DRILLING 0.00% $0.00
Total: 20.22% $1,547,229.51

Bid Items & Bid Tabulations

105 Total 0 of 105
BEXAR  |  US 90  |  SAN ANTONIO  |  0024-07-069  |  03/05/2024  |  $8,187,290.85  |  STP 2024(782)HES  |  HAZARD ELIM & SAFETY  |  307 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J3 COMPANY, LLC
RELMCO, INC.
CAPITAL EXCAVATION COMPANY
STERLING DELAWARE HOLDING COMPANY
HARPER BROTHERS CONSTRUCTION LLC
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 28.000 $3,000.000 $1,000.000 $15,000.000 $1,330.000 $16,951.000 $28,000.000 $4,940.000
REMOVING TRT BASE AND ASPH PAV(13"-17")
SY 279.000 $15.000 $25.000 $50.000 $23.000 $51.000 $32.000 $23.600
EXCAVATION (ROADWAY)
CY 3,667.000 $16.000 $15.000 $15.000 $10.600 $15.000 $11.000 $11.500
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 2,616.000 $16.000 $55.000 $35.000 $48.010 $62.000 $26.000 $35.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 111,033.000 $15.000 $13.000 $13.000 $17.550 $18.000 $17.500 $23.960
COMPOST MANUF TOPSOIL (4")
SY 24,479.000 $4.500 $2.000 $3.000 $3.250 $3.000 $2.000 $2.300
STRAW OR HAY MULCHING
SY 24,479.000 $2.500 $0.380 $0.350 $0.750 $0.470 $0.380 $0.400
DRILL SEED (TEMP)(WARM OR COOL)
SY 24,479.000 $0.250 $0.150 $0.300 $0.250 $0.150 $0.220 $0.230
DRILL SEEDING (PERM)(WARM OR COOL)
SY 24,479.000 $0.300 $0.180 $0.350 $0.300 $0.180 $0.320 $0.340
VEGETATIVE WATERING
MG 767.000 $75.000 $32.000 $35.000 $50.200 $33.000 $20.000 $44.200
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
CY 1,756.000 $60.000 $70.000 $78.000 $83.800 $101.000 $49.000 $73.600
LIME (HYDRATED LIME (SLURRY))
TON 107.000 $350.000 $320.000 $35.000 $340.000 $351.000 $303.000 $399.000
LIME TRT (EXST MATL) (12")
SY 2,457.000 $5.000 $15.000 $5.000 $21.250 $18.000 $8.000 $8.100
PRIME COAT(MC-30 OR AE-P)
GAL 1,526.000 $4.150 $6.000 $4.670 $4.500 $5.000 $4.000 $5.900
CEM STABIL BKFL
CY 301.000 $160.000 $150.000 $145.000 $213.000 $156.000 $163.000 $186.000
DRILL SHAFT (18 IN)
LF 240.000 $160.000 $150.000 $80.000 $137.000 $101.000 $83.000 $138.000
DRILL SHAFT (36 IN)
LF 720.000 $370.000 $250.000 $250.000 $255.000 $205.000 $239.000 $265.000
DRILL SHAFT (48 IN)
LF 540.000 $500.000 $350.000 $450.000 $369.000 $303.000 $489.000 $381.000
CL C CONC (ABUT)
CY 75.400 $1,600.000 $1,000.000 $966.000 $1,140.000 $1,840.000 $1,502.000 $1,020.000
CL C CONC (CAP)
CY 153.600 $1,700.000 $1,000.000 $799.400 $1,240.000 $1,300.000 $1,596.000 $1,580.000
CL C CONC (COLUMN)
CY 142.200 $1,550.000 $1,200.000 $1,052.800 $1,390.000 $1,700.000 $1,886.000 $1,980.000
CL C CONC (RAIL FOUNDATION)
CY 54.000 $530.000 $750.000 $854.000 $750.000 $680.000 $667.000 $745.000
REINF CONC SLAB
SF 22,000.000 $22.500 $22.000 $24.570 $23.600 $28.000 $27.000 $27.500
APPROACH SLAB
CY 87.000 $700.000 $500.000 $834.400 $1,070.000 $620.000 $844.000 $935.000
PRESTR CONC GIRDER (TX54)
LF 2,388.260 $250.000 $220.000 $225.000 $185.000 $230.000 $207.000 $242.000
RIPRAP (CONC)(4 IN)
CY 325.000 $600.000 $400.000 $415.000 $650.000 $580.000 $560.000 $726.000
RIPRAP (CONC)(5 IN)
CY 479.000 $600.000 $400.000 $415.000 $540.000 $565.000 $534.000 $752.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 394.000 $500.000 $400.000 $415.000 $710.000 $577.000 $613.000 $765.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 2.000 $225.000 $350.000 $1,500.000 $1,340.000 $360.000 $800.000 $1,060.000
RIPRAP (CONC)(FLUME)
CY 8.000 $480.000 $500.000 $1,200.000 $940.000 $533.000 $565.000 $1,090.000
STR STEEL (MISC NON - BRIDGE)
LB 420.000 $23.000 $55.000 $30.000 $19.400 $20.000 $18.000 $19.400
RAIL (TY T411)(MOD)
LF 436.000 $250.000 $200.000 $150.000 $234.000 $208.000 $267.000 $178.000
RAIL (TY SSTR)(MOD)
LF 38.000 $65.000 $195.000 $215.000 $360.000 $128.000 $299.000 $248.000
RAIL (TY C411) (MOD)
LF 780.000 $250.000 $200.000 $140.000 $215.000 $218.000 $290.000 $175.000
RAIL (TY C402) (MOD-1)
LF 440.000 $250.000 $260.000 $140.000 $260.000 $175.000 $182.000 $225.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 162.000 $290.000 $200.000 $190.000 $260.000 $220.000 $204.000 $227.000
RC PIPE (CL III)(24 IN)
LF 124.000 $200.000 $150.000 $80.000 $111.000 $176.000 $94.000 $149.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,600.000 $5,000.000 $1,500.000 $2,840.000 $2,295.000 $2,559.000 $3,550.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,700.000 $5,000.000 $1,500.000 $2,900.000 $2,450.000 $2,701.000 $3,580.000
CLEAN EXIST CULVERTS
EA 3.000 $8,000.000 $6,500.000 $2,000.000 $1,430.000 $2,470.000 $3,372.000 $3,790.000
MOBILIZATION
LS 1.000 $740,200.000 $374,000.000 $800,000.000 $695,000.000 $880,000.000 $800,561.550 $815,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $10,000.000 $10,000.000 $6,500.000 $6,600.000 $6,490.000 $10,000.000 $6,580.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 120.000 $36.000 $30.000 $40.260 $25.750 $22.140 $35.000 $36.500
ROCK FILTER DAMS (REMOVE)
LF 120.000 $13.000 $15.000 $19.800 $15.600 $13.440 $9.000 $9.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $27.000 $16.000 $51.960 $17.900 $15.390 $19.000 $20.300
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $9.000 $8.000 $19.800 $7.450 $6.410 $5.000 $5.200
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,917.000 $4.100 $3.000 $4.400 $2.400 $5.000 $4.000 $3.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,917.000 $1.000 $2.000 $0.830 $1.550 $1.340 $0.250 $0.260
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 24.000 $9.000 $10.000 $4.400 $10.100 $8.710 $8.000 $8.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 24.000 $3.500 $5.000 $0.820 $2.050 $1.750 $2.000 $2.100
CONSTRUCTING DETOURS
SY 3,946.000 $65.000 $85.000 $79.200 $93.400 $100.000 $80.000 $82.600
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,450.000 $55.000 $30.000 $56.000 $86.000 $65.000 $34.000 $83.300
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,480.000 $12.000 $12.000 $10.000 $11.650 $5.000 $10.000 $14.200
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,800.000 $18.000 $12.000 $15.000 $22.250 $11.000 $12.000 $19.700
CONC CURB (TY I)
LF 1,001.000 $15.000 $20.000 $25.000 $30.100 $10.000 $10.000 $38.900
CONC SIDEWALKS (6")
SY 443.000 $77.000 $55.000 $65.000 $73.800 $65.000 $85.000 $95.300
MTL W-BEAM GD FEN (STEEL POST)
LF 150.000 $30.000 $35.000 $43.520 $43.150 $28.840 $30.000 $30.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,600.000 $2,200.000 $3,528.520 $2,930.000 $2,092.720 $2,211.000 $2,560.000
CABLE BARRIER TERMINAL SECTION (TL-3)
EA 1.000 $3,300.000 $5,500.000 $1,500.000 $3,610.000 $5,558.450 $1,500.000 $5,290.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,400.000 $4,000.000 $4,121.470 $3,370.000 $2,931.540 $3,097.000 $3,100.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $750.000 $400.000 $800.000 $790.000 $366.460 $387.000 $388.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 7.000 $8,200.000 $8,200.000 $8,000.000 $8,800.000 $7,718.330 $8,153.000 $8,170.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $750.000 $695.000 $779.200 $750.000 $695.000 $695.000 $736.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $900.000 $845.000 $1,190.290 $910.000 $845.000 $845.000 $894.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,200.000 $1,175.000 $1,033.410 $1,270.000 $1,175.000 $1,175.000 $1,240.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,500.000 $2,580.000 $5,364.130 $2,790.000 $2,580.000 $2,580.000 $2,730.000
REMOVE SM RD SN SUP&AM
EA 3.000 $120.000 $95.000 $104.500 $103.000 $95.000 $95.000 $101.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 1.000 $400.000 $360.000 $3,170.500 $390.000 $360.000 $360.000 $381.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 7.000 $30.000 $22.000 $13.200 $28.400 $22.000 $22.000 $23.300
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 7.000 $30.000 $22.000 $13.200 $28.400 $22.000 $22.000 $23.300
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 2.000 $35.000 $28.000 $39.600 $44.350 $28.000 $28.000 $29.600
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 2.000 $30.000 $28.000 $39.600 $44.350 $28.000 $28.000 $29.600
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $120.000 $118.000 $61.360 $110.000 $118.000 $118.000 $125.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 789.000 $1.800 $1.000 $1.100 $1.100 $1.000 $0.950 $1.050
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 3,446.000 $1.000 $0.700 $0.770 $0.750 $0.700 $0.950 $0.740
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 342.000 $1.500 $1.500 $1.650 $1.600 $1.500 $3.000 $1.600
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 36.000 $11.000 $9.400 $10.340 $10.150 $9.400 $8.000 $10.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $450.000 $245.000 $269.500 $260.000 $245.000 $350.000 $259.000
PAVEMENT SEALER 6"
LF 5,212.000 $0.600 $0.360 $0.390 $0.400 $0.360 $0.450 $0.380
PAVEMENT SEALER 8"
LF 50.000 $1.000 $0.700 $0.770 $0.750 $0.700 $1.000 $0.740
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 30.000 $0.600 $0.950 $1.040 $1.050 $0.950 $1.000 $1.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 775.000 $0.700 $1.100 $1.210 $1.200 $1.100 $0.900 $1.150
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,798.000 $0.700 $1.000 $1.100 $1.100 $1.000 $1.000 $1.050
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 6,228.000 $1.400 $1.000 $1.100 $1.100 $1.000 $1.000 $1.050
REFL PAV MRKR TY II-C-R
EA 62.000 $5.000 $5.000 $5.500 $5.400 $5.000 $7.000 $5.300
ELIM EXT PAV MRK & MRKS (4")
LF 4,213.000 $0.850 $0.650 $0.710 $0.700 $0.650 $0.750 $0.690
PAV SURF PREP FOR MRK (6")
LF 5,212.000 $0.100 $0.020 $0.020 $0.020 $0.020 $0.100 $0.020
PAV SURF PREP FOR MRK (8")
LF 50.000 $0.600 $0.020 $0.020 $0.020 $0.020 $0.150 $0.020
STRIP MOWING
CYC 7.000 $2,300.000 $2,400.000 $1,500.000 $1,220.000 $3,600.000 $2,345.000 $2,530.000
LITTER REMOVAL
CYC 19.000 $1,900.000 $500.000 $3,500.000 $550.000 $877.000 $1,426.000 $2,390.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 38.000 $1,400.000 $1,000.000 $2,000.000 $270.000 $877.000 $1,426.000 $3,770.000
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 19.000 $700.000 $1,000.000 $2,000.000 $550.000 $877.000 $1,426.000 $3,770.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 19.000 $1,400.000 $1,200.000 $300.000 $480.000 $528.000 $1,245.000 $3,180.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 19.000 $1,400.000 $1,200.000 $1,500.000 $480.000 $528.000 $1,245.000 $3,180.000
POST AND CABLE FENCE (REMOVAL)
LF 1,329.000 $6.000 $5.000 $5.500 $3.550 $3.750 $5.000 $5.300
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 1.000 $350.000 $1,000.000 $483.630 $1,470.000 $873.600 $1,500.000 $476.000
D-GR HMA TY-B PG64-22
TON 1,968.000 $93.000 $115.000 $104.500 $101.000 $84.000 $95.000 $101.000
D-GR HMA TY-C PG70-22
TON 1,727.000 $100.000 $130.000 $129.800 $125.000 $104.000 $118.000 $125.000
TACK COAT
GAL 862.000 $3.800 $6.000 $4.120 $3.950 $4.500 $4.000 $3.950
UNDERSEAL COURSE
GAL 1,477.000 $4.250 $6.000 $4.400 $4.250 $5.500 $4.000 $4.250
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $500.000 $500.000 $540.000 $500.000 $500.000 $237.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 570.000 $70.000 $50.000 $200.000 $19.950 $40.000 $53.000 $68.500
TMA (STATIONARY)
DAY 84.000 $200.000 $400.000 $250.000 $330.000 $149.000 $534.000 $198.000
TMA (MOBILE OPERATION)
DAY 40.000 $300.000 $1,000.000 $250.000 $850.000 $592.000 $450.000 $385.000
TEMP CON EQUIP ALERT SYS
EA 1.000 $27,000.000 $24,000.000 $30,000.000 $29,100.000 $22,000.000 $23,750.000 $40,000.000
Totals: $8,187,290.850 $6,869,481.900 $7,731,174.280 $8,214,804.000 $8,829,707.980 $8,969,000.000 $9,776,188.110