BEXAR IH 35 (0017-10-294)

Items: 55

County: BEXAR
Length: 0.0000 MILES
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-10-294
DBE Goal: 0.0%
Project: C 17-10-294
Guaranty: $90,000.00
Time: 1109 WORKING DAYS
Engineer's Estimate: $34,738,196.47
Date: 04/08/2026 (2 months ago)
Contract Number: 4263203
Type: INSTALL/UPGRADE DRAINAGE STRUCTURE(S)
Project ID: A00200988
Project Description: UPGRADE 4 PUMP STATIONS FOR IH 35 NEAR EAST ELMIRA, SOUTH LAREDO, ST. MARY'S, AND MARTIN ST.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTEN LONGORIA
CITLALI TAPIA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$34,738,196.47
1
$32,786,222.60
Over/Under Est: -5.62% -$1,951,973.87
Over/Under Est: 14.68% $5,100,094.03
Amt Left: 21.51% $7,052,067.90

Bid Items & Bid Tabulations

55 Total 0 of 55
BEXAR  |  IH 35  |  SAN ANTONIO  |  0017-10-294  |  04/08/2026  |  $34,738,196.47  |  C 17-10-294  |  INSTL/UPGRADE DRAINAGE STRUCT(S)  |  1109 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
RAGLE CONSTRUCTION, INC.
REMOV CONC (RIPRAP)
CY 76.000 $200.000 $100.000 $205.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 524.000 $18.850 $50.000 $20.000
REMOV CONC (CURB)
LF 521.000 $5.180 $30.000 $9.500
REMOV CONC (RAIL)
LF 30.000 $43.470 $150.000 $50.000
CUT & RESTORE ASPH PAVING
SY 210.000 $200.000 $150.000 $110.000
FLOWABLE BACKFILL
CY 31.000 $250.000 $165.000 $470.000
TRENCH EXCAVATION PROTECTION
LF 1,412.000 $36.000 $15.000 $9.000
RETAINING WALL (MSE)
SF 3,151.000 $79.690 $85.000 $95.000
RETAINING WALL (SPREAD FOOTING)
SF 550.000 $110.000 $60.000 $175.000
RIPRAP (CONC)(5 IN)
CY 95.000 $575.000 $525.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 0.400 $701.630 $3,500.000 $4,350.000
RAIL (HANDRAIL)(TY F)
LF 75.000 $150.000 $210.000 $230.000
CONC BOX CULV (5 FT X 4 FT)
LF 1,170.000 $595.330 $739.000 $610.000
CONC BOX CULV (6 FT X 3 FT)
LF 33.000 $650.000 $751.800 $1,445.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 2.000 $14,850.000 $24,920.000 $28,000.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $7,500.000 $10,570.000 $8,775.000
RING & COVER
EA 3.000 $2,000.000 $1,500.000 $1,520.000
REMOV STR (INLET)
EA 1.000 $875.000 $2,500.000 $915.000
REMOV STR (HEADWALL)
EA 1.000 $2,856.520 $1,500.000 $1,750.000
REMOV STR (PIPE)
LF 1,170.000 $20.050 $15.000 $26.000
MOBILIZATION
LS 1.000 $3,141,552.510 $2,900,000.000 $4,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 40.000 $2,000.000 $3,500.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 35.000 $57.930 $300.000 $150.000
TMA (STATIONARY)
DAY 35.000 $145.630 $300.000 $450.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 20.000 $46.540 $50.000 $80.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,105.000 $3.030 $15.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 914.000 $12.000 $15.000 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 914.000 $1.610 $8.000 $2.000
PERM CTB (F-SHAPE) (TY 1)
LF 30.000 $75.000 $300.000 $120.000
CONC CURB (TY I)
LF 252.000 $15.470 $35.000 $50.000
DRIVEWAYS (CONC)
SY 16.000 $135.000 $100.000 $450.000
CONC SIDEWALKS (5")
SY 126.000 $64.350 $75.000 $150.000
MTL W-BEAM GD FEN (TIM POST)
LF 305.000 $27.360 $34.100 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 30.000 $5.130 $3.300 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,568.330 $4,351.600 $2,850.000
ABATE ASBESTOS (CONDUIT)
LF 17.000 $200.000 $200.000 $150.000
TEMPORARY BLOW-OFF (COMPLETE)(2")
EA 2.000 $1,500.000 $3,500.000 $4,880.000
TIE-IN (COMPLETE)(8")
EA 2.000 $4,000.000 $10,500.000 $26,500.000
CONCRETE ENCASEMENT
CY 1.000 $2,500.000 $5,500.000 $740.000
DUCTILE IRON FITTINGS
TON 0.260 $12,000.000 $30,000.000 $13,250.000
GATE VALVE AND BOX (COMPLETE)(8")
EA 1.000 $3,000.000 $5,500.000 $6,450.000
HYDROSTATIC PRESSURE TEST
EA 1.000 $6,000.060 $500.000 $3,750.000
PIPE WATER MAIN (PVC)(8")
LF 50.000 $215.000 $100.000 $205.000
NGP (MAIN)(2" PLASTIC W/TW)(OPEN CUT)
LF 202.000 $200.000 $176.000 $265.000
NGP (REMOVE ABANDONED MAIN)(2")
LF 224.000 $100.000 $88.000 $65.000
NGP MOBILIZATION
LS 1.000 $11,080.000 $5,500.000 $30,000.000
NGP (MAIN)(4'' PLASTIC W/TW)(OPEN CUT)
LF 327.000 $200.000 $919.600 $115.000
NGP (REMOVE ABANDONED MAIN)(4'')
LF 23.000 $100.000 $630.300 $80.000
NGP SERVICE (RE-RUN)
EA 5.000 $3,600.000 $15,400.000 $19,000.000
STORM WATER PUMP STATION # 1
EA 1.000 $4,937,230.000 $3,977,650.000 $5,400,000.000
STORM WATER PUMP STATION # 2
EA 1.000 $5,942,117.000 $3,977,650.000 $7,600,000.000
STORM WATER PUMP STATION # 3
EA 1.000 $5,109,579.000 $3,977,650.000 $6,400,000.000
STORM WATER PUMP STATION # 4
EA 1.000 $3,985,129.000 $3,977,650.000 $4,300,000.000
STORM WATER PUMP STATION #9
EA 1.000 $9,918,990.000 $7,790,500.000 $10,000,000.000
STORM WATER PUMP STATION #10
EA 1.000 $76,125.000 $3,977,650.000 $100,000.000
Totals: $34,738,196.472 $32,786,222.600 $39,838,290.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
STATE FORCE ACCOUNT WORK (NON-PART) $5,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $2,400.00
Total: $13,400.00