Items: 493

County: BEXAR
Length: 3.3320 MILES
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-10-292
DBE Goal: 0.0%
Project: F 2025(732)
Guaranty: $200,000.00
Time: 1317 WORKING DAYS
Engineer's Estimate: $279,877,583.81
Date: 12/03/2025 (6 months ago)
Contract Number: 12253201
Type: WIDEN ROAD - ADD LANES
Project ID: A00186339
Contract Type: Federal
Project Description: EXPAND FROM 6 LANE TO 10 LANE EXPRESSWAY FROM 0.4 MILES NORTH OF AT&T PARKWAY TO IH 410 S AND FROM 4/6 TO 4/6 FR LANES; REPLACE IH 35/UPRR AND AT&T PARKWAY BRIDGES
Mail/Deliver Bids To: N/A
CHRISTEN LONGORIA
CITLALI TAPIA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$279,877,583.81
Over/Under Est: -20.87% -$58,397,164.25
$279,695,015.38
Over/Under Est: -0.07% -$182,568.43
Amt Left: 26.28% $58,214,595.82
Over/Under Est: 1.22% $3,418,225.95
Amt Left: 27.91% $61,815,390.20
Delta: -1.29% -$3,600,794.38
$301,117,029.54
Over/Under Est: 7.59% $21,239,445.73
Amt Left: 35.96% $79,636,609.98
Delta: -6.29% -$17,821,219.78
$302,860,000.00
Over/Under Est: 8.21% $22,982,416.19
Amt Left: 36.74% $81,379,580.44
Delta: -0.58% -$1,742,970.46
Over/Under Est: 8.21% $22,982,416.19
Amt Left: 36.74% $81,379,580.44
Delta: 0.00% $0.00

Bid Items & Bid Tabulations

493 Total 0 of 493
BEXAR  |  IH 35  |  SAN ANTONIO  |  0017-10-292  |  12/03/2025  |  $279,877,583.81  |  F 2025(732)  |  WIDEN ROAD - ADD LANES  |  1317 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
PULICE CONSTRUCTION, INC.
ZACHRY CONSTRUCTION CORPORATION
WEBBER, LLC
FLUOR HEAVY CIVIL, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 186.000 $15,000.000 $119,000.000 $85,250.000 $152,000.000 $142,875.120 $163,040.320 $163,040.320
REMOV CONC (PAV)
SY 38,315.000 $14.600 $7.000 $19.460 $10.130 $13.940 $9.590 $9.590
REMOV CONC (MOWSTRIP)
LF 9,998.000 $10.000 $6.000 $1.000 $3.620 $15.310 $2.660 $2.660
REMOV CONC (RIPRAP)
SY 18,839.000 $20.000 $6.000 $5.440 $4.800 $9.930 $4.880 $4.880
REMOV CONC (DRIVEWAYS)
SY 3,478.000 $20.000 $12.000 $24.770 $11.230 $17.820 $21.090 $21.090
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 6,648.000 $20.000 $9.000 $34.310 $5.570 $23.540 $5.720 $5.720
REMOV CONC (CURB)
LF 52,928.000 $7.000 $3.000 $2.760 $2.320 $4.570 $1.490 $1.490
REMOV CONC (FOUNDATIONS)
CY 470.000 $200.000 $350.000 $137.580 $50.990 $74.510 $103.080 $103.080
REMOV CONC (TRAFFIC BARRIER)
LF 13,914.000 $15.000 $9.000 $7.330 $5.620 $14.690 $15.210 $15.210
REMOV CONC (RAIL)
LF 3,321.000 $35.000 $15.000 $18.750 $6.120 $12.690 $14.400 $14.400
RMV (4") TRT/UNTRT BASE & ASPH PAV
SY 39,314.000 $5.000 $2.500 $3.660 $2.630 $4.240 $3.490 $3.490
RMV (9") TRT/UNTRT BASE & ASPH PAV
SY 10,452.000 $8.500 $5.500 $9.810 $36.220 $11.920 $6.870 $6.870
RMV (17") TRT/UNTRT BASE & ASPH PAV
SY 18,108.000 $10.000 $10.000 $12.490 $12.380 $15.690 $7.390 $7.390
RMV (27") TRT/UNTRT BASE & ASPH PAV
SY 48,176.000 $20.000 $14.000 $22.670 $18.730 $9.750 $11.850 $11.850
EXCAV (ROADWAY)
CY 93,386.000 $15.000 $20.000 $21.270 $18.370 $15.420 $19.000 $19.000
EMBANK (FNL)(OC)(TY A)
CY 64,043.000 $20.000 $20.000 $32.900 $26.160 $15.870 $35.000 $35.000
EMBANK (FNL)(OC)(TY C)
CY 9,211.000 $18.000 $40.000 $32.570 $29.500 $52.000 $35.000 $35.000
EMBANK (FNL)(OC)(TY C2)(DS)
CY 99,611.000 $55.000 $40.000 $57.220 $65.000 $67.500 $53.000 $53.000
DRILL SEED (PERM_URBAN_CLAY)
SY 39,710.000 $0.250 $0.210 $0.260 $0.250 $0.400 $0.240 $0.240
STRAW/HAY MLCH SEED (TEMP_WARM)
SY 10,899.000 $5.000 $0.300 $0.720 $1.020 $0.560 $0.560 $0.560
STRAW/HAY MLCH SEED (TEMP_COOL)
SY 10,899.000 $9.000 $0.310 $0.720 $1.020 $0.560 $0.560 $0.560
VEGETATIVE WATERING
TGL 814.000 $50.000 $30.000 $75.240 $27.240 $32.920 $42.670 $42.670
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
SY 39,710.000 $4.500 $2.000 $1.610 $1.540 $1.950 $1.500 $1.500
PROOF ROLLING
HR 35.000 $100.000 $250.000 $108.400 $152.890 $392.500 $200.000 $200.000
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
CY 16,460.000 $82.000 $60.000 $67.870 $69.410 $61.820 $49.910 $49.910
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 16,715.000 $2.500 $2.000 $3.050 $1.540 $2.440 $2.600 $2.600
LIME (COM OR QK)(SLURRY)
TON 1,394.000 $325.000 $300.000 $430.950 $200.000 $312.220 $304.000 $304.000
LIME TRT (EXIST MATL)(8")
SY 52,601.000 $12.000 $6.000 $5.180 $3.500 $6.110 $2.580 $2.580
CEM TRT(PLNT MX)(CL L)(TYA)(GR1-2)(6")
SY 77,134.000 $20.000 $14.000 $37.760 $28.740 $29.930 $22.880 $22.880
PRIME COAT(MC-30 OR AE-P)
GAL 24,592.000 $4.000 $3.150 $4.740 $3.380 $4.300 $4.300 $4.300
LRA PAV TY-II GR-DS
TON 5,179.000 $200.000 $120.000 $165.200 $100.000 $179.860 $150.000 $150.000
D-GR HMA TY-B PG64-22
TON 39,525.000 $85.000 $75.000 $79.850 $96.460 $75.000 $72.500 $72.500
D-GR HMA TY-D PG64-22
TON 6,827.000 $100.000 $85.000 $91.960 $103.020 $86.000 $83.500 $83.500
TACK COAT
GAL 9,166.000 $3.000 $3.150 $4.520 $4.000 $4.100 $4.100 $4.100
SP MIXES SP-D SAC-A PG76-22
TON 19,837.000 $130.000 $110.000 $117.850 $114.700 $112.000 $107.000 $107.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 22,959.000 $135.000 $115.000 $134.370 $137.010 $127.000 $122.000 $122.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 37,448.000 $90.000 $45.000 $55.910 $57.260 $44.000 $44.000 $44.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 4,558.000 $110.000 $50.000 $72.500 $77.810 $58.000 $58.000 $58.000
PLANE ASPH CONC PAV(2")
SY 324,193.000 $1.500 $2.600 $3.160 $2.290 $3.630 $2.100 $2.100
CONC PVMT (CRCP) (13")
SY 74,516.000 $135.000 $50.000 $105.000 $123.730 $108.310 $130.000 $130.000
CONC PVMT(TRANSITION SLAB) (13")
SY 119.000 $200.000 $250.000 $157.730 $150.070 $176.890 $303.710 $303.710
CUT & RESTORING PAV
SY 2,419.000 $160.000 $220.000 $742.750 $147.280 $151.910 $126.500 $126.500
CUT & RESTORE ASPH PAVING
SY 75.000 $150.000 $188.000 $275.640 $218.490 $295.680 $276.090 $276.090
CEM STABIL BKFL
CY 5,839.000 $175.000 $70.000 $216.350 $104.330 $375.000 $157.830 $157.830
FLOWABLE BACKFILL
CY 239.000 $325.000 $230.000 $341.440 $159.040 $375.000 $198.080 $198.080
TRENCH EXCAVATION PROTECTION
LF 10,356.000 $10.000 $3.000 $2.640 $15.560 $6.680 $4.890 $4.890
TEMPORARY SPL SHORING
SF 73,371.000 $20.000 $2.000 $53.820 $38.890 $35.510 $40.000 $40.000
TEMPORARY SPECIAL SHORING (SOIL NAIL)
SF 64,442.000 $30.000 $2.000 $51.890 $40.960 $42.100 $50.000 $50.000
SOIL NAIL ANCHORS
LF 2,378.000 $35.000 $20.000 $34.960 $68.360 $19.040 $29.210 $29.210
VERIFICATION TESTS
EA 2.000 $1,000.000 $5,000.000 $5,635.540 $2,559.890 $7,500.000 $15,000.000 $15,000.000
DRILL SHAFT (18 IN)
LF 1,848.000 $225.000 $100.000 $121.720 $118.410 $194.300 $140.000 $140.000
DRILL SHAFT (24 IN)
LF 168.000 $275.000 $310.000 $332.340 $202.790 $310.000 $300.000 $300.000
DRILL SHAFT (42 IN)
LF 3,432.000 $500.000 $225.000 $302.180 $291.610 $327.180 $325.000 $325.000
DRILL SHAFT (48 IN)
LF 8,588.000 $340.000 $250.000 $390.000 $389.240 $372.290 $395.000 $395.000
DRILL SHAFT (54 IN)
LF 50.000 $650.000 $650.000 $825.490 $527.590 $770.000 $925.000 $925.000
DRILL SHAFT (60 IN)
LF 1,917.000 $700.000 $700.000 $642.230 $640.850 $625.100 $650.000 $650.000
DRILL SHAFT (84 IN)
LF 2,114.000 $1,500.000 $1,000.000 $1,072.020 $1,214.540 $1,047.660 $1,100.000 $1,100.000
DRILL SHAFT (96 IN)
LF 6,037.000 $1,900.000 $1,100.000 $1,100.000 $1,408.690 $1,320.870 $1,500.000 $1,500.000
DRILL SHAFT (108 IN)
LF 895.000 $2,000.000 $1,200.000 $1,647.140 $1,691.200 $1,585.280 $1,800.000 $1,800.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 34.000 $280.000 $290.000 $310.900 $271.350 $290.000 $269.300 $269.300
DRILL SHAFT (SIGN MTS) (36 IN)
LF 160.000 $350.000 $360.000 $385.940 $409.580 $360.000 $406.890 $406.890
DRILL SHAFT (SIGN MTS) (42 IN)
LF 596.000 $380.000 $360.000 $385.940 $435.190 $360.000 $433.830 $433.830
DRILL SHAFT (SIGN MTS) (54 IN)
LF 928.000 $850.000 $670.000 $718.280 $757.740 $670.000 $754.530 $754.530
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 32.000 $860.000 $1,300.000 $1,393.680 $1,331.150 $1,300.000 $715.180 $715.180
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $350.000 $340.000 $364.500 $348.150 $340.000 $333.350 $333.350
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 55.000 $350.000 $360.000 $385.940 $368.630 $360.000 $356.670 $356.670
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 130.000 $430.000 $410.000 $439.550 $419.830 $410.000 $403.080 $403.080
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $550.000 $550.000 $589.640 $563.170 $550.000 $544.380 $544.380
DRILL SHAFT (HI MST POLE)(48 IN)(ROCK)
LF 20.000 $1,250.000 $640.000 $686.120 $655.330 $640.000 $573.300 $573.300
CL A CONC (MISC)
CY 191.000 $750.000 $1,300.000 $679.120 $636.130 $258.410 $546.900 $546.900
CL A CONC (COLLAR)
EA 41.000 $500.000 $1,318.000 $364.350 $2,026.810 $1,888.960 $1,518.110 $1,518.110
CL C CONC (ABUT)
CY 689.000 $1,500.000 $900.000 $1,283.520 $1,089.630 $1,124.550 $1,200.000 $1,200.000
CL C CONC (CAP)
CY 666.800 $1,200.000 $700.000 $1,500.000 $1,401.700 $1,307.040 $1,100.000 $1,100.000
CL C CONC (COLUMN)
CY 816.900 $1,400.000 $1,500.000 $2,100.000 $1,082.720 $1,428.570 $1,300.000 $1,300.000
CL C CONC (FOOTING)(SRC)
CY 193.000 $1,500.000 $1,500.000 $2,608.300 $957.440 $1,292.080 $1,375.000 $1,375.000
CL C CONC (RAIL FOUNDATION)
CY 5,534.000 $450.000 $400.000 $410.000 $750.680 $428.580 $550.000 $550.000
CL C CONC (SIGN COLUMN)
CY 938.000 $2,000.000 $1,000.000 $1,750.000 $1,142.630 $1,652.710 $1,400.000 $1,400.000
CL F CONC (CAP)(MASS)
CY 7,171.800 $1,200.000 $800.000 $1,270.000 $1,260.970 $1,541.660 $1,350.000 $1,350.000
CL F CONC (CAP)(INVT)(MASS)
CY 76.900 $1,200.000 $900.000 $2,102.490 $2,262.930 $1,418.440 $1,700.000 $1,700.000
CL F CONC (CAP)(STRDL)(MASS)
CY 1,370.100 $1,200.000 $1,400.000 $1,550.000 $1,424.080 $1,668.260 $1,550.000 $1,550.000
CL F CONC (COLUMN)(MASS)
CY 9,983.700 $1,200.000 $816.100 $1,125.000 $944.710 $1,174.720 $1,200.000 $1,200.000
CL F CONC (FOOTING)(MASS)
CY 1,556.600 $1,500.000 $700.000 $775.000 $692.140 $944.030 $1,000.000 $1,000.000
CL H CONC (CAP)
CY 1.400 $4,400.000 $10,000.000 $11,355.910 $7,502.630 $5,184.110 $9,427.520 $9,427.520
CL H CONC (CAP)(HPC)
CY 1.900 $4,400.000 $10,000.000 $11,098.510 $5,528.260 $4,338.230 $6,294.760 $6,294.760
CL F CONC (ABUT)
CY 43.500 $1,400.000 $1,100.000 $1,657.120 $1,267.280 $1,406.090 $1,209.740 $1,209.740
CL C CONC (CULV)(EXTEND)
CY 10.300 $4,000.000 $1,989.000 $1,398.770 $1,663.070 $2,021.800 $3,020.030 $3,020.030
REINF CONC SLAB
SF 1,034,880.000 $23.000 $17.000 $18.500 $19.070 $24.870 $22.500 $22.500
APPROACH SLAB
CY 1,528.900 $650.000 $500.000 $600.000 $534.870 $743.610 $533.230 $533.230
RETAINING WALL (MSE)
SF 152,370.000 $77.000 $40.000 $50.000 $63.370 $71.060 $75.000 $75.000
RETAINING WALL (TEMP WALL)
SF 30,437.000 $30.000 $16.000 $12.610 $32.310 $28.760 $40.000 $40.000
RETAINING WALL (SOIL NAIL) (FASCIA)
SF 2,622.000 $70.000 $60.000 $85.000 $151.110 $79.590 $84.470 $84.470
PRESTR CONC GIRDER (TX62)
LF 113,857.910 $250.000 $120.000 $235.000 $229.500 $209.590 $230.000 $230.000
RIPRAP (CONC)(4 IN)
CY 11,040.100 $525.000 $575.000 $390.000 $453.000 $476.930 $419.540 $419.540
RIPRAP (CONC)(5 IN)
CY 10.000 $500.000 $575.000 $2,443.330 $800.650 $778.570 $466.020 $466.020
RIPRAP (MOW STRIP)(4 IN)
CY 63.000 $675.000 $575.000 $1,459.820 $507.160 $587.290 $532.530 $532.530
RIPRAP (STONE PROTECTION)(18 IN)
CY 113.000 $325.000 $200.000 $386.260 $231.530 $279.640 $218.420 $218.420
RIPRAP (CONC)(8 IN)
CY 767.000 $525.000 $575.000 $347.660 $375.530 $1,148.880 $441.270 $441.270
RIPRAP (CONC)(SIGN MOUNTS)(CLB)
CY 21.000 $1,350.000 $575.000 $1,500.000 $966.700 $924.820 $582.550 $582.550
ELASTOMERIC BEARING (EE2)
EA 12.000 $5,000.000 $3,500.000 $1,942.040 $2,937.850 $4,083.790 $2,707.700 $2,707.700
ELASTOMERIC BEARING (E7)
EA 10.000 $5,000.000 $3,500.000 $4,410.090 $5,179.300 $6,498.340 $4,926.420 $4,926.420
ELASTOMERIC BEARING (F4)
EA 12.000 $5,500.000 $3,500.000 $3,082.400 $4,150.230 $5,534.410 $3,886.710 $3,886.710
ELASTOMERIC BEARING (F7)
EA 10.000 $5,000.000 $3,500.000 $4,424.300 $5,087.650 $6,498.340 $4,814.570 $4,814.570
SLIDING ELASTOMERIC BEARING (ES 4)
EA 20.000 $4,000.000 $3,500.000 $3,378.090 $4,619.670 $6,447.360 $3,962.770 $3,962.770
HLMR BEARING (F - 800)
EA 18.000 $18,500.000 $6,000.000 $9,642.290 $6,140.240 $6,087.300 $6,706.340 $6,706.340
HLMR BEARING (GE - 500)
EA 36.000 $18,500.000 $6,000.000 $8,734.430 $6,930.740 $6,215.420 $6,706.340 $6,706.340
HLMR BEARING (GE - 800)
EA 18.000 $18,500.000 $6,000.000 $12,709.880 $8,801.510 $8,686.290 $6,706.340 $6,706.340
CLEANING EXISTING JOINTS
LF 980.000 $20.000 $10.000 $15.890 $4.380 $253.440 $30.000 $30.000
STR STEEL (PLATE GIRDER)
LB 9,177,400.000 $2.500 $2.000 $2.250 $2.400 $2.420 $2.550 $2.550
RAIL (TY SSTR)
LF 99,345.500 $75.000 $60.000 $53.000 $55.930 $48.930 $55.000 $55.000
RAIL (TY T80SS)
LF 1,134.000 $150.000 $120.000 $301.470 $207.580 $141.090 $201.890 $201.890
RAIL (CLF-RO)
LF 668.900 $150.000 $100.000 $115.840 $195.430 $161.880 $175.000 $175.000
RAIL (TY T80PP)
LF 300.000 $150.000 $300.000 $254.910 $217.660 $456.570 $230.050 $230.050
RAIL (HANDRAIL)(TY E)
LF 2,949.000 $200.000 $130.000 $143.720 $121.770 $134.750 $102.980 $102.980
RAIL (TY SSTR)(MOD)
LF 4,237.900 $100.000 $160.000 $250.000 $156.960 $269.300 $123.900 $123.900
RETROFIT RAIL (TY SSTR)
LF 448.000 $220.000 $235.000 $245.250 $145.440 $663.980 $334.710 $334.710
RETROFIT RAIL (TY T80SS)
LF 448.000 $250.000 $260.000 $273.570 $145.440 $699.790 $496.950 $496.950
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 2,443.000 $240.000 $175.000 $210.000 $202.930 $264.560 $224.980 $224.980
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 769.000 $325.000 $175.000 $180.000 $233.740 $301.710 $224.980 $224.980
HEADER TYPE EXPANSION JOINT
CF 131.000 $550.000 $330.000 $454.940 $409.580 $335.000 $725.000 $725.000
JOINT SEALANT
LF 980.000 $25.000 $13.000 $34.280 $4.780 $15.000 $35.000 $35.000
CMP (GAL STL 18 IN)
LF 52.000 $120.000 $74.000 $468.680 $128.370 $366.960 $367.030 $367.030
CONC BOX CULV (4 FT X 2 FT)
LF 336.000 $500.000 $300.000 $354.770 $293.050 $316.290 $355.900 $355.900
CONC BOX CULV (5 FT X 2 FT)
LF 1,439.000 $555.000 $395.000 $487.830 $434.680 $381.460 $450.120 $450.120
CONC BOX CULV (5 FT X 3 FT)
LF 87.000 $510.000 $425.000 $546.880 $452.250 $437.010 $498.370 $498.370
CONC BOX CULV (6 FT X 3 FT)
LF 450.000 $575.000 $525.000 $682.380 $546.200 $621.140 $581.440 $581.440
RC PIPE (CL III)(15 IN)
LF 190.000 $90.000 $150.000 $328.550 $101.920 $205.910 $99.000 $99.000
RC PIPE (CL III)(18 IN)
LF 797.000 $100.000 $100.000 $114.020 $121.100 $84.230 $84.810 $84.810
RC PIPE (CL III)(24 IN)
LF 8,700.000 $130.000 $115.000 $112.700 $93.140 $94.280 $102.840 $102.840
RC PIPE (CL III)(30 IN)
LF 67.000 $150.000 $135.000 $440.340 $105.840 $215.750 $148.870 $148.870
RC PIPE (CL III)(36 IN)
LF 1,003.000 $190.000 $170.000 $173.960 $148.470 $136.900 $172.050 $172.050
RC PIPE (CL III)(42 IN)
LF 1,355.000 $450.000 $205.000 $247.900 $198.910 $188.750 $227.560 $227.560
RC PIPE (CL IV)(30 IN)
LF 96.000 $150.000 $240.000 $181.620 $123.580 $128.580 $194.730 $194.730
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $7,900.000 $4,975.000 $6,733.570 $6,233.020 $9,927.260 $6,137.400 $6,137.400
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 24.000 $11,000.000 $6,135.000 $13,071.250 $9,346.390 $10,259.450 $7,231.240 $7,231.240
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 3.000 $12,000.000 $6,601.000 $9,664.380 $9,689.240 $10,449.430 $7,413.690 $7,413.690
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 3.000 $14,000.000 $8,080.000 $12,487.070 $13,371.430 $11,478.490 $10,046.110 $10,046.110
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 1.000 $15,000.000 $9,953.000 $15,216.650 $22,498.450 $16,670.090 $11,777.900 $11,777.900
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 1.000 $20,000.000 $6,840.000 $10,471.300 $8,825.850 $10,154.890 $10,756.570 $10,756.570
INLET (COMPL)(PCO)(6FT)(LEFT)
EA 2.000 $12,000.000 $7,227.000 $10,961.340 $8,848.810 $10,521.480 $11,141.720 $11,141.720
INLET (COMPL)(PCO)(6FT)(RIGHT)
EA 2.000 $10,750.000 $7,210.000 $10,943.630 $8,913.320 $10,521.480 $11,163.630 $11,163.630
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 3.000 $11,000.000 $7,613.000 $12,721.440 $9,481.600 $11,739.400 $11,360.590 $11,360.590
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 1.000 $9,000.000 $5,773.000 $10,355.910 $7,605.360 $9,156.710 $9,753.090 $9,753.090
INLET (COMPL)(PMBD)(4FT)
EA 28.000 $8,600.000 $5,743.000 $9,897.050 $7,774.220 $8,975.690 $9,547.670 $9,547.670
INLET (COMPL)(PMBD)(5FT)
EA 11.000 $10,200.000 $6,520.000 $11,019.640 $8,255.370 $9,703.690 $10,299.230 $10,299.230
INLET (COMPL)(PMBD)(6FT)
EA 7.000 $10,000.000 $7,296.000 $13,167.020 $8,724.470 $10,431.930 $11,054.330 $11,054.330
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 19.000 $10,000.000 $5,413.000 $11,948.390 $5,614.170 $9,443.430 $5,857.880 $5,857.880
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $12,000.000 $5,922.000 $9,910.130 $6,797.270 $8,879.630 $6,356.800 $6,356.800
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $6,000.000 $5,993.000 $11,832.720 $7,718.300 $10,208.940 $6,461.980 $6,461.980
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 16.000 $8,000.000 $7,204.000 $12,301.430 $8,607.770 $10,802.690 $7,030.620 $7,030.620
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
EA 5.000 $15,000.000 $7,882.000 $13,678.870 $8,961.480 $11,667.680 $7,900.140 $7,900.140
INLET (COMP)(TY SIDEWALK BRIDGE)
EA 8.000 $16,000.000 $13,993.000 $13,656.890 $18,419.640 $16,675.040 $21,006.920 $21,006.920
INLET (COMPL)(ARMOR CURB SLOT)
EA 9.000 $4,000.000 $3,713.000 $3,670.470 $4,652.360 $6,731.870 $5,586.260 $5,586.260
INLET(COMPL)(TY MSE1)
EA 29.000 $15,000.000 $4,963.000 $16,130.810 $4,987.950 $8,550.710 $9,063.230 $9,063.230
JCTBOX (COMPL)(11FT X 6FT)
EA 1.000 $35,000.000 $46,134.000 $18,640.670 $18,726.660 $18,682.540 $20,967.770 $20,967.770
HEADWALL (CH - FW - 30) (DIA= 30 IN)
EA 2.000 $15,000.000 $8,562.000 $17,283.530 $16,186.840 $9,276.090 $9,286.540 $9,286.540
HEADWALL (CH - FW - 45) (DIA= 30 IN)
EA 1.000 $15,000.000 $8,408.000 $32,113.350 $16,464.540 $9,274.960 $17,787.970 $17,787.970
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $12,500.000 $9,133.000 $19,089.450 $10,771.990 $13,513.630 $7,511.760 $7,511.760
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $20,000.000 $9,620.000 $14,881.000 $6,629.460 $15,538.150 $9,615.340 $9,615.340
WINGWALL (SW - 0) (HW=5 FT)
EA 1.000 $15,000.000 $12,850.000 $20,738.450 $7,272.790 $16,941.700 $13,951.200 $13,951.200
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 10.000 $2,000.000 $2,459.000 $2,009.420 $2,892.610 $2,775.810 $1,771.090 $1,771.090
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $2,750.000 $2,699.000 $2,634.470 $3,452.220 $3,505.840 $2,180.810 $2,180.810
GRATE AND FRAME (BRIDGE DRAIN)
EA 129.000 $3,500.000 $6,000.000 $5,942.200 $3,672.190 $4,765.890 $3,173.810 $3,173.810
ADJUSTING INLETS (CAP)
EA 16.000 $4,800.000 $2,768.000 $4,634.070 $3,889.090 $4,399.830 $3,948.610 $3,948.610
CLEAN EXIST CULVERTS
EA 7.000 $2,500.000 $2,082.000 $6,965.380 $17,407.290 $5,402.570 $15,673.840 $15,673.840
PIPE (PVC) (SCH 40) (6 IN)
LF 8,015.000 $80.000 $45.000 $46.970 $31.620 $43.340 $49.230 $49.230
PIPE (PVC) (SCH 40) (8 IN)
LF 840.000 $100.000 $60.000 $42.250 $94.910 $74.260 $167.330 $167.330
REMOV STR (INLET)
EA 34.000 $1,300.000 $466.000 $2,559.770 $588.300 $1,742.370 $1,093.330 $1,093.330
REMOV STR (MANHOLE)
EA 5.000 $1,450.000 $393.000 $2,628.940 $583.690 $2,613.620 $2,232.820 $2,232.820
REMOV STR (SET)
EA 8.000 $725.000 $394.000 $2,391.150 $524.940 $1,387.760 $865.330 $865.330
REMOV STR (HEADWALL)
EA 9.000 $2,800.000 $1,376.000 $2,715.380 $1,087.500 $2,789.070 $748.750 $748.750
REMOV STR (PIPE)
LF 6,852.000 $20.000 $20.000 $60.380 $9.900 $30.890 $21.360 $21.360
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 4.000 $275,000.000 $50,000.000 $382,425.840 $90,962.530 $143,974.820 $140,122.180 $140,122.180
REMOVE STR (RAIL)
LF 806.000 $25.000 $15.000 $34.390 $90.370 $76.670 $0.010 $0.010
REMOV STR (RET WALL)
LF 1,464.000 $200.000 $60.000 $64.500 $38.730 $188.610 $44.050 $44.050
MOBILIZATION
LS 1.000 $25,808,020.160 $24,300,000.000 $27,969,501.530 $28,000,000.000 $29,750,000.000 $29,930,500.000 $29,930,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 52.000 $15,000.000 $15,000.000 $93,158.360 $40,000.000 $195,000.000 $147,175.870 $147,175.870
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $7,500.000 $1,000.000 $1,989.800 $19,397.600 $25,983.250 $16,267.360 $16,267.360
TMA (STATIONARY)
DAY 210.000 $225.000 $310.000 $178.570 $266.350 $517.450 $1,300.000 $1,300.000
TMA (MOBILE OPERATION)
DAY 120.000 $200.000 $620.000 $1,224.490 $723.020 $603.960 $1,500.000 $1,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,935.000 $45.000 $40.000 $37.520 $35.840 $54.500 $70.000 $70.000
ROCK FILTER DAMS (REMOVE)
LF 1,935.000 $12.000 $13.000 $8.580 $8.190 $8.250 $8.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $22.000 $22.000 $26.800 $25.590 $40.000 $45.000 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $3.500 $8.000 $5.360 $5.120 $6.250 $5.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 18,505.000 $3.500 $4.000 $3.480 $3.330 $5.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 18,505.000 $1.000 $1.000 $0.860 $0.820 $2.000 $0.800 $0.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,953.000 $5.250 $6.000 $3.480 $3.330 $6.500 $3.250 $3.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,953.000 $1.000 $1.000 $0.640 $0.610 $2.000 $0.600 $0.600
CONSTRUCTING DETOURS
SY 53,471.000 $75.000 $115.000 $87.920 $86.740 $74.140 $100.000 $100.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 72.000 $80.000 $76.000 $59.070 $38.680 $80.000 $66.420 $66.420
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 32,430.000 $30.000 $5.000 $71.910 $37.820 $36.360 $75.000 $75.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 15,460.000 $30.000 $5.000 $65.130 $30.920 $46.210 $80.000 $80.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 740.000 $55.000 $5.000 $61.440 $51.140 $101.250 $80.000 $80.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 110,580.000 $9.000 $5.000 $11.360 $7.410 $8.930 $5.880 $5.880
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 36,900.000 $10.000 $5.000 $12.170 $8.690 $11.060 $8.410 $8.410
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,500.000 $25.000 $5.000 $12.240 $11.450 $18.910 $8.730 $8.730
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 32,430.000 $13.000 $5.000 $12.890 $7.550 $10.830 $9.160 $9.160
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 15,460.000 $12.000 $5.000 $11.160 $5.800 $10.070 $9.450 $9.450
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 740.000 $17.000 $5.000 $11.160 $7.050 $23.600 $9.450 $9.450
PORT CTB (PINNING)
EA 488.000 $30.000 $120.000 $112.690 $228.780 $50.000 $90.410 $90.410
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 8,354.000 $90.000 $60.000 $99.660 $84.060 $79.500 $68.200 $68.200
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 557.000 $240.000 $250.000 $422.920 $616.260 $425.000 $281.290 $281.290
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 1,989.000 $125.000 $280.000 $170.550 $180.630 $134.720 $163.170 $163.170
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 138.000 $250.000 $350.000 $528.500 $850.960 $995.000 $307.150 $307.150
CONC CURB (TY I)
LF 11,893.000 $20.000 $14.000 $20.000 $23.550 $20.620 $12.790 $12.790
CONC CURB (TY II)
LF 361.000 $25.000 $13.000 $40.000 $69.350 $36.880 $12.680 $12.680
CONC CURB (TY F3)
LF 2,929.000 $190.000 $175.000 $142.430 $239.250 $180.150 $237.520 $237.520
DRIVEWAYS (CONC)
SY 3,455.000 $120.000 $75.000 $119.430 $86.130 $106.390 $108.230 $108.230
CONC SIDEWALKS (4")
SY 9,824.000 $75.000 $65.000 $65.210 $98.020 $70.000 $72.240 $72.240
CURB RAMPS (TY 1)
EA 7.000 $3,500.000 $2,500.000 $3,208.580 $2,868.320 $2,500.000 $2,229.990 $2,229.990
CURB RAMPS (TY 2)
EA 8.000 $4,000.000 $2,500.000 $4,002.970 $2,965.710 $2,500.000 $2,232.470 $2,232.470
CURB RAMPS (TY 3)
EA 6.000 $4,500.000 $3,000.000 $3,555.880 $3,396.530 $3,000.000 $2,230.040 $2,230.040
CURB RAMPS (TY 5)
EA 1.000 $4,750.000 $3,000.000 $2,430.310 $3,396.530 $3,000.000 $2,244.920 $2,244.920
CURB RAMPS (TY 7)
EA 9.000 $5,000.000 $3,000.000 $4,254.060 $3,558.870 $3,000.000 $2,429.920 $2,429.920
CURB RAMPS (TY 10)
EA 3.000 $3,000.000 $3,100.000 $2,702.770 $3,336.600 $3,100.000 $2,430.380 $2,430.380
CURB RAMPS (TY 22)
EA 1.000 $5,250.000 $5,000.000 $4,470.090 $5,363.290 $5,000.000 $2,431.720 $2,431.720
MTL W-BEAM GD FEN (TIM POST)
LF 625.000 $25.000 $26.500 $28.420 $32.730 $31.970 $26.500 $26.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $2,200.000 $2,397.000 $2,102.210 $2,062.250 $2,014.000 $1,960.000 $1,960.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,120.000 $1,201.260 $1,628.110 $1,590.000 $1,120.000 $1,120.000
REMOVE METAL BEAM GUARD FENCE
LF 11,707.000 $4.000 $2.000 $2.150 $5.120 $5.000 $2.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $279.000 $220.000 $235.970 $307.200 $300.000 $220.000 $220.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 24.000 $200.000 $230.000 $246.690 $307.200 $300.000 $230.000 $230.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 25.000 $275.000 $258.000 $276.720 $307.200 $300.000 $258.000 $258.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,000.000 $3,200.000 $3,432.180 $3,807.070 $3,718.000 $3,200.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $300.000 $330.000 $353.940 $307.200 $300.000 $330.000 $330.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 59.000 $1,500.000 $1,515.000 $1,624.930 $1,023.960 $1,000.000 $2,246.750 $2,246.750
CRASH CUSH ATTEN (REMOVE)
EA 19.000 $800.000 $810.000 $868.770 $1,023.960 $1,000.000 $426.830 $426.830
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 14.000 $30,000.000 $25,900.000 $27,779.250 $29,438.800 $28,750.000 $25,900.000 $25,900.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 16.000 $8,900.000 $7,725.000 $8,285.510 $8,857.230 $8,650.000 $7,608.540 $7,608.540
PIPE UNDERDRAINS (TY 6) (6")
LF 8,974.000 $15.000 $25.000 $54.220 $25.730 $23.170 $33.970 $33.970
REMOVE RD IL ASM (CTB MOUNT)
EA 57.000 $450.000 $370.000 $396.660 $378.870 $370.000 $1,569.010 $1,569.010
REMOVE RD IL ASM (TRANS-BASE)
EA 67.000 $450.000 $1,870.000 $396.660 $378.870 $370.000 $1,569.010 $1,569.010
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 34.000 $1,800.000 $1,800.000 $1,929.720 $1,843.130 $1,800.000 $1,150.940 $1,150.940
IN RD IL (U/P) (TY 1) (250W EQ) LED
EA 8.000 $1,300.000 $1,500.000 $1,608.100 $1,535.940 $1,500.000 $862.200 $862.200
IN RD IL (TY SP) 28S-8-8 (250W EQ) LED
EA 49.000 $3,000.000 $5,900.000 $6,325.180 $6,041.350 $5,900.000 $7,090.100 $7,090.100
IN RD IL (TY SA) 30T-8 (250W EQ) LED
EA 2.000 $3,500.000 $3,850.000 $3,859.430 $3,686.250 $3,600.000 $5,903.070 $5,903.070
IN RD IL (TY SP) 48S-10 (400W EQ) LED
EA 37.000 $7,500.000 $5,950.000 $6,110.770 $5,836.560 $5,700.000 $6,937.710 $6,937.710
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 10.000 $8,225.000 $7,050.000 $7,290.040 $6,962.910 $6,800.000 $8,209.960 $8,209.960
IN RD IL (TY SA) 50B-10 (400W EQ) LED
EA 79.000 $7,000.000 $5,700.000 $6,110.770 $5,836.560 $5,700.000 $6,114.610 $6,114.610
IN RD IL (TY SA) 50B-10-10(400W EQ)LED
EA 1.000 $7,000.000 $6,800.000 $7,290.040 $6,962.910 $6,800.000 $7,386.860 $7,386.860
IN RD IL (TY SA) 50S-10 (400W EQ) LED
EA 7.000 $7,000.000 $5,900.000 $6,325.180 $6,041.350 $5,900.000 $6,041.420 $6,041.420
HI MST IL POLE (125 FT)(100 MPH)
EA 1.000 $75,000.000 $101,300.000 $108,278.510 $103,419.860 $101,000.000 $104,599.440 $104,599.440
TEMP RD IL SETUP AND REMOVE
EA 30.000 $11,000.000 $8,100.000 $8,683.720 $8,294.070 $8,100.000 $1,812.630 $1,812.630
CONDT (HDPE) (1 1/4")
LF 650.000 $3.750 $11.000 $11.790 $11.270 $11.000 $50.130 $50.130
CONDT (HDPE) (4") BORE
LF 325.000 $150.000 $61.000 $65.400 $62.460 $61.000 $40.100 $40.100
CONDT (PVC) (SCH 40) (2")
LF 55,450.000 $10.000 $8.570 $9.190 $8.780 $8.570 $14.040 $14.040
CONDT (PVC) (SCH 40) (3")
LF 25,305.000 $30.000 $20.000 $21.440 $20.480 $20.000 $19.050 $19.050
CONDT (PVC) (SCH 80) (2")
LF 2,500.000 $20.000 $17.000 $18.230 $17.410 $17.000 $16.040 $16.040
CONDT (PVC) (SCH 80) (2") (BORE)
LF 9,690.000 $30.000 $30.000 $32.160 $30.720 $30.000 $21.050 $21.050
CONDT (PVC) (SCH 80) (3")
LF 5,110.000 $25.000 $21.000 $22.510 $21.500 $21.000 $21.050 $21.050
CONDT (PVC) (SCH 80) (3") (BORE)
LF 27,970.000 $35.000 $34.000 $36.450 $34.810 $34.000 $28.070 $28.070
CONDT (RM) (1")
LF 2,235.000 $35.000 $29.000 $31.090 $29.690 $29.000 $38.100 $38.100
CONDT (RM) (2")
LF 300.000 $50.000 $63.000 $67.540 $64.500 $63.000 $47.120 $47.120
CONDT (RM) (3")
LF 1,265.000 $125.000 $85.000 $91.130 $87.040 $85.000 $50.130 $50.130
CONDUIT (PREPARE)
LF 1,440.000 $2.000 $1.950 $2.090 $2.000 $1.950 $10.030 $10.030
ELEC CONDR (NO.14) INSULATED
LF 24,445.000 $2.000 $1.050 $1.130 $1.080 $1.050 $1.800 $1.800
ELEC CONDR (NO.10) BARE
LF 5,070.000 $1.900 $1.650 $1.770 $1.690 $1.650 $2.310 $2.310
ELEC CONDR (NO.10) INSULATED
LF 12,840.000 $2.000 $1.650 $1.770 $1.690 $1.650 $3.110 $3.110
ELEC CONDR (NO.8) BARE
LF 19,755.000 $2.500 $1.950 $2.090 $2.000 $1.950 $2.810 $2.810
ELEC CONDR (NO.8) INSULATED
LF 20,240.000 $2.500 $1.950 $2.090 $2.000 $1.950 $2.810 $2.810
ELEC CONDR (NO.6) BARE
LF 3,450.000 $2.500 $2.000 $2.140 $2.050 $2.000 $2.410 $2.410
ELEC CONDR (NO.6) INSULATED
LF 8,640.000 $2.500 $2.300 $2.470 $2.360 $2.300 $2.910 $2.910
ELEC CONDR (NO.4) BARE
LF 40,285.000 $3.000 $2.800 $3.000 $2.870 $2.800 $3.210 $3.210
ELEC CONDR (NO.4) INSULATED
LF 88,590.000 $3.250 $3.050 $3.270 $3.120 $3.050 $3.510 $3.510
ELEC CONDR (NO.2) INSULATED
LF 35,395.000 $5.500 $4.900 $5.250 $5.020 $4.900 $5.610 $5.610
TRAY CABLE (3 CONDR) (12 AWG)
LF 5,970.000 $3.000 $2.300 $2.470 $2.360 $2.300 $3.510 $3.510
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 28.000 $6,000.000 $5,300.000 $5,681.940 $5,426.980 $5,300.000 $5,151.150 $5,151.150
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 9.000 $10,000.000 $8,300.000 $8,898.130 $8,498.850 $8,300.000 $10,338.390 $10,338.390
GROUND BOX TY A (122311)
EA 10.000 $900.000 $1,100.000 $1,179.270 $1,126.350 $1,100.000 $1,511.860 $1,511.860
GROUND BOX TY A (122311)W/APRON
EA 28.000 $1,500.000 $1,400.000 $1,500.890 $1,433.540 $1,400.000 $1,411.600 $1,411.600
GROUND BOX TY D (162922)
EA 16.000 $1,400.000 $1,400.000 $1,500.890 $1,433.540 $1,400.000 $1,744.450 $1,744.450
GROUND BOX TY D (162922)W/APRON
EA 90.000 $1,800.000 $1,800.000 $1,929.720 $1,843.130 $1,800.000 $1,523.890 $1,523.890
TIMBER POLE (CL 2) 40 FT
EA 2.000 $2,600.000 $4,600.000 $4,931.500 $4,710.210 $4,600.000 $13,080.390 $13,080.390
REMOVE ELECTRICAL SERVICES
EA 8.000 $500.000 $760.000 $493.150 $471.030 $460.000 $1,162.970 $1,162.970
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
EA 8.000 $9,300.000 $9,200.000 $9,541.370 $9,113.230 $8,900.000 $6,687.070 $6,687.070
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $8,000.000 $6,800.000 $6,968.420 $6,655.740 $6,500.000 $9,303.750 $9,303.750
ELC SRV TY A 240/480 125(NS)SS(E)SP(O)
EA 1.000 $4,750.000 $6,800.000 $6,968.420 $6,655.740 $6,500.000 $12,792.660 $12,792.660
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
EA 8.000 $4,500.000 $6,800.000 $6,968.420 $6,655.740 $6,500.000 $6,832.440 $6,832.440
ELC SRV TY D 120/240 100(NS)AL(E)PS(U)
EA 3.000 $6,600.000 $8,500.000 $8,790.930 $8,396.460 $8,200.000 $7,364.800 $7,364.800
ELC SRV TY D 120/240 100(NS)GS(N)SP(O)
EA 2.000 $3,200.000 $6,800.000 $6,968.420 $6,655.740 $6,500.000 $9,303.750 $9,303.750
ELC SRV TY D 120/240 070(NS)GS(N)SP(O)
EA 1.000 $5,500.000 $6,800.000 $6,968.420 $6,655.740 $6,500.000 $9,303.750 $9,303.750
ALUMINUM SIGNS (TY A)
SF 405.000 $50.000 $48.000 $26.460 $46.080 $48.000 $28.940 $28.940
ALUMINUM SIGNS (TY G)
SF 210.000 $35.000 $27.000 $33.000 $43.010 $27.000 $42.000 $42.000
ALUMINUM SIGNS (TY O)
SF 5,605.000 $35.000 $27.000 $30.000 $46.080 $27.000 $45.000 $45.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 74.000 $50.000 $62.000 $40.360 $51.200 $62.000 $39.170 $39.170
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 22.000 $800.000 $690.000 $752.750 $742.370 $500.000 $839.300 $839.300
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 39.000 $800.000 $845.000 $921.850 $870.370 $600.000 $951.210 $951.210
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 4.000 $800.000 $675.000 $736.390 $870.370 $600.000 $895.260 $895.260
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 17.000 $800.000 $880.000 $960.030 $921.570 $625.000 $1,007.160 $1,007.160
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $1,000.000 $1,030.000 $1,123.670 $972.770 $1,350.000 $1,119.070 $1,119.070
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 9.000 $1,200.000 $1,020.000 $1,112.760 $1,126.350 $850.000 $951.210 $951.210
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,200.000 $1,050.000 $1,145.490 $1,177.560 $900.000 $1,286.930 $1,286.930
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,500.000 $1,160.000 $1,265.490 $1,279.950 $1,500.000 $1,426.810 $1,426.810
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 6.000 $1,000.000 $1,075.000 $1,172.760 $1,279.950 $1,000.000 $1,258.950 $1,258.950
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 5.000 $2,000.000 $2,200.000 $2,400.070 $2,303.900 $1,850.000 $3,077.440 $3,077.440
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 7.000 $2,325.000 $2,270.000 $2,476.440 $2,406.300 $1,850.000 $3,077.440 $3,077.440
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 11.000 $2,000.000 $2,200.000 $2,209.160 $2,252.710 $1,800.000 $3,334.000 $3,334.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,000.000 $2,200.000 $2,263.710 $2,355.100 $2,800.000 $3,413.880 $3,413.880
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 7.000 $3,500.000 $4,535.000 $4,947.420 $4,889.410 $5,500.000 $5,237.440 $5,237.440
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $860.000 $730.000 $741.840 $819.170 $1,000.000 $615.490 $615.490
REMOVE SM RD SN SUP&AM
EA 128.000 $105.000 $142.000 $100.370 $102.400 $85.000 $167.860 $167.860
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 8.000 $200.000 $250.000 $1,200.040 $716.780 $250.000 $158.330 $158.330
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 8.000 $60.000 $130.000 $120.000 $204.790 $130.000 $55.950 $55.950
INSTALL LRSS (STRUCT STEEL)
LB 1,578.000 $7.000 $6.000 $7.200 $7.680 $6.000 $7.500 $7.500
RELOCATE LRSA
EA 2.000 $3,250.000 $5,450.000 $5,038.710 $1,843.120 $4,700.000 $1,800.000 $1,800.000
REMOVE LRSA
EA 9.000 $800.000 $1,360.000 $653.960 $819.170 $610.000 $800.000 $800.000
RELOCATE LRSS (SIGN ONLY)
EA 2.000 $960.000 $910.000 $975.580 $614.370 $910.000 $600.000 $600.000
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $50,000.000 $49,600.000 $53,174.400 $50,788.360 $49,600.000 $48,000.000 $48,000.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 1.000 $25,000.000 $29,800.000 $31,947.520 $30,513.980 $29,800.000 $25,000.000 $25,000.000
INS OH SN SUP(45 FT BRDG)(SPAN ONLY)
EA 1.000 $40,000.000 $79,100.000 $84,800.300 $80,995.160 $79,100.000 $63,000.000 $63,000.000
INS OH SN SUP(50 FT BRDG)(SPAN ONLY)
EA 3.000 $45,000.000 $80,700.000 $86,515.600 $82,633.500 $80,700.000 $67,500.000 $67,500.000
INS OH SN SUP(65 FT BRDG)(SPAN ONLY)
EA 2.000 $65,000.000 $81,000.000 $86,837.220 $82,940.680 $81,000.000 $69,000.000 $69,000.000
INS OH SN SUP(75 FT BRDG)(SPAN ONLY)
EA 1.000 $110,000.000 $81,900.000 $87,802.080 $83,862.250 $81,900.000 $72,000.000 $72,000.000
INS OH SN SUP(85 FT BRDG)(SPAN ONLY)
EA 1.000 $120,000.000 $92,300.000 $98,951.550 $94,511.430 $92,300.000 $78,000.000 $78,000.000
INS OH SN SUP(90 FT BRDG)
EA 1.000 $130,000.000 $91,100.000 $97,665.070 $93,282.670 $91,100.000 $85,000.000 $85,000.000
INS OH SN SUP(90 FT BRDG)(SPAN ONLY)
EA 2.000 $140,000.000 $111,000.000 $118,999.150 $113,659.460 $111,000.000 $94,750.000 $94,750.000
INS OH SN SUP(95 FT BRDG)
EA 1.000 $150,000.000 $95,500.000 $102,382.150 $97,788.090 $95,500.000 $88,500.000 $88,500.000
INS OH SN SUP(95 FT BRDG)(SPAN ONLY)
EA 1.000 $100,000.000 $106,000.000 $113,638.830 $108,539.660 $106,000.000 $91,500.000 $91,500.000
INS OH SN SUP(110 FT BRDG)(SPAN ONLY)
EA 2.000 $180,000.000 $130,000.000 $139,368.380 $133,114.700 $130,000.000 $116,500.000 $116,500.000
REMOVE OVERHD SIGN SUP
EA 8.000 $8,500.000 $14,437.000 $9,648.580 $9,215.620 $9,000.000 $6,500.000 $6,500.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000 $1,550.000 $510.000 $546.750 $522.210 $510.000 $600.000 $600.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 579.000 $30.000 $24.000 $26.180 $24.570 $35.000 $39.170 $39.170
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $28.000 $30.000 $32.730 $39.930 $45.000 $50.360 $50.360
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 743.000 $22.000 $24.000 $26.180 $23.550 $35.000 $39.170 $39.170
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 21.000 $28.000 $30.000 $32.730 $17.920 $45.000 $50.360 $50.360
INSTL OM ASSM (OM-1)(WFLX)GND
EA 16.000 $100.000 $260.000 $283.650 $66.550 $125.000 $139.880 $139.880
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 260.000 $5.000 $4.150 $4.190 $4.250 $4.150 $4.150 $4.150
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 785.000 $5.000 $4.150 $4.190 $4.250 $4.150 $4.150 $4.150
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 14,991.000 $2.000 $1.750 $1.770 $1.790 $1.750 $1.750 $1.750
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 4,908.000 $1.500 $1.750 $1.770 $1.790 $1.750 $1.750 $1.750
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 89,933.000 $1.000 $0.950 $0.960 $0.970 $0.950 $0.950 $0.950
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 3,828.000 $1.400 $1.950 $1.970 $2.000 $1.950 $1.950 $1.950
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 371,533.000 $0.800 $0.750 $0.760 $0.770 $0.750 $0.750 $0.750
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 11.000 $80.000 $105.000 $106.060 $107.510 $105.000 $105.000 $105.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 268,300.000 $0.800 $0.750 $0.760 $0.770 $0.750 $0.750 $0.750
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 436.000 $3.000 $1.650 $1.670 $1.690 $1.650 $1.650 $1.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 23,678.000 $1.750 $1.000 $1.010 $1.020 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 8,134.000 $5.000 $3.800 $3.840 $3.890 $3.800 $3.800 $3.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,830.000 $9.000 $7.650 $7.730 $7.840 $7.650 $7.650 $7.650
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 66.000 $270.000 $135.000 $136.360 $138.240 $135.000 $135.000 $135.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 3.000 $240.000 $200.000 $202.020 $204.790 $200.000 $200.000 $200.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $300.000 $250.000 $252.530 $256.000 $250.000 $250.000 $250.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 8.000 $300.000 $325.000 $328.280 $332.790 $325.000 $325.000 $325.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 49.000 $300.000 $165.000 $166.670 $168.950 $165.000 $165.000 $165.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 6.000 $650.000 $580.000 $585.860 $593.900 $580.000 $580.000 $580.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 41.000 $30.000 $57.000 $57.580 $58.370 $57.000 $57.000 $57.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 109.000 $1.000 $1.000 $1.010 $1.020 $1.000 $1.000 $1.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 62.000 $15.000 $7.650 $7.730 $7.840 $7.650 $7.650 $7.650
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 89,379.000 $0.600 $0.900 $0.910 $0.920 $0.900 $0.900 $0.900
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 103,280.000 $0.600 $0.900 $0.910 $0.920 $0.900 $0.900 $0.900
PAVEMENT SLER 6"
LF 227,343.000 $0.300 $0.200 $0.200 $0.200 $0.200 $0.200 $0.200
PAVEMENT SLER 8"
LF 23,787.000 $0.350 $0.400 $0.400 $0.410 $0.400 $0.400 $0.400
PAVEMENT SLER 12"
LF 11,412.000 $1.500 $1.350 $1.360 $1.380 $1.350 $1.350 $1.350
PAVEMENT SLER 24"
LF 1,892.000 $2.500 $2.400 $2.420 $2.460 $2.400 $2.400 $2.400
PAVEMENT SLER (ARROW)
EA 66.000 $50.000 $85.000 $85.860 $87.040 $85.000 $85.000 $85.000
PAVEMENT SLER (WORD)
EA 49.000 $80.000 $95.000 $95.960 $97.280 $95.000 $95.000 $95.000
PAVEMENT SLER (UTURN ARROW)
EA 3.000 $80.000 $115.000 $116.160 $117.750 $115.000 $115.000 $115.000
PAVEMENT SLER (LN REDUCT ARROW)
EA 4.000 $80.000 $150.000 $151.520 $153.590 $150.000 $150.000 $150.000
PAVEMENT SLER (RR XING)
EA 6.000 $80.000 $225.000 $227.270 $230.390 $225.000 $225.000 $225.000
PAVEMENT SLER (YLD TRI)
EA 41.000 $10.000 $32.000 $32.320 $32.760 $32.000 $32.000 $32.000
PAVEMENT SLER (NUMBER)
EA 8.000 $80.000 $130.000 $131.310 $133.110 $130.000 $130.000 $130.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 23,369.000 $1.000 $0.700 $0.710 $0.720 $0.700 $0.700 $0.700
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 3,278.000 $4.000 $4.000 $4.040 $4.100 $4.000 $4.000 $4.000
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 10,879.000 $10.000 $9.250 $9.340 $9.470 $9.250 $9.250 $9.250
REFL PAV MRKR TY I-C
EA 203.000 $7.000 $4.000 $4.040 $4.100 $4.000 $4.000 $4.000
REFL PAV MRKR TY I-R
EA 224.000 $7.000 $9.500 $9.600 $9.730 $9.500 $9.500 $9.500
REFL PAV MRKR TY II-A-A
EA 20.000 $10.000 $4.000 $4.040 $4.100 $4.000 $4.000 $4.000
REFL PAV MRKR TY II-C-R
EA 3,222.000 $8.000 $4.000 $4.040 $4.100 $4.000 $4.000 $4.000
PAV SURF PREP FOR MRK (6")
LF 227,343.000 $0.150 $0.050 $0.050 $0.050 $0.050 $0.050 $0.050
PAV SURF PREP FOR MRK (8")
LF 23,590.000 $0.200 $0.150 $0.150 $0.150 $0.150 $0.150 $0.150
PAV SURF PREP FOR MRK (12")
LF 11,412.000 $0.350 $0.500 $0.510 $0.510 $0.500 $0.500 $0.500
PAV SURF PREP FOR MRK (24")
LF 1,892.000 $0.450 $1.650 $1.670 $1.690 $1.650 $1.650 $1.650
PAV SURF PREP FOR MRK (ARROW)
EA 70.000 $20.000 $25.000 $25.250 $25.590 $25.000 $25.000 $25.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 3.000 $20.000 $15.000 $15.150 $15.360 $15.000 $15.000 $15.000
PAV SURF PREP FOR MRK (NUMBER)
EA 8.000 $20.000 $15.000 $15.150 $15.360 $15.000 $15.000 $15.000
PAV SURF PREP FOR MRK (WORD)
EA 49.000 $20.000 $15.000 $15.150 $15.360 $15.000 $15.000 $15.000
PAV SURF PREP FOR MRK (RR XING)
EA 6.000 $20.000 $50.000 $50.510 $51.200 $50.000 $50.000 $50.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 41.000 $10.000 $5.500 $5.560 $5.630 $5.500 $5.500 $5.500
INSTALL HWY TRF SIG (SYSTEM)
EA 3.000 $40,000.000 $48,000.000 $51,459.090 $49,150.040 $48,000.000 $25,063.980 $25,063.980
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $4,000.000 $6,000.000 $6,432.390 $6,143.750 $6,000.000 $25,063.980 $25,063.980
REMOVING TRAFFIC SIGNALS (DIAMOND)
EA 3.000 $8,000.000 $19,100.000 $9,755.790 $9,318.010 $9,100.000 $20,051.180 $20,051.180
VEH SIG SEC (12")LED(GRN)
EA 52.000 $300.000 $320.000 $343.060 $327.670 $320.000 $264.680 $264.680
VEH SIG SEC (12")LED(GRN ARW)
EA 26.000 $300.000 $320.000 $343.060 $327.670 $320.000 $264.680 $264.680
VEH SIG SEC (12")LED(YEL)
EA 55.000 $300.000 $320.000 $343.060 $327.670 $320.000 $264.680 $264.680
VEH SIG SEC (12")LED(YEL ARW)
EA 21.000 $300.000 $320.000 $343.060 $327.670 $320.000 $264.680 $264.680
VEH SIG SEC (12")LED(RED)
EA 55.000 $300.000 $320.000 $343.060 $327.670 $320.000 $264.680 $264.680
VEH SIG SEC (12")LED(RED ARW)
EA 9.000 $300.000 $320.000 $343.060 $327.670 $320.000 $264.680 $264.680
PED SIG SEC (LED)(COUNTDOWN)
EA 36.000 $800.000 $790.000 $846.930 $808.930 $790.000 $717.830 $717.830
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 45.000 $170.000 $160.000 $171.530 $163.830 $160.000 $297.760 $297.760
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 10.000 $220.000 $190.000 $203.690 $194.550 $190.000 $478.220 $478.220
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 9.000 $220.000 $210.000 $225.130 $215.030 $210.000 $264.680 $264.680
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
LF 9,440.000 $3.500 $2.000 $2.140 $2.050 $2.000 $3.560 $3.560
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 22,045.000 $4.000 $3.300 $3.540 $3.380 $3.300 $4.410 $4.410
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
LF 12,455.000 $2.000 $1.450 $1.550 $1.490 $1.450 $3.210 $3.210
INS TRF SIG PL AM(S)1 ARM(28')LUM&ILSN
EA 2.000 $12,000.000 $11,100.000 $11,899.920 $11,365.940 $11,100.000 $16,742.740 $16,742.740
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $12,000.000 $8,300.000 $8,898.130 $8,498.850 $8,300.000 $12,832.760 $12,832.760
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
EA 2.000 $13,000.000 $11,600.000 $12,435.950 $11,877.920 $11,600.000 $17,244.020 $17,244.020
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
EA 3.000 $14,000.000 $13,000.000 $13,936.840 $13,311.460 $13,000.000 $18,547.340 $18,547.340
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
EA 3.000 $16,000.000 $14,500.000 $15,544.930 $14,847.410 $14,500.000 $19,449.650 $19,449.650
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
EA 2.000 $24,000.000 $16,400.000 $17,581.860 $16,792.920 $16,400.000 $20,552.470 $20,552.470
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
EA 1.000 $43,000.000 $42,200.000 $45,241.120 $43,211.080 $42,200.000 $43,511.070 $43,511.070
INS TRF SIG PL AM(S)2 ARM(44-28')
EA 2.000 $22,000.000 $17,800.000 $19,082.750 $18,226.470 $17,800.000 $20,051.190 $20,051.190
PED POLE ASSEMBLY
EA 57.000 $3,000.000 $2,000.000 $2,144.130 $2,047.920 $2,000.000 $2,736.990 $2,736.990
PED DETECT PUSH BUTTON (APS)
EA 48.000 $1,300.000 $990.000 $1,061.340 $1,013.720 $990.000 $1,295.310 $1,295.310
PED DETECTOR CONTROLLER UNIT
EA 4.000 $3,500.000 $3,900.000 $4,181.050 $3,993.450 $3,900.000 $646.650 $646.650
REMOVAL OF SIGNAL HEAD ASSM
EA 18.000 $75.000 $42.000 $45.030 $43.010 $42.000 $113.290 $113.290
REMOVAL OF SIGNAL RELATED SIGNS
EA 5.000 $30.000 $21.000 $22.510 $21.500 $21.000 $200.510 $200.510
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 12.000 $100.000 $21.000 $22.510 $21.500 $21.000 $113.290 $113.290
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 10.000 $200.000 $290.000 $310.900 $296.950 $290.000 $401.020 $401.020
FULL - WIDTH MOWING
CYC 18.000 $5,500.000 $6,000.000 $9,594.740 $5,631.760 $1,500.000 $4,500.000 $4,500.000
LITTER REMOVAL
CYC 104.000 $2,000.000 $3,000.000 $3,197.370 $2,355.110 $3,453.140 $2,400.000 $2,400.000
LITTER REMOVAL (SPOT)
AC 4.000 $1,000.000 $2,500.000 $4,796.050 $1,535.940 $3,000.000 $2,000.000 $2,000.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 104.000 $800.000 $2,600.000 $1,598.680 $3,071.890 $3,000.000 $750.000 $750.000
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 104.000 $1,000.000 $3,600.000 $1,598.680 $1,228.750 $2,500.000 $750.000 $750.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
CYC 104.000 $500.000 $1,800.000 $1,598.680 $1,023.960 $2,000.000 $750.000 $750.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 52.000 $200.000 $2,400.000 $799.340 $1,023.960 $2,500.000 $250.000 $250.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 52.000 $4,000.000 $6,500.000 $5,533.380 $3,583.860 $3,000.000 $750.000 $750.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 52.000 $2,500.000 $5,000.000 $2,766.690 $2,047.920 $2,500.000 $750.000 $750.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 52.000 $1,200.000 $2,500.000 $2,766.690 $1,023.960 $3,000.000 $750.000 $750.000
ANTI-GRAFFITI COATING (PERMNENT-TY II)
SF 124,646.000 $0.750 $0.870 $0.870 $0.890 $0.800 $0.880 $0.880
REP STL BRIDGE MBR (WELD REPAIR)
EA 6.000 $8,000.000 $7,500.000 $7,575.760 $3,071.880 $7,500.000 $7,500.000 $7,500.000
REP STL BRIDGE MBR (COTTER PIN OR BOLT)
EA 2.000 $4,000.000 $5,000.000 $11,527.540 $4,607.820 $5,000.000 $5,000.000 $5,000.000
UNDERSEAL COURSE
GAL 74,427.000 $3.500 $3.150 $5.180 $1.670 $4.700 $4.700 $4.700
TIP TESTING(DRILL SHAFT)
EA 159.000 $18,000.000 $5,000.000 $9,465.610 $8,905.640 $8,832.070 $8,860.740 $8,860.740
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 6.000 $500.000 $500.000 $500.000 $511.980 $578.730 $507.630 $507.630
ILSN (6 D)
EA 12.000 $4,100.000 $3,400.000 $3,645.020 $3,481.460 $3,400.000 $4,160.620 $4,160.620
ILSN (8D)
EA 4.000 $4,500.000 $3,600.000 $3,859.430 $3,686.250 $3,600.000 $4,419.280 $4,419.280
ILSN (10D)
EA 2.000 $5,000.000 $3,900.000 $4,181.050 $3,993.450 $3,900.000 $5,325.600 $5,325.600
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $22,000.000 $10,400.000 $11,149.470 $10,649.160 $10,400.000 $2,120.420 $2,120.420
INSTALL DMS (FOUNDATION MTD CABINET)
EA 5.000 $25,000.000 $19,900.000 $21,334.080 $20,376.780 $19,900.000 $3,794.690 $3,794.690
ITS COM CBL (ETHERNET)
LF 2,740.000 $3.200 $1.500 $1.610 $1.540 $1.500 $2.110 $2.110
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 4.000 $9,000.000 $8,400.000 $9,005.340 $8,601.250 $8,400.000 $9,065.140 $9,065.140
RVDS (PRESENCE DETECTION ONLY)
EA 24.000 $10,000.000 $6,000.000 $6,432.390 $6,143.750 $6,000.000 $10,622.110 $10,622.110
RVDS (ADVANCE DETENTION ONLY)
EA 13.000 $10,000.000 $6,000.000 $6,432.390 $6,143.750 $6,000.000 $8,253.070 $8,253.070
ITS RVSD (DATA COLLECT & WWA) SYS
EA 8.000 $25,000.000 $13,900.000 $14,901.700 $14,233.030 $13,900.000 $17,419.470 $17,419.470
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 7.000 $6,438.000 $5,700.000 $6,110.770 $5,836.560 $5,700.000 $6,588.820 $6,588.820
ITS POLE (40 FT)(90 MPH)
EA 1.000 $14,500.000 $12,600.000 $13,508.010 $12,901.880 $12,600.000 $14,324.570 $14,324.570
ITS POLE (55 FT)(RELOCATE)
EA 2.000 $7,500.000 $3,400.000 $3,645.020 $3,481.460 $3,400.000 $4,771.180 $4,771.180
ITS POLE (8 FT)(COSS/OSB)
EA 4.000 $10,500.000 $10,300.000 $11,042.260 $10,546.780 $10,300.000 $8,797.460 $8,797.460
ITS POLE MNTD CAB (TY 2)(CONF 1)
EA 2.000 $7,764.000 $5,600.000 $6,003.560 $5,734.170 $5,600.000 $7,236.470 $7,236.470
ITS POLE(40 FT)(90 MPH)(W/STIFF)
EA 2.000 $16,000.000 $18,800.000 $20,154.810 $19,250.420 $18,800.000 $16,024.910 $16,024.910
GROUND BOX (PREPARE)
EA 11.000 $300.000 $260.000 $278.740 $266.240 $260.000 $739.890 $739.890
RELOCATE ITS RADIO
EA 1.000 $2,459.000 $3,100.000 $3,323.400 $3,174.270 $3,100.000 $1,552.960 $1,552.960
REMOVE ITS RADIO
EA 1.000 $1,800.000 $510.000 $546.750 $522.210 $510.000 $401.020 $401.020
CCTV FIELD EQUIPMENT (DIGITAL)
EA 16.000 $9,600.000 $7,400.000 $7,933.280 $7,577.300 $7,400.000 $1,503.840 $1,503.840
CCTV MOUNT (POLE)
EA 8.000 $250.000 $32.000 $34.310 $32.760 $32.000 $11,228.660 $11,228.660
RELOCATE CCTV FIELD EQUIPMENT
EA 4.000 $4,731.000 $6,100.000 $4,931.500 $4,710.210 $4,600.000 $2,005.120 $2,005.120
REMOVE CCTV FIELD EQUIPMENT
EA 3.000 $1,136.000 $2,000.000 $536.030 $511.980 $500.000 $501.280 $501.280
FIELD HARDENED ETHERNET SWITCH RELOCATE
EA 1.000 $2,000.000 $590.000 $632.520 $604.130 $590.000 $6,087.540 $6,087.540
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 23,420.000 $6.000 $4.350 $4.660 $4.460 $4.350 $1.550 $1.550
FO SPLICE ENCLOSURE (TYPE 2)
EA 12.000 $2,300.000 $1,900.000 $2,036.920 $1,945.510 $1,900.000 $1,521.890 $1,521.890
FIBER OPTIC FUSION SPLICE
EA 1,552.000 $175.000 $90.000 $96.490 $92.160 $90.000 $109.280 $109.280
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 44.000 $1,575.000 $1,200.000 $1,286.480 $45.050 $1,200.000 $1,521.880 $1,521.880
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
LF 19,605.000 $5.000 $4.700 $5.040 $4.810 $4.700 $4.010 $4.010
FIBER OPTIC PATCH PANEL (144 POSITIONS)
EA 9.000 $10,000.000 $8,600.000 $9,219.750 $8,806.040 $8,600.000 $2,265.780 $2,265.780
ETHERNET SWITCH (INSTALL ONLY)
EA 32.000 $2,500.000 $470.000 $503.870 $481.260 $470.000 $1,203.070 $1,203.070
INSTALL WRONG WAY DRIVER DETECTION SYS
EA 6.000 $85,000.000 $62,500.000 $67,004.030 $63,997.400 $62,500.000 $8,822.520 $8,822.520
INSTALLATION OF BLUETOOTH READER
EA 6.000 $1,567.000 $820.000 $879.090 $839.650 $820.000 $9,624.570 $9,624.570
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 9.000 $22,500.000 $11,600.000 $12,435.950 $11,877.920 $11,600.000 $12,610.190 $12,610.190
ITS GRND MNT CAB (TY 6)(CONF 2)
EA 2.000 $19,000.000 $19,400.000 $20,798.050 $19,864.810 $19,400.000 $15,719.130 $15,719.130
REMOVE DMS
EA 7.000 $4,000.000 $10,300.000 $5,681.940 $5,426.980 $5,300.000 $1,002.560 $1,002.560
REMOVE EXISTING FIBER HUB
EA 1.000 $2,500.000 $9,700.000 $10,399.020 $9,932.400 $9,700.000 $3,809.720 $3,809.720
TEMP CONSTR EQUIPMENT ALERT SYS
EA 7.000 $15,000.000 $12,000.000 $11,426.530 $20,299.980 $19,825.000 $12,652.650 $12,652.650
TEMP CONSTR EQUIP ALERT SYS (RELOCATE)
EA 12.000 $6,000.000 $300.000 $305.100 $102.400 $4,500.000 $337.840 $337.840
CCTV ON HIGH MAST ILLUMIN. ASSEM.
EA 2.000 $1,250.000 $10,800.000 $11,578.300 $37,451.300 $10,800.000 $11,397.100 $11,397.100
LCS SIGNAL UNIT (REMOVE)
EA 7.000 $1,425.000 $490.000 $525.310 $501.740 $490.000 $1,618.130 $1,618.130
TEMP INCIDENT DETECT & SURVEIL SYSTEM
EA 8.000 $68,500.000 $50,000.000 $46,723.470 $58,872.500 $57,495.000 $51,737.130 $51,737.130
TEMPORARY BLOW-OFF (COMPLETE)(2")
EA 3.000 $4,000.000 $2,197.000 $4,166.530 $4,301.710 $1,950.000 $1,950.000 $1,950.000
TIE-IN (COMPLETE)(8")
EA 3.000 $6,500.000 $3,670.000 $13,064.550 $5,555.280 $7,750.000 $7,750.000 $7,750.000
TRENCH EXCAVATION PROTECTION
LF 120.000 $20.000 $8.000 $49.430 $424.350 $25.000 $25.000 $25.000
WATER MAIN BREAKS LEAK REPAIR
EA 2.000 $7,500.000 $3,577.000 $8,121.210 $6,207.330 $5,750.000 $5,750.000 $5,750.000
WATER MAIN REMOVAL (16"& SMALLER)
LF 76.000 $40.000 $83.000 $105.930 $66.090 $75.000 $75.000 $75.000
WTR (JACK, BORE, OR TUNNEL)(24")
LF 187.000 $1,050.000 $964.000 $826.240 $1,011.600 $485.000 $485.000 $485.000
CONCRETE ENCASEMENT
CY 4.900 $250.000 $1,103.000 $494.330 $581.010 $325.000 $325.000 $325.000
CARRIER PIPE (IN CASING)(PVC)(8")
LF 187.000 $150.000 $137.000 $176.550 $173.440 $75.000 $75.000 $75.000
CONCRETE SADDLE
CY 5.000 $600.000 $1,103.000 $529.640 $831.800 $375.000 $375.000 $375.000
DUCTILE IRON FITTINGS
TON 0.500 $15,500.000 $12,683.000 $8,474.300 $5,422.170 $6,000.000 $6,000.000 $6,000.000
FLOWABLE FILL BACKFILL
CY 370.000 $260.000 $192.000 $247.170 $165.370 $175.000 $175.000 $175.000
GATE VALVE AND BOX (COMPLETE)(8")
EA 2.000 $5,000.000 $3,302.000 $6,002.630 $4,292.030 $3,500.000 $3,500.000 $3,500.000
GROUT ABANDONMENT WATER MAIN (8")
LF 157.000 $30.000 $105.000 $28.250 $23.310 $20.000 $20.000 $20.000
HYDROSTATIC PRESSURE TEST
EA 2.000 $4,500.000 $2,619.000 $3,530.960 $4,338.420 $2,500.000 $2,500.000 $2,500.000
PIPE WATER MAIN (PVC)(8")
LF 107.000 $150.000 $135.000 $247.170 $120.600 $155.000 $155.000 $155.000
STEEL CASING (24")(BORE)
LF 187.000 $180.000 $120.000 $247.170 $153.590 $165.000 $165.000 $165.000
STRUCTURAL EXCAVATION (PIPE)
CY 5.200 $400.000 $450.000 $353.100 $487.000 $250.000 $250.000 $250.000
30" FLAT BOTTOM CHECK VALVE
EA 1.000 $38,000.000 $30,000.000 $50,000.000 $5,341.250 $15,000.000 $30,192.690 $30,192.690
NGP (MAIN)(2" PLASTIC W/TW)(OPEN CUT)
LF 20.000 $200.000 $256.670 $331.520 $262.830 $189.700 $200.000 $200.000
NGP (MAIN) (8" PLASTIC W/TW) (OPEN CUT)
LF 100.000 $200.000 $371.640 $480.020 $380.550 $265.600 $200.000 $200.000
NGP (GROUT ABANDONED MAIN)(8")
LF 388.000 $100.000 $95.860 $120.940 $98.160 $16.400 $250.000 $250.000
NGP (REMOVE ABANDONED MAIN)(2")
LF 12.000 $100.000 $32.500 $41.980 $33.280 $7.750 $100.000 $100.000
NGP (REMOVE ABANDONED MAIN)(8")
LF 345.000 $100.000 $33.520 $43.010 $34.320 $50.000 $150.000 $150.000
NGP(BORING)(8" PLASTIC W/TW)
LF 775.000 $300.000 $181.000 $224.380 $185.340 $482.000 $300.000 $300.000
NGP STEEL TIE-IN (2" STEEL)
EA 1.000 $10,000.000 $4,100.000 $5,293.770 $4,198.230 $2,610.000 $3,000.000 $3,000.000
NGP STEEL TIE-IN (8" STEEL)
EA 2.000 $10,000.000 $8,565.550 $11,064.960 $8,770.770 $10,850.000 $5,000.000 $5,000.000
HIGH PRESSURE WATER BLASTING SYSTEM 6"
LF 132,432.000 $5.000 $0.200 $0.200 $0.200 $0.200 $0.200 $0.200
Totals: $279,877,583.810 $221,480,419.560 $279,695,015.378 $283,295,809.745 $301,117,029.529 $302,860,000.002 $302,860,000.002