|
|
PREPARING ROW
|
STA
|
186.000
|
$15,000.000
|
$119,000.000
|
$85,250.000
|
$152,000.000
|
$142,875.120
|
$163,040.320
|
$163,040.320
|
|
|
REMOV CONC (PAV)
|
SY
|
38,315.000
|
$14.600
|
$7.000
|
$19.460
|
$10.130
|
$13.940
|
$9.590
|
$9.590
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
9,998.000
|
$10.000
|
$6.000
|
$1.000
|
$3.620
|
$15.310
|
$2.660
|
$2.660
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
18,839.000
|
$20.000
|
$6.000
|
$5.440
|
$4.800
|
$9.930
|
$4.880
|
$4.880
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
3,478.000
|
$20.000
|
$12.000
|
$24.770
|
$11.230
|
$17.820
|
$21.090
|
$21.090
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
6,648.000
|
$20.000
|
$9.000
|
$34.310
|
$5.570
|
$23.540
|
$5.720
|
$5.720
|
|
|
REMOV CONC (CURB)
|
LF
|
52,928.000
|
$7.000
|
$3.000
|
$2.760
|
$2.320
|
$4.570
|
$1.490
|
$1.490
|
|
|
REMOV CONC (FOUNDATIONS)
|
CY
|
470.000
|
$200.000
|
$350.000
|
$137.580
|
$50.990
|
$74.510
|
$103.080
|
$103.080
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
13,914.000
|
$15.000
|
$9.000
|
$7.330
|
$5.620
|
$14.690
|
$15.210
|
$15.210
|
|
|
REMOV CONC (RAIL)
|
LF
|
3,321.000
|
$35.000
|
$15.000
|
$18.750
|
$6.120
|
$12.690
|
$14.400
|
$14.400
|
|
|
RMV (4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
39,314.000
|
$5.000
|
$2.500
|
$3.660
|
$2.630
|
$4.240
|
$3.490
|
$3.490
|
|
|
RMV (9") TRT/UNTRT BASE & ASPH PAV
|
SY
|
10,452.000
|
$8.500
|
$5.500
|
$9.810
|
$36.220
|
$11.920
|
$6.870
|
$6.870
|
|
|
RMV (17") TRT/UNTRT BASE & ASPH PAV
|
SY
|
18,108.000
|
$10.000
|
$10.000
|
$12.490
|
$12.380
|
$15.690
|
$7.390
|
$7.390
|
|
|
RMV (27") TRT/UNTRT BASE & ASPH PAV
|
SY
|
48,176.000
|
$20.000
|
$14.000
|
$22.670
|
$18.730
|
$9.750
|
$11.850
|
$11.850
|
|
|
EXCAV (ROADWAY)
|
CY
|
93,386.000
|
$15.000
|
$20.000
|
$21.270
|
$18.370
|
$15.420
|
$19.000
|
$19.000
|
|
|
EMBANK (FNL)(OC)(TY A)
|
CY
|
64,043.000
|
$20.000
|
$20.000
|
$32.900
|
$26.160
|
$15.870
|
$35.000
|
$35.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
9,211.000
|
$18.000
|
$40.000
|
$32.570
|
$29.500
|
$52.000
|
$35.000
|
$35.000
|
|
|
EMBANK (FNL)(OC)(TY C2)(DS)
|
CY
|
99,611.000
|
$55.000
|
$40.000
|
$57.220
|
$65.000
|
$67.500
|
$53.000
|
$53.000
|
|
|
DRILL SEED (PERM_URBAN_CLAY)
|
SY
|
39,710.000
|
$0.250
|
$0.210
|
$0.260
|
$0.250
|
$0.400
|
$0.240
|
$0.240
|
|
|
STRAW/HAY MLCH SEED (TEMP_WARM)
|
SY
|
10,899.000
|
$5.000
|
$0.300
|
$0.720
|
$1.020
|
$0.560
|
$0.560
|
$0.560
|
|
|
STRAW/HAY MLCH SEED (TEMP_COOL)
|
SY
|
10,899.000
|
$9.000
|
$0.310
|
$0.720
|
$1.020
|
$0.560
|
$0.560
|
$0.560
|
|
|
VEGETATIVE WATERING
|
TGL
|
814.000
|
$50.000
|
$30.000
|
$75.240
|
$27.240
|
$32.920
|
$42.670
|
$42.670
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
|
SY
|
39,710.000
|
$4.500
|
$2.000
|
$1.610
|
$1.540
|
$1.950
|
$1.500
|
$1.500
|
|
|
PROOF ROLLING
|
HR
|
35.000
|
$100.000
|
$250.000
|
$108.400
|
$152.890
|
$392.500
|
$200.000
|
$200.000
|
|
|
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
|
CY
|
16,460.000
|
$82.000
|
$60.000
|
$67.870
|
$69.410
|
$61.820
|
$49.910
|
$49.910
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
16,715.000
|
$2.500
|
$2.000
|
$3.050
|
$1.540
|
$2.440
|
$2.600
|
$2.600
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
1,394.000
|
$325.000
|
$300.000
|
$430.950
|
$200.000
|
$312.220
|
$304.000
|
$304.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
52,601.000
|
$12.000
|
$6.000
|
$5.180
|
$3.500
|
$6.110
|
$2.580
|
$2.580
|
|
|
CEM TRT(PLNT MX)(CL L)(TYA)(GR1-2)(6")
|
SY
|
77,134.000
|
$20.000
|
$14.000
|
$37.760
|
$28.740
|
$29.930
|
$22.880
|
$22.880
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
24,592.000
|
$4.000
|
$3.150
|
$4.740
|
$3.380
|
$4.300
|
$4.300
|
$4.300
|
|
|
LRA PAV TY-II GR-DS
|
TON
|
5,179.000
|
$200.000
|
$120.000
|
$165.200
|
$100.000
|
$179.860
|
$150.000
|
$150.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
39,525.000
|
$85.000
|
$75.000
|
$79.850
|
$96.460
|
$75.000
|
$72.500
|
$72.500
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
6,827.000
|
$100.000
|
$85.000
|
$91.960
|
$103.020
|
$86.000
|
$83.500
|
$83.500
|
|
|
TACK COAT
|
GAL
|
9,166.000
|
$3.000
|
$3.150
|
$4.520
|
$4.000
|
$4.100
|
$4.100
|
$4.100
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
19,837.000
|
$130.000
|
$110.000
|
$117.850
|
$114.700
|
$112.000
|
$107.000
|
$107.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
22,959.000
|
$135.000
|
$115.000
|
$134.370
|
$137.010
|
$127.000
|
$122.000
|
$122.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
37,448.000
|
$90.000
|
$45.000
|
$55.910
|
$57.260
|
$44.000
|
$44.000
|
$44.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
4,558.000
|
$110.000
|
$50.000
|
$72.500
|
$77.810
|
$58.000
|
$58.000
|
$58.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
324,193.000
|
$1.500
|
$2.600
|
$3.160
|
$2.290
|
$3.630
|
$2.100
|
$2.100
|
|
|
CONC PVMT (CRCP) (13")
|
SY
|
74,516.000
|
$135.000
|
$50.000
|
$105.000
|
$123.730
|
$108.310
|
$130.000
|
$130.000
|
|
|
CONC PVMT(TRANSITION SLAB) (13")
|
SY
|
119.000
|
$200.000
|
$250.000
|
$157.730
|
$150.070
|
$176.890
|
$303.710
|
$303.710
|
|
|
CUT & RESTORING PAV
|
SY
|
2,419.000
|
$160.000
|
$220.000
|
$742.750
|
$147.280
|
$151.910
|
$126.500
|
$126.500
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
75.000
|
$150.000
|
$188.000
|
$275.640
|
$218.490
|
$295.680
|
$276.090
|
$276.090
|
|
|
CEM STABIL BKFL
|
CY
|
5,839.000
|
$175.000
|
$70.000
|
$216.350
|
$104.330
|
$375.000
|
$157.830
|
$157.830
|
|
|
FLOWABLE BACKFILL
|
CY
|
239.000
|
$325.000
|
$230.000
|
$341.440
|
$159.040
|
$375.000
|
$198.080
|
$198.080
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
10,356.000
|
$10.000
|
$3.000
|
$2.640
|
$15.560
|
$6.680
|
$4.890
|
$4.890
|
|
|
TEMPORARY SPL SHORING
|
SF
|
73,371.000
|
$20.000
|
$2.000
|
$53.820
|
$38.890
|
$35.510
|
$40.000
|
$40.000
|
|
|
TEMPORARY SPECIAL SHORING (SOIL NAIL)
|
SF
|
64,442.000
|
$30.000
|
$2.000
|
$51.890
|
$40.960
|
$42.100
|
$50.000
|
$50.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
2,378.000
|
$35.000
|
$20.000
|
$34.960
|
$68.360
|
$19.040
|
$29.210
|
$29.210
|
|
|
VERIFICATION TESTS
|
EA
|
2.000
|
$1,000.000
|
$5,000.000
|
$5,635.540
|
$2,559.890
|
$7,500.000
|
$15,000.000
|
$15,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,848.000
|
$225.000
|
$100.000
|
$121.720
|
$118.410
|
$194.300
|
$140.000
|
$140.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
168.000
|
$275.000
|
$310.000
|
$332.340
|
$202.790
|
$310.000
|
$300.000
|
$300.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
3,432.000
|
$500.000
|
$225.000
|
$302.180
|
$291.610
|
$327.180
|
$325.000
|
$325.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
8,588.000
|
$340.000
|
$250.000
|
$390.000
|
$389.240
|
$372.290
|
$395.000
|
$395.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
50.000
|
$650.000
|
$650.000
|
$825.490
|
$527.590
|
$770.000
|
$925.000
|
$925.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
1,917.000
|
$700.000
|
$700.000
|
$642.230
|
$640.850
|
$625.100
|
$650.000
|
$650.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
2,114.000
|
$1,500.000
|
$1,000.000
|
$1,072.020
|
$1,214.540
|
$1,047.660
|
$1,100.000
|
$1,100.000
|
|
|
DRILL SHAFT (96 IN)
|
LF
|
6,037.000
|
$1,900.000
|
$1,100.000
|
$1,100.000
|
$1,408.690
|
$1,320.870
|
$1,500.000
|
$1,500.000
|
|
|
DRILL SHAFT (108 IN)
|
LF
|
895.000
|
$2,000.000
|
$1,200.000
|
$1,647.140
|
$1,691.200
|
$1,585.280
|
$1,800.000
|
$1,800.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
34.000
|
$280.000
|
$290.000
|
$310.900
|
$271.350
|
$290.000
|
$269.300
|
$269.300
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
160.000
|
$350.000
|
$360.000
|
$385.940
|
$409.580
|
$360.000
|
$406.890
|
$406.890
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
596.000
|
$380.000
|
$360.000
|
$385.940
|
$435.190
|
$360.000
|
$433.830
|
$433.830
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
928.000
|
$850.000
|
$670.000
|
$718.280
|
$757.740
|
$670.000
|
$754.530
|
$754.530
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
32.000
|
$860.000
|
$1,300.000
|
$1,393.680
|
$1,331.150
|
$1,300.000
|
$715.180
|
$715.180
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
16.000
|
$350.000
|
$340.000
|
$364.500
|
$348.150
|
$340.000
|
$333.350
|
$333.350
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
55.000
|
$350.000
|
$360.000
|
$385.940
|
$368.630
|
$360.000
|
$356.670
|
$356.670
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
130.000
|
$430.000
|
$410.000
|
$439.550
|
$419.830
|
$410.000
|
$403.080
|
$403.080
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
$550.000
|
$550.000
|
$589.640
|
$563.170
|
$550.000
|
$544.380
|
$544.380
|
|
|
DRILL SHAFT (HI MST POLE)(48 IN)(ROCK)
|
LF
|
20.000
|
$1,250.000
|
$640.000
|
$686.120
|
$655.330
|
$640.000
|
$573.300
|
$573.300
|
|
|
CL A CONC (MISC)
|
CY
|
191.000
|
$750.000
|
$1,300.000
|
$679.120
|
$636.130
|
$258.410
|
$546.900
|
$546.900
|
|
|
CL A CONC (COLLAR)
|
EA
|
41.000
|
$500.000
|
$1,318.000
|
$364.350
|
$2,026.810
|
$1,888.960
|
$1,518.110
|
$1,518.110
|
|
|
CL C CONC (ABUT)
|
CY
|
689.000
|
$1,500.000
|
$900.000
|
$1,283.520
|
$1,089.630
|
$1,124.550
|
$1,200.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
666.800
|
$1,200.000
|
$700.000
|
$1,500.000
|
$1,401.700
|
$1,307.040
|
$1,100.000
|
$1,100.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
816.900
|
$1,400.000
|
$1,500.000
|
$2,100.000
|
$1,082.720
|
$1,428.570
|
$1,300.000
|
$1,300.000
|
|
|
CL C CONC (FOOTING)(SRC)
|
CY
|
193.000
|
$1,500.000
|
$1,500.000
|
$2,608.300
|
$957.440
|
$1,292.080
|
$1,375.000
|
$1,375.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5,534.000
|
$450.000
|
$400.000
|
$410.000
|
$750.680
|
$428.580
|
$550.000
|
$550.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
938.000
|
$2,000.000
|
$1,000.000
|
$1,750.000
|
$1,142.630
|
$1,652.710
|
$1,400.000
|
$1,400.000
|
|
|
CL F CONC (CAP)(MASS)
|
CY
|
7,171.800
|
$1,200.000
|
$800.000
|
$1,270.000
|
$1,260.970
|
$1,541.660
|
$1,350.000
|
$1,350.000
|
|
|
CL F CONC (CAP)(INVT)(MASS)
|
CY
|
76.900
|
$1,200.000
|
$900.000
|
$2,102.490
|
$2,262.930
|
$1,418.440
|
$1,700.000
|
$1,700.000
|
|
|
CL F CONC (CAP)(STRDL)(MASS)
|
CY
|
1,370.100
|
$1,200.000
|
$1,400.000
|
$1,550.000
|
$1,424.080
|
$1,668.260
|
$1,550.000
|
$1,550.000
|
|
|
CL F CONC (COLUMN)(MASS)
|
CY
|
9,983.700
|
$1,200.000
|
$816.100
|
$1,125.000
|
$944.710
|
$1,174.720
|
$1,200.000
|
$1,200.000
|
|
|
CL F CONC (FOOTING)(MASS)
|
CY
|
1,556.600
|
$1,500.000
|
$700.000
|
$775.000
|
$692.140
|
$944.030
|
$1,000.000
|
$1,000.000
|
|
|
CL H CONC (CAP)
|
CY
|
1.400
|
$4,400.000
|
$10,000.000
|
$11,355.910
|
$7,502.630
|
$5,184.110
|
$9,427.520
|
$9,427.520
|
|
|
CL H CONC (CAP)(HPC)
|
CY
|
1.900
|
$4,400.000
|
$10,000.000
|
$11,098.510
|
$5,528.260
|
$4,338.230
|
$6,294.760
|
$6,294.760
|
|
|
CL F CONC (ABUT)
|
CY
|
43.500
|
$1,400.000
|
$1,100.000
|
$1,657.120
|
$1,267.280
|
$1,406.090
|
$1,209.740
|
$1,209.740
|
|
|
CL C CONC (CULV)(EXTEND)
|
CY
|
10.300
|
$4,000.000
|
$1,989.000
|
$1,398.770
|
$1,663.070
|
$2,021.800
|
$3,020.030
|
$3,020.030
|
|
|
REINF CONC SLAB
|
SF
|
1,034,880.000
|
$23.000
|
$17.000
|
$18.500
|
$19.070
|
$24.870
|
$22.500
|
$22.500
|
|
|
APPROACH SLAB
|
CY
|
1,528.900
|
$650.000
|
$500.000
|
$600.000
|
$534.870
|
$743.610
|
$533.230
|
$533.230
|
|
|
RETAINING WALL (MSE)
|
SF
|
152,370.000
|
$77.000
|
$40.000
|
$50.000
|
$63.370
|
$71.060
|
$75.000
|
$75.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
30,437.000
|
$30.000
|
$16.000
|
$12.610
|
$32.310
|
$28.760
|
$40.000
|
$40.000
|
|
|
RETAINING WALL (SOIL NAIL) (FASCIA)
|
SF
|
2,622.000
|
$70.000
|
$60.000
|
$85.000
|
$151.110
|
$79.590
|
$84.470
|
$84.470
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
113,857.910
|
$250.000
|
$120.000
|
$235.000
|
$229.500
|
$209.590
|
$230.000
|
$230.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
11,040.100
|
$525.000
|
$575.000
|
$390.000
|
$453.000
|
$476.930
|
$419.540
|
$419.540
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$500.000
|
$575.000
|
$2,443.330
|
$800.650
|
$778.570
|
$466.020
|
$466.020
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
63.000
|
$675.000
|
$575.000
|
$1,459.820
|
$507.160
|
$587.290
|
$532.530
|
$532.530
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
113.000
|
$325.000
|
$200.000
|
$386.260
|
$231.530
|
$279.640
|
$218.420
|
$218.420
|
|
|
RIPRAP (CONC)(8 IN)
|
CY
|
767.000
|
$525.000
|
$575.000
|
$347.660
|
$375.530
|
$1,148.880
|
$441.270
|
$441.270
|
|
|
RIPRAP (CONC)(SIGN MOUNTS)(CLB)
|
CY
|
21.000
|
$1,350.000
|
$575.000
|
$1,500.000
|
$966.700
|
$924.820
|
$582.550
|
$582.550
|
|
|
ELASTOMERIC BEARING (EE2)
|
EA
|
12.000
|
$5,000.000
|
$3,500.000
|
$1,942.040
|
$2,937.850
|
$4,083.790
|
$2,707.700
|
$2,707.700
|
|
|
ELASTOMERIC BEARING (E7)
|
EA
|
10.000
|
$5,000.000
|
$3,500.000
|
$4,410.090
|
$5,179.300
|
$6,498.340
|
$4,926.420
|
$4,926.420
|
|
|
ELASTOMERIC BEARING (F4)
|
EA
|
12.000
|
$5,500.000
|
$3,500.000
|
$3,082.400
|
$4,150.230
|
$5,534.410
|
$3,886.710
|
$3,886.710
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
10.000
|
$5,000.000
|
$3,500.000
|
$4,424.300
|
$5,087.650
|
$6,498.340
|
$4,814.570
|
$4,814.570
|
|
|
SLIDING ELASTOMERIC BEARING (ES 4)
|
EA
|
20.000
|
$4,000.000
|
$3,500.000
|
$3,378.090
|
$4,619.670
|
$6,447.360
|
$3,962.770
|
$3,962.770
|
|
|
HLMR BEARING (F - 800)
|
EA
|
18.000
|
$18,500.000
|
$6,000.000
|
$9,642.290
|
$6,140.240
|
$6,087.300
|
$6,706.340
|
$6,706.340
|
|
|
HLMR BEARING (GE - 500)
|
EA
|
36.000
|
$18,500.000
|
$6,000.000
|
$8,734.430
|
$6,930.740
|
$6,215.420
|
$6,706.340
|
$6,706.340
|
|
|
HLMR BEARING (GE - 800)
|
EA
|
18.000
|
$18,500.000
|
$6,000.000
|
$12,709.880
|
$8,801.510
|
$8,686.290
|
$6,706.340
|
$6,706.340
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
980.000
|
$20.000
|
$10.000
|
$15.890
|
$4.380
|
$253.440
|
$30.000
|
$30.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
9,177,400.000
|
$2.500
|
$2.000
|
$2.250
|
$2.400
|
$2.420
|
$2.550
|
$2.550
|
|
|
RAIL (TY SSTR)
|
LF
|
99,345.500
|
$75.000
|
$60.000
|
$53.000
|
$55.930
|
$48.930
|
$55.000
|
$55.000
|
|
|
RAIL (TY T80SS)
|
LF
|
1,134.000
|
$150.000
|
$120.000
|
$301.470
|
$207.580
|
$141.090
|
$201.890
|
$201.890
|
|
|
RAIL (CLF-RO)
|
LF
|
668.900
|
$150.000
|
$100.000
|
$115.840
|
$195.430
|
$161.880
|
$175.000
|
$175.000
|
|
|
RAIL (TY T80PP)
|
LF
|
300.000
|
$150.000
|
$300.000
|
$254.910
|
$217.660
|
$456.570
|
$230.050
|
$230.050
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
2,949.000
|
$200.000
|
$130.000
|
$143.720
|
$121.770
|
$134.750
|
$102.980
|
$102.980
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
4,237.900
|
$100.000
|
$160.000
|
$250.000
|
$156.960
|
$269.300
|
$123.900
|
$123.900
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
448.000
|
$220.000
|
$235.000
|
$245.250
|
$145.440
|
$663.980
|
$334.710
|
$334.710
|
|
|
RETROFIT RAIL (TY T80SS)
|
LF
|
448.000
|
$250.000
|
$260.000
|
$273.570
|
$145.440
|
$699.790
|
$496.950
|
$496.950
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
2,443.000
|
$240.000
|
$175.000
|
$210.000
|
$202.930
|
$264.560
|
$224.980
|
$224.980
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
769.000
|
$325.000
|
$175.000
|
$180.000
|
$233.740
|
$301.710
|
$224.980
|
$224.980
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
131.000
|
$550.000
|
$330.000
|
$454.940
|
$409.580
|
$335.000
|
$725.000
|
$725.000
|
|
|
JOINT SEALANT
|
LF
|
980.000
|
$25.000
|
$13.000
|
$34.280
|
$4.780
|
$15.000
|
$35.000
|
$35.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
52.000
|
$120.000
|
$74.000
|
$468.680
|
$128.370
|
$366.960
|
$367.030
|
$367.030
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
336.000
|
$500.000
|
$300.000
|
$354.770
|
$293.050
|
$316.290
|
$355.900
|
$355.900
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,439.000
|
$555.000
|
$395.000
|
$487.830
|
$434.680
|
$381.460
|
$450.120
|
$450.120
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
87.000
|
$510.000
|
$425.000
|
$546.880
|
$452.250
|
$437.010
|
$498.370
|
$498.370
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
450.000
|
$575.000
|
$525.000
|
$682.380
|
$546.200
|
$621.140
|
$581.440
|
$581.440
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
190.000
|
$90.000
|
$150.000
|
$328.550
|
$101.920
|
$205.910
|
$99.000
|
$99.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
797.000
|
$100.000
|
$100.000
|
$114.020
|
$121.100
|
$84.230
|
$84.810
|
$84.810
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,700.000
|
$130.000
|
$115.000
|
$112.700
|
$93.140
|
$94.280
|
$102.840
|
$102.840
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
67.000
|
$150.000
|
$135.000
|
$440.340
|
$105.840
|
$215.750
|
$148.870
|
$148.870
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,003.000
|
$190.000
|
$170.000
|
$173.960
|
$148.470
|
$136.900
|
$172.050
|
$172.050
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,355.000
|
$450.000
|
$205.000
|
$247.900
|
$198.910
|
$188.750
|
$227.560
|
$227.560
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
96.000
|
$150.000
|
$240.000
|
$181.620
|
$123.580
|
$128.580
|
$194.730
|
$194.730
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$7,900.000
|
$4,975.000
|
$6,733.570
|
$6,233.020
|
$9,927.260
|
$6,137.400
|
$6,137.400
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
24.000
|
$11,000.000
|
$6,135.000
|
$13,071.250
|
$9,346.390
|
$10,259.450
|
$7,231.240
|
$7,231.240
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
3.000
|
$12,000.000
|
$6,601.000
|
$9,664.380
|
$9,689.240
|
$10,449.430
|
$7,413.690
|
$7,413.690
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
3.000
|
$14,000.000
|
$8,080.000
|
$12,487.070
|
$13,371.430
|
$11,478.490
|
$10,046.110
|
$10,046.110
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
$15,000.000
|
$9,953.000
|
$15,216.650
|
$22,498.450
|
$16,670.090
|
$11,777.900
|
$11,777.900
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
$20,000.000
|
$6,840.000
|
$10,471.300
|
$8,825.850
|
$10,154.890
|
$10,756.570
|
$10,756.570
|
|
|
INLET (COMPL)(PCO)(6FT)(LEFT)
|
EA
|
2.000
|
$12,000.000
|
$7,227.000
|
$10,961.340
|
$8,848.810
|
$10,521.480
|
$11,141.720
|
$11,141.720
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
2.000
|
$10,750.000
|
$7,210.000
|
$10,943.630
|
$8,913.320
|
$10,521.480
|
$11,163.630
|
$11,163.630
|
|
|
INLET (COMPL)(PCO)(6FT)(BOTH)
|
EA
|
3.000
|
$11,000.000
|
$7,613.000
|
$12,721.440
|
$9,481.600
|
$11,739.400
|
$11,360.590
|
$11,360.590
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
1.000
|
$9,000.000
|
$5,773.000
|
$10,355.910
|
$7,605.360
|
$9,156.710
|
$9,753.090
|
$9,753.090
|
|
|
INLET (COMPL)(PMBD)(4FT)
|
EA
|
28.000
|
$8,600.000
|
$5,743.000
|
$9,897.050
|
$7,774.220
|
$8,975.690
|
$9,547.670
|
$9,547.670
|
|
|
INLET (COMPL)(PMBD)(5FT)
|
EA
|
11.000
|
$10,200.000
|
$6,520.000
|
$11,019.640
|
$8,255.370
|
$9,703.690
|
$10,299.230
|
$10,299.230
|
|
|
INLET (COMPL)(PMBD)(6FT)
|
EA
|
7.000
|
$10,000.000
|
$7,296.000
|
$13,167.020
|
$8,724.470
|
$10,431.930
|
$11,054.330
|
$11,054.330
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
19.000
|
$10,000.000
|
$5,413.000
|
$11,948.390
|
$5,614.170
|
$9,443.430
|
$5,857.880
|
$5,857.880
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$12,000.000
|
$5,922.000
|
$9,910.130
|
$6,797.270
|
$8,879.630
|
$6,356.800
|
$6,356.800
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$6,000.000
|
$5,993.000
|
$11,832.720
|
$7,718.300
|
$10,208.940
|
$6,461.980
|
$6,461.980
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
16.000
|
$8,000.000
|
$7,204.000
|
$12,301.430
|
$8,607.770
|
$10,802.690
|
$7,030.620
|
$7,030.620
|
|
|
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
5.000
|
$15,000.000
|
$7,882.000
|
$13,678.870
|
$8,961.480
|
$11,667.680
|
$7,900.140
|
$7,900.140
|
|
|
INLET (COMP)(TY SIDEWALK BRIDGE)
|
EA
|
8.000
|
$16,000.000
|
$13,993.000
|
$13,656.890
|
$18,419.640
|
$16,675.040
|
$21,006.920
|
$21,006.920
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
9.000
|
$4,000.000
|
$3,713.000
|
$3,670.470
|
$4,652.360
|
$6,731.870
|
$5,586.260
|
$5,586.260
|
|
|
INLET(COMPL)(TY MSE1)
|
EA
|
29.000
|
$15,000.000
|
$4,963.000
|
$16,130.810
|
$4,987.950
|
$8,550.710
|
$9,063.230
|
$9,063.230
|
|
|
JCTBOX (COMPL)(11FT X 6FT)
|
EA
|
1.000
|
$35,000.000
|
$46,134.000
|
$18,640.670
|
$18,726.660
|
$18,682.540
|
$20,967.770
|
$20,967.770
|
|
|
HEADWALL (CH - FW - 30) (DIA= 30 IN)
|
EA
|
2.000
|
$15,000.000
|
$8,562.000
|
$17,283.530
|
$16,186.840
|
$9,276.090
|
$9,286.540
|
$9,286.540
|
|
|
HEADWALL (CH - FW - 45) (DIA= 30 IN)
|
EA
|
1.000
|
$15,000.000
|
$8,408.000
|
$32,113.350
|
$16,464.540
|
$9,274.960
|
$17,787.970
|
$17,787.970
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$12,500.000
|
$9,133.000
|
$19,089.450
|
$10,771.990
|
$13,513.630
|
$7,511.760
|
$7,511.760
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$20,000.000
|
$9,620.000
|
$14,881.000
|
$6,629.460
|
$15,538.150
|
$9,615.340
|
$9,615.340
|
|
|
WINGWALL (SW - 0) (HW=5 FT)
|
EA
|
1.000
|
$15,000.000
|
$12,850.000
|
$20,738.450
|
$7,272.790
|
$16,941.700
|
$13,951.200
|
$13,951.200
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,000.000
|
$2,459.000
|
$2,009.420
|
$2,892.610
|
$2,775.810
|
$1,771.090
|
$1,771.090
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,750.000
|
$2,699.000
|
$2,634.470
|
$3,452.220
|
$3,505.840
|
$2,180.810
|
$2,180.810
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
129.000
|
$3,500.000
|
$6,000.000
|
$5,942.200
|
$3,672.190
|
$4,765.890
|
$3,173.810
|
$3,173.810
|
|
|
ADJUSTING INLETS (CAP)
|
EA
|
16.000
|
$4,800.000
|
$2,768.000
|
$4,634.070
|
$3,889.090
|
$4,399.830
|
$3,948.610
|
$3,948.610
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$2,500.000
|
$2,082.000
|
$6,965.380
|
$17,407.290
|
$5,402.570
|
$15,673.840
|
$15,673.840
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
8,015.000
|
$80.000
|
$45.000
|
$46.970
|
$31.620
|
$43.340
|
$49.230
|
$49.230
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
840.000
|
$100.000
|
$60.000
|
$42.250
|
$94.910
|
$74.260
|
$167.330
|
$167.330
|
|
|
REMOV STR (INLET)
|
EA
|
34.000
|
$1,300.000
|
$466.000
|
$2,559.770
|
$588.300
|
$1,742.370
|
$1,093.330
|
$1,093.330
|
|
|
REMOV STR (MANHOLE)
|
EA
|
5.000
|
$1,450.000
|
$393.000
|
$2,628.940
|
$583.690
|
$2,613.620
|
$2,232.820
|
$2,232.820
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$725.000
|
$394.000
|
$2,391.150
|
$524.940
|
$1,387.760
|
$865.330
|
$865.330
|
|
|
REMOV STR (HEADWALL)
|
EA
|
9.000
|
$2,800.000
|
$1,376.000
|
$2,715.380
|
$1,087.500
|
$2,789.070
|
$748.750
|
$748.750
|
|
|
REMOV STR (PIPE)
|
LF
|
6,852.000
|
$20.000
|
$20.000
|
$60.380
|
$9.900
|
$30.890
|
$21.360
|
$21.360
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$275,000.000
|
$50,000.000
|
$382,425.840
|
$90,962.530
|
$143,974.820
|
$140,122.180
|
$140,122.180
|
|
|
REMOVE STR (RAIL)
|
LF
|
806.000
|
$25.000
|
$15.000
|
$34.390
|
$90.370
|
$76.670
|
$0.010
|
$0.010
|
|
|
REMOV STR (RET WALL)
|
LF
|
1,464.000
|
$200.000
|
$60.000
|
$64.500
|
$38.730
|
$188.610
|
$44.050
|
$44.050
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$25,808,020.160
|
$24,300,000.000
|
$27,969,501.530
|
$28,000,000.000
|
$29,750,000.000
|
$29,930,500.000
|
$29,930,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
52.000
|
$15,000.000
|
$15,000.000
|
$93,158.360
|
$40,000.000
|
$195,000.000
|
$147,175.870
|
$147,175.870
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$7,500.000
|
$1,000.000
|
$1,989.800
|
$19,397.600
|
$25,983.250
|
$16,267.360
|
$16,267.360
|
|
|
TMA (STATIONARY)
|
DAY
|
210.000
|
$225.000
|
$310.000
|
$178.570
|
$266.350
|
$517.450
|
$1,300.000
|
$1,300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
120.000
|
$200.000
|
$620.000
|
$1,224.490
|
$723.020
|
$603.960
|
$1,500.000
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,935.000
|
$45.000
|
$40.000
|
$37.520
|
$35.840
|
$54.500
|
$70.000
|
$70.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,935.000
|
$12.000
|
$13.000
|
$8.580
|
$8.190
|
$8.250
|
$8.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$22.000
|
$22.000
|
$26.800
|
$25.590
|
$40.000
|
$45.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$3.500
|
$8.000
|
$5.360
|
$5.120
|
$6.250
|
$5.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
18,505.000
|
$3.500
|
$4.000
|
$3.480
|
$3.330
|
$5.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
18,505.000
|
$1.000
|
$1.000
|
$0.860
|
$0.820
|
$2.000
|
$0.800
|
$0.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,953.000
|
$5.250
|
$6.000
|
$3.480
|
$3.330
|
$6.500
|
$3.250
|
$3.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,953.000
|
$1.000
|
$1.000
|
$0.640
|
$0.610
|
$2.000
|
$0.600
|
$0.600
|
|
|
CONSTRUCTING DETOURS
|
SY
|
53,471.000
|
$75.000
|
$115.000
|
$87.920
|
$86.740
|
$74.140
|
$100.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
72.000
|
$80.000
|
$76.000
|
$59.070
|
$38.680
|
$80.000
|
$66.420
|
$66.420
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
32,430.000
|
$30.000
|
$5.000
|
$71.910
|
$37.820
|
$36.360
|
$75.000
|
$75.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
15,460.000
|
$30.000
|
$5.000
|
$65.130
|
$30.920
|
$46.210
|
$80.000
|
$80.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$55.000
|
$5.000
|
$61.440
|
$51.140
|
$101.250
|
$80.000
|
$80.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
110,580.000
|
$9.000
|
$5.000
|
$11.360
|
$7.410
|
$8.930
|
$5.880
|
$5.880
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
36,900.000
|
$10.000
|
$5.000
|
$12.170
|
$8.690
|
$11.060
|
$8.410
|
$8.410
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,500.000
|
$25.000
|
$5.000
|
$12.240
|
$11.450
|
$18.910
|
$8.730
|
$8.730
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
32,430.000
|
$13.000
|
$5.000
|
$12.890
|
$7.550
|
$10.830
|
$9.160
|
$9.160
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
15,460.000
|
$12.000
|
$5.000
|
$11.160
|
$5.800
|
$10.070
|
$9.450
|
$9.450
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$17.000
|
$5.000
|
$11.160
|
$7.050
|
$23.600
|
$9.450
|
$9.450
|
|
|
PORT CTB (PINNING)
|
EA
|
488.000
|
$30.000
|
$120.000
|
$112.690
|
$228.780
|
$50.000
|
$90.410
|
$90.410
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
8,354.000
|
$90.000
|
$60.000
|
$99.660
|
$84.060
|
$79.500
|
$68.200
|
$68.200
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
557.000
|
$240.000
|
$250.000
|
$422.920
|
$616.260
|
$425.000
|
$281.290
|
$281.290
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
1,989.000
|
$125.000
|
$280.000
|
$170.550
|
$180.630
|
$134.720
|
$163.170
|
$163.170
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
138.000
|
$250.000
|
$350.000
|
$528.500
|
$850.960
|
$995.000
|
$307.150
|
$307.150
|
|
|
CONC CURB (TY I)
|
LF
|
11,893.000
|
$20.000
|
$14.000
|
$20.000
|
$23.550
|
$20.620
|
$12.790
|
$12.790
|
|
|
CONC CURB (TY II)
|
LF
|
361.000
|
$25.000
|
$13.000
|
$40.000
|
$69.350
|
$36.880
|
$12.680
|
$12.680
|
|
|
CONC CURB (TY F3)
|
LF
|
2,929.000
|
$190.000
|
$175.000
|
$142.430
|
$239.250
|
$180.150
|
$237.520
|
$237.520
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,455.000
|
$120.000
|
$75.000
|
$119.430
|
$86.130
|
$106.390
|
$108.230
|
$108.230
|
|
|
CONC SIDEWALKS (4")
|
SY
|
9,824.000
|
$75.000
|
$65.000
|
$65.210
|
$98.020
|
$70.000
|
$72.240
|
$72.240
|
|
|
CURB RAMPS (TY 1)
|
EA
|
7.000
|
$3,500.000
|
$2,500.000
|
$3,208.580
|
$2,868.320
|
$2,500.000
|
$2,229.990
|
$2,229.990
|
|
|
CURB RAMPS (TY 2)
|
EA
|
8.000
|
$4,000.000
|
$2,500.000
|
$4,002.970
|
$2,965.710
|
$2,500.000
|
$2,232.470
|
$2,232.470
|
|
|
CURB RAMPS (TY 3)
|
EA
|
6.000
|
$4,500.000
|
$3,000.000
|
$3,555.880
|
$3,396.530
|
$3,000.000
|
$2,230.040
|
$2,230.040
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$4,750.000
|
$3,000.000
|
$2,430.310
|
$3,396.530
|
$3,000.000
|
$2,244.920
|
$2,244.920
|
|
|
CURB RAMPS (TY 7)
|
EA
|
9.000
|
$5,000.000
|
$3,000.000
|
$4,254.060
|
$3,558.870
|
$3,000.000
|
$2,429.920
|
$2,429.920
|
|
|
CURB RAMPS (TY 10)
|
EA
|
3.000
|
$3,000.000
|
$3,100.000
|
$2,702.770
|
$3,336.600
|
$3,100.000
|
$2,430.380
|
$2,430.380
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$5,250.000
|
$5,000.000
|
$4,470.090
|
$5,363.290
|
$5,000.000
|
$2,431.720
|
$2,431.720
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
625.000
|
$25.000
|
$26.500
|
$28.420
|
$32.730
|
$31.970
|
$26.500
|
$26.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$2,200.000
|
$2,397.000
|
$2,102.210
|
$2,062.250
|
$2,014.000
|
$1,960.000
|
$1,960.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$1,120.000
|
$1,201.260
|
$1,628.110
|
$1,590.000
|
$1,120.000
|
$1,120.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
11,707.000
|
$4.000
|
$2.000
|
$2.150
|
$5.120
|
$5.000
|
$2.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$279.000
|
$220.000
|
$235.970
|
$307.200
|
$300.000
|
$220.000
|
$220.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
24.000
|
$200.000
|
$230.000
|
$246.690
|
$307.200
|
$300.000
|
$230.000
|
$230.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$275.000
|
$258.000
|
$276.720
|
$307.200
|
$300.000
|
$258.000
|
$258.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,000.000
|
$3,200.000
|
$3,432.180
|
$3,807.070
|
$3,718.000
|
$3,200.000
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
30.000
|
$300.000
|
$330.000
|
$353.940
|
$307.200
|
$300.000
|
$330.000
|
$330.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
59.000
|
$1,500.000
|
$1,515.000
|
$1,624.930
|
$1,023.960
|
$1,000.000
|
$2,246.750
|
$2,246.750
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
19.000
|
$800.000
|
$810.000
|
$868.770
|
$1,023.960
|
$1,000.000
|
$426.830
|
$426.830
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
14.000
|
$30,000.000
|
$25,900.000
|
$27,779.250
|
$29,438.800
|
$28,750.000
|
$25,900.000
|
$25,900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
16.000
|
$8,900.000
|
$7,725.000
|
$8,285.510
|
$8,857.230
|
$8,650.000
|
$7,608.540
|
$7,608.540
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
8,974.000
|
$15.000
|
$25.000
|
$54.220
|
$25.730
|
$23.170
|
$33.970
|
$33.970
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
57.000
|
$450.000
|
$370.000
|
$396.660
|
$378.870
|
$370.000
|
$1,569.010
|
$1,569.010
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
67.000
|
$450.000
|
$1,870.000
|
$396.660
|
$378.870
|
$370.000
|
$1,569.010
|
$1,569.010
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
34.000
|
$1,800.000
|
$1,800.000
|
$1,929.720
|
$1,843.130
|
$1,800.000
|
$1,150.940
|
$1,150.940
|
|
|
IN RD IL (U/P) (TY 1) (250W EQ) LED
|
EA
|
8.000
|
$1,300.000
|
$1,500.000
|
$1,608.100
|
$1,535.940
|
$1,500.000
|
$862.200
|
$862.200
|
|
|
IN RD IL (TY SP) 28S-8-8 (250W EQ) LED
|
EA
|
49.000
|
$3,000.000
|
$5,900.000
|
$6,325.180
|
$6,041.350
|
$5,900.000
|
$7,090.100
|
$7,090.100
|
|
|
IN RD IL (TY SA) 30T-8 (250W EQ) LED
|
EA
|
2.000
|
$3,500.000
|
$3,850.000
|
$3,859.430
|
$3,686.250
|
$3,600.000
|
$5,903.070
|
$5,903.070
|
|
|
IN RD IL (TY SP) 48S-10 (400W EQ) LED
|
EA
|
37.000
|
$7,500.000
|
$5,950.000
|
$6,110.770
|
$5,836.560
|
$5,700.000
|
$6,937.710
|
$6,937.710
|
|
|
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
|
EA
|
10.000
|
$8,225.000
|
$7,050.000
|
$7,290.040
|
$6,962.910
|
$6,800.000
|
$8,209.960
|
$8,209.960
|
|
|
IN RD IL (TY SA) 50B-10 (400W EQ) LED
|
EA
|
79.000
|
$7,000.000
|
$5,700.000
|
$6,110.770
|
$5,836.560
|
$5,700.000
|
$6,114.610
|
$6,114.610
|
|
|
IN RD IL (TY SA) 50B-10-10(400W EQ)LED
|
EA
|
1.000
|
$7,000.000
|
$6,800.000
|
$7,290.040
|
$6,962.910
|
$6,800.000
|
$7,386.860
|
$7,386.860
|
|
|
IN RD IL (TY SA) 50S-10 (400W EQ) LED
|
EA
|
7.000
|
$7,000.000
|
$5,900.000
|
$6,325.180
|
$6,041.350
|
$5,900.000
|
$6,041.420
|
$6,041.420
|
|
|
HI MST IL POLE (125 FT)(100 MPH)
|
EA
|
1.000
|
$75,000.000
|
$101,300.000
|
$108,278.510
|
$103,419.860
|
$101,000.000
|
$104,599.440
|
$104,599.440
|
|
|
TEMP RD IL SETUP AND REMOVE
|
EA
|
30.000
|
$11,000.000
|
$8,100.000
|
$8,683.720
|
$8,294.070
|
$8,100.000
|
$1,812.630
|
$1,812.630
|
|
|
CONDT (HDPE) (1 1/4")
|
LF
|
650.000
|
$3.750
|
$11.000
|
$11.790
|
$11.270
|
$11.000
|
$50.130
|
$50.130
|
|
|
CONDT (HDPE) (4") BORE
|
LF
|
325.000
|
$150.000
|
$61.000
|
$65.400
|
$62.460
|
$61.000
|
$40.100
|
$40.100
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
55,450.000
|
$10.000
|
$8.570
|
$9.190
|
$8.780
|
$8.570
|
$14.040
|
$14.040
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
25,305.000
|
$30.000
|
$20.000
|
$21.440
|
$20.480
|
$20.000
|
$19.050
|
$19.050
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
2,500.000
|
$20.000
|
$17.000
|
$18.230
|
$17.410
|
$17.000
|
$16.040
|
$16.040
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
9,690.000
|
$30.000
|
$30.000
|
$32.160
|
$30.720
|
$30.000
|
$21.050
|
$21.050
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
5,110.000
|
$25.000
|
$21.000
|
$22.510
|
$21.500
|
$21.000
|
$21.050
|
$21.050
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
27,970.000
|
$35.000
|
$34.000
|
$36.450
|
$34.810
|
$34.000
|
$28.070
|
$28.070
|
|
|
CONDT (RM) (1")
|
LF
|
2,235.000
|
$35.000
|
$29.000
|
$31.090
|
$29.690
|
$29.000
|
$38.100
|
$38.100
|
|
|
CONDT (RM) (2")
|
LF
|
300.000
|
$50.000
|
$63.000
|
$67.540
|
$64.500
|
$63.000
|
$47.120
|
$47.120
|
|
|
CONDT (RM) (3")
|
LF
|
1,265.000
|
$125.000
|
$85.000
|
$91.130
|
$87.040
|
$85.000
|
$50.130
|
$50.130
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,440.000
|
$2.000
|
$1.950
|
$2.090
|
$2.000
|
$1.950
|
$10.030
|
$10.030
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
24,445.000
|
$2.000
|
$1.050
|
$1.130
|
$1.080
|
$1.050
|
$1.800
|
$1.800
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
5,070.000
|
$1.900
|
$1.650
|
$1.770
|
$1.690
|
$1.650
|
$2.310
|
$2.310
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
12,840.000
|
$2.000
|
$1.650
|
$1.770
|
$1.690
|
$1.650
|
$3.110
|
$3.110
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
19,755.000
|
$2.500
|
$1.950
|
$2.090
|
$2.000
|
$1.950
|
$2.810
|
$2.810
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
20,240.000
|
$2.500
|
$1.950
|
$2.090
|
$2.000
|
$1.950
|
$2.810
|
$2.810
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
3,450.000
|
$2.500
|
$2.000
|
$2.140
|
$2.050
|
$2.000
|
$2.410
|
$2.410
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
8,640.000
|
$2.500
|
$2.300
|
$2.470
|
$2.360
|
$2.300
|
$2.910
|
$2.910
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
40,285.000
|
$3.000
|
$2.800
|
$3.000
|
$2.870
|
$2.800
|
$3.210
|
$3.210
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
88,590.000
|
$3.250
|
$3.050
|
$3.270
|
$3.120
|
$3.050
|
$3.510
|
$3.510
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
35,395.000
|
$5.500
|
$4.900
|
$5.250
|
$5.020
|
$4.900
|
$5.610
|
$5.610
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
5,970.000
|
$3.000
|
$2.300
|
$2.470
|
$2.360
|
$2.300
|
$3.510
|
$3.510
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
28.000
|
$6,000.000
|
$5,300.000
|
$5,681.940
|
$5,426.980
|
$5,300.000
|
$5,151.150
|
$5,151.150
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
9.000
|
$10,000.000
|
$8,300.000
|
$8,898.130
|
$8,498.850
|
$8,300.000
|
$10,338.390
|
$10,338.390
|
|
|
GROUND BOX TY A (122311)
|
EA
|
10.000
|
$900.000
|
$1,100.000
|
$1,179.270
|
$1,126.350
|
$1,100.000
|
$1,511.860
|
$1,511.860
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
28.000
|
$1,500.000
|
$1,400.000
|
$1,500.890
|
$1,433.540
|
$1,400.000
|
$1,411.600
|
$1,411.600
|
|
|
GROUND BOX TY D (162922)
|
EA
|
16.000
|
$1,400.000
|
$1,400.000
|
$1,500.890
|
$1,433.540
|
$1,400.000
|
$1,744.450
|
$1,744.450
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
90.000
|
$1,800.000
|
$1,800.000
|
$1,929.720
|
$1,843.130
|
$1,800.000
|
$1,523.890
|
$1,523.890
|
|
|
TIMBER POLE (CL 2) 40 FT
|
EA
|
2.000
|
$2,600.000
|
$4,600.000
|
$4,931.500
|
$4,710.210
|
$4,600.000
|
$13,080.390
|
$13,080.390
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
8.000
|
$500.000
|
$760.000
|
$493.150
|
$471.030
|
$460.000
|
$1,162.970
|
$1,162.970
|
|
|
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
|
EA
|
8.000
|
$9,300.000
|
$9,200.000
|
$9,541.370
|
$9,113.230
|
$8,900.000
|
$6,687.070
|
$6,687.070
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$8,000.000
|
$6,800.000
|
$6,968.420
|
$6,655.740
|
$6,500.000
|
$9,303.750
|
$9,303.750
|
|
|
ELC SRV TY A 240/480 125(NS)SS(E)SP(O)
|
EA
|
1.000
|
$4,750.000
|
$6,800.000
|
$6,968.420
|
$6,655.740
|
$6,500.000
|
$12,792.660
|
$12,792.660
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
|
EA
|
8.000
|
$4,500.000
|
$6,800.000
|
$6,968.420
|
$6,655.740
|
$6,500.000
|
$6,832.440
|
$6,832.440
|
|
|
ELC SRV TY D 120/240 100(NS)AL(E)PS(U)
|
EA
|
3.000
|
$6,600.000
|
$8,500.000
|
$8,790.930
|
$8,396.460
|
$8,200.000
|
$7,364.800
|
$7,364.800
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)SP(O)
|
EA
|
2.000
|
$3,200.000
|
$6,800.000
|
$6,968.420
|
$6,655.740
|
$6,500.000
|
$9,303.750
|
$9,303.750
|
|
|
ELC SRV TY D 120/240 070(NS)GS(N)SP(O)
|
EA
|
1.000
|
$5,500.000
|
$6,800.000
|
$6,968.420
|
$6,655.740
|
$6,500.000
|
$9,303.750
|
$9,303.750
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
405.000
|
$50.000
|
$48.000
|
$26.460
|
$46.080
|
$48.000
|
$28.940
|
$28.940
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
210.000
|
$35.000
|
$27.000
|
$33.000
|
$43.010
|
$27.000
|
$42.000
|
$42.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
5,605.000
|
$35.000
|
$27.000
|
$30.000
|
$46.080
|
$27.000
|
$45.000
|
$45.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
74.000
|
$50.000
|
$62.000
|
$40.360
|
$51.200
|
$62.000
|
$39.170
|
$39.170
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
22.000
|
$800.000
|
$690.000
|
$752.750
|
$742.370
|
$500.000
|
$839.300
|
$839.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
39.000
|
$800.000
|
$845.000
|
$921.850
|
$870.370
|
$600.000
|
$951.210
|
$951.210
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
4.000
|
$800.000
|
$675.000
|
$736.390
|
$870.370
|
$600.000
|
$895.260
|
$895.260
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
17.000
|
$800.000
|
$880.000
|
$960.030
|
$921.570
|
$625.000
|
$1,007.160
|
$1,007.160
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
1.000
|
$1,000.000
|
$1,030.000
|
$1,123.670
|
$972.770
|
$1,350.000
|
$1,119.070
|
$1,119.070
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$1,200.000
|
$1,020.000
|
$1,112.760
|
$1,126.350
|
$850.000
|
$951.210
|
$951.210
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,200.000
|
$1,050.000
|
$1,145.490
|
$1,177.560
|
$900.000
|
$1,286.930
|
$1,286.930
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,500.000
|
$1,160.000
|
$1,265.490
|
$1,279.950
|
$1,500.000
|
$1,426.810
|
$1,426.810
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
6.000
|
$1,000.000
|
$1,075.000
|
$1,172.760
|
$1,279.950
|
$1,000.000
|
$1,258.950
|
$1,258.950
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
5.000
|
$2,000.000
|
$2,200.000
|
$2,400.070
|
$2,303.900
|
$1,850.000
|
$3,077.440
|
$3,077.440
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
|
EA
|
7.000
|
$2,325.000
|
$2,270.000
|
$2,476.440
|
$2,406.300
|
$1,850.000
|
$3,077.440
|
$3,077.440
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
11.000
|
$2,000.000
|
$2,200.000
|
$2,209.160
|
$2,252.710
|
$1,800.000
|
$3,334.000
|
$3,334.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,000.000
|
$2,200.000
|
$2,263.710
|
$2,355.100
|
$2,800.000
|
$3,413.880
|
$3,413.880
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
7.000
|
$3,500.000
|
$4,535.000
|
$4,947.420
|
$4,889.410
|
$5,500.000
|
$5,237.440
|
$5,237.440
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$860.000
|
$730.000
|
$741.840
|
$819.170
|
$1,000.000
|
$615.490
|
$615.490
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
128.000
|
$105.000
|
$142.000
|
$100.370
|
$102.400
|
$85.000
|
$167.860
|
$167.860
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
8.000
|
$200.000
|
$250.000
|
$1,200.040
|
$716.780
|
$250.000
|
$158.330
|
$158.330
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
8.000
|
$60.000
|
$130.000
|
$120.000
|
$204.790
|
$130.000
|
$55.950
|
$55.950
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,578.000
|
$7.000
|
$6.000
|
$7.200
|
$7.680
|
$6.000
|
$7.500
|
$7.500
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
$3,250.000
|
$5,450.000
|
$5,038.710
|
$1,843.120
|
$4,700.000
|
$1,800.000
|
$1,800.000
|
|
|
REMOVE LRSA
|
EA
|
9.000
|
$800.000
|
$1,360.000
|
$653.960
|
$819.170
|
$610.000
|
$800.000
|
$800.000
|
|
|
RELOCATE LRSS (SIGN ONLY)
|
EA
|
2.000
|
$960.000
|
$910.000
|
$975.580
|
$614.370
|
$910.000
|
$600.000
|
$600.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
2.000
|
$50,000.000
|
$49,600.000
|
$53,174.400
|
$50,788.360
|
$49,600.000
|
$48,000.000
|
$48,000.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$25,000.000
|
$29,800.000
|
$31,947.520
|
$30,513.980
|
$29,800.000
|
$25,000.000
|
$25,000.000
|
|
|
INS OH SN SUP(45 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$40,000.000
|
$79,100.000
|
$84,800.300
|
$80,995.160
|
$79,100.000
|
$63,000.000
|
$63,000.000
|
|
|
INS OH SN SUP(50 FT BRDG)(SPAN ONLY)
|
EA
|
3.000
|
$45,000.000
|
$80,700.000
|
$86,515.600
|
$82,633.500
|
$80,700.000
|
$67,500.000
|
$67,500.000
|
|
|
INS OH SN SUP(65 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
$65,000.000
|
$81,000.000
|
$86,837.220
|
$82,940.680
|
$81,000.000
|
$69,000.000
|
$69,000.000
|
|
|
INS OH SN SUP(75 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$110,000.000
|
$81,900.000
|
$87,802.080
|
$83,862.250
|
$81,900.000
|
$72,000.000
|
$72,000.000
|
|
|
INS OH SN SUP(85 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$120,000.000
|
$92,300.000
|
$98,951.550
|
$94,511.430
|
$92,300.000
|
$78,000.000
|
$78,000.000
|
|
|
INS OH SN SUP(90 FT BRDG)
|
EA
|
1.000
|
$130,000.000
|
$91,100.000
|
$97,665.070
|
$93,282.670
|
$91,100.000
|
$85,000.000
|
$85,000.000
|
|
|
INS OH SN SUP(90 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
$140,000.000
|
$111,000.000
|
$118,999.150
|
$113,659.460
|
$111,000.000
|
$94,750.000
|
$94,750.000
|
|
|
INS OH SN SUP(95 FT BRDG)
|
EA
|
1.000
|
$150,000.000
|
$95,500.000
|
$102,382.150
|
$97,788.090
|
$95,500.000
|
$88,500.000
|
$88,500.000
|
|
|
INS OH SN SUP(95 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$100,000.000
|
$106,000.000
|
$113,638.830
|
$108,539.660
|
$106,000.000
|
$91,500.000
|
$91,500.000
|
|
|
INS OH SN SUP(110 FT BRDG)(SPAN ONLY)
|
EA
|
2.000
|
$180,000.000
|
$130,000.000
|
$139,368.380
|
$133,114.700
|
$130,000.000
|
$116,500.000
|
$116,500.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
8.000
|
$8,500.000
|
$14,437.000
|
$9,648.580
|
$9,215.620
|
$9,000.000
|
$6,500.000
|
$6,500.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
1.000
|
$1,550.000
|
$510.000
|
$546.750
|
$522.210
|
$510.000
|
$600.000
|
$600.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
579.000
|
$30.000
|
$24.000
|
$26.180
|
$24.570
|
$35.000
|
$39.170
|
$39.170
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
18.000
|
$28.000
|
$30.000
|
$32.730
|
$39.930
|
$45.000
|
$50.360
|
$50.360
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
743.000
|
$22.000
|
$24.000
|
$26.180
|
$23.550
|
$35.000
|
$39.170
|
$39.170
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
21.000
|
$28.000
|
$30.000
|
$32.730
|
$17.920
|
$45.000
|
$50.360
|
$50.360
|
|
|
INSTL OM ASSM (OM-1)(WFLX)GND
|
EA
|
16.000
|
$100.000
|
$260.000
|
$283.650
|
$66.550
|
$125.000
|
$139.880
|
$139.880
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
260.000
|
$5.000
|
$4.150
|
$4.190
|
$4.250
|
$4.150
|
$4.150
|
$4.150
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
785.000
|
$5.000
|
$4.150
|
$4.190
|
$4.250
|
$4.150
|
$4.150
|
$4.150
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
14,991.000
|
$2.000
|
$1.750
|
$1.770
|
$1.790
|
$1.750
|
$1.750
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
4,908.000
|
$1.500
|
$1.750
|
$1.770
|
$1.790
|
$1.750
|
$1.750
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
89,933.000
|
$1.000
|
$0.950
|
$0.960
|
$0.970
|
$0.950
|
$0.950
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
3,828.000
|
$1.400
|
$1.950
|
$1.970
|
$2.000
|
$1.950
|
$1.950
|
$1.950
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
371,533.000
|
$0.800
|
$0.750
|
$0.760
|
$0.770
|
$0.750
|
$0.750
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
11.000
|
$80.000
|
$105.000
|
$106.060
|
$107.510
|
$105.000
|
$105.000
|
$105.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
268,300.000
|
$0.800
|
$0.750
|
$0.760
|
$0.770
|
$0.750
|
$0.750
|
$0.750
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
436.000
|
$3.000
|
$1.650
|
$1.670
|
$1.690
|
$1.650
|
$1.650
|
$1.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
23,678.000
|
$1.750
|
$1.000
|
$1.010
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
8,134.000
|
$5.000
|
$3.800
|
$3.840
|
$3.890
|
$3.800
|
$3.800
|
$3.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,830.000
|
$9.000
|
$7.650
|
$7.730
|
$7.840
|
$7.650
|
$7.650
|
$7.650
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
66.000
|
$270.000
|
$135.000
|
$136.360
|
$138.240
|
$135.000
|
$135.000
|
$135.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
3.000
|
$240.000
|
$200.000
|
$202.020
|
$204.790
|
$200.000
|
$200.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$300.000
|
$250.000
|
$252.530
|
$256.000
|
$250.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
8.000
|
$300.000
|
$325.000
|
$328.280
|
$332.790
|
$325.000
|
$325.000
|
$325.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
49.000
|
$300.000
|
$165.000
|
$166.670
|
$168.950
|
$165.000
|
$165.000
|
$165.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
6.000
|
$650.000
|
$580.000
|
$585.860
|
$593.900
|
$580.000
|
$580.000
|
$580.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
41.000
|
$30.000
|
$57.000
|
$57.580
|
$58.370
|
$57.000
|
$57.000
|
$57.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
109.000
|
$1.000
|
$1.000
|
$1.010
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
62.000
|
$15.000
|
$7.650
|
$7.730
|
$7.840
|
$7.650
|
$7.650
|
$7.650
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
89,379.000
|
$0.600
|
$0.900
|
$0.910
|
$0.920
|
$0.900
|
$0.900
|
$0.900
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
103,280.000
|
$0.600
|
$0.900
|
$0.910
|
$0.920
|
$0.900
|
$0.900
|
$0.900
|
|
|
PAVEMENT SLER 6"
|
LF
|
227,343.000
|
$0.300
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
|
PAVEMENT SLER 8"
|
LF
|
23,787.000
|
$0.350
|
$0.400
|
$0.400
|
$0.410
|
$0.400
|
$0.400
|
$0.400
|
|
|
PAVEMENT SLER 12"
|
LF
|
11,412.000
|
$1.500
|
$1.350
|
$1.360
|
$1.380
|
$1.350
|
$1.350
|
$1.350
|
|
|
PAVEMENT SLER 24"
|
LF
|
1,892.000
|
$2.500
|
$2.400
|
$2.420
|
$2.460
|
$2.400
|
$2.400
|
$2.400
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
66.000
|
$50.000
|
$85.000
|
$85.860
|
$87.040
|
$85.000
|
$85.000
|
$85.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
49.000
|
$80.000
|
$95.000
|
$95.960
|
$97.280
|
$95.000
|
$95.000
|
$95.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
3.000
|
$80.000
|
$115.000
|
$116.160
|
$117.750
|
$115.000
|
$115.000
|
$115.000
|
|
|
PAVEMENT SLER (LN REDUCT ARROW)
|
EA
|
4.000
|
$80.000
|
$150.000
|
$151.520
|
$153.590
|
$150.000
|
$150.000
|
$150.000
|
|
|
PAVEMENT SLER (RR XING)
|
EA
|
6.000
|
$80.000
|
$225.000
|
$227.270
|
$230.390
|
$225.000
|
$225.000
|
$225.000
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
41.000
|
$10.000
|
$32.000
|
$32.320
|
$32.760
|
$32.000
|
$32.000
|
$32.000
|
|
|
PAVEMENT SLER (NUMBER)
|
EA
|
8.000
|
$80.000
|
$130.000
|
$131.310
|
$133.110
|
$130.000
|
$130.000
|
$130.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
23,369.000
|
$1.000
|
$0.700
|
$0.710
|
$0.720
|
$0.700
|
$0.700
|
$0.700
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
3,278.000
|
$4.000
|
$4.000
|
$4.040
|
$4.100
|
$4.000
|
$4.000
|
$4.000
|
|
PREFAB PM TY B (W)(6")(BRK)CONTRAST
|
LF
|
10,879.000
|
$10.000
|
$9.250
|
$9.340
|
$9.470
|
$9.250
|
$9.250
|
$9.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
203.000
|
$7.000
|
$4.000
|
$4.040
|
$4.100
|
$4.000
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
224.000
|
$7.000
|
$9.500
|
$9.600
|
$9.730
|
$9.500
|
$9.500
|
$9.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
20.000
|
$10.000
|
$4.000
|
$4.040
|
$4.100
|
$4.000
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,222.000
|
$8.000
|
$4.000
|
$4.040
|
$4.100
|
$4.000
|
$4.000
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
227,343.000
|
$0.150
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
23,590.000
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
11,412.000
|
$0.350
|
$0.500
|
$0.510
|
$0.510
|
$0.500
|
$0.500
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,892.000
|
$0.450
|
$1.650
|
$1.670
|
$1.690
|
$1.650
|
$1.650
|
$1.650
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
70.000
|
$20.000
|
$25.000
|
$25.250
|
$25.590
|
$25.000
|
$25.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
3.000
|
$20.000
|
$15.000
|
$15.150
|
$15.360
|
$15.000
|
$15.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
8.000
|
$20.000
|
$15.000
|
$15.150
|
$15.360
|
$15.000
|
$15.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
49.000
|
$20.000
|
$15.000
|
$15.150
|
$15.360
|
$15.000
|
$15.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
6.000
|
$20.000
|
$50.000
|
$50.510
|
$51.200
|
$50.000
|
$50.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
41.000
|
$10.000
|
$5.500
|
$5.560
|
$5.630
|
$5.500
|
$5.500
|
$5.500
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
3.000
|
$40,000.000
|
$48,000.000
|
$51,459.090
|
$49,150.040
|
$48,000.000
|
$25,063.980
|
$25,063.980
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$4,000.000
|
$6,000.000
|
$6,432.390
|
$6,143.750
|
$6,000.000
|
$25,063.980
|
$25,063.980
|
|
|
REMOVING TRAFFIC SIGNALS (DIAMOND)
|
EA
|
3.000
|
$8,000.000
|
$19,100.000
|
$9,755.790
|
$9,318.010
|
$9,100.000
|
$20,051.180
|
$20,051.180
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
52.000
|
$300.000
|
$320.000
|
$343.060
|
$327.670
|
$320.000
|
$264.680
|
$264.680
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
26.000
|
$300.000
|
$320.000
|
$343.060
|
$327.670
|
$320.000
|
$264.680
|
$264.680
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
55.000
|
$300.000
|
$320.000
|
$343.060
|
$327.670
|
$320.000
|
$264.680
|
$264.680
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
21.000
|
$300.000
|
$320.000
|
$343.060
|
$327.670
|
$320.000
|
$264.680
|
$264.680
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
55.000
|
$300.000
|
$320.000
|
$343.060
|
$327.670
|
$320.000
|
$264.680
|
$264.680
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
9.000
|
$300.000
|
$320.000
|
$343.060
|
$327.670
|
$320.000
|
$264.680
|
$264.680
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
36.000
|
$800.000
|
$790.000
|
$846.930
|
$808.930
|
$790.000
|
$717.830
|
$717.830
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
45.000
|
$170.000
|
$160.000
|
$171.530
|
$163.830
|
$160.000
|
$297.760
|
$297.760
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
10.000
|
$220.000
|
$190.000
|
$203.690
|
$194.550
|
$190.000
|
$478.220
|
$478.220
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
9.000
|
$220.000
|
$210.000
|
$225.130
|
$215.030
|
$210.000
|
$264.680
|
$264.680
|
|
|
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
|
LF
|
9,440.000
|
$3.500
|
$2.000
|
$2.140
|
$2.050
|
$2.000
|
$3.560
|
$3.560
|
|
|
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
|
LF
|
22,045.000
|
$4.000
|
$3.300
|
$3.540
|
$3.380
|
$3.300
|
$4.410
|
$4.410
|
|
|
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
|
LF
|
12,455.000
|
$2.000
|
$1.450
|
$1.550
|
$1.490
|
$1.450
|
$3.210
|
$3.210
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM&ILSN
|
EA
|
2.000
|
$12,000.000
|
$11,100.000
|
$11,899.920
|
$11,365.940
|
$11,100.000
|
$16,742.740
|
$16,742.740
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
1.000
|
$12,000.000
|
$8,300.000
|
$8,898.130
|
$8,498.850
|
$8,300.000
|
$12,832.760
|
$12,832.760
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
2.000
|
$13,000.000
|
$11,600.000
|
$12,435.950
|
$11,877.920
|
$11,600.000
|
$17,244.020
|
$17,244.020
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
|
EA
|
3.000
|
$14,000.000
|
$13,000.000
|
$13,936.840
|
$13,311.460
|
$13,000.000
|
$18,547.340
|
$18,547.340
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
3.000
|
$16,000.000
|
$14,500.000
|
$15,544.930
|
$14,847.410
|
$14,500.000
|
$19,449.650
|
$19,449.650
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
|
EA
|
2.000
|
$24,000.000
|
$16,400.000
|
$17,581.860
|
$16,792.920
|
$16,400.000
|
$20,552.470
|
$20,552.470
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
|
EA
|
1.000
|
$43,000.000
|
$42,200.000
|
$45,241.120
|
$43,211.080
|
$42,200.000
|
$43,511.070
|
$43,511.070
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-28')
|
EA
|
2.000
|
$22,000.000
|
$17,800.000
|
$19,082.750
|
$18,226.470
|
$17,800.000
|
$20,051.190
|
$20,051.190
|
|
|
PED POLE ASSEMBLY
|
EA
|
57.000
|
$3,000.000
|
$2,000.000
|
$2,144.130
|
$2,047.920
|
$2,000.000
|
$2,736.990
|
$2,736.990
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
48.000
|
$1,300.000
|
$990.000
|
$1,061.340
|
$1,013.720
|
$990.000
|
$1,295.310
|
$1,295.310
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
$3,500.000
|
$3,900.000
|
$4,181.050
|
$3,993.450
|
$3,900.000
|
$646.650
|
$646.650
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
18.000
|
$75.000
|
$42.000
|
$45.030
|
$43.010
|
$42.000
|
$113.290
|
$113.290
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
5.000
|
$30.000
|
$21.000
|
$22.510
|
$21.500
|
$21.000
|
$200.510
|
$200.510
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
12.000
|
$100.000
|
$21.000
|
$22.510
|
$21.500
|
$21.000
|
$113.290
|
$113.290
|
|
|
REMOVE VID IMAGE VEH DET SYS (VIVDS)
|
EA
|
10.000
|
$200.000
|
$290.000
|
$310.900
|
$296.950
|
$290.000
|
$401.020
|
$401.020
|
|
|
FULL - WIDTH MOWING
|
CYC
|
18.000
|
$5,500.000
|
$6,000.000
|
$9,594.740
|
$5,631.760
|
$1,500.000
|
$4,500.000
|
$4,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
104.000
|
$2,000.000
|
$3,000.000
|
$3,197.370
|
$2,355.110
|
$3,453.140
|
$2,400.000
|
$2,400.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
4.000
|
$1,000.000
|
$2,500.000
|
$4,796.050
|
$1,535.940
|
$3,000.000
|
$2,000.000
|
$2,000.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
104.000
|
$800.000
|
$2,600.000
|
$1,598.680
|
$3,071.890
|
$3,000.000
|
$750.000
|
$750.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
104.000
|
$1,000.000
|
$3,600.000
|
$1,598.680
|
$1,228.750
|
$2,500.000
|
$750.000
|
$750.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
104.000
|
$500.000
|
$1,800.000
|
$1,598.680
|
$1,023.960
|
$2,000.000
|
$750.000
|
$750.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
52.000
|
$200.000
|
$2,400.000
|
$799.340
|
$1,023.960
|
$2,500.000
|
$250.000
|
$250.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
52.000
|
$4,000.000
|
$6,500.000
|
$5,533.380
|
$3,583.860
|
$3,000.000
|
$750.000
|
$750.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
52.000
|
$2,500.000
|
$5,000.000
|
$2,766.690
|
$2,047.920
|
$2,500.000
|
$750.000
|
$750.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
52.000
|
$1,200.000
|
$2,500.000
|
$2,766.690
|
$1,023.960
|
$3,000.000
|
$750.000
|
$750.000
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
124,646.000
|
$0.750
|
$0.870
|
$0.870
|
$0.890
|
$0.800
|
$0.880
|
$0.880
|
|
|
REP STL BRIDGE MBR (WELD REPAIR)
|
EA
|
6.000
|
$8,000.000
|
$7,500.000
|
$7,575.760
|
$3,071.880
|
$7,500.000
|
$7,500.000
|
$7,500.000
|
|
|
REP STL BRIDGE MBR (COTTER PIN OR BOLT)
|
EA
|
2.000
|
$4,000.000
|
$5,000.000
|
$11,527.540
|
$4,607.820
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
74,427.000
|
$3.500
|
$3.150
|
$5.180
|
$1.670
|
$4.700
|
$4.700
|
$4.700
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
159.000
|
$18,000.000
|
$5,000.000
|
$9,465.610
|
$8,905.640
|
$8,832.070
|
$8,860.740
|
$8,860.740
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
6.000
|
$500.000
|
$500.000
|
$500.000
|
$511.980
|
$578.730
|
$507.630
|
$507.630
|
|
|
ILSN (6 D)
|
EA
|
12.000
|
$4,100.000
|
$3,400.000
|
$3,645.020
|
$3,481.460
|
$3,400.000
|
$4,160.620
|
$4,160.620
|
|
|
ILSN (8D)
|
EA
|
4.000
|
$4,500.000
|
$3,600.000
|
$3,859.430
|
$3,686.250
|
$3,600.000
|
$4,419.280
|
$4,419.280
|
|
|
ILSN (10D)
|
EA
|
2.000
|
$5,000.000
|
$3,900.000
|
$4,181.050
|
$3,993.450
|
$3,900.000
|
$5,325.600
|
$5,325.600
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
$22,000.000
|
$10,400.000
|
$11,149.470
|
$10,649.160
|
$10,400.000
|
$2,120.420
|
$2,120.420
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
5.000
|
$25,000.000
|
$19,900.000
|
$21,334.080
|
$20,376.780
|
$19,900.000
|
$3,794.690
|
$3,794.690
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
2,740.000
|
$3.200
|
$1.500
|
$1.610
|
$1.540
|
$1.500
|
$2.110
|
$2.110
|
|
|
BBU SYSTEM (EXTERNAL BATTERY CABINET)
|
EA
|
4.000
|
$9,000.000
|
$8,400.000
|
$9,005.340
|
$8,601.250
|
$8,400.000
|
$9,065.140
|
$9,065.140
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
24.000
|
$10,000.000
|
$6,000.000
|
$6,432.390
|
$6,143.750
|
$6,000.000
|
$10,622.110
|
$10,622.110
|
|
|
RVDS (ADVANCE DETENTION ONLY)
|
EA
|
13.000
|
$10,000.000
|
$6,000.000
|
$6,432.390
|
$6,143.750
|
$6,000.000
|
$8,253.070
|
$8,253.070
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
8.000
|
$25,000.000
|
$13,900.000
|
$14,901.700
|
$14,233.030
|
$13,900.000
|
$17,419.470
|
$17,419.470
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)
|
EA
|
7.000
|
$6,438.000
|
$5,700.000
|
$6,110.770
|
$5,836.560
|
$5,700.000
|
$6,588.820
|
$6,588.820
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
1.000
|
$14,500.000
|
$12,600.000
|
$13,508.010
|
$12,901.880
|
$12,600.000
|
$14,324.570
|
$14,324.570
|
|
|
ITS POLE (55 FT)(RELOCATE)
|
EA
|
2.000
|
$7,500.000
|
$3,400.000
|
$3,645.020
|
$3,481.460
|
$3,400.000
|
$4,771.180
|
$4,771.180
|
|
|
ITS POLE (8 FT)(COSS/OSB)
|
EA
|
4.000
|
$10,500.000
|
$10,300.000
|
$11,042.260
|
$10,546.780
|
$10,300.000
|
$8,797.460
|
$8,797.460
|
|
|
ITS POLE MNTD CAB (TY 2)(CONF 1)
|
EA
|
2.000
|
$7,764.000
|
$5,600.000
|
$6,003.560
|
$5,734.170
|
$5,600.000
|
$7,236.470
|
$7,236.470
|
|
|
ITS POLE(40 FT)(90 MPH)(W/STIFF)
|
EA
|
2.000
|
$16,000.000
|
$18,800.000
|
$20,154.810
|
$19,250.420
|
$18,800.000
|
$16,024.910
|
$16,024.910
|
|
|
GROUND BOX (PREPARE)
|
EA
|
11.000
|
$300.000
|
$260.000
|
$278.740
|
$266.240
|
$260.000
|
$739.890
|
$739.890
|
|
|
RELOCATE ITS RADIO
|
EA
|
1.000
|
$2,459.000
|
$3,100.000
|
$3,323.400
|
$3,174.270
|
$3,100.000
|
$1,552.960
|
$1,552.960
|
|
|
REMOVE ITS RADIO
|
EA
|
1.000
|
$1,800.000
|
$510.000
|
$546.750
|
$522.210
|
$510.000
|
$401.020
|
$401.020
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
16.000
|
$9,600.000
|
$7,400.000
|
$7,933.280
|
$7,577.300
|
$7,400.000
|
$1,503.840
|
$1,503.840
|
|
|
CCTV MOUNT (POLE)
|
EA
|
8.000
|
$250.000
|
$32.000
|
$34.310
|
$32.760
|
$32.000
|
$11,228.660
|
$11,228.660
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
4.000
|
$4,731.000
|
$6,100.000
|
$4,931.500
|
$4,710.210
|
$4,600.000
|
$2,005.120
|
$2,005.120
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
3.000
|
$1,136.000
|
$2,000.000
|
$536.030
|
$511.980
|
$500.000
|
$501.280
|
$501.280
|
|
|
FIELD HARDENED ETHERNET SWITCH RELOCATE
|
EA
|
1.000
|
$2,000.000
|
$590.000
|
$632.520
|
$604.130
|
$590.000
|
$6,087.540
|
$6,087.540
|
|
|
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
|
LF
|
23,420.000
|
$6.000
|
$4.350
|
$4.660
|
$4.460
|
$4.350
|
$1.550
|
$1.550
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
12.000
|
$2,300.000
|
$1,900.000
|
$2,036.920
|
$1,945.510
|
$1,900.000
|
$1,521.890
|
$1,521.890
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
1,552.000
|
$175.000
|
$90.000
|
$96.490
|
$92.160
|
$90.000
|
$109.280
|
$109.280
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
44.000
|
$1,575.000
|
$1,200.000
|
$1,286.480
|
$45.050
|
$1,200.000
|
$1,521.880
|
$1,521.880
|
|
|
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
|
LF
|
19,605.000
|
$5.000
|
$4.700
|
$5.040
|
$4.810
|
$4.700
|
$4.010
|
$4.010
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITIONS)
|
EA
|
9.000
|
$10,000.000
|
$8,600.000
|
$9,219.750
|
$8,806.040
|
$8,600.000
|
$2,265.780
|
$2,265.780
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
32.000
|
$2,500.000
|
$470.000
|
$503.870
|
$481.260
|
$470.000
|
$1,203.070
|
$1,203.070
|
|
|
INSTALL WRONG WAY DRIVER DETECTION SYS
|
EA
|
6.000
|
$85,000.000
|
$62,500.000
|
$67,004.030
|
$63,997.400
|
$62,500.000
|
$8,822.520
|
$8,822.520
|
|
|
INSTALLATION OF BLUETOOTH READER
|
EA
|
6.000
|
$1,567.000
|
$820.000
|
$879.090
|
$839.650
|
$820.000
|
$9,624.570
|
$9,624.570
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 2)
|
EA
|
9.000
|
$22,500.000
|
$11,600.000
|
$12,435.950
|
$11,877.920
|
$11,600.000
|
$12,610.190
|
$12,610.190
|
|
|
ITS GRND MNT CAB (TY 6)(CONF 2)
|
EA
|
2.000
|
$19,000.000
|
$19,400.000
|
$20,798.050
|
$19,864.810
|
$19,400.000
|
$15,719.130
|
$15,719.130
|
|
|
REMOVE DMS
|
EA
|
7.000
|
$4,000.000
|
$10,300.000
|
$5,681.940
|
$5,426.980
|
$5,300.000
|
$1,002.560
|
$1,002.560
|
|
|
REMOVE EXISTING FIBER HUB
|
EA
|
1.000
|
$2,500.000
|
$9,700.000
|
$10,399.020
|
$9,932.400
|
$9,700.000
|
$3,809.720
|
$3,809.720
|
|
|
TEMP CONSTR EQUIPMENT ALERT SYS
|
EA
|
7.000
|
$15,000.000
|
$12,000.000
|
$11,426.530
|
$20,299.980
|
$19,825.000
|
$12,652.650
|
$12,652.650
|
|
|
TEMP CONSTR EQUIP ALERT SYS (RELOCATE)
|
EA
|
12.000
|
$6,000.000
|
$300.000
|
$305.100
|
$102.400
|
$4,500.000
|
$337.840
|
$337.840
|
|
|
CCTV ON HIGH MAST ILLUMIN. ASSEM.
|
EA
|
2.000
|
$1,250.000
|
$10,800.000
|
$11,578.300
|
$37,451.300
|
$10,800.000
|
$11,397.100
|
$11,397.100
|
|
|
LCS SIGNAL UNIT (REMOVE)
|
EA
|
7.000
|
$1,425.000
|
$490.000
|
$525.310
|
$501.740
|
$490.000
|
$1,618.130
|
$1,618.130
|
|
|
TEMP INCIDENT DETECT & SURVEIL SYSTEM
|
EA
|
8.000
|
$68,500.000
|
$50,000.000
|
$46,723.470
|
$58,872.500
|
$57,495.000
|
$51,737.130
|
$51,737.130
|
|
|
TEMPORARY BLOW-OFF (COMPLETE)(2")
|
EA
|
3.000
|
$4,000.000
|
$2,197.000
|
$4,166.530
|
$4,301.710
|
$1,950.000
|
$1,950.000
|
$1,950.000
|
|
|
TIE-IN (COMPLETE)(8")
|
EA
|
3.000
|
$6,500.000
|
$3,670.000
|
$13,064.550
|
$5,555.280
|
$7,750.000
|
$7,750.000
|
$7,750.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
120.000
|
$20.000
|
$8.000
|
$49.430
|
$424.350
|
$25.000
|
$25.000
|
$25.000
|
|
|
WATER MAIN BREAKS LEAK REPAIR
|
EA
|
2.000
|
$7,500.000
|
$3,577.000
|
$8,121.210
|
$6,207.330
|
$5,750.000
|
$5,750.000
|
$5,750.000
|
|
|
WATER MAIN REMOVAL (16"& SMALLER)
|
LF
|
76.000
|
$40.000
|
$83.000
|
$105.930
|
$66.090
|
$75.000
|
$75.000
|
$75.000
|
|
|
WTR (JACK, BORE, OR TUNNEL)(24")
|
LF
|
187.000
|
$1,050.000
|
$964.000
|
$826.240
|
$1,011.600
|
$485.000
|
$485.000
|
$485.000
|
|
|
CONCRETE ENCASEMENT
|
CY
|
4.900
|
$250.000
|
$1,103.000
|
$494.330
|
$581.010
|
$325.000
|
$325.000
|
$325.000
|
|
|
CARRIER PIPE (IN CASING)(PVC)(8")
|
LF
|
187.000
|
$150.000
|
$137.000
|
$176.550
|
$173.440
|
$75.000
|
$75.000
|
$75.000
|
|
|
CONCRETE SADDLE
|
CY
|
5.000
|
$600.000
|
$1,103.000
|
$529.640
|
$831.800
|
$375.000
|
$375.000
|
$375.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
0.500
|
$15,500.000
|
$12,683.000
|
$8,474.300
|
$5,422.170
|
$6,000.000
|
$6,000.000
|
$6,000.000
|
|
|
FLOWABLE FILL BACKFILL
|
CY
|
370.000
|
$260.000
|
$192.000
|
$247.170
|
$165.370
|
$175.000
|
$175.000
|
$175.000
|
|
|
GATE VALVE AND BOX (COMPLETE)(8")
|
EA
|
2.000
|
$5,000.000
|
$3,302.000
|
$6,002.630
|
$4,292.030
|
$3,500.000
|
$3,500.000
|
$3,500.000
|
|
|
GROUT ABANDONMENT WATER MAIN (8")
|
LF
|
157.000
|
$30.000
|
$105.000
|
$28.250
|
$23.310
|
$20.000
|
$20.000
|
$20.000
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
2.000
|
$4,500.000
|
$2,619.000
|
$3,530.960
|
$4,338.420
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
|
|
PIPE WATER MAIN (PVC)(8")
|
LF
|
107.000
|
$150.000
|
$135.000
|
$247.170
|
$120.600
|
$155.000
|
$155.000
|
$155.000
|
|
|
STEEL CASING (24")(BORE)
|
LF
|
187.000
|
$180.000
|
$120.000
|
$247.170
|
$153.590
|
$165.000
|
$165.000
|
$165.000
|
|
|
STRUCTURAL EXCAVATION (PIPE)
|
CY
|
5.200
|
$400.000
|
$450.000
|
$353.100
|
$487.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
30" FLAT BOTTOM CHECK VALVE
|
EA
|
1.000
|
$38,000.000
|
$30,000.000
|
$50,000.000
|
$5,341.250
|
$15,000.000
|
$30,192.690
|
$30,192.690
|
|
|
NGP (MAIN)(2" PLASTIC W/TW)(OPEN CUT)
|
LF
|
20.000
|
$200.000
|
$256.670
|
$331.520
|
$262.830
|
$189.700
|
$200.000
|
$200.000
|
|
|
NGP (MAIN) (8" PLASTIC W/TW) (OPEN CUT)
|
LF
|
100.000
|
$200.000
|
$371.640
|
$480.020
|
$380.550
|
$265.600
|
$200.000
|
$200.000
|
|
|
NGP (GROUT ABANDONED MAIN)(8")
|
LF
|
388.000
|
$100.000
|
$95.860
|
$120.940
|
$98.160
|
$16.400
|
$250.000
|
$250.000
|
|
|
NGP (REMOVE ABANDONED MAIN)(2")
|
LF
|
12.000
|
$100.000
|
$32.500
|
$41.980
|
$33.280
|
$7.750
|
$100.000
|
$100.000
|
|
|
NGP (REMOVE ABANDONED MAIN)(8")
|
LF
|
345.000
|
$100.000
|
$33.520
|
$43.010
|
$34.320
|
$50.000
|
$150.000
|
$150.000
|
|
|
NGP(BORING)(8" PLASTIC W/TW)
|
LF
|
775.000
|
$300.000
|
$181.000
|
$224.380
|
$185.340
|
$482.000
|
$300.000
|
$300.000
|
|
|
NGP STEEL TIE-IN (2" STEEL)
|
EA
|
1.000
|
$10,000.000
|
$4,100.000
|
$5,293.770
|
$4,198.230
|
$2,610.000
|
$3,000.000
|
$3,000.000
|
|
|
NGP STEEL TIE-IN (8" STEEL)
|
EA
|
2.000
|
$10,000.000
|
$8,565.550
|
$11,064.960
|
$8,770.770
|
$10,850.000
|
$5,000.000
|
$5,000.000
|
|
|
HIGH PRESSURE WATER BLASTING SYSTEM 6"
|
LF
|
132,432.000
|
$5.000
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
Totals: |
$279,877,583.810
|
$221,480,419.560
|
$279,695,015.378
|
$283,295,809.745
|
$301,117,029.529
|
$302,860,000.002
|
$302,860,000.002
|