ASPH (AC-20-5TR)
|
GAL
|
62,407.000
|
$5.000
|
$6.440
|
$5.850
|
$6.500
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
1,625.000
|
$115.000
|
$455.200
|
$464.420
|
$300.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
195,023.000
|
$4.000
|
$8.540
|
$7.500
|
$7.500
|
|
|
STRUCT EXCAV
|
CY
|
150.000
|
$10.000
|
$150.000
|
$155.930
|
$90.000
|
|
|
CEM STABIL BKFL
|
CY
|
151.000
|
$90.000
|
$215.000
|
$269.540
|
$550.000
|
|
|
CUT & RESTORING PAV
|
SY
|
269.000
|
$110.000
|
$370.000
|
$316.110
|
$220.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
211.000
|
$25.000
|
$15.000
|
$50.000
|
$300.000
|
|
|
OPAQUE SEALER FINISH
|
SF
|
660,856.210
|
$0.320
|
$0.390
|
$0.350
|
$0.540
|
|
|
BLAST FINISH
|
SF
|
216,618.150
|
$1.500
|
$0.280
|
$0.250
|
$0.570
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
2,000.000
|
$100.000
|
$82.000
|
$82.000
|
$94.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
3,000.000
|
$200.000
|
$290.000
|
$290.000
|
$348.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
560.000
|
$170.000
|
$195.000
|
$195.000
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
69.000
|
$500.000
|
$1,050.000
|
$779.550
|
$1,840.000
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
7.000
|
$1,000.000
|
$22,500.000
|
$22,500.000
|
$26,000.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM I-A)
|
LS
|
29.000
|
$50,000.000
|
$23,080.960
|
$20,610.000
|
$23,000.000
|
|
|
RETROFIT RAIL (TY T80SS)
|
LF
|
466.000
|
$200.000
|
$400.000
|
$550.000
|
$430.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,767,379.780
|
$2,391,000.000
|
$2,664,040.080
|
$3,550,932.710
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
39.000
|
$20,000.000
|
$38,050.000
|
$19,867.940
|
$135,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
108.000
|
$4.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
108.000
|
$1.000
|
$10.000
|
$6.000
|
$6.100
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
750.000
|
$35.000
|
$72.000
|
$75.000
|
$61.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
750.000
|
$8.000
|
$40.000
|
$20.000
|
$48.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
56.000
|
$57.000
|
$420.000
|
$500.000
|
$390.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
693.000
|
$25.000
|
$30.110
|
$24.600
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,400.000
|
$2,153.280
|
$2,405.000
|
$2,400.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,553.510
|
$1,385.000
|
$1,390.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
693.000
|
$3.000
|
$2.200
|
$2.750
|
$2.750
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$230.000
|
$97.550
|
$225.000
|
$260.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$240.000
|
$194.620
|
$225.000
|
$230.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,200.000
|
$3,659.030
|
$3,305.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$300.000
|
$291.710
|
$225.000
|
$230.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,200.000
|
$1,500.000
|
$875.000
|
$880.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
$25,250.000
|
$25,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
825.000
|
$15.000
|
$137.500
|
$44.000
|
$50.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
25.000
|
$40.000
|
$220.000
|
$197.000
|
$220.000
|
|
|
CONDT (RM) (1")
|
LF
|
1,255.000
|
$40.000
|
$63.800
|
$53.000
|
$60.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
3,850.000
|
$1.400
|
$3.850
|
$6.000
|
$6.750
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
10.000
|
$1,200.000
|
$3,630.000
|
$1,300.000
|
$146.000
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)TP(O)
|
EA
|
2.000
|
$3,000.000
|
$10,890.000
|
$11,000.000
|
$12,400.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
16,150.000
|
$0.800
|
$0.610
|
$0.550
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
30,440.000
|
$0.600
|
$0.610
|
$0.550
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
11,799.000
|
$0.600
|
$0.910
|
$0.830
|
$0.910
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
|
LF
|
3,175.000
|
$2.500
|
$1.190
|
$1.080
|
$1.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
1,312.000
|
$2.500
|
$1.190
|
$1.080
|
$1.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
31,510.000
|
$0.600
|
$0.610
|
$0.550
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
121.000
|
$3.500
|
$3.780
|
$3.440
|
$3.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
267.000
|
$4.000
|
$3.780
|
$3.440
|
$3.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
809.000
|
$4.000
|
$4.590
|
$4.170
|
$4.550
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
2,405.000
|
$1.700
|
$1.020
|
$0.930
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
1,775.000
|
$4.000
|
$3.030
|
$2.750
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
1,792.000
|
$1.000
|
$1.020
|
$0.930
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
500.000
|
$1.500
|
$10.000
|
$1.000
|
$7.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
500.000
|
$1.500
|
$10.000
|
$1.000
|
$7.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
21,683.000
|
$0.900
|
$1.100
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
2,856.000
|
$2.750
|
$1.650
|
$1.500
|
$1.650
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
8,960.000
|
$3.200
|
$3.850
|
$3.500
|
$3.850
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
31.000
|
$150.000
|
$200.200
|
$182.000
|
$199.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
7.000
|
$230.000
|
$220.000
|
$200.000
|
$220.000
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
1.000
|
$165.000
|
$330.000
|
$300.000
|
$330.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
2.000
|
$200.000
|
$275.000
|
$250.000
|
$270.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
48.000
|
$160.000
|
$203.500
|
$185.000
|
$200.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
66,197.000
|
$0.900
|
$1.160
|
$1.050
|
$1.150
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
65,074.000
|
$1.000
|
$1.160
|
$1.050
|
$1.150
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
29,919.000
|
$0.600
|
$0.720
|
$0.650
|
$0.710
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
17.000
|
$2,600.000
|
$2,640.000
|
$2,400.000
|
$2,600.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,110.000
|
$4.600
|
$5.500
|
$5.000
|
$5.450
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,294.000
|
$0.500
|
$0.980
|
$0.890
|
$0.970
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
292.000
|
$1.000
|
$1.430
|
$1.300
|
$1.400
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,792.000
|
$2.000
|
$2.200
|
$2.000
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (NUMBER)
|
EA
|
2.000
|
$125.000
|
$79.200
|
$72.000
|
$79.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$65.000
|
$79.200
|
$72.000
|
$79.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
80,799.000
|
$0.100
|
$0.330
|
$0.300
|
$0.330
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
11,824.000
|
$0.200
|
$0.550
|
$0.500
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
8,533.000
|
$0.750
|
$0.660
|
$0.600
|
$0.660
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
24.000
|
$15.000
|
$44.000
|
$40.000
|
$44.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
7.000
|
$20.000
|
$88.000
|
$80.000
|
$88.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
2.000
|
$65.000
|
$55.000
|
$50.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
41.000
|
$35.000
|
$55.000
|
$50.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
17.000
|
$225.000
|
$660.000
|
$600.000
|
$660.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
12.000
|
$2,200.000
|
$6,105.000
|
$4,400.000
|
$5,000.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
1,000.000
|
$115.000
|
$80.000
|
$72.000
|
$83.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
GAL
|
200.000
|
$75.000
|
$1,156.000
|
$1,156.000
|
$1,330.000
|
|
|
BRIDGE JOINT REPAIR (STEEL)
|
LF
|
400.000
|
$600.000
|
$1,339.000
|
$1,340.000
|
$1,087.000
|
|
|
BRIDGE JOINT REPLACEMENT (FINGER)
|
LF
|
9,336.000
|
$500.000
|
$755.000
|
$770.000
|
$1,125.000
|
|
|
D-GR HMA TY-C PG76-22 (EXEMPT)
|
TON
|
4.000
|
$250.000
|
$1,155.000
|
$1,000.180
|
$1,000.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
30,550.000
|
$210.000
|
$196.630
|
$246.000
|
$210.000
|
|
|
STONE-MTRX-ASPH SMA-D PG76-22
|
TON
|
565.000
|
$270.000
|
$196.630
|
$246.000
|
$210.000
|
|
|
TACK COAT
|
GAL
|
11,685.000
|
$3.200
|
$4.700
|
$3.100
|
$2.500
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$300.000
|
$1,000.000
|
$1,000.000
|
$1,940.000
|
|
|
DEBRIS CONTAINMENT SYSTEM
|
LF
|
9,336.000
|
$50.000
|
$13.500
|
$14.000
|
$60.000
|
|
|
SPECIAL SURFACE FILLER
|
GAL
|
506.360
|
$0.800
|
$276.480
|
$247.000
|
$390.000
|
|
|
SPECIAL PROTECTIOVE COAT
|
SY
|
8,022.920
|
$33.500
|
$20.160
|
$18.000
|
$27.000
|
|
|
INSTALL BES
|
SF
|
2,300.000
|
$100.000
|
$68.000
|
$120.000
|
$89.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$25,500.000
|
$19,200.000
|
$37,000.000
|
|
|
INS LED WRONG WAY SIGN
|
EA
|
12.000
|
$1,400.000
|
$1,870.000
|
$2,900.000
|
$3,300.000
|
|
|
INS LED WW SGN W/BASIC SOL PWR KIT
|
EA
|
34.000
|
$1,700.000
|
$1,650.000
|
$3,300.000
|
$3,700.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,244.000
|
$180.000
|
$260.000
|
$350.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
72.000
|
$250.000
|
$260.000
|
$350.000
|
$950.000
|
|
|
LCS SIGNAL UNIT (REMOVE)
|
EA
|
169.000
|
$530.000
|
$2,277.000
|
$1,040.000
|
$1,170.000
|
|
Totals: |
$20,567,530.650
|
$25,956,302.554
|
$26,774,272.231
|
$35,544,872.009
|