BEXAR IH 35 (0017-10-280)

Items: 132

County: BEXAR
Length: N/A
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-10-280
DBE Goal: N/A
Project: STP 2018(860)MM
Guaranty: N/A
Time: 301 WORKING DAYS
Engineer's Estimate: $5,046,510.55
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$5,046,510.55
$4,561,840.84
Over/Under Est: -9.6% -$484,669.71
Over/Under Est: -9.41% -$475,088.79
Amt Left: 0.21% $9,580.92
Over/Under Est: -9.32% -$470,397.35
Amt Left: 0.31% $14,272.36
Delta: -0.10% -$4,691.44
$4,647,777.40
Over/Under Est: -7.9% -$398,733.15
Amt Left: 1.88% $85,936.56
Delta: -1.57% -$71,664.20
Over/Under Est: -6.35% -$320,344.17
Amt Left: 3.6% $164,325.54
Delta: -1.69% -$78,388.98
Over/Under Est: -2.8% -$141,490.02
Amt Left: 7.52% $343,179.69
Delta: -3.78% -$178,854.15
$4,997,968.08
Over/Under Est: -0.96% -$48,542.47
Amt Left: 9.56% $436,127.24
Delta: -1.89% -$92,947.55
Over/Under Est: 1.85% $93,109.45
Amt Left: 12.67% $577,779.16
Delta: -2.83% -$141,651.92
$5,153,555.70
Over/Under Est: 2.12% $107,045.15
Amt Left: 12.97% $591,714.86
Delta: -0.27% -$13,935.70

Bid Items & Bid Tabulations

132 Total 0 of 132
BEXAR  |  IH 35  |  SAN ANTONIO  |  0017-10-280  |  05/01/2018  |  $5,046,510.55  |  STP 2018(860)MM  |  CONSTRUCT SIDEWALKS ALONG FRONTAGE R...  |  301 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J3 COMPANY, LLC
CAPITAL EXCAVATION COMPANY
CURRAN CONTRACTING COMPANY
F. D. CONCRETE, LLC
SOUTH TEXAS ILLUMINATION, LLC
E-Z BEL CONSTRUCTION, LLC
TI-ZACK CONCRETE, INC.
HIGHWAY 19 CONSTRUCTION LLC
ENCINO LANDSCAPE, INC.
REMOVING CONC (RIPRAP)
SY 887.000 $15.000 $20.000 $15.000 $9.000 $12.000 $10.000 $7.000 $12.000 $10.000 $10.000
REMOVING CONC (MEDIANS)
SY 44.000 $25.000 $30.000 $50.000 $27.000 $15.000 $14.000 $25.000 $12.000 $10.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 9,582.000 $25.000 $20.000 $15.000 $11.500 $18.000 $10.000 $7.000 $20.000 $10.000 $10.000
REMOVING CONC (RETAINING WALLS)
SY 77.000 $25.000 $90.000 $45.000 $25.750 $20.000 $13.000 $12.000 $15.000 $10.000 $20.000
REMOVING CONC (MISC)
SY 3.000 $45.000 $300.000 $500.000 $82.000 $13.000 $85.000 $85.000 $30.000 $100.000 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 7,901.000 $10.000 $7.000 $5.000 $6.150 $2.000 $5.000 $2.500 $6.000 $5.000 $7.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 2,166.000 $15.000 $15.000 $13.000 $8.700 $16.000 $12.000 $8.000 $15.000 $10.000 $10.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 6,448.000 $15.000 $14.000 $10.000 $43.500 $13.000 $20.000 $10.000 $15.000 $10.000 $10.000
EXCAVATION (CHANNEL)
CY 562.000 $18.000 $20.000 $20.000 $17.000 $30.000 $12.000 $34.000 $25.000 $10.000 $15.000
EXCAVATION (SPECIAL)
CY 150.000 $20.000 $15.000 $50.000 $55.000 $30.000 $50.000 $30.000 $25.000 $100.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 150.000 $25.000 $10.040 $60.000 $15.500 $15.000 $15.000 $9.000 $25.000 $35.000 $25.000
BLOCK SODDING
SY 17,153.000 $6.000 $4.000 $3.910 $5.000 $7.500 $4.260 $3.600 $4.400 $6.000 $5.000
VEGETATIVE WATERING
MG 267.590 $30.000 $28.000 $33.800 $34.500 $125.000 $29.880 $25.000 $115.000 $100.000 $30.000
D-GR HMA(SQ) TY-C PG76-22
TON 359.300 $95.000 $150.000 $155.280 $150.000 $550.000 $446.370 $165.000 $140.000 $180.000 $200.000
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 3,074.000 $100.000 $90.000 $93.000 $63.000 $70.000 $73.550 $75.000 $85.000 $35.000 $30.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 416.000 $75.000 $145.000 $90.000 $113.000 $80.000 $73.550 $114.000 $155.000 $110.000 $200.000
FLOWABLE BACKFILL
CY 53.000 $210.000 $91.700 $200.000 $99.000 $150.000 $143.010 $125.000 $250.000 $180.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 10.000 $5.000 $120.000 $10.000 $26.500 $15.000 $150.000 $1.000 $10.000 $10.000 $100.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $235.000 $391.400 $358.590 $415.000 $450.000 $329.310 $400.000 $400.000 $380.000 $500.000
CL A CONC (MISC)
CY 20.000 $500.000 $420.000 $700.000 $310.000 $600.000 $657.150 $180.000 $1,000.000 $1,000.000 $1,000.000
CL A CONC (COLLAR)
EA 1.000 $650.000 $2,000.000 $1,000.000 $765.000 $700.000 $424.500 $715.000 $1,000.000 $1,500.000 $2,000.000
CL C CONC (MISC)
CY 314.800 $650.000 $525.000 $625.000 $418.000 $550.000 $594.300 $990.000 $550.000 $1,000.000 $1,000.000
CL A CONC (STEPS)
CY 2.000 $650.000 $2,000.000 $2,000.000 $582.000 $250.000 $395.880 $890.000 $1,000.000 $1,000.000 $2,000.000
RETAINING WALL (CAST - IN - PLACE)
SF 931.000 $45.000 $50.000 $35.000 $50.750 $38.000 $76.190 $78.000 $45.000 $30.000 $60.000
RIPRAP (CONC)(6 IN)
CY 218.000 $450.000 $475.000 $410.000 $287.000 $500.000 $419.400 $450.000 $650.000 $500.000 $500.000
RAIL (HANDRAIL)(TY B)
LF 606.000 $110.000 $70.000 $65.000 $62.500 $126.000 $59.900 $90.000 $61.000 $100.000 $80.000
CONC BOX CULV (8 FT X 4 FT)
LF 14.000 $500.000 $1,200.000 $900.000 $1,047.000 $1,200.000 $969.750 $750.000 $850.000 $1,000.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 88.000 $60.000 $80.000 $82.000 $68.400 $120.000 $57.580 $88.000 $45.000 $75.000 $100.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $4,500.000 $6,500.000 $5,000.000 $3,100.000 $9,200.000 $6,160.000 $7,500.000 $5,000.000 $3,500.000 $2,500.000
GRATE & FRAME
EA 95.000 $1,200.000 $900.000 $1,000.000 $896.000 $2,100.000 $2,255.750 $1,100.000 $1,000.000 $1,500.000 $1,500.000
ADJUSTING MANHOLES
EA 3.000 $750.000 $1,500.000 $1,300.000 $657.750 $1,200.000 $786.750 $1,200.000 $550.000 $500.000 $1,500.000
REMOV STR (INLET)
EA 1.000 $2,500.000 $3,500.000 $2,000.000 $496.000 $800.000 $1,195.000 $1,200.000 $550.000 $700.000 $500.000
REMOV STR (PIPE)
LF 12.000 $50.000 $250.000 $20.000 $28.500 $10.000 $59.750 $100.000 $15.000 $50.000 $100.000
REMOVE STR (RAIL)
LF 120.000 $45.000 $30.000 $25.000 $25.800 $27.000 $29.880 $5.000 $15.000 $50.000 $30.000
MOBILIZATION
LS 1.000 $420,000.000 $458,496.100 $525,000.000 $419,000.000 $124,172.000 $448,987.500 $400,000.000 $400,000.000 $400,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $2,500.000 $7,500.000 $5,000.000 $5,650.000 $10,025.000 $7,843.750 $5,000.000 $2,000.000 $5,000.000 $10,000.000
SANDBAGS FOR EROSION CONTROL
EA 6,000.000 $6.000 $4.500 $4.500 $4.750 $5.000 $4.530 $5.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,000.000 $5.000 $3.500 $3.500 $3.700 $6.000 $3.510 $3.500 $1.000 $1.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,000.000 $2.000 $1.500 $1.500 $1.600 $0.500 $0.600 $0.500 $1.000 $1.000 $0.500
LANDSCAPE PAVERS
SY 52.000 $65.000 $90.000 $138.460 $143.000 $52.000 $88.260 $5.000 $115.000 $75.000 $100.000
REMOVE AND RELAY PAVERS
SY 67.000 $70.000 $90.000 $153.850 $159.000 $70.000 $72.700 $12.500 $115.000 $75.000 $100.000
CONC CURB (TY I)
LF 1,007.000 $18.000 $16.000 $7.000 $23.850 $18.000 $11.040 $9.000 $35.000 $20.000 $12.000
CONC CURB (TY II)
LF 9,541.000 $20.000 $16.000 $9.500 $21.650 $15.000 $9.820 $5.500 $30.000 $35.000 $12.000
CONC CURB (SLOTTED)
LF 99.000 $40.000 $40.000 $50.000 $38.600 $26.000 $36.230 $23.000 $15.000 $75.000 $20.000
CONC CURB & GUTTER (ARMOR CURB)
LF 112.000 $200.000 $120.000 $200.000 $146.000 $200.000 $194.160 $285.000 $400.000 $150.000 $200.000
CONC CURB & GUTTER(VALLEY GUTTER)(36")
LF 209.000 $80.000 $45.000 $17.000 $29.900 $40.000 $82.040 $29.000 $36.000 $50.000 $50.000
DRIVEWAYS (CONC)
SY 12,105.000 $75.000 $62.000 $70.000 $58.200 $56.000 $74.400 $75.000 $72.000 $65.000 $60.000
DRIVEWAYS (ACP)
SY 3,542.000 $65.000 $55.000 $58.000 $44.800 $35.000 $54.650 $40.000 $45.000 $50.000 $40.000
CONC SIDEWALKS (4")
SY 16,076.000 $60.000 $48.500 $45.000 $49.650 $45.500 $51.540 $55.000 $74.000 $55.000 $45.000
CURB RAMPS (TY 1)
SY 43.000 $65.000 $90.000 $100.000 $128.000 $130.000 $93.990 $100.000 $110.000 $1,000.000 $1,500.000
CURB RAMPS (TY 2)
SY 31.000 $65.000 $90.000 $110.000 $124.000 $130.000 $96.980 $100.000 $90.000 $1,800.000 $1,500.000
CURB RAMPS (TY 3)
SY 39.000 $65.000 $90.000 $130.000 $125.000 $130.000 $96.980 $100.000 $90.000 $1,500.000 $1,500.000
CURB RAMPS (TY 6)
SY 103.000 $65.000 $90.000 $110.000 $124.000 $129.000 $96.980 $100.000 $90.000 $1,200.000 $1,500.000
CURB RAMPS (TY 7)
SY 119.000 $65.000 $90.000 $100.000 $155.000 $120.000 $96.980 $100.000 $90.000 $1,000.000 $1,500.000
CURB RAMPS (TY 10)
SY 59.000 $65.000 $75.000 $130.000 $125.000 $120.000 $103.080 $100.000 $90.000 $1,100.000 $1,500.000
CURB RAMPS (TY 22)
SY 21.000 $65.000 $120.000 $300.000 $169.000 $110.000 $103.080 $100.000 $90.000 $3,000.000 $1,500.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 1,376.000 $75.000 $160.000 $90.000 $204.000 $105.000 $100.210 $495.000 $145.000 $100.000 $70.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 5.000 $250.000 $450.000 $401.620 $426.000 $200.000 $554.950 $175.000 $225.000 $350.000 $500.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $2,300.000 $3,296.000 $2,373.740 $3,500.000 $2,500.000 $1,937.120 $3,000.000 $3,500.000 $500.000 $4,000.000
CONDT (PVC) (SCH 40) (1")
LF 613.000 $14.000 $8.240 $10.100 $8.750 $12.000 $7.900 $6.000 $9.000 $8.000 $5.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 110.000 $35.000 $61.800 $35.350 $65.600 $40.000 $25.220 $60.000 $65.000 $60.000 $40.000
CONDT (PVC) (SCH 80) (3")
LF 165.000 $20.000 $15.450 $15.150 $16.400 $20.000 $11.400 $12.000 $20.000 $15.000 $25.000
ELEC CONDR (NO.8) BARE
LF 473.000 $4.000 $1.130 $1.110 $1.200 $1.200 $1.100 $1.500 $1.250 $2.000 $5.000
GROUND BOX TY D (162922)
EA 7.000 $500.000 $772.500 $934.340 $819.850 $1,200.000 $565.900 $645.000 $800.000 $750.000 $2,000.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $650.000 $927.000 $934.340 $983.850 $1,300.000 $656.150 $895.000 $1,000.000 $900.000 $2,000.000
REMOVE GROUND BOX
EA 8.000 $200.000 $257.500 $151.520 $273.300 $200.000 $119.500 $75.000 $250.000 $250.000 $300.000
ALUMINUM SIGNS (TY A)
SF 53.000 $30.000 $19.810 $19.190 $20.150 $30.000 $19.420 $45.000 $40.000 $55.000 $100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $1,100.000 $539.470 $539.470 $572.050 $700.000 $456.880 $580.000 $450.000 $900.000 $500.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $1,500.000 $1,605.990 $1,944.450 $2,041.200 $2,200.000 $1,227.170 $1,200.000 $1,500.000 $1,100.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY S80
EA 63.000 $300.000 $515.810 $515.810 $546.950 $400.000 $364.750 $400.000 $325.000 $350.000 $300.000
REMOVE SM RD SN SUP&AM
EA 12.000 $50.000 $65.000 $65.000 $35.750 $65.000 $29.880 $60.000 $75.000 $200.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $200.000 $32.500 $32.500 $34.450 $60.000 $93.500 $60.000 $50.000 $35.000 $100.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 5.000 $200.000 $54.500 $54.500 $57.800 $125.000 $93.500 $60.000 $65.000 $35.000 $100.000
INSTL OM ASSM (OM-3C)(FLX)SRF
EA 1.000 $200.000 $305.500 $305.500 $323.950 $125.000 $104.500 $145.000 $150.000 $75.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 7.000 $25.000 $25.000 $25.000 $16.600 $28.000 $2.990 $4.000 $5.000 $100.000 $100.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 34.000 $2.000 $5.000 $2.500 $3.400 $5.000 $2.750 $2.500 $2.500 $5.000 $10.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 63.000 $3.000 $7.000 $2.000 $4.450 $5.000 $2.200 $2.000 $2.000 $3.000 $20.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 709.000 $4.000 $1.500 $1.000 $2.250 $3.000 $1.100 $1.000 $1.000 $3.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,010.000 $7.000 $5.000 $5.000 $6.700 $7.000 $5.500 $5.000 $5.000 $6.000 $10.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 7.000 $25.000 $100.000 $100.000 $111.350 $125.000 $110.000 $100.000 $100.000 $50.000 $300.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $120.000 $150.000 $125.000 $201.450 $250.000 $137.500 $125.000 $125.000 $50.000 $400.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 2.000 $200.000 $200.000 $400.000 $312.800 $325.000 $440.000 $400.000 $450.000 $50.000 $500.000
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 72.000 $3.000 $5.000 $1.000 $3.400 $5.000 $79.200 $1.000 $1.000 $2.000 $20.000
PAVEMENT SEALER 4"
LF 845.000 $0.600 $0.400 $0.300 $0.550 $0.750 $0.330 $0.300 $0.300 $2.000 $0.500
PAVEMENT SEALER 8"
LF 772.000 $0.700 $0.500 $0.650 $1.050 $2.000 $0.720 $0.650 $0.650 $2.000 $1.500
PAVEMENT SEALER 24"
LF 1,010.000 $1.250 $1.000 $2.400 $3.200 $4.000 $2.640 $2.400 $2.400 $5.000 $4.000
PAVEMENT SEALER (ARROW)
EA 7.000 $10.000 $20.000 $63.000 $58.300 $100.000 $69.300 $63.000 $65.000 $5.000 $60.000
PAVEMENT SEALER (WORD)
EA 6.000 $20.000 $20.000 $63.000 $100.750 $125.000 $69.300 $63.000 $65.000 $5.000 $100.000
PAVEMENT SEALER (SYMBOL)
EA 2.000 $25.000 $20.000 $200.000 $159.050 $200.000 $220.000 $200.000 $200.000 $5.000 $200.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 230.000 $0.550 $2.000 $2.500 $3.900 $4.000 $2.750 $2.500 $2.500 $10.000 $5.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 509.000 $0.400 $2.000 $2.500 $3.300 $4.000 $2.750 $2.500 $2.500 $10.000 $5.000
TRAFFIC BUTTON TY II-C-R
EA 62.000 $5.000 $5.000 $8.000 $5.900 $7.000 $8.800 $8.000 $8.000 $300.000 $500.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,242.000 $1.250 $0.750 $0.740 $1.450 $1.500 $0.810 $0.740 $0.740 $1.000 $1.500
ELIM EXT PAV MRK & MRKS (8")
LF 960.000 $2.250 $1.000 $1.500 $2.850 $3.000 $1.650 $1.500 $1.500 $1.000 $3.000
ELIM EXT PAV MRK & MRKS (24")
LF 828.000 $3.000 $3.000 $2.000 $8.600 $9.000 $2.200 $2.000 $2.000 $1.000 $10.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 3.000 $20.000 $50.000 $53.000 $58.300 $60.000 $58.300 $53.000 $53.000 $5.000 $70.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 6.000 $50.000 $50.000 $53.000 $100.750 $125.000 $58.300 $53.000 $53.000 $10.000 $100.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 2.000 $65.000 $50.000 $200.000 $201.450 $200.000 $220.000 $200.000 $200.000 $10.000 $200.000
PAV SURF PREP FOR MRK (4")
LF 845.000 $0.200 $0.150 $0.100 $0.250 $0.500 $0.110 $0.100 $0.100 $1.000 $0.500
PAV SURF PREP FOR MRK (8")
LF 772.000 $0.300 $0.200 $0.200 $0.550 $1.000 $0.220 $0.200 $0.200 $1.000 $2.000
PAV SURF PREP FOR MRK (24")
LF 1,010.000 $0.650 $0.500 $1.000 $1.600 $2.000 $1.100 $1.000 $1.000 $5.000 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 7.000 $1.250 $15.000 $37.000 $26.500 $50.000 $40.700 $37.000 $37.000 $10.000 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $4.000 $15.000 $37.000 $53.000 $100.000 $40.700 $37.000 $37.000 $10.000 $75.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 2.000 $5.000 $15.000 $100.000 $79.550 $100.000 $110.000 $100.000 $100.000 $30.000 $100.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $25,000.000 $16,480.000 $10,101.010 $17,490.350 $15,000.000 $7,274.750 $5,500.000 $20,000.000 $16,000.000 $1,000.000
VEH SIG SEC (12")LED(GRN)
EA 6.000 $300.000 $257.500 $217.170 $273.300 $300.000 $223.830 $225.000 $300.000 $250.000 $500.000
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $300.000 $257.500 $217.170 $273.300 $300.000 $193.950 $225.000 $300.000 $250.000 $500.000
VEH SIG SEC (12")LED(YEL)
EA 6.000 $315.000 $257.500 $217.170 $273.300 $300.000 $193.950 $225.000 $300.000 $250.000 $500.000
VEH SIG SEC (12")LED(RED)
EA 6.000 $315.000 $257.500 $217.170 $273.300 $300.000 $172.950 $225.000 $300.000 $250.000 $500.000
BACK PLATE (12")(3 SEC)
EA 5.000 $125.000 $61.800 $80.810 $65.600 $90.000 $73.060 $95.000 $70.000 $60.000 $800.000
BACK PLATE (12")(4 SEC)
EA 1.000 $150.000 $61.800 $106.060 $65.600 $125.000 $94.540 $100.000 $70.000 $60.000 $1,000.000
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 1,177.000 $2.000 $2.580 $1.520 $2.750 $1.900 $1.940 $2.900 $3.000 $3.000 $5.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $4,000.000 $2,060.000 $1,439.390 $2,186.300 $2,200.000 $1,567.250 $2,500.000 $2,500.000 $2,500.000 $2,000.000
INS TRF SIG PL AM(S)1 ARM(60')
EA 1.000 $145,000.000 $25,750.000 $25,404.040 $27,328.700 $28,150.000 $23,961.130 $25,500.000 $30,000.000 $25,000.000 $20,000.000
PED DETECT PUSH BUTTON (APS)
EA 3.000 $500.000 $824.000 $904.040 $874.500 $1,200.000 $700.880 $1,950.000 $1,000.000 $800.000 $500.000
PED DETECT PUSH BUTTON (STANDARD)
EA 8.000 $450.000 $515.000 $277.780 $546.550 $2,300.000 $77.460 $495.000 $600.000 $500.000 $300.000
INSTALL OF VEHICLE DETECTORS
LF 10,000.000 $2.000 $3.090 $18.180 $3.300 $17.000 $6.050 $0.010 $0.300 $1.000 $0.010
REMOVAL OF SIGNAL RELATED SIGNS
EA 1.000 $150.000 $257.500 $101.010 $273.300 $100.000 $179.250 $122.000 $300.000 $250.000 $300.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 12.000 $75.000 $154.500 $40.400 $163.950 $100.000 $14.940 $122.000 $200.000 $150.000 $100.000
TREE AND BRUSH REMOVAL
AC 2.000 $5,500.000 $5,000.000 $7,500.000 $2,650.900 $4,000.000 $9,350.000 $4,500.000 $10,000.000 $10,000.000 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $5,000.000 $7,500.000 $7,500.000 $24,793.200 $7,000.000 $9,150.000 $1,500.000 $2,500.000 $10,000.000 $18,000.000
CCTV MOUNT (POLE)
EA 1.000 $400.000 $4,635.000 $4,368.690 $4,919.150 $5,000.000 $3,025.000 $5,400.000 $5,000.000 $5,000.000 $10,000.000
RADAR PRESENCE DETECTOR
EA 1.000 $6,500.000 $6,695.000 $7,575.760 $7,105.450 $8,000.000 $7,621.250 $8,300.000 $7,000.000 $6,500.000 $7,000.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 264.000 $4.000 $3.090 $2.780 $3.300 $5.000 $1.940 $4.600 $3.000 $3.000 $10.000
CONDUIT (PREPARE)
LF 220.000 $3.000 $2.580 $5.050 $2.750 $8.000 $3.590 $6.400 $2.500 $3.000 $5.000
GROUND BOX (PREPARE)
EA 4.000 $400.000 $309.000 $202.020 $327.950 $300.000 $298.750 $345.000 $300.000 $300.000 $300.000
RADAR ADVANCED DETECTION DEVICE
EA 1.000 $8,000.000 $6,695.000 $9,595.960 $7,105.450 $11,000.000 $7,066.000 $7,995.000 $7,000.000 $6,500.000 $5,000.000
TMA (STATIONARY)
DAY 516.000 $200.000 $100.000 $147.220 $186.000 $550.000 $137.500 $195.000 $50.000 $200.000 $250.000
ADJUST GAS FACILITY ACCESS COVER
EA 5.000 $225.000 $750.000 $677.560 $240.000 $200.000 $1,805.000 $365.000 $450.000 $500.000 $1,000.000
SANITARY SEWER (ADJUST MANHOLE)
EA 5.000 $1,100.000 $3,500.000 $2,010.150 $660.000 $1,200.000 $933.150 $1,500.000 $450.000 $500.000 $2,000.000
ADJUST EXISTING VALVE BOX
EA 6.000 $225.000 $500.000 $923.080 $200.000 $50.000 $481.750 $450.000 $450.000 $500.000 $500.000
ADJUST EXISTING METER AND NEW METER BOX
EA 13.000 $400.000 $600.000 $1,006.700 $325.000 $400.000 $241.500 $400.000 $450.000 $500.000 $500.000
Totals: $5,046,510.550 $4,561,840.840 $4,571,421.766 $4,576,113.205 $4,647,777.400 $4,726,166.390 $4,905,020.530 $4,997,968.080 $5,139,620.000 $5,153,555.700