REMOVING CONC (RIPRAP)
|
SY
|
887.000
|
$15.000
|
$20.000
|
$15.000
|
$9.000
|
$12.000
|
$10.000
|
$7.000
|
$12.000
|
$10.000
|
$10.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
44.000
|
$25.000
|
$30.000
|
$50.000
|
$27.000
|
$15.000
|
$14.000
|
$25.000
|
$12.000
|
$10.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
9,582.000
|
$25.000
|
$20.000
|
$15.000
|
$11.500
|
$18.000
|
$10.000
|
$7.000
|
$20.000
|
$10.000
|
$10.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
77.000
|
$25.000
|
$90.000
|
$45.000
|
$25.750
|
$20.000
|
$13.000
|
$12.000
|
$15.000
|
$10.000
|
$20.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
3.000
|
$45.000
|
$300.000
|
$500.000
|
$82.000
|
$13.000
|
$85.000
|
$85.000
|
$30.000
|
$100.000
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
7,901.000
|
$10.000
|
$7.000
|
$5.000
|
$6.150
|
$2.000
|
$5.000
|
$2.500
|
$6.000
|
$5.000
|
$7.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
2,166.000
|
$15.000
|
$15.000
|
$13.000
|
$8.700
|
$16.000
|
$12.000
|
$8.000
|
$15.000
|
$10.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
6,448.000
|
$15.000
|
$14.000
|
$10.000
|
$43.500
|
$13.000
|
$20.000
|
$10.000
|
$15.000
|
$10.000
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
562.000
|
$18.000
|
$20.000
|
$20.000
|
$17.000
|
$30.000
|
$12.000
|
$34.000
|
$25.000
|
$10.000
|
$15.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
150.000
|
$20.000
|
$15.000
|
$50.000
|
$55.000
|
$30.000
|
$50.000
|
$30.000
|
$25.000
|
$100.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
150.000
|
$25.000
|
$10.040
|
$60.000
|
$15.500
|
$15.000
|
$15.000
|
$9.000
|
$25.000
|
$35.000
|
$25.000
|
|
|
BLOCK SODDING
|
SY
|
17,153.000
|
$6.000
|
$4.000
|
$3.910
|
$5.000
|
$7.500
|
$4.260
|
$3.600
|
$4.400
|
$6.000
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
267.590
|
$30.000
|
$28.000
|
$33.800
|
$34.500
|
$125.000
|
$29.880
|
$25.000
|
$115.000
|
$100.000
|
$30.000
|
|
|
D-GR HMA(SQ) TY-C PG76-22
|
TON
|
359.300
|
$95.000
|
$150.000
|
$155.280
|
$150.000
|
$550.000
|
$446.370
|
$165.000
|
$140.000
|
$180.000
|
$200.000
|
|
|
FLEX PAVE STRUCTURE REPAIR (8"-10")
|
SY
|
3,074.000
|
$100.000
|
$90.000
|
$93.000
|
$63.000
|
$70.000
|
$73.550
|
$75.000
|
$85.000
|
$35.000
|
$30.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
416.000
|
$75.000
|
$145.000
|
$90.000
|
$113.000
|
$80.000
|
$73.550
|
$114.000
|
$155.000
|
$110.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
53.000
|
$210.000
|
$91.700
|
$200.000
|
$99.000
|
$150.000
|
$143.010
|
$125.000
|
$250.000
|
$180.000
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
10.000
|
$5.000
|
$120.000
|
$10.000
|
$26.500
|
$15.000
|
$150.000
|
$1.000
|
$10.000
|
$10.000
|
$100.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
$235.000
|
$391.400
|
$358.590
|
$415.000
|
$450.000
|
$329.310
|
$400.000
|
$400.000
|
$380.000
|
$500.000
|
|
|
CL A CONC (MISC)
|
CY
|
20.000
|
$500.000
|
$420.000
|
$700.000
|
$310.000
|
$600.000
|
$657.150
|
$180.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
1.000
|
$650.000
|
$2,000.000
|
$1,000.000
|
$765.000
|
$700.000
|
$424.500
|
$715.000
|
$1,000.000
|
$1,500.000
|
$2,000.000
|
|
|
CL C CONC (MISC)
|
CY
|
314.800
|
$650.000
|
$525.000
|
$625.000
|
$418.000
|
$550.000
|
$594.300
|
$990.000
|
$550.000
|
$1,000.000
|
$1,000.000
|
|
|
CL A CONC (STEPS)
|
CY
|
2.000
|
$650.000
|
$2,000.000
|
$2,000.000
|
$582.000
|
$250.000
|
$395.880
|
$890.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
931.000
|
$45.000
|
$50.000
|
$35.000
|
$50.750
|
$38.000
|
$76.190
|
$78.000
|
$45.000
|
$30.000
|
$60.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
218.000
|
$450.000
|
$475.000
|
$410.000
|
$287.000
|
$500.000
|
$419.400
|
$450.000
|
$650.000
|
$500.000
|
$500.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
606.000
|
$110.000
|
$70.000
|
$65.000
|
$62.500
|
$126.000
|
$59.900
|
$90.000
|
$61.000
|
$100.000
|
$80.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
14.000
|
$500.000
|
$1,200.000
|
$900.000
|
$1,047.000
|
$1,200.000
|
$969.750
|
$750.000
|
$850.000
|
$1,000.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
88.000
|
$60.000
|
$80.000
|
$82.000
|
$68.400
|
$120.000
|
$57.580
|
$88.000
|
$45.000
|
$75.000
|
$100.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
1.000
|
$4,500.000
|
$6,500.000
|
$5,000.000
|
$3,100.000
|
$9,200.000
|
$6,160.000
|
$7,500.000
|
$5,000.000
|
$3,500.000
|
$2,500.000
|
|
|
GRATE & FRAME
|
EA
|
95.000
|
$1,200.000
|
$900.000
|
$1,000.000
|
$896.000
|
$2,100.000
|
$2,255.750
|
$1,100.000
|
$1,000.000
|
$1,500.000
|
$1,500.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
3.000
|
$750.000
|
$1,500.000
|
$1,300.000
|
$657.750
|
$1,200.000
|
$786.750
|
$1,200.000
|
$550.000
|
$500.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$2,500.000
|
$3,500.000
|
$2,000.000
|
$496.000
|
$800.000
|
$1,195.000
|
$1,200.000
|
$550.000
|
$700.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
12.000
|
$50.000
|
$250.000
|
$20.000
|
$28.500
|
$10.000
|
$59.750
|
$100.000
|
$15.000
|
$50.000
|
$100.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
120.000
|
$45.000
|
$30.000
|
$25.000
|
$25.800
|
$27.000
|
$29.880
|
$5.000
|
$15.000
|
$50.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$420,000.000
|
$458,496.100
|
$525,000.000
|
$419,000.000
|
$124,172.000
|
$448,987.500
|
$400,000.000
|
$400,000.000
|
$400,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$2,500.000
|
$7,500.000
|
$5,000.000
|
$5,650.000
|
$10,025.000
|
$7,843.750
|
$5,000.000
|
$2,000.000
|
$5,000.000
|
$10,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
6,000.000
|
$6.000
|
$4.500
|
$4.500
|
$4.750
|
$5.000
|
$4.530
|
$5.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
6,000.000
|
$5.000
|
$3.500
|
$3.500
|
$3.700
|
$6.000
|
$3.510
|
$3.500
|
$1.000
|
$1.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
6,000.000
|
$2.000
|
$1.500
|
$1.500
|
$1.600
|
$0.500
|
$0.600
|
$0.500
|
$1.000
|
$1.000
|
$0.500
|
|
|
LANDSCAPE PAVERS
|
SY
|
52.000
|
$65.000
|
$90.000
|
$138.460
|
$143.000
|
$52.000
|
$88.260
|
$5.000
|
$115.000
|
$75.000
|
$100.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
67.000
|
$70.000
|
$90.000
|
$153.850
|
$159.000
|
$70.000
|
$72.700
|
$12.500
|
$115.000
|
$75.000
|
$100.000
|
|
|
CONC CURB (TY I)
|
LF
|
1,007.000
|
$18.000
|
$16.000
|
$7.000
|
$23.850
|
$18.000
|
$11.040
|
$9.000
|
$35.000
|
$20.000
|
$12.000
|
|
|
CONC CURB (TY II)
|
LF
|
9,541.000
|
$20.000
|
$16.000
|
$9.500
|
$21.650
|
$15.000
|
$9.820
|
$5.500
|
$30.000
|
$35.000
|
$12.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
99.000
|
$40.000
|
$40.000
|
$50.000
|
$38.600
|
$26.000
|
$36.230
|
$23.000
|
$15.000
|
$75.000
|
$20.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
112.000
|
$200.000
|
$120.000
|
$200.000
|
$146.000
|
$200.000
|
$194.160
|
$285.000
|
$400.000
|
$150.000
|
$200.000
|
|
|
CONC CURB & GUTTER(VALLEY GUTTER)(36")
|
LF
|
209.000
|
$80.000
|
$45.000
|
$17.000
|
$29.900
|
$40.000
|
$82.040
|
$29.000
|
$36.000
|
$50.000
|
$50.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
12,105.000
|
$75.000
|
$62.000
|
$70.000
|
$58.200
|
$56.000
|
$74.400
|
$75.000
|
$72.000
|
$65.000
|
$60.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,542.000
|
$65.000
|
$55.000
|
$58.000
|
$44.800
|
$35.000
|
$54.650
|
$40.000
|
$45.000
|
$50.000
|
$40.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
16,076.000
|
$60.000
|
$48.500
|
$45.000
|
$49.650
|
$45.500
|
$51.540
|
$55.000
|
$74.000
|
$55.000
|
$45.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
43.000
|
$65.000
|
$90.000
|
$100.000
|
$128.000
|
$130.000
|
$93.990
|
$100.000
|
$110.000
|
$1,000.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
31.000
|
$65.000
|
$90.000
|
$110.000
|
$124.000
|
$130.000
|
$96.980
|
$100.000
|
$90.000
|
$1,800.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
39.000
|
$65.000
|
$90.000
|
$130.000
|
$125.000
|
$130.000
|
$96.980
|
$100.000
|
$90.000
|
$1,500.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
103.000
|
$65.000
|
$90.000
|
$110.000
|
$124.000
|
$129.000
|
$96.980
|
$100.000
|
$90.000
|
$1,200.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
119.000
|
$65.000
|
$90.000
|
$100.000
|
$155.000
|
$120.000
|
$96.980
|
$100.000
|
$90.000
|
$1,000.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
59.000
|
$65.000
|
$75.000
|
$130.000
|
$125.000
|
$120.000
|
$103.080
|
$100.000
|
$90.000
|
$1,100.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 22)
|
SY
|
21.000
|
$65.000
|
$120.000
|
$300.000
|
$169.000
|
$110.000
|
$103.080
|
$100.000
|
$90.000
|
$3,000.000
|
$1,500.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
1,376.000
|
$75.000
|
$160.000
|
$90.000
|
$204.000
|
$105.000
|
$100.210
|
$495.000
|
$145.000
|
$100.000
|
$70.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
5.000
|
$250.000
|
$450.000
|
$401.620
|
$426.000
|
$200.000
|
$554.950
|
$175.000
|
$225.000
|
$350.000
|
$500.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$2,300.000
|
$3,296.000
|
$2,373.740
|
$3,500.000
|
$2,500.000
|
$1,937.120
|
$3,000.000
|
$3,500.000
|
$500.000
|
$4,000.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
613.000
|
$14.000
|
$8.240
|
$10.100
|
$8.750
|
$12.000
|
$7.900
|
$6.000
|
$9.000
|
$8.000
|
$5.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
110.000
|
$35.000
|
$61.800
|
$35.350
|
$65.600
|
$40.000
|
$25.220
|
$60.000
|
$65.000
|
$60.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
165.000
|
$20.000
|
$15.450
|
$15.150
|
$16.400
|
$20.000
|
$11.400
|
$12.000
|
$20.000
|
$15.000
|
$25.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
473.000
|
$4.000
|
$1.130
|
$1.110
|
$1.200
|
$1.200
|
$1.100
|
$1.500
|
$1.250
|
$2.000
|
$5.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
7.000
|
$500.000
|
$772.500
|
$934.340
|
$819.850
|
$1,200.000
|
$565.900
|
$645.000
|
$800.000
|
$750.000
|
$2,000.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$650.000
|
$927.000
|
$934.340
|
$983.850
|
$1,300.000
|
$656.150
|
$895.000
|
$1,000.000
|
$900.000
|
$2,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
8.000
|
$200.000
|
$257.500
|
$151.520
|
$273.300
|
$200.000
|
$119.500
|
$75.000
|
$250.000
|
$250.000
|
$300.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
53.000
|
$30.000
|
$19.810
|
$19.190
|
$20.150
|
$30.000
|
$19.420
|
$45.000
|
$40.000
|
$55.000
|
$100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$1,100.000
|
$539.470
|
$539.470
|
$572.050
|
$700.000
|
$456.880
|
$580.000
|
$450.000
|
$900.000
|
$500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,500.000
|
$1,605.990
|
$1,944.450
|
$2,041.200
|
$2,200.000
|
$1,227.170
|
$1,200.000
|
$1,500.000
|
$1,100.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
63.000
|
$300.000
|
$515.810
|
$515.810
|
$546.950
|
$400.000
|
$364.750
|
$400.000
|
$325.000
|
$350.000
|
$300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$50.000
|
$65.000
|
$65.000
|
$35.750
|
$65.000
|
$29.880
|
$60.000
|
$75.000
|
$200.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$200.000
|
$32.500
|
$32.500
|
$34.450
|
$60.000
|
$93.500
|
$60.000
|
$50.000
|
$35.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
5.000
|
$200.000
|
$54.500
|
$54.500
|
$57.800
|
$125.000
|
$93.500
|
$60.000
|
$65.000
|
$35.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-3C)(FLX)SRF
|
EA
|
1.000
|
$200.000
|
$305.500
|
$305.500
|
$323.950
|
$125.000
|
$104.500
|
$145.000
|
$150.000
|
$75.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
7.000
|
$25.000
|
$25.000
|
$25.000
|
$16.600
|
$28.000
|
$2.990
|
$4.000
|
$5.000
|
$100.000
|
$100.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
34.000
|
$2.000
|
$5.000
|
$2.500
|
$3.400
|
$5.000
|
$2.750
|
$2.500
|
$2.500
|
$5.000
|
$10.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
63.000
|
$3.000
|
$7.000
|
$2.000
|
$4.450
|
$5.000
|
$2.200
|
$2.000
|
$2.000
|
$3.000
|
$20.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
709.000
|
$4.000
|
$1.500
|
$1.000
|
$2.250
|
$3.000
|
$1.100
|
$1.000
|
$1.000
|
$3.000
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,010.000
|
$7.000
|
$5.000
|
$5.000
|
$6.700
|
$7.000
|
$5.500
|
$5.000
|
$5.000
|
$6.000
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
7.000
|
$25.000
|
$100.000
|
$100.000
|
$111.350
|
$125.000
|
$110.000
|
$100.000
|
$100.000
|
$50.000
|
$300.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$120.000
|
$150.000
|
$125.000
|
$201.450
|
$250.000
|
$137.500
|
$125.000
|
$125.000
|
$50.000
|
$400.000
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
2.000
|
$200.000
|
$200.000
|
$400.000
|
$312.800
|
$325.000
|
$440.000
|
$400.000
|
$450.000
|
$50.000
|
$500.000
|
|
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
|
LF
|
72.000
|
$3.000
|
$5.000
|
$1.000
|
$3.400
|
$5.000
|
$79.200
|
$1.000
|
$1.000
|
$2.000
|
$20.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
845.000
|
$0.600
|
$0.400
|
$0.300
|
$0.550
|
$0.750
|
$0.330
|
$0.300
|
$0.300
|
$2.000
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
772.000
|
$0.700
|
$0.500
|
$0.650
|
$1.050
|
$2.000
|
$0.720
|
$0.650
|
$0.650
|
$2.000
|
$1.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,010.000
|
$1.250
|
$1.000
|
$2.400
|
$3.200
|
$4.000
|
$2.640
|
$2.400
|
$2.400
|
$5.000
|
$4.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
7.000
|
$10.000
|
$20.000
|
$63.000
|
$58.300
|
$100.000
|
$69.300
|
$63.000
|
$65.000
|
$5.000
|
$60.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$20.000
|
$20.000
|
$63.000
|
$100.750
|
$125.000
|
$69.300
|
$63.000
|
$65.000
|
$5.000
|
$100.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
2.000
|
$25.000
|
$20.000
|
$200.000
|
$159.050
|
$200.000
|
$220.000
|
$200.000
|
$200.000
|
$5.000
|
$200.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
230.000
|
$0.550
|
$2.000
|
$2.500
|
$3.900
|
$4.000
|
$2.750
|
$2.500
|
$2.500
|
$10.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
509.000
|
$0.400
|
$2.000
|
$2.500
|
$3.300
|
$4.000
|
$2.750
|
$2.500
|
$2.500
|
$10.000
|
$5.000
|
|
TRAFFIC BUTTON TY II-C-R
|
EA
|
62.000
|
$5.000
|
$5.000
|
$8.000
|
$5.900
|
$7.000
|
$8.800
|
$8.000
|
$8.000
|
$300.000
|
$500.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,242.000
|
$1.250
|
$0.750
|
$0.740
|
$1.450
|
$1.500
|
$0.810
|
$0.740
|
$0.740
|
$1.000
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
960.000
|
$2.250
|
$1.000
|
$1.500
|
$2.850
|
$3.000
|
$1.650
|
$1.500
|
$1.500
|
$1.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
828.000
|
$3.000
|
$3.000
|
$2.000
|
$8.600
|
$9.000
|
$2.200
|
$2.000
|
$2.000
|
$1.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$20.000
|
$50.000
|
$53.000
|
$58.300
|
$60.000
|
$58.300
|
$53.000
|
$53.000
|
$5.000
|
$70.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$50.000
|
$50.000
|
$53.000
|
$100.750
|
$125.000
|
$58.300
|
$53.000
|
$53.000
|
$10.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
2.000
|
$65.000
|
$50.000
|
$200.000
|
$201.450
|
$200.000
|
$220.000
|
$200.000
|
$200.000
|
$10.000
|
$200.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
845.000
|
$0.200
|
$0.150
|
$0.100
|
$0.250
|
$0.500
|
$0.110
|
$0.100
|
$0.100
|
$1.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
772.000
|
$0.300
|
$0.200
|
$0.200
|
$0.550
|
$1.000
|
$0.220
|
$0.200
|
$0.200
|
$1.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,010.000
|
$0.650
|
$0.500
|
$1.000
|
$1.600
|
$2.000
|
$1.100
|
$1.000
|
$1.000
|
$5.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
7.000
|
$1.250
|
$15.000
|
$37.000
|
$26.500
|
$50.000
|
$40.700
|
$37.000
|
$37.000
|
$10.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$4.000
|
$15.000
|
$37.000
|
$53.000
|
$100.000
|
$40.700
|
$37.000
|
$37.000
|
$10.000
|
$75.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
2.000
|
$5.000
|
$15.000
|
$100.000
|
$79.550
|
$100.000
|
$110.000
|
$100.000
|
$100.000
|
$30.000
|
$100.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$25,000.000
|
$16,480.000
|
$10,101.010
|
$17,490.350
|
$15,000.000
|
$7,274.750
|
$5,500.000
|
$20,000.000
|
$16,000.000
|
$1,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
6.000
|
$300.000
|
$257.500
|
$217.170
|
$273.300
|
$300.000
|
$223.830
|
$225.000
|
$300.000
|
$250.000
|
$500.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
1.000
|
$300.000
|
$257.500
|
$217.170
|
$273.300
|
$300.000
|
$193.950
|
$225.000
|
$300.000
|
$250.000
|
$500.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
6.000
|
$315.000
|
$257.500
|
$217.170
|
$273.300
|
$300.000
|
$193.950
|
$225.000
|
$300.000
|
$250.000
|
$500.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
6.000
|
$315.000
|
$257.500
|
$217.170
|
$273.300
|
$300.000
|
$172.950
|
$225.000
|
$300.000
|
$250.000
|
$500.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
5.000
|
$125.000
|
$61.800
|
$80.810
|
$65.600
|
$90.000
|
$73.060
|
$95.000
|
$70.000
|
$60.000
|
$800.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
1.000
|
$150.000
|
$61.800
|
$106.060
|
$65.600
|
$125.000
|
$94.540
|
$100.000
|
$70.000
|
$60.000
|
$1,000.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
|
LF
|
1,177.000
|
$2.000
|
$2.580
|
$1.520
|
$2.750
|
$1.900
|
$1.940
|
$2.900
|
$3.000
|
$3.000
|
$5.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$4,000.000
|
$2,060.000
|
$1,439.390
|
$2,186.300
|
$2,200.000
|
$1,567.250
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')
|
EA
|
1.000
|
$145,000.000
|
$25,750.000
|
$25,404.040
|
$27,328.700
|
$28,150.000
|
$23,961.130
|
$25,500.000
|
$30,000.000
|
$25,000.000
|
$20,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
3.000
|
$500.000
|
$824.000
|
$904.040
|
$874.500
|
$1,200.000
|
$700.880
|
$1,950.000
|
$1,000.000
|
$800.000
|
$500.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
8.000
|
$450.000
|
$515.000
|
$277.780
|
$546.550
|
$2,300.000
|
$77.460
|
$495.000
|
$600.000
|
$500.000
|
$300.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
10,000.000
|
$2.000
|
$3.090
|
$18.180
|
$3.300
|
$17.000
|
$6.050
|
$0.010
|
$0.300
|
$1.000
|
$0.010
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
1.000
|
$150.000
|
$257.500
|
$101.010
|
$273.300
|
$100.000
|
$179.250
|
$122.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
12.000
|
$75.000
|
$154.500
|
$40.400
|
$163.950
|
$100.000
|
$14.940
|
$122.000
|
$200.000
|
$150.000
|
$100.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
2.000
|
$5,500.000
|
$5,000.000
|
$7,500.000
|
$2,650.900
|
$4,000.000
|
$9,350.000
|
$4,500.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$5,000.000
|
$7,500.000
|
$7,500.000
|
$24,793.200
|
$7,000.000
|
$9,150.000
|
$1,500.000
|
$2,500.000
|
$10,000.000
|
$18,000.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
1.000
|
$400.000
|
$4,635.000
|
$4,368.690
|
$4,919.150
|
$5,000.000
|
$3,025.000
|
$5,400.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
|
|
RADAR PRESENCE DETECTOR
|
EA
|
1.000
|
$6,500.000
|
$6,695.000
|
$7,575.760
|
$7,105.450
|
$8,000.000
|
$7,621.250
|
$8,300.000
|
$7,000.000
|
$6,500.000
|
$7,000.000
|
|
|
RADAR PRESENCE DETECTOR COMM CABLE
|
LF
|
264.000
|
$4.000
|
$3.090
|
$2.780
|
$3.300
|
$5.000
|
$1.940
|
$4.600
|
$3.000
|
$3.000
|
$10.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
220.000
|
$3.000
|
$2.580
|
$5.050
|
$2.750
|
$8.000
|
$3.590
|
$6.400
|
$2.500
|
$3.000
|
$5.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
4.000
|
$400.000
|
$309.000
|
$202.020
|
$327.950
|
$300.000
|
$298.750
|
$345.000
|
$300.000
|
$300.000
|
$300.000
|
|
|
RADAR ADVANCED DETECTION DEVICE
|
EA
|
1.000
|
$8,000.000
|
$6,695.000
|
$9,595.960
|
$7,105.450
|
$11,000.000
|
$7,066.000
|
$7,995.000
|
$7,000.000
|
$6,500.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
516.000
|
$200.000
|
$100.000
|
$147.220
|
$186.000
|
$550.000
|
$137.500
|
$195.000
|
$50.000
|
$200.000
|
$250.000
|
|
|
ADJUST GAS FACILITY ACCESS COVER
|
EA
|
5.000
|
$225.000
|
$750.000
|
$677.560
|
$240.000
|
$200.000
|
$1,805.000
|
$365.000
|
$450.000
|
$500.000
|
$1,000.000
|
|
|
SANITARY SEWER (ADJUST MANHOLE)
|
EA
|
5.000
|
$1,100.000
|
$3,500.000
|
$2,010.150
|
$660.000
|
$1,200.000
|
$933.150
|
$1,500.000
|
$450.000
|
$500.000
|
$2,000.000
|
|
|
ADJUST EXISTING VALVE BOX
|
EA
|
6.000
|
$225.000
|
$500.000
|
$923.080
|
$200.000
|
$50.000
|
$481.750
|
$450.000
|
$450.000
|
$500.000
|
$500.000
|
|
|
ADJUST EXISTING METER AND NEW METER BOX
|
EA
|
13.000
|
$400.000
|
$600.000
|
$1,006.700
|
$325.000
|
$400.000
|
$241.500
|
$400.000
|
$450.000
|
$500.000
|
$500.000
|
|
Totals: |
$5,046,510.550
|
$4,561,840.840
|
$4,571,421.766
|
$4,576,113.205
|
$4,647,777.400
|
$4,726,166.390
|
$4,905,020.530
|
$4,997,968.080
|
$5,139,620.000
|
$5,153,555.700
|