BEXAR IH 35 (0017-10-277)

Items: 11

County: BEXAR
Length: N/A
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-10-277
DBE Goal: N/A
Project: STP 2019(040)HES
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $49,861.61
Date: 09/06/2018 (7 years ago)
Contract Number: N/A
Type: WRONG WAY DRIVER ADVANCED TECHNOLOGIES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$49,861.61
$83,094.73
Over/Under Est: 66.65% $33,233.12
Over/Under Est: 111.26% $55,478.39
Amt Left: 26.77% $22,245.27
Over/Under Est: 177.35% $88,429.39
Amt Left: 66.43% $55,196.27
Delta: -31.28% -$32,951.00
Over/Under Est: 217.47% $108,436.39
Amt Left: 90.5% $75,203.27
Delta: -14.47% -$20,007.00
Over/Under Est: 285.75% $142,478.39
Amt Left: 131.47% $109,245.27
Delta: -21.51% -$34,042.00

Bid Items & Bid Tabulations

11 Total 0 of 11
BEXAR  |  IH 35  |  SAN ANTONIO  |  0017-10-277  |  09/06/2018  |  $49,861.61  |  STP 2019(040)HES  |  WRONG WAY DRIVER ADVANCED TECHNOLOGI...  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, INC.
TEXCON GENERAL CONTRACTORS
BXB GROUP INCORPORATION
K-BAR SERVICES, INC.
E-Z BEL CONSTRUCTION, LLC
MOBILIZATION
LS 1.000 $8,089.280 $8,309.470 $10,000.000 $14,525.000 $7,538.000 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,717.970 $1,568.890 $6,500.000 $6,900.000 $8,000.000 $25,330.000
CONDT (PVC) (SCH 40) (2")
LF 200.000 $6.920 $41.410 $28.000 $27.000 $35.000 $25.000
CONDT (RM) (1")
LF 70.000 $17.390 $48.310 $32.000 $69.000 $40.000 $50.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $793.320 $1,311.290 $6,500.000 $9,456.000 $1,200.000 $1,250.000
PED POLE ASSEMBLY
EA 2.000 $1,707.260 $2,484.550 $3,500.000 $7,522.000 $2,800.000 $4,500.000
ITS COM CBL (ETHERNET)
LF 380.000 $2.600 $6.220 $15.000 $19.000 $12.000 $20.000
TMA (STATIONARY)
DAY 16.000 $163.830 $971.210 $450.000 $908.000 $350.000 $550.000
INSTALL LED WW SIGN W/WW RADAR DETECTOR
EA 8.000 $650.000 $1,725.380 $2,400.000 $2,233.000 $4,000.000 $5,100.000
INSTALL WWD THERMAL CAMERA AND EQUIP
EA 2.000 $750.000 $6,349.400 $3,200.000 $5,555.000 $14,000.000 $5,100.000
INST WWD IN-PAV WIRELESS DET & EQUIP
EA 2.000 $750.000 $3,864.850 $8,000.000 $8,807.000 $20,000.000 $5,100.000
Totals: $49,861.610 $83,094.730 $105,340.000 $138,291.000 $158,298.000 $192,340.000